CN104156050B - The method of Mission Monitor and electronic equipment - Google Patents

The method of Mission Monitor and electronic equipment Download PDF

Info

Publication number
CN104156050B
CN104156050B CN201410406067.5A CN201410406067A CN104156050B CN 104156050 B CN104156050 B CN 104156050B CN 201410406067 A CN201410406067 A CN 201410406067A CN 104156050 B CN104156050 B CN 104156050B
Authority
CN
China
Prior art keywords
task
electronic equipment
dump energy
setting
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410406067.5A
Other languages
Chinese (zh)
Other versions
CN104156050A (en
Inventor
苏寅
张渊毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lenovo Beijing Ltd
Original Assignee
Lenovo Beijing Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lenovo Beijing Ltd filed Critical Lenovo Beijing Ltd
Priority to CN201410406067.5A priority Critical patent/CN104156050B/en
Publication of CN104156050A publication Critical patent/CN104156050A/en
Application granted granted Critical
Publication of CN104156050B publication Critical patent/CN104156050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The embodiment of the present invention provides a kind of method of Mission Monitor and electronic equipment.Including:Obtain and set instruction, described setting instruction includes very first time parameter;Response is described to set instruction, first task according to described very first time parameter setting;According to described very first time parameter determination storage and monitoring time segment;Monitor the dump energy of described electronic equipment and described first task executes at least one second task before completing in described storage and monitoring time segment;At least one second task according to control strategy corresponding with described dump energy response, so that described electronic equipment is able to carry out completing according to the described described first task setting instruction setting.The embodiment of the present invention is passed through when electronic equipment dump energy is relatively low, the task that user is set, and the power consumption of other tasks carries out prosecution, complete the task of user's setting so as to avoid electronic equipment dump energy to be not enough to, and lead to task in the expected outer situation about interrupting of user, improve Consumer's Experience.

Description

The method of Mission Monitor and electronic equipment
Technical field
The present embodiments relate to task management field, and set more particularly, to the method and electronics of Mission Monitor Standby.
Background technology
On the electronic equipments such as mobile phone, panel computer, some are for example conversed, record a video, are recorded by the task that user operation triggers Sound, countdown, alarm clock, recovery system etc., need electronic equipment to have enough electricity to support completing of these tasks.
However, the increase to electronic equipment viscosity with electronic apparatus application quantity and people, and electronic equipment backstage The increasing of operation program, battery power consumption speed is also increasing.User when using electronic equipment, be frequently encountered due to Can not support that completing assigned tasks carries out anticipation, or the electricity leading to according to the deviation of current information anticipation for dump energy Not enough and the situation of assigned tasks cannot be completed.For example, call, recording or system recovery proceed to and shut down suddenly during half;Electricity Amount exhausts and leads to quarter-bell or countdown inefficacy etc..And this tasks interrupt situation outside user is expected, can severely impact To the information communication of people, work efficiency, living arrangement etc., or even the normal use having influence on mobile terminal.
The electricity of current mobile device is using display mode that is graphical or quantifying, and the dump energy showing is often not Real surplus electricity, this can make user due to the deficiency of experience, and can dump energy be supported with the anticipation completing assigned tasks is produced Raw deviation.
Therefore, depart from the electricity display mode of specific tasks, user can be made when setting some tasks, ignore for residue Whether electricity is supported to complete the anticipation of assigned tasks.Thus leading to interruption outside user is expected for the assigned tasks, impact user exists Experience on electronic equipment.
Content of the invention
The embodiment of the present invention provides a kind of method of Mission Monitor and electronic equipment, it can be avoided that electronic equipment dump energy It is not enough to complete the task of user's setting, and lead to task in the expected outer situation about interrupting of user.
A kind of first aspect, there is provided Mission Monitor method, methods described is applied in electronic equipment, methods described bag Include:Obtain and set instruction, described setting instruction includes very first time parameter, and described setting instructs for indicating described electronic equipment According to described very first time parameter setting first task;Response is described to set instruction, according to described very first time parameter setting institute State first task;According to described very first time parameter determination storage and monitoring time segment;Described electronics is monitored in described storage and monitoring time segment The dump energy of equipment and described first task execute at least one second task before completing;According to described dump energy At least one second task described in corresponding control strategy response, so that described electronic equipment sets instruction setting according to described Described first task be able to carry out completing.
In conjunction with a first aspect, in its first implementation, described basis control plan corresponding with described dump energy Slightly respond at least one second task described, including:When the dump energy of described electronic equipment is less than predetermined threshold value, using low Power consumption mode responds and processes at least one second task described;Or it is more than default threshold in the dump energy of described electronic equipment During value, respond and process at least one second task described using normal-power mode, when the surplus of described electronic equipment is detected When remaining electricity is less than described predetermined threshold value, conversion low-power consumption mode responds and processes at least one second task described.
In conjunction with first aspect and its above-mentioned implementation, in the second implementation of first aspect, described according to institute After stating very first time parameter determination storage and monitoring time segment, also include:Determine the dump energy of described electronic equipment, and determine institute At the end of stating storage and monitoring time segment, execution completes the electricity that described first task needs;Described electronic equipment dump energy not During enough to supporting that described electronic equipment execution completes described first task, point out first task described in user cannot complete.
In conjunction with first aspect and its above-mentioned implementation, in the third implementation of first aspect, described described Monitor the dump energy of described electronic equipment in storage and monitoring time segment and the execution of described first task complete before at least one the Two tasks, including:In described storage and monitoring time segment, during at least one during execution at least one second task described Carve, determine the dump energy of described electronic equipment;It is not enough to support described electronic equipment in the dump energy of described electronic equipment When execution completes described first task, point out first task described in user cannot complete.
In conjunction with first aspect and its above-mentioned implementation, in the 4th kind of implementation of first aspect, described in execution During first task, at least one second task described includes described first task, described monitoring institute in described storage and monitoring time segment State the dump energy of electronic equipment and the execution of described first task complete before at least one second task, including:Described The dump energy of described electronic equipment and described first task is monitored in storage and monitoring time segment.
Second aspect, there is provided a kind of electronic equipment, including:Acquiring unit, sets instruction for obtaining, and described setting refers to Order includes very first time parameter, and described setting instructs for indicating described electronic equipment according to described very first time parameter setting the One task;Response unit, instructs for responding described setting, first task according to described very first time parameter setting;Really Order unit, for according to described very first time parameter determination storage and monitoring time segment;Monitoring unit, in described storage and monitoring time segment Monitor the dump energy of described electronic equipment and described first task executes at least one second task before completing;Described sound Answer unit, at least one second task according to control strategy corresponding with described dump energy response, so that described electricity Sub- equipment is able to carry out completing according to the described described first task setting instruction setting.
In conjunction with second aspect, in the first implementation of second aspect, described response unit specifically for:Described When the dump energy of electronic equipment is less than predetermined threshold value, respond and process described at least one second using low-power consumption mode Business;Or when the dump energy of described electronic equipment is more than predetermined threshold value, responded using normal-power mode and process described At least one second task, when the dump energy described electronic equipment is detected is less than described predetermined threshold value, low-power consumption of converting Mode response simultaneously processes at least one second task described.
In conjunction with second aspect and its above-mentioned implementation, in the second implementation of second aspect, described electronics sets For also including display unit, described determining unit is additionally operable to:Determine the dump energy of described electronic equipment, and determine described prison At the end of the control time period, execution completes the electricity that described first task needs;It is not enough in the dump energy of described electronic equipment When supporting that described electronic equipment execution completes described first task, point out first task described in user no by described display unit Method completes.
In conjunction with second aspect and its above-mentioned implementation, in the third implementation of second aspect, in described monitoring In time period, at least one moment during execution at least one second task described, determine described electronic equipment Dump energy;It is not enough to support that described electronic equipment execution completes described first task in the dump energy of described electronic equipment When, point out first task described in user cannot complete by described display unit.
In conjunction with second aspect and its above-mentioned implementation, in the 4th kind of implementation of second aspect, in described electronics When equipment executes described first task, at least one second task described includes described first task, and described monitoring unit is concrete For:The dump energy of described electronic equipment and described first task is monitored in described storage and monitoring time segment.
The embodiment of the present invention passes through, when electronic equipment dump energy is relatively low, user being set of task, and other The power consumption of business carries out detecting and management and control is such that it is able to avoid electronic equipment dump energy to be not enough to complete appointing of user's setting Business, and lead to task in the expected outer situation about interrupting of user, improve Consumer's Experience.
Brief description
Fig. 1 is the flow chart of the Mission Monitor method of one embodiment of the invention.
Fig. 2 is the flow chart of the Mission Monitor method of one embodiment of the invention.
Fig. 3 is the schematic diagram assuming anticipation implementing result of one embodiment of the invention.
Fig. 4 is the schematic block diagram of the electronic equipment of one embodiment of the invention.
Fig. 5 is the schematic block diagram of the electronic equipment of another embodiment of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes it is clear that described embodiment is a part of embodiment of the present invention, rather than whole embodiments.Based on this Embodiment in bright, the every other reality that those of ordinary skill in the art are obtained on the premise of not making creative work Apply example, all should belong to the scope of protection of the invention.
Electronic equipment (Electronic Equipment), can include terminal unit (Terminal Equipment) and move Dynamic terminal (Mobile Terminal), user equipment (UE, User Equipment), mobile subscriber equipment etc., can be through wireless Access network (for example, RAN, Radio Access Network) is communicated it is also possible to be passed through access point with mobile network (Access Point, AP) accesses WLAN (Wireless Local Area Network, WLAN), it is of course also possible to It is the stand-alone device not accessing any network.Electronic equipment can be mobile terminal, such as mobile phone (or referred to as " honeycomb " electricity Words) and there is the computer of mobile terminal, for example, it may be portable, pocket, hand-held, built-in computer or car Mobile device carrying etc..
Fig. 1 is the flow chart of the Mission Monitor method of one embodiment of the invention.The method of Fig. 1 is by having processor, deposit Reservoir, the mobile terminal execution of display.
101, obtain and set instruction, set instruction and include very first time parameter, set instruction and be used for indicating electronic equipment root According to very first time parameter setting first task.
102, response sets instruction, according to very first time parameter setting first task.
103, according to very first time parameter determination storage and monitoring time segment.
104, monitor the dump energy of electronic equipment in storage and monitoring time segment and first task executes before completing at least One the second task.
105, at least one second task is responded according to control strategy corresponding with dump energy, so that electronic equipment root It is able to carry out completing according to the first task setting instruction setting.
The embodiment of the present invention pass through when electronic equipment dump energy is relatively low, to user set first task and other The power consumption of task carries out detecting and management and control is such that it is able to avoid electronic equipment dump energy to be not enough to complete the of user's setting One task, and lead to task in the expected outer situation interrupted or cannot complete of user, improve Consumer's Experience.
First, electronic equipment detects the operation from user, and this operation triggering sets instruction, and electronic equipment obtains this and sets After fixed instruction, first task is set according to this instruction.Specifically, first task can be such as call, video recording, recording, fall to count When, alarm clock, recovery system etc..Set first task user operation can be user enter this first task operation interface or Set interface, for example, for call task, user operation can be click on the button for opening dialing interface;For For alarm clock, user operation can be that setting alarm clock sounds the operation of time.
Alternatively, after above task can be divided at once executing after user sets of task and Preset Time, execution appoints Business, for example at once executing of task can include call, video recording, recording etc., and after Preset Time, the task of execution can include Quarter-bell, default system upgrade task, default recording task etc..It should be understood that some tasks both can after setting at once Execution is it is also possible to execute after the user preset time.
Different according to setting of task, corresponding very first time parameter is also different.Specifically, very first time parameter can be wrapped Include:Time that the first task setting starts, persistent period of first task etc..For example, the operation according to user, can set 6 points of quarter-bell of the next morning, this quarter-bell sounds lasting 1 minute, and dials electricity to someone afterwards within 2 hours for example, it is possible to set Words, this call continues 3 minutes.It should be understood that the time started of first task can also only be set, or only set first task Persistent period.
Electronic equipment sets after first task according to setting instruction, can also be according to the very first time comprising in setting instruction Parameter determination monitors the period.Specifically, the moment that can complete the moment setting first task to first task execution determines For monitoring the period.The moment that wherein first task execution completes can be according to very first time parameter determination.For example, current time is 22:00, set 6 points of quarter-bell of the next morning, and this quarter-bell continues 1 minute, then the monitoring period can determine as 22:00 To the next morning 6:01.Again for example, set first task is call 5 minutes, then the monitoring period can determine as starting Dial in the time period of end of conversation.
Alternatively, as an embodiment, respond at least one second according to control strategy corresponding with dump energy Business, including:When the dump energy of electronic equipment is less than predetermined threshold value, responded using low-power consumption mode and process at least one the Two tasks;Or when the dump energy of electronic equipment is more than predetermined threshold value, is responded using normal-power mode and process at least One the second task, when dump energy electronic equipment is detected is less than predetermined threshold value, conversion low-power consumption mode responds and locates Manage at least one second task.
Within the monitoring period, electronic equipment can be with the current residual electricity of real-time monitoring equipment, and current execution is extremely Few second task, and control the power consumption of execution the second task according to control strategy corresponding with dump energy, so that Obtain electronic equipment and can complete set first task.It should be understood that except to the dump energy of electronic equipment and the second task Monitor in real time it is also possible to any one or more moment within the monitoring period, the dump energy to electronic equipment and the Two tasks are monitored.
Specifically, dump energy and the corresponding relation of control strategy can preset, and control strategy is with dump energy Change and change.For example when dump energy electronic equipment is detected is less than 30%, respond the second task, to the second task To be executed using low-power consumption mode or to run.That is, before execution the second task, that is, determining needs using low-power consumption mould Formula is executing or to run the second task.
Again for example, dump energy electronic equipment is detected is 40%, and the threshold value more than default 30% then adopts normal Power consumption mode execution or operation the second task, when dump energy is reduced to 30%, the second task remains unfulfilled execution, then convert low Power consumption mode responds and processes the second task.
As a specific example, when user sets first task, the dump energy of electronic equipment is less than 30%, Period user triggering the second task, for example, play video, running game etc., and electronic equipment can play dividing of video by reducing Resolution, screen intensity, the mode such as FR is reducing the power consumption speed of the second task.
Additionally, predetermined threshold value can also be completes for excluding can supporting of estimating in the dump energy of electronic equipment The electricity of one task and set in advance.Wherein, electronic equipment is permissible for the electricity completing first task can be supported to estimate Based on the basic electricity completing needed for this first task, do not execute the power consumption of other tasks, for example, maintain electronic equipment to treat The basic electricity of machine it should be appreciated that the setting of this threshold value can be slightly above above-mentioned basic electricity, to reserve certain electricity more than needed. As a specific example, when user sets first task, the dump energy of electronic equipment is 30%, and electronic equipment is pre- Estimate that to complete basic electricity needed for first task be 10%, exclude in the dump energy of electronic equipment estimate complete first task Electricity more than needed after required basic electricity is 20%, is reduced to predetermined threshold value (example when electronic equipment detects this electricity more than needed As 10%) when, can be by reducing the resolution playing video, screen intensity, the mode such as FR is reducing by second The power consumption speed of task.
Alternatively, as an embodiment, after very first time parameter determination storage and monitoring time segment, also include:Determine The dump energy of electronic equipment, and at the end of determining storage and monitoring time segment, execution completes the electricity of first task needs;In electronics When the dump energy of equipment is not enough to support that electronic equipment execution completes first task, point out user's first task cannot complete.
Electronic equipment after user sets first task, in the time period before completing to first task, Ke Yishi When ground detection electronic equipment dump energy, when determine complete first task needs electricity be less than dump energy when, electronics sets For information can be assumed, to remind user's current residual electricity to be not enough to complete first task, can also remind further User is charged to guarantee that first task can normally run or complete.
Alternatively, in storage and monitoring time segment, as an embodiment, monitor dump energy and the first task of electronic equipment Execute at least one second task before completing, including:In storage and monitoring time segment, in the mistake executing at least one the second task In at least one of journey moment, determine the dump energy of electronic equipment;It is not enough to support electronics in the dump energy of electronic equipment When equipment execution completes first task, point out user's first task cannot complete.
Specifically, during the second tasks carrying, the second task power consumption makes the dump energy of electronic equipment faster Decline fastly, when dump energy drop to be not enough to support first task execution complete when, electronic equipment can present prompting letter Breath, to remind user's current residual electricity to be not enough to complete first task, can also remind user to be charged with true further Protect first task can normally run or complete.
Additionally, the current residual electricity of electronic equipment when user operation triggers the interface setting first task, can be estimated Whether amount can complete first task, and estimation results are presented.For example, when user opens dialing interface, electronic equipment is permissible The dump energy supported air time is determined according to the power consumption speed of current residual electricity and call, and by this estimate logical The words time presents to user.Again for example, when user's setting alarm clock sounds the time, electronic equipment can detect current residual electricity Amount, and estimate the alarm clock that current time sets to the user time maintenance electronic equipment that sounds and normally run institute's subfam. Spiraeoideae, determination Whether current residual electricity can support that alarm clock sounds on time, if estimate sounding, can point out or not pointing out user This result, if estimate quarter-bell when the time comes cannot sound, user can be pointed out it is possible to further remind user be charged so that Obtain dump energy and support that quarter-bell sounds on time.Similarly, if first task is can be with completing the task that program shows, electronics Equipment can estimate the ratio that current residual electricity can support first task to complete, and user is pointed out.
It should be understood that the particular type estimating mode and presentation mode needs and first task of first task completeness Join, but first task can have a lot of types, the embodiment of the present invention is not limited to above-described embodiment and completes for first task That spends estimates and presentation mode.
Alternatively, as an embodiment, when executing first task, at least one second task includes first task, Monitor the dump energy of electronic equipment in storage and monitoring time segment and first task execution complete before at least one second task, Including:Dump energy and the first task of electronic equipment is monitored in storage and monitoring time segment.
That is, first task is the goal task according to set by set and instruct, the second task sets for first task After fixed, execute performed task in the period completing to first task, within this period, multiple second tasks may be had to hold OK.When first task is performed, first task can be equal to one of at least one second task, that is, at least one Two tasks include first task.
Give a concrete illustration, set first task and called afterwards 5 minutes as 3 hours, at this 3 hours 05 minutes The task of triggering/execution is the second task in the middle of process, due to first task call also must be 3 hours 05 points Execution in clock, therefore first task can wait upon execution and be all second task.And, do not had in 3 hours 05 minutes In the case of having other tasks to be triggered/execute, then calling of task is unique second task.
Be all the second task because first task can wait upon execution, then first task in storage and monitoring time segment similarly Monitored, specifically it is referred to the monitoring method of above-mentioned second task, here is omitted.
The embodiment of the present invention passes through, when electronic equipment dump energy is relatively low, user being set of task, and other The power consumption of business carries out detecting and management and control is such that it is able to avoid electronic equipment dump energy to be not enough to complete appointing of user's setting Business, and lead to task in the expected outer situation about interrupting of user, improve Consumer's Experience.
Fig. 2 is the flow chart of the Mission Monitor method of one embodiment of the invention.
201, detection user sets the operation of first task.
First, from the operation for setting first task of user, specifically, first task is permissible for electronic equipment detection It is the persistence task that for example user such as call, video recording, recording, countdown, alarm clock, recovery system can trigger.For setting the The user operation of one task can be that user enters the operation interface of this first task or sets interface, for example, appoints for call For business, user operation can be click on the button for opening dialing interface, assumes the dialing interface as shown in (1) in Fig. 3; For alarm clock, user operation can be that setting alarm clock sounds the operation of time, and the quarter-bell as shown in (3) in Fig. 3 sets boundary Face.
202, determine the anticipation implementing result of first task.
As an optional step, when user operation triggers the interface setting first task, electronics can be estimated and set Whether standby current residual electricity can complete first task, this anticipation implementing result can include first task can complete, First task cannot complete, the operating time of the completed percentage of first task, first task etc..Specifically, electronic equipment Current residual electricity can be detected, and estimate the electricity completing needed for first task, so that it is determined that whether current residual electricity can Enough support completing of first task.For example, when user opens dialing interface, electronic equipment can according to current residual electricity and The power consumption speed of call determines the dump energy supported air time.Again for example, when user's setting alarm clock sounds the time, electricity Sub- equipment can detect current residual electricity, and estimate the alarm clock that current time sets to user time of sounding and maintain electronics to set Standby normal operation institute subfam. Spiraeoideae, determines whether current residual electricity can support that alarm clock sounds on time.
203, assume anticipation implementing result.
In the anticipation implementing result determining first task, this anticipation implementing result can be presented, to point out user first Whether task can complete, or first task being capable of duration etc..Specifically, as an example, first task is noisy Bell, if quarter-bell when the time comes estimated by electronic equipment cannot sound, can point out user it is possible to remind user to be charged further So that dump energy supports that quarter-bell sounds on time, in such as Fig. 3 shown in (3).As another example, first task is dialing, The air time estimated can be presented to user by electronic equipment, in such as Fig. 3 shown in (1).Such as first task is system liter again Level, if electronic equipment is estimated upgrading and cannot be completed, can point out user, it is possible to remind further shown in (2) in such as Fig. 3 User is charged.
It should be understood that the particular type estimating mode and presentation mode needs and first task of first task completeness Join, but first task can have a lot of types, the embodiment of the present invention is not limited to above-described embodiment and completes for first task That spends estimates and presentation mode.It will further be understood that the only several way of example presenting and reminding shown in Fig. 3, carry Awake mode and the position presenting are not limited to the example in Fig. 3.
204, monitor in real time
Electronic equipment after user sets first task, in the time period before completing to first task, Ke Yishi When ground detection electronic equipment dump energy, and the power consumption of the second task during this period of time happening suddenly, and control fall The power consumption of low second task, so that electronic equipment can complete set first task.It should be understood that except to electronic equipment Dump energy and the second task power consumption monitor in real time it is also possible to any one or more within the above-mentioned time period Moment is monitored to the dump energy of electronic equipment and the power consumption of the second task.
205, battery saving mode executes the second task
When the dump energy of electronic equipment is less than predetermined threshold value, at least one second task is executed using battery saving mode. Specifically, predetermined threshold value can be set in advance for the dump energy of electronic equipment, such as when electronic equipment is detected Dump energy be less than 30% when, the second task in addition to the first task that user sets is executed using battery saving mode Or run.As a specific example, when user sets first task, the dump energy of electronic equipment is 40%, the phase Between user trigger the second task, for example play video, running game etc., when dump energy is detected and being less than 30%, electronics sets Standby can be by reducing the resolution playing video, screen intensity, the mode such as FR is reducing the consumption of the second task Electric speed.Additionally, predetermined threshold value can also be completes for excluding can supporting of estimating in the dump energy of electronic equipment The electricity of one task and set in advance.Wherein, electronic equipment is permissible for the electricity completing first task can be supported to estimate Based on the basic electricity completing needed for this first task, do not execute the power consumption of other tasks, for example, maintain electronic equipment to treat The basic electricity of machine it should be appreciated that the setting of this threshold value can be slightly above above-mentioned basic electricity, to reserve certain electricity more than needed. As a specific example, when user sets first task, the dump energy of electronic equipment is 30%, and electronic equipment is pre- Estimate that to complete basic electricity needed for first task be 10%, exclude in the dump energy of electronic equipment estimate complete first task Electricity more than needed after required basic electricity is 20%, is reduced to predetermined threshold value (example when electronic equipment detects this electricity more than needed As 10%) when, can be by reducing the resolution playing video, screen intensity, the mode such as FR is reducing by second The power consumption speed of task.
206, remind user cannot complete first task.
Electronic equipment after user sets first task, in the time period before completing to first task, Ke Yishi When ground detection electronic equipment dump energy, when determine complete first task needs electricity be less than dump energy when, electronics sets For information can be assumed, to remind user's current residual electricity to be not enough to complete first task, can also remind further User is charged to guarantee that first task can normally run or complete.Concrete alerting pattern may be referred to above-mentioned steps 203, Here is omitted.
Fig. 4 is the schematic block diagram of the electronic equipment of one embodiment of the invention.Electronic equipment 400 shown in Fig. 4 includes obtaining Take unit 401, response unit 402, determining unit 403 and monitoring unit 404.
Acquiring unit 401 obtains and sets instruction, sets instruction and includes very first time parameter, sets instruction and is used for indicating electronics Equipment is according to very first time parameter setting first task;Response unit 402 response sets instruction, according to very first time parameter setting First task;Determining unit 403 is according to very first time parameter determination storage and monitoring time segment;Monitoring unit 404 is in storage and monitoring time segment The dump energy of monitoring electronic equipment and first task execute at least one second task before completing;Response unit 402 Respond at least one second task according to control strategy corresponding with dump energy, so that electronic equipment sets according to setting instruction First task be able to carry out completing.
The embodiment of the present invention passes through, when electronic equipment 400 dump energy is relatively low, user being set of task, and other The power consumption of task carries out detecting and management and control is such that it is able to avoid electronic equipment dump energy to be not enough to complete appointing of user's setting Business, and lead to task in the expected outer situation about interrupting of user, improve Consumer's Experience.
Alternatively, as an embodiment, response unit 402 specifically for:It is less than pre- in the dump energy of electronic equipment If during threshold value, respond and process at least one second task using low-power consumption mode;Or it is big in the dump energy of electronic equipment When predetermined threshold value, respond and process at least one second task using normal-power mode, when the surplus of electronic equipment is detected When remaining electricity is less than predetermined threshold value, conversion low-power consumption mode responds and processes at least one second task.
Specifically, dump energy and the corresponding relation of control strategy can preset, and control strategy is with dump energy Change and change.For example when dump energy electronic equipment is detected is less than 30%, respond the second task, to the second task To be executed using low-power consumption mode or to run.That is, before execution the second task, that is, determining needs using low-power consumption mould Formula is executing or to run the second task.
Again for example, dump energy electronic equipment is detected is 40%, and the threshold value more than default 30% then adopts normal Power consumption mode execution or operation the second task, when dump energy is reduced to 30%, the second task remains unfulfilled execution, then convert low Power consumption mode responds and processes the second task.
As a specific example, when user sets first task, the dump energy of electronic equipment is less than 30%, Period user triggering the second task, for example, play video, running game etc., and electronic equipment can play dividing of video by reducing Resolution, screen intensity, the mode such as FR is reducing the power consumption speed of the second task.
Additionally, predetermined threshold value can also be completes for excluding can supporting of estimating in the dump energy of electronic equipment The electricity of one task and set in advance.Wherein, electronic equipment is permissible for the electricity completing first task can be supported to estimate Based on the basic electricity completing needed for this first task, do not execute the power consumption of other tasks, for example, maintain electronic equipment to treat The basic electricity of machine it should be appreciated that the setting of this threshold value can be slightly above above-mentioned basic electricity, to reserve certain electricity more than needed. As a specific example, when user sets first task, the dump energy of electronic equipment is 30%, and electronic equipment is pre- Estimate that to complete basic electricity needed for first task be 10%, exclude in the dump energy of electronic equipment estimate complete first task Electricity more than needed after required basic electricity is 20%, is reduced to predetermined threshold value (example when electronic equipment detects this electricity more than needed As 10%) when, can be by reducing the resolution playing video, screen intensity, the mode such as FR is reducing by second The power consumption speed of task.
Alternatively, as an embodiment, electronic equipment also includes display unit 405, and determining unit 403 is additionally operable to:Really Determine the dump energy of electronic equipment, and at the end of determining storage and monitoring time segment, execution completes the electricity of first task needs;In electricity When the dump energy of sub- equipment is not enough to support that electronic equipment execution completes first task, point out user by display unit 405 First task cannot complete.
Electronic equipment 400 is after user sets first task, in the time period before completing to first task, permissible Detect the dump energy of electronic equipment 400 in real time, when determining that the electricity completing first task needs is less than dump energy, electricity Sub- equipment 400 can assume information by display unit 405, to remind user's current residual electricity to be not enough to complete first Task, can also remind user to be charged to guarantee that first task can normally run or complete further.
Alternatively, as an embodiment, Power Management Unit 402 is additionally operable to:Electronic equipment also includes display unit 405, determining unit 403 is additionally operable to:At least one in storage and monitoring time segment, during executing at least one second task In the moment, determine the dump energy of electronic equipment;It is not enough to support that electronic equipment execution completes the in the dump energy of electronic equipment During one task, point out user's first task cannot complete by display unit 405.
Specifically, during the second tasks carrying, the second task power consumption makes the dump energy of electronic equipment faster Decline fastly, when dump energy drop to be not enough to support first task execution complete when, electronic equipment can present prompting letter Breath, to remind user's current residual electricity to be not enough to complete first task, can also remind user to be charged with true further Protect first task can normally run or complete.
Additionally, the current residual electricity of electronic equipment when user operation triggers the interface setting first task, can be estimated Whether amount can complete first task, and estimation results are presented.For example, when user opens dialing interface, electronic equipment is permissible The dump energy supported air time is determined according to the power consumption speed of current residual electricity and call, and by this estimate logical The words time presents to user by display unit 405.Again for example, when user's setting alarm clock sounds the time, electronic equipment is permissible Detection current residual electricity, and estimate the alarm clock that current time sets to the user time maintenance electronic equipment that sounds and normally run Institute's subfam. Spiraeoideae, determines whether current residual electricity can support that alarm clock sounds on time, if estimate to sound, can point out or Person does not point out user this result, if estimate quarter-bell when the time comes cannot sound, can point out user by display unit 405, and can To remind user to be charged further so that dump energy supports that quarter-bell sounds on time.Similarly, if first task is Can be with completing the task that program shows, electronic equipment can estimate the ratio that current residual electricity can support first task to complete Example, and by display unit 405, user is pointed out.
It should be understood that the particular type estimating mode and presentation mode needs and first task of first task completeness Join, but first task can have a lot of types, the embodiment of the present invention is not limited to above-described embodiment and completes for first task That spends estimates and presentation mode.
Alternatively, as an embodiment, when executing first task, at least one second task includes first task, Monitoring unit 404 specifically for:Dump energy and the first task of electronic equipment is monitored in storage and monitoring time segment.
That is, first task is the goal task according to set by set and instruct, the second task sets for first task After fixed, execute performed task in the period completing to first task, within this period, multiple second tasks may be had to hold OK.When first task is performed, first task can be equal to one of at least one second task, that is, at least one Two tasks include first task.
Give a concrete illustration, set first task and called afterwards 5 minutes as 3 hours, at this 3 hours 05 minutes The task of triggering/execution is the second task in the middle of process, due to first task call also must be 3 hours 05 points Execution in clock, therefore first task can wait upon execution and be all second task.And, do not had in 3 hours 05 minutes In the case of having other tasks to be triggered/execute, then calling of task is unique second task.
Be all the second task because first task can wait upon execution, then first task in storage and monitoring time segment similarly Monitored, specifically it is referred to the monitoring method of above-mentioned second task, here is omitted.
The embodiment of the present invention passes through, when electronic equipment dump energy is relatively low, user being set of task, and other The power consumption of business carries out detecting and management and control is such that it is able to avoid electronic equipment dump energy to be not enough to complete appointing of user's setting Business, and lead to task in the expected outer situation about interrupting of user, improve Consumer's Experience.
Fig. 5 is the schematic block diagram of the electronic equipment of another embodiment of the present invention.The electronic equipment 500 of Fig. 5 includes processor 51st, memorizer 52, display 53, processor 51, memorizer 52 are connected by bus system 54 with display 53.
Memorizer 52 is used for storage and makes processor 51 execute the instruction of following operation:Obtain and set instruction, set instruction Including very first time parameter, set instruction and be used for indicating electronic equipment 500 according to very first time parameter setting first task;Response Set instruction, according to very first time parameter setting first task;According to very first time parameter determination storage and monitoring time segment;In monitoring Between at least one second task before the dump energy of monitoring electronic equipment 500 and first task execution complete in section;According to Control strategy corresponding with dump energy responds at least one second task, so that electronic equipment 500 sets according to setting instruction Fixed first task is able to carry out completing.
The embodiment of the present invention passes through, when electronic equipment dump energy is relatively low, user being set of task, and other The power consumption of business carries out detecting and management and control is such that it is able to avoid electronic equipment dump energy to be not enough to complete appointing of user's setting Business, and lead to task in the expected outer situation about interrupting of user, improve Consumer's Experience.
Additionally, electronic equipment 500 can also include radiating circuit 55, receiving circuit 56 and antenna 57 etc..Processor 51 is controlled The operation of electronic equipment 500 processed, processor 51 can also be referred to as CPU, and (Central Processing Unit, central authorities process single Unit).Memorizer 52 can include read only memory and random access memory, and to processor 51 provide instruction and data.Deposit The a part of of reservoir 52 can also include nonvolatile RAM (NVRAM).In specific application, radiating circuit 55 It may be coupled to antenna 57 with receiving circuit 56.Each assembly of electronic equipment 500 is coupled by bus system 54, its Middle bus system 54, in addition to including data/address bus, can also include power bus, controlling bus and status signal bus in addition etc..But It is for the sake of clear explanation, in figure, various buses are all designated as bus system 54.
The method that the embodiments of the present invention disclose can apply in processor 51, or is realized by processor 51.Place Reason device 51 is probably a kind of IC chip, has the disposal ability of signal.During realizing, each step of said method Can be completed by the instruction of the integrated logic circuit of the hardware in processor 51 or software form.Above-mentioned processor 51 can To be general processor, digital signal processor (DSP), special IC (ASIC), ready-made programmable gate array (FPGA) Or other PLDs, discrete gate or transistor logic, discrete hardware components.Can realize or execute Disclosed each method in the embodiment of the present invention, step and logic diagram.General processor can be microprocessor or this at Reason device can also be any conventional processor etc..Step in conjunction with the method disclosed in the embodiment of the present invention can directly embody Complete for hardware decoding processor execution, or completed with the hardware in decoding processor and software module combination execution.Software Module may be located at random access memory, flash memory, read only memory, programmable read only memory or electrically erasable programmable storage In the ripe storage medium in this areas such as device, depositor.This storage medium is located at memorizer 52, and processor 51 reads memorizer 52 In information, the step completing said method in conjunction with its hardware.
Alternatively, as an embodiment, processor 51 specifically for:It is less than default threshold in the dump energy of electronic equipment During value, respond and process at least one second task using low-power consumption mode;Or it is more than pre- in the dump energy of electronic equipment If during threshold value, respond and process at least one second task using normal-power mode, when remaining electricity electronic equipment is detected When amount is less than predetermined threshold value, conversion low-power consumption mode responds and processes at least one second task.
Alternatively, as an embodiment, processor 51 is additionally operable to:Determine the dump energy of electronic equipment, and determine At the end of storage and monitoring time segment, execution completes the electricity of first task needs;It is not enough to support electricity in the dump energy of electronic equipment When sub- equipment execution completes first task, point out user's first task cannot complete.
Alternatively, as an embodiment, processor 51 is additionally operable to:The residue of electronic equipment is monitored in storage and monitoring time segment Electricity and first task execution complete before at least one second task, including:In storage and monitoring time segment, in execution at least In at least one moment during individual second task, determine the dump energy of electronic equipment;Dump energy in electronic equipment When being not enough to support that electronic equipment execution completes first task, point out user's first task cannot complete.
Alternatively, as an embodiment, when executing first task, at least one second task includes first task, Processor 51 specifically for:Dump energy and the first task of electronic equipment is monitored in storage and monitoring time segment.
It should be understood that processor 51 can carry out task management and power management, the response list shown in above-mentioned Fig. 4 can be executed The function of unit 402, determining unit 403 and monitoring unit 404.And the method in above-mentioned Fig. 1 can be executed.
The embodiment of the present invention passes through, when electronic equipment dump energy is relatively low, user being set of task, and other The power consumption of business carries out detecting and management and control is such that it is able to avoid electronic equipment dump energy to be not enough to complete appointing of user's setting Business, and lead to task in the expected outer situation about interrupting of user, improve Consumer's Experience.
It should be understood that in various embodiments of the present invention, the size of the sequence number of above-mentioned each process is not meant to execute suitable The priority of sequence, the execution sequence of each process should be determined with its function and internal logic, and should not be to the enforcement of the embodiment of the present invention Process constitutes any restriction.
Those of ordinary skill in the art are it is to be appreciated that combine the list of each example of the embodiments described herein description Unit and algorithm steps, being capable of being implemented in combination in electronic hardware or computer software and electronic hardware.These functions are actually To be executed with hardware or software mode, the application-specific depending on technical scheme and design constraint.Professional and technical personnel Each specific application can be used different methods to realize described function, but this realization is it is not considered that exceed The scope of the present invention.
Those skilled in the art can be understood that, for convenience and simplicity of description, the system of foregoing description, Device and the specific work process of unit, may be referred to the corresponding process in preceding method embodiment, will not be described here.
It should be understood that disclosed system, apparatus and method in several embodiments provided herein, permissible Realize by another way.For example, device embodiment described above is only schematically, for example, described unit Divide, only a kind of division of logic function, actual can have other dividing mode when realizing, for example multiple units or assembly Can in conjunction with or be desirably integrated into another system, or some features can be ignored, or does not execute.Another, shown or The coupling each other discussing or direct-coupling or communication connection can be by some interfaces, the indirect coupling of device or unit Close or communicate to connect, can be electrical, mechanical or other forms.
The described unit illustrating as separating component can be or may not be physically separate, show as unit The part showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.The mesh to realize this embodiment scheme for some or all of unit therein can be selected according to the actual needs 's.
In addition, can be integrated in a processing unit in each functional unit in each embodiment of the present invention it is also possible to It is that unit is individually physically present it is also possible to two or more units are integrated in a unit.
If described function realized using in the form of SFU software functional unit and as independent production marketing or use when, permissible It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words Partly being embodied in the form of software product of part that prior art is contributed or this technical scheme, this meter Calculation machine software product is stored in a storage medium, including some instructions with so that a computer equipment (can be individual People's computer, server, or network equipment etc.) execution each embodiment methods described of the present invention all or part of step. And aforesaid storage medium includes:USB flash disk, portable hard drive, read only memory (ROM, Read-Only Memory), random access memory are deposited Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, and any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, all should contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be defined by described scope of the claims.

Claims (8)

1. it is characterised in that methods described is applied in electronic equipment, methods described includes a kind of Mission Monitor method:
Obtain and set instruction, described set instruction and include very first time parameter, described setting instructs for indicating that described electronics sets For according to described very first time parameter setting first task;
Response is described to set instruction, first task according to described very first time parameter setting;
According to described very first time parameter determination storage and monitoring time segment;
Monitor the dump energy of described electronic equipment and described first task executes before completing in described storage and monitoring time segment At least one second task;
At least one second task according to control strategy corresponding with described dump energy response, so that described electronics sets The standby described first task according to described setting instruction setting is able to carry out completing;
Wherein, described basis control strategy corresponding with described dump energy response at least one second task described, including:
Described electronic equipment dump energy be less than predetermined threshold value when, responded using low-power consumption mode and process described at least one Individual second task;Or
Described electronic equipment dump energy be more than predetermined threshold value when, responded using normal-power mode and process described at least One the second task, when the dump energy described electronic equipment is detected is less than described predetermined threshold value, low-power consumption mode of converting Respond and process at least one second task described.
2. method according to claim 1 it is characterised in that described according to described very first time parameter determination monitoring period After section, also include:
Determine the dump energy of described electronic equipment, and at the end of determining described storage and monitoring time segment, execution completes described first The electricity that task needs;
When the dump energy of described electronic equipment is not enough to support that described electronic equipment execution completes described first task, point out First task described in user cannot complete.
3. method according to claim 1 is it is characterised in that described monitor described electronics in described storage and monitoring time segment and set Standby dump energy and described first task execution complete before at least one second task, including:
In described storage and monitoring time segment, at least one moment during execution at least one second task described, determine The dump energy of described electronic equipment;
When the dump energy of described electronic equipment is not enough to support that described electronic equipment execution completes described first task, point out First task described in user cannot complete.
4. method according to claim 1 is it is characterised in that when executing described first task, described at least one the Two tasks include described first task,
The described dump energy monitoring described electronic equipment in described storage and monitoring time segment and the execution of described first task complete it Front at least one second task, including:The dump energy of described electronic equipment and described is monitored in described storage and monitoring time segment First task.
5. a kind of electronic equipment, including:
Acquiring unit, sets instruction for obtaining, and described setting instruction includes very first time parameter, and described setting instructs for referring to Show described electronic equipment according to described very first time parameter setting first task;
Response unit, instructs for responding described setting, first task according to described very first time parameter setting;
Determining unit, for according to described very first time parameter determination storage and monitoring time segment;
Monitoring unit, dump energy and described first task for monitoring described electronic equipment in described storage and monitoring time segment are held At least one second task gone before completing;
Described response unit, at least one second task according to control strategy corresponding with described dump energy response, with Described electronic equipment is made to be able to carry out completing according to the described described first task setting instruction setting;
Described response unit specifically for:
Described electronic equipment dump energy be less than predetermined threshold value when, responded using low-power consumption mode and process described at least one Individual second task;Or
Described electronic equipment dump energy be more than predetermined threshold value when, responded using normal-power mode and process described at least One the second task, when the dump energy described electronic equipment is detected is less than described predetermined threshold value, low-power consumption mode of converting Respond and process at least one second task described.
6. electronic equipment according to claim 5, described electronic equipment also includes display unit, and described determining unit is also used In:
Determine the dump energy of described electronic equipment, and at the end of determining described storage and monitoring time segment, execution completes described first The electricity that task needs;
When the dump energy of described electronic equipment is not enough to support that described electronic equipment execution completes described first task, pass through First task described in described display unit prompting user cannot complete.
7. electronic equipment according to claim 5, described electronic equipment also includes display unit, and described determining unit is also used In:
In described storage and monitoring time segment, at least one moment during execution at least one second task described, determine The dump energy of described electronic equipment;
When the dump energy of described electronic equipment is not enough to support that described electronic equipment execution completes described first task, pass through First task described in described display unit prompting user cannot complete.
8. electronic equipment according to claim 7, when described electronic equipment executes described first task, described at least one Individual second task includes described first task,
Described monitoring unit specifically for:The dump energy and described of described electronic equipment is monitored in described storage and monitoring time segment One task.
CN201410406067.5A 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment Active CN104156050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410406067.5A CN104156050B (en) 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410406067.5A CN104156050B (en) 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment

Publications (2)

Publication Number Publication Date
CN104156050A CN104156050A (en) 2014-11-19
CN104156050B true CN104156050B (en) 2017-03-01

Family

ID=51881573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410406067.5A Active CN104156050B (en) 2014-08-18 2014-08-18 The method of Mission Monitor and electronic equipment

Country Status (1)

Country Link
CN (1) CN104156050B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106303096B (en) * 2015-06-10 2020-12-18 联想(北京)有限公司 Electronic equipment and method for adjusting power management strategy thereof
CN106095057B (en) * 2016-06-03 2019-02-01 上海新案数字科技有限公司 A kind of multistage idle method and mobile unit of mobile unit
CN106211286B (en) * 2016-06-29 2019-10-08 努比亚技术有限公司 A kind of control method and mobile terminal
CN107197103B (en) * 2017-07-06 2020-07-31 三星电子(中国)研发中心 Power-saving operation control method and device for intelligent terminal
CN108646938B (en) * 2018-03-13 2020-04-17 Oppo广东移动通信有限公司 Configuration method and device of touch screen, terminal and storage medium
CN111198607B (en) * 2018-11-20 2022-11-25 浙江宇视科技有限公司 Method and device for managing power consumption of electronic equipment
CN109710166A (en) * 2018-12-26 2019-05-03 努比亚技术有限公司 A kind of displaying method of terminal, terminal and computer readable storage medium
CN111212326A (en) * 2020-01-14 2020-05-29 咪咕视讯科技有限公司 Video playing method, electronic equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102369647A (en) * 2011-09-14 2012-03-07 华为技术有限公司 Power supply managment method and device of mobile terminal
CN103019825A (en) * 2012-12-24 2013-04-03 北京小米科技有限责任公司 Method and device for controlling applications
CN103500002A (en) * 2013-09-17 2014-01-08 小米科技有限责任公司 Method, device and terminal equipment for managing application program

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8244311B2 (en) * 2009-12-29 2012-08-14 International Business Machines Corporation Time-related power systems
US8525520B2 (en) * 2010-05-26 2013-09-03 Landis+Gyr Innovations, Inc. System and method for low battery detection

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102369647A (en) * 2011-09-14 2012-03-07 华为技术有限公司 Power supply managment method and device of mobile terminal
CN103019825A (en) * 2012-12-24 2013-04-03 北京小米科技有限责任公司 Method and device for controlling applications
CN103500002A (en) * 2013-09-17 2014-01-08 小米科技有限责任公司 Method, device and terminal equipment for managing application program

Also Published As

Publication number Publication date
CN104156050A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN104156050B (en) The method of Mission Monitor and electronic equipment
CN106256116B (en) A kind of method and terminal controlling application program
CN103500002B (en) The method of application program management, device and terminal unit
CN103401991B (en) A kind of method and apparatus that the communication event of terminal unit is pointed out
CN108076218A (en) A kind of charging reminding method and mobile terminal
CN106293445A (en) Application program uses the acquisition methods of data, device and terminal unit
WO2015007247A1 (en) Method and device for obtaining abnormal power consumption application and mobile terminal
CN108604265B (en) Method for offline managing application program use time and terminal equipment
CN107517127A (en) Processing method, mobile unit and the storage medium of communication abnormality
CN106055077A (en) Wake-up lock-based processing method and device
CN107315468B (en) Electricity based reminding method, device, storage medium and terminal
CN104052857A (en) Control device and method for mobile device
CN105786552B (en) A kind of memory method for cleaning and electronic equipment
CN103501390A (en) Mobile terminal with reminding function and reminding realization method thereof
CN106775809A (en) A kind of method of mobile terminal internal memory cleaning, device and mobile terminal
CN101442574A (en) Prompting method, apparatus and mobile terminal
CN107623899A (en) Information processing method, device, storage medium and electronic equipment
US11502529B2 (en) Battery charging method employing historical data
CN106502783A (en) A kind of EMS memory management process and terminal device
CN103902011A (en) Electronic device controlling method and electronic device
CN106326065A (en) Terminal use time management method and device
CN107943570A (en) application management method, device, storage medium and electronic equipment
CN103837835A (en) Method and device for detecting capacity decreasing degree of mobile device battery
CN103345440B (en) Statistical method and device of accumulated running time of electronic equipment and electronic equipment
CN105354491B (en) Intelligent terminal standby mode detection method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant