CN104153583A - Intelligent tensioning system - Google Patents

Intelligent tensioning system Download PDF

Info

Publication number
CN104153583A
CN104153583A CN201310682078.1A CN201310682078A CN104153583A CN 104153583 A CN104153583 A CN 104153583A CN 201310682078 A CN201310682078 A CN 201310682078A CN 104153583 A CN104153583 A CN 104153583A
Authority
CN
China
Prior art keywords
wireless communication
plc
computer
control computer
communication module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310682078.1A
Other languages
Chinese (zh)
Inventor
苏东科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU YOUCHENG MACHINERY MANUFACTURING Co Ltd
Original Assignee
ZHENGZHOU YOUCHENG MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU YOUCHENG MACHINERY MANUFACTURING Co Ltd filed Critical ZHENGZHOU YOUCHENG MACHINERY MANUFACTURING Co Ltd
Priority to CN201310682078.1A priority Critical patent/CN104153583A/en
Publication of CN104153583A publication Critical patent/CN104153583A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to an intelligent tensioning system. The system at least comprises a control computer and hydraulic pump stations, wherein each hydraulic pump station is provided with a PLC for control, each PLC is connected with a pressure sensor and a displacement sensor, each PLC is connected with a wireless communication module, and the control computer is also connected with a wireless communication module or is a computer with the wireless communication function. The control computer and the PLCs of the hydraulic pump stations are respectively connected with one wireless communication module, a wired mode is replaced with a wireless communication mode, and the construction efficiency is greatly improved. According to the system, an alarm for abnormal conditions such as communication interruption, faults of sensors and overrun happening in the automatic tensioning process can be given accurately in time, operators on site are warned to handle the abnormal conditions in time, and therefore it can be guaranteed that a tensioning device is safe and reliable.

Description

A kind of intelligent tensioning system
Technical field
The present invention relates to a kind of intelligent tensioning system.
Background technology
Intelligent tensioning system applies is in prestressed stretch-draw, and prestressed stretch-draw is to strain presstressed reinforcing steel by jack, gives in advance bridge or member stress application, makes bridge or member produce camber upwards, to improve the supporting capacity of bridge or member.
Mode is before manual stretch-draw, along with technological progress, development place intelligent tensioning now, carry out stretch-draw by Based Intelligent Control control tensioning equipment, the impact of the factors such as stretch-draw is not subject to artificially, environment, can set easily pause point, loading speed by intelligent program, hold the stretching process key elements such as lotus time.Intelligent tensioning system mainly comprises control appliance (computer, PLC, sensor), tensioning equipment (hydraulic power unit, electromagnetic valve), jack, ground tackle etc.
In existing mode, control computer and adopt Industrial Personal Computer (IPC), the Information Monitoring of transferring control command or accepting sensor by controlling computer.Because job site environment is more complicated, adopt Industrial Personal Computer (IPC) to need field connection to arrive the equipment such as controller of hydraulic power unit.And need to have technician all the time supervisory control computer in order to avoid pressure or displacement is transfinited or communicating interrupt, sensor fault and go wrong in stretching process.
Summary of the invention
The object of this invention is to provide a kind of intelligent tensioning system, need the problem of the on-the-spot cable of deploying to ensure effective monitoring and control of illegal activities in order to solve prior art.
For achieving the above object, the solution of the present invention comprises:
A kind of intelligent tensioning system, at least comprise and control computer and hydraulic power unit, hydraulic power unit is provided with the PLC that controls use, PLC is connected with pressure sensor and displacement transducer, PLC is all connected with wireless communication module, and described control computer is also connected with wireless communication module or is the computer with wireless communication function.
Described control computer is laptop computer.
On described control computer, alarm module is installed.
On the controller (PLC) of control computer of the present invention and hydraulic power unit, wireless communication module is all installed, substitutes wired mode by wireless communication mode, greatly improved efficiency of construction.
The present invention passes through audio alert, to the abnormal conditions that occur in automatic Tensioning process, as communicating interrupt, sensor fault or situation about transfiniting is carried out in time, report to the police accurately, remind site operation personnel to process in time, thereby can ensure tensioning equipment safety, reliable.
Brief description of the drawings
Fig. 1 is functional block diagram of the present invention;
Fig. 2, Fig. 3 are circuit theory diagrams of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
As shown in Figure 1, Figure 2, Figure 3 shows, the concrete equipment such as jack, ground tackle that intelligent tensioning system comprises is not shown in the diagram, and what in figure, mainly provide is control section circuit theory diagrams.Intelligent tensioning system, at least comprise and control computer and two hydraulic power units, each hydraulic power unit is provided with the PLC that controls use, PLC is connected with pressure sensor and displacement transducer, PLC is all connected with wireless communication module, and described control computer is also connected with wireless communication module or is the computer with wireless communication function.
Fig. 2 mainly comprises that AC power passes through air switch Q and be connected frequency converter with control relay KM1, transducer drive motor M.On alternating current circuit, also comprise pump start, stop button; The control coil of electromagnetic valve A, B, indicator lamp L etc.It is PLC power supply that AC power forms dc source by transformer T, rectification and filter unit.
In Fig. 3, PLC is connected with pressure sensor and displacement transducer, and wireless communication module (i.e. wireless transmit receiver module in figure), and PLC is also connected with inverter communication.
In the present embodiment, control computer and adopted laptop computer.Control on computer alarm module is installed, for reporting to the police and related voice function.As: in the time that computer enters intelligent tensioning control program picture, audio alert program starts, and quotes salutatory.A little less than computer identifies communication quality or while not having signal, send audio alert prompting.If PLC, in the time gathering when pressure signal pressure signal not or exceed (0----60MP), sends voice message.If PLC, in the time gathering when displacement signal displacement signal not or exceed (0----200MM), sends voice message.
More than provide a kind of concrete embodiment, but the present invention is not limited to described embodiment.Basic ideas of the present invention are such scheme, and for those of ordinary skill in the art, according to instruction of the present invention, the parameter of designing various distortion does not need to spend creative work.Variation, amendment, replacement and the modification of without departing from the principles and spirit of the present invention embodiment being carried out still fall within the scope of protection of the present invention.

Claims (3)

1. an intelligent tensioning system, at least comprise and control computer and hydraulic power unit, hydraulic power unit is provided with the PLC that controls use, PLC is connected with pressure sensor and displacement transducer, it is characterized in that, PLC is all connected with wireless communication module, and described control computer is also connected with wireless communication module or is the computer with wireless communication function.
2. a kind of intelligent tensioning system according to claim 1, is characterized in that, described control computer is laptop computer.
3. a kind of intelligent tensioning system according to claim 1, is characterized in that, on described control computer, alarm module is installed.
CN201310682078.1A 2013-12-11 2013-12-11 Intelligent tensioning system Pending CN104153583A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310682078.1A CN104153583A (en) 2013-12-11 2013-12-11 Intelligent tensioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310682078.1A CN104153583A (en) 2013-12-11 2013-12-11 Intelligent tensioning system

Publications (1)

Publication Number Publication Date
CN104153583A true CN104153583A (en) 2014-11-19

Family

ID=51879197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310682078.1A Pending CN104153583A (en) 2013-12-11 2013-12-11 Intelligent tensioning system

Country Status (1)

Country Link
CN (1) CN104153583A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887683A (en) * 2016-04-11 2016-08-24 长安大学 Prestressed tensioning system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102032990A (en) * 2009-09-25 2011-04-27 中国第一汽车集团公司 Engine cylinder block fatigue testing machine
CN102031874A (en) * 2010-11-24 2011-04-27 湖南联智桥隧技术有限公司 Intelligent type synchronous prestress tensioning system
JP2012021343A (en) * 2010-07-15 2012-02-02 Sumitomo Mitsui Construction Co Ltd Tensile force introduction device
CN102431090A (en) * 2011-10-25 2012-05-02 南开大学滨海学院 Fiber grating precast beam prestress intelligent tensioning control system and implementation method thereof
CN202622995U (en) * 2012-06-29 2012-12-26 贵阳电气控制设备有限公司 Prestress intelligent tension control system
CN203096616U (en) * 2012-12-26 2013-07-31 北京科技大学 Intelligent synchronous tensioning system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102032990A (en) * 2009-09-25 2011-04-27 中国第一汽车集团公司 Engine cylinder block fatigue testing machine
JP2012021343A (en) * 2010-07-15 2012-02-02 Sumitomo Mitsui Construction Co Ltd Tensile force introduction device
CN102031874A (en) * 2010-11-24 2011-04-27 湖南联智桥隧技术有限公司 Intelligent type synchronous prestress tensioning system
CN102431090A (en) * 2011-10-25 2012-05-02 南开大学滨海学院 Fiber grating precast beam prestress intelligent tensioning control system and implementation method thereof
CN202622995U (en) * 2012-06-29 2012-12-26 贵阳电气控制设备有限公司 Prestress intelligent tension control system
CN203096616U (en) * 2012-12-26 2013-07-31 北京科技大学 Intelligent synchronous tensioning system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887683A (en) * 2016-04-11 2016-08-24 长安大学 Prestressed tensioning system

Similar Documents

Publication Publication Date Title
KR101064538B1 (en) Smart air compressor system
CN102849544B (en) Elevator lift control system and method
CN202245886U (en) Control system of winch hoist
CN215238446U (en) Intelligent tubular pile welding system based on BIM
CN103430443A (en) Drive device, crane, and control method for drive device
CN102587941A (en) Mining hydraulic support monitoring system and mining hydraulic support monitoring method
CN104153583A (en) Intelligent tensioning system
CN204847641U (en) Construction elevator intelligence operation panel and system
CN102830653A (en) Wireless communication robot winding control system
CN209398409U (en) A kind of oil/gas well job platform intelligent comprehensive control system
CN202053417U (en) Fan blade mould tilting device
CN103193159A (en) Lifting and slewing cycle number detecting system and method for automobile crane boom
CN103496638B (en) Lifting protection system and lifting method for hoisting equipment
JP2011020816A (en) Die carrying system by overhead crane
CN206232351U (en) A kind of steel cable hoisting protection device with height limit switch
CN114922254A (en) Automatic switching non-negative pressure water supply system and implementation method thereof
CN207965609U (en) Cage guide rope auto-tensioning intelligence control system in a kind of mine hoisting system
KR20110129097A (en) Crane state monitoring system
CN102671956B (en) Emergency stop control method of cold rolling continuous processing line
TW393433B (en) Electric device for moving shelves
CN203847365U (en) Multifunctional monitoring and controlling alarm of vacuum pump
CN204287886U (en) A kind of air compressor machine remote monitoring and control device
CN205104996U (en) Transformer operational monitoring device based on internet
CN110775765A (en) Elevator safety detection method, device and system and machine-readable storage medium
CN105141698B (en) A kind of centralized monitoring system and monitoring method applied to coke oven hydraulic switch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141119

RJ01 Rejection of invention patent application after publication