CN104153393A - Method for rebuilding street well mouths - Google Patents

Method for rebuilding street well mouths Download PDF

Info

Publication number
CN104153393A
CN104153393A CN201310177776.6A CN201310177776A CN104153393A CN 104153393 A CN104153393 A CN 104153393A CN 201310177776 A CN201310177776 A CN 201310177776A CN 104153393 A CN104153393 A CN 104153393A
Authority
CN
China
Prior art keywords
underground passage
street
underground
well
passage door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310177776.6A
Other languages
Chinese (zh)
Inventor
王守玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310177776.6A priority Critical patent/CN104153393A/en
Publication of CN104153393A publication Critical patent/CN104153393A/en
Pending legal-status Critical Current

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention relates to street well lids, and particularly belongs to a method for rebuilding street well mouths. The method involves an underground well 1, an underground passage 2, an underground passage door 3, a ground observation opening 4, a ventilation opening 5 and a flowerpot 6. The method is characterized in that the ground observation opening 4 is formed above the underground well 1, the underground well 1 is communicated with the underground passage door 3 through the underground passage 2, and the underground passage door 3 is arranged outside a street. According to the method, all well lids of the street can be removed, multiple underground wells with different applications respectively share one underground passage and one underground passage door, and the flowerpot and a hanging basket are arranged above the underground passage door and the ventilation opening. The method can be widely used for rebuilding the urban and rural street well mouths, incidents of casualties caused by the street well mouths can be effectively avoided, and the traveling sense of fear of people can be eliminated.

Description

The method of street well head reconstruction
Technical field
The present invention relates to the well lid on street, belong to specifically the method for street well head reconstruction.
Background technology
At present, in majority of streets, be all provided with the well lid of various uses, if any tap water, sewage, heating installation, telecommunications, electric power, the well lid of mobile communication and cable television, structure and quality problems because of well lid and derrick, often can cause indivedual well lids to tilt, broken, by people, stolen and moved by people, make well head without well lid, cause vehicle rollover and personnel casualty accidents often to occur, about having caused national governments and governments at all levels, well lid safety problem pays much attention to, how on street, all to remove well lid, make the oral area of missile silo safe and reliable, it is main purpose of the present invention.
Summary of the invention
The method that the object of this invention is to provide the well head reconstruction of a kind of street, can share a underground passage by several mouthfuls of missile silos respectively, and underground passage door is arranged on the outside in street, can effectively prevent well head traffic accident, eliminates the fear of people's trip.
Object of the present invention can realize by following measures:
The method of street well head reconstruction, by missile silo 1, underground passage 2, underground passage door 3, ground observation mouth 4, ventilation opening 5, flowerpot 6, formed, it is characterized in that: on missile silo 1, ground observation mouth 4 is set, missile silo 1 communicates with underground passage door 3 by underground passage 2, and underground passage door 3 is arranged on the outside in street.
The beneficial effect of advantage of the present invention and generation is:
1, can respectively several mouthfuls of missile silos of different purposes be shared to a underground passage, underground passage door is arranged on the outside in street.
2, can all remove the well lid that street is greater than 60cm diameter, reconstruct as only having the ground observation mouth of 10-15cm diameter, can effectively prevent street well head injures and deaths people's event, also can eliminate the fear of people's trip.
3, underground passage door and ventilation opening and flowerpot and hanging basket are combined as a whole, and can beautify the environment.
Accompanying drawing explanation
Fig. 1 is icon schematic diagram of the present invention
Fig. 2 is structural profile schematic diagram of the present invention
Structure of the present invention is indicated by accompanying drawing:
Missile silo 1 underground passage 2 underground passage door 3 ground observation mouth 4 ventilation opening 5 flowerpots 6
The specific embodiment
The invention will be further described by reference to the accompanying drawings:
Embodiment mono-, take a bite missile silo as example, and the method for street well head reconstruction, is comprised of missile silo 1, underground passage 2, access door 3, ground observation mouth 4, ventilation opening 5, flowerpot 6.On missile silo 1, ground observation mouth 4 is set, missile silo 1 communicates with underground passage door 3 by underground passage 2, and underground passage door 3 is arranged on the outside in street.At the side of underground passage door 3, be provided with one or several ventilation opening 5, at underground passage door 3 with above ventilation opening 5, flowerpot 6 is set.The height of access door 3 can be set to 110cm, and width is set to 60cm.The height of underground passage 2 can be set to 170cm, and the height of missile silo 1 oral area can be made as 50cm, and the height of sink hole oral area will be higher than 100cm.The diameter of ground observation mouth 4, can be set to 10-15cm.
Embodiment bis-, and the three mouthfuls of missile silos 1 of take are example, with the difference of embodiment mono-are, three mouthfuls of missile silos 1 are interconnected by underground passage 2, and communicate with underground passage door 3.
The present embodiment remarks item:
1, sink hole and the natural gas well will arrange separately passage, can according to circumstances, try not to share a underground passage with the missile silo of other purposes.
2, the top board of underground passage and ground observation mouth, adopt thickened reinforced around.
3, the surrounding of flowerpot and access door can divide two parts, makes respectively of concrete mold, during use, upper and lower two parts is fixed together, and then fixes with ground.
4, the different purposes that go into the well in base area, ground observation mouth can arrange a fixing iron gate, also can be set to reinforcing bar railing.

Claims (4)

1. the method that street well head is reconstructed, by missile silo 1, underground passage 2, underground passage door 3, ground observation mouth 4, ventilation opening 5, flowerpot 6, formed, it is characterized in that: on missile silo 1, ground observation mouth 4 is set, missile silo 1 communicates with underground passage door 3 through underground passage 2, and underground passage door 3 is arranged on outside, street.
2. according to the method for street claimed in claim 1 well head reconstruction, it is characterized in that: ground observation mouth 4, be arranged on missile silo 1 above.
3. according to the method for street claimed in claim 1 well head reconstruction, it is characterized in that: underground passage 2, can be communicated with several mouthfuls of missile silos 1.
4. according to the method for street claimed in claim 1 well head reconstruction, it is characterized in that: underground passage door 3 is arranged on outside, street, and ventilation opening 5 is arranged on the side of underground passage door 3, at underground passage door 3 with above ventilation opening 5, flowerpot 6 is set.
CN201310177776.6A 2013-05-14 2013-05-14 Method for rebuilding street well mouths Pending CN104153393A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310177776.6A CN104153393A (en) 2013-05-14 2013-05-14 Method for rebuilding street well mouths

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310177776.6A CN104153393A (en) 2013-05-14 2013-05-14 Method for rebuilding street well mouths

Publications (1)

Publication Number Publication Date
CN104153393A true CN104153393A (en) 2014-11-19

Family

ID=51879007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310177776.6A Pending CN104153393A (en) 2013-05-14 2013-05-14 Method for rebuilding street well mouths

Country Status (1)

Country Link
CN (1) CN104153393A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120860A (en) * 2016-07-05 2016-11-16 陈俊光 A kind of assembled work well installation method in reconstruction and extension project
CN106193123A (en) * 2016-07-05 2016-12-07 陈俊光 A kind of assembled work well standard knot and the installation method in reconstruction and extension project thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5199233A (en) * 1990-05-23 1993-04-06 Misawa Homes Co. Ltd. Prefabricated concrete basement and process for constructing the same
CN201165703Y (en) * 2008-03-21 2008-12-17 四川天鑫塑胶管业有限公司 Leak detection plastic inspection shaft for collapsible loess area
KR20100032075A (en) * 2008-09-17 2010-03-25 이명숙 Cover for underground passage with a garbage collecting means
CN201981553U (en) * 2011-03-10 2011-09-21 沈家同 Plastic pipeline type inspection shaft
CN202755380U (en) * 2012-09-06 2013-02-27 上海市城市建设设计研究总院 Tee joint working well for long-distance large-pipe-diameter underground water delivery main pipe system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5199233A (en) * 1990-05-23 1993-04-06 Misawa Homes Co. Ltd. Prefabricated concrete basement and process for constructing the same
CN201165703Y (en) * 2008-03-21 2008-12-17 四川天鑫塑胶管业有限公司 Leak detection plastic inspection shaft for collapsible loess area
KR20100032075A (en) * 2008-09-17 2010-03-25 이명숙 Cover for underground passage with a garbage collecting means
CN201981553U (en) * 2011-03-10 2011-09-21 沈家同 Plastic pipeline type inspection shaft
CN202755380U (en) * 2012-09-06 2013-02-27 上海市城市建设设计研究总院 Tee joint working well for long-distance large-pipe-diameter underground water delivery main pipe system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120860A (en) * 2016-07-05 2016-11-16 陈俊光 A kind of assembled work well installation method in reconstruction and extension project
CN106193123A (en) * 2016-07-05 2016-12-07 陈俊光 A kind of assembled work well standard knot and the installation method in reconstruction and extension project thereof
CN106120860B (en) * 2016-07-05 2018-04-13 陈俊光 A kind of installation method of assembly type work well in reconstruction and extension project
CN106193123B (en) * 2016-07-05 2018-04-24 陈俊光 A kind of assembled work well standard knot and its installation method in reconstruction and extension project

Similar Documents

Publication Publication Date Title
CN203939047U (en) A kind of buoy warning thing
CN202871087U (en) Micro-energy self-power-supply wireless early warning system for road surface deposited water below flyover
CN104153393A (en) Method for rebuilding street well mouths
CN205277434U (en) Tunnel portal pre -reinforcing structure
CN204597415U (en) A kind of safety high-pressure Electric wire support
CN104499933B (en) A kind of concealed electric tower ladder stand
CN203925579U (en) A kind of tunnel bottom drainage structure
CN203411998U (en) Safety protection net of underground pipeline inspection well
CN203284750U (en) Cast-in-place concrete anti-collision guardrail
CN206784441U (en) A kind of anti-stealing manhole cover
CN211337333U (en) Composite bearing well lid
CN105804789A (en) Dangerous passage efficient safe protection construction device
CN203175570U (en) Supporting and protecting structure in super-shallow buried weak surrounding rock tunnel construction
CN203411930U (en) Fixed direct burial type guardrail
CN203334317U (en) Novel anti-theft and anti-dropping combined type safety well lid
CN204266236U (en) A kind of manhole
CN205667187U (en) A kind of water system being applied in Dangshan pear frost protection in early spring
CN204386143U (en) A kind of railroad bridge high pier construction safety climbing ladder
CN203383322U (en) Double-bearing-platform falling prevention inspection well lid
CN206570738U (en) A kind of road safety warning guardrail
CN204174559U (en) A kind of closed safety fence for railway track
CN205676830U (en) A kind of Novel water conservancy project retaining wall
CN203625935U (en) Cable well lid anti-fall protecting device
CN203866863U (en) Anti-falling inspection well cover
CN102852548A (en) Safety device for construction, danger removal and blockage prevention

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141119