CN104149643B - For controlling the method and system of the energy requirement that network is got on the bus - Google Patents

For controlling the method and system of the energy requirement that network is got on the bus Download PDF

Info

Publication number
CN104149643B
CN104149643B CN201410363730.8A CN201410363730A CN104149643B CN 104149643 B CN104149643 B CN 104149643B CN 201410363730 A CN201410363730 A CN 201410363730A CN 104149643 B CN104149643 B CN 104149643B
Authority
CN
China
Prior art keywords
energy
network
electric motor
motor car
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410363730.8A
Other languages
Chinese (zh)
Other versions
CN104149643A (en
Inventor
W·C·施库恩梅克
D·A·埃尔德雷格
V·V·姆迪亚姆
J·K·库珀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/148,833 external-priority patent/US8948940B2/en
Application filed by General Electric Co filed Critical General Electric Co
Publication of CN104149643A publication Critical patent/CN104149643A/en
Application granted granted Critical
Publication of CN104149643B publication Critical patent/CN104149643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of method includes monitoring simultaneously for the available quantity of electric energy on the electrical network of one or more load supplyings.Can be consumed the while that the available quantity of electric energy representing and be less than the amount of the electric energy of electrical network ability.The method also includes the electrical energy demands monitoring the multiple electric motor cars on the network being traveling in route, and the network of this route includes one or more conductive path extended along route, for electric energy is sent to electric motor car from electrical network.The method farther includes to control the movement of electric motor car so that the electrical energy demands of electric motor car is less than the available quantity of electric energy on electrical network.

Description

For controlling the method and system of the energy requirement that network is got on the bus
Cross-Reference to Related Applications
This application claims the priority that U.S. Provisional Patent Application No. is 61/819,823 proposed on May 6th, 2013, its Entitled " for controlling the method and system of the energy requirement that network is got on the bus " (this 823 application).This 823 application whole interior Appearance is incorporated herein by reference.
Technical field
Embodiment of the subject matter described herein relates to electric vehicle system.Other embodiments relates to being traveling in route network On electric vehicle system.
Background technology
Known Vehicular system includes one or more motor-car or unit, and in some cases, including one or many Individual non-motor-car or unit, they are connected with each other to advance along route.Motor-car provides pull strength to drive described motor-car and non-motor-car Advance along route.
Motor-car can provide electric current to drive, this conduction from off-board power supply for vehicle by one or more conductive paths Path extends along the route advanced.Such as, route (or at least one part) can include conductive path, and it is a part for route Or it extends along route and it provides current to motor-car to drive described vehicle.This conductive path can include electric tracks, top Stretched wire, etc..
Pull strength needed for driving described motor-car and non-motor-car along route can change with stroke, owing to parameters is expert at Change with position and/or time during journey.The parameter of these changes can include road curvature of a curve and/or the gradient, Vehicular system Speed limit and/or requirement, etc..Driving for electricity, it is driven by electric energy (such as electric current), and this electric energy carries from electrical network A part for the electric power route of confession, the electricity of (such as traction) becomes with the change of required pull strength required for electricity is driven Change.
At present, all electricity drive to be operated on Some routes, and described route is supplied to the electric energy of these motor-cars and is subject to Restriction to power supply capacity.Each motor-car needs mutually in the same time from same power supplies or the electric energy in power station, example, it may require group The electricity closed, exists and exceedes the risk that maybe can exceed that power supply capacity.Exceed this capacity may result in be supplied to one or more dynamic The electric energy of car is not enough, thus causes one or more vehicle to stop.This stopping may result in propagation delay.
It addition, other may need the electric energy from same power supplies relative to the external loading of vehicle, this power supply is also Car is powered.Such as, city, cities and towns etc. can have a lot of electrical load, and it is come by the identical power supply powered for motor-car simultaneously Electric energy is provided.If power supply capacity has exceeded traction motor-car and the energy of other load, the electric energy of other available load will Deficiency, may result in power-off.
One of the problems referred to above possible solution the capacity being to increase power supply, has additional supply of the conductive path of electric energy Capacity, and/or increase the quantity of power supply.But, these solutions include that huge financial cost and these schemes may be non- Chang Anggui.
Summary of the invention
In an embodiment, it is provided that a kind of method (as controlled the energy requirement of multiple motor-cars on network), it includes monitoring It it is the available quantity of electric energy on the electrical network of one or more load supplying simultaneously.The available quantity of electric energy represent can be consumed simultaneously and not Exceed the electric flux of electrical network ability.The method also includes that the electric energy monitoring the multiple electric motor cars on the network being traveling in route needs Asking, this network includes one or more conductive path extended along route, for electric energy is sent to electric motor car from electrical network.The party Method farther includes to control the movement of electric motor car so that the electrical energy demands of electric motor car is less than the available quantity of electric energy on electrical network.
In an embodiment, it is provided that a kind of network planner system, it includes power network monitoring equipment and one or more place Reason device.This power network monitoring equipment is configured to monitor simultaneously for the available quantity of electric energy on the electrical network of one or more load supplyings.Electricity Can available quantity represent can be consumed simultaneously and less than the amount of electric energy of electrical network ability.Electrical network is configured to by along route One or more conductive paths of Network stretch transmit electric energy, and multiple electric motor cars are traveling on conductive path for by electric energy transmission To electric motor car to power to electric motor car.One or more processors are configured to and the stroke in power network monitoring equipment and electric motor car Planner system communicates to control the movement of vehicle, so that the electrical energy demands of electric motor car is less than electric energy on electrical network Available quantity.
In an embodiment, it is provided that a kind of network planner system, including power network monitoring equipment, energy requirement monitoring device With one or more processors.This power network monitoring equipment is configured to monitor electrical network for one or more load supplyings simultaneously and powers on The available quantity of energy.The available quantity of electric energy represent can be consumed simultaneously and less than the amount of electric energy of electrical network ability.Energy requirement is supervised Measurement equipment is configured to monitor the electrical energy demands of the multiple electric motor cars on the network being traveling in route, the network of route include one or Multiple conductive paths extended along route, for being sent to electric motor car to power electric motor car by electric energy from electrical network.One or many Individual processor is configured to control the movement of electric motor car, so that the electrical energy demands of electric motor car is less than electric energy available on electrical network Amount.One or more processors are configured through revising the energy application plan submitted to by the electric motor car being traveling on network, or Each electric motor car specific for vehicle is sent in electric motor car at least one to control electricity to the maximum power of electrical network demand The movement of motor-car.
A kind of method is provided, comprising:
Monitoring is for simultaneously to the available quantity of electric energy on the electrical network of one or more load supplyings, the described available quantity of electric energy Represent and can be consumed simultaneously and be less than the amount of the electric energy of electrical network ability;
The electrical energy demands of multiple electric motor cars that monitoring is traveling on the network of route, the network of described route include one or Multiple conductive paths extended along route are for being sent to described electric motor car by described electric energy from electrical network;And
Control the movement of described electric motor car so that the described electrical energy demands of described electric motor car is less than the institute of electric energy on electrical network State available quantity.
In one embodiment, monitor described electrical energy demands and include monitoring the energy application plan of each electric motor car, energy The electrical energy demands that each electric motor car is advanced along route is described in application plan in detail, and carrys out self energy by being summarised in future time Measure the electrical energy demands of application plan and determine the expected energy demand at future time.
In one embodiment, the movement controlling electric motor car includes replanning based on stroke, and other electric motor car additional exists Network uplink enters, or at least one that anticipated energy requirement is in future time exceedes the available quantity of electric energy makes to revise energy With plan;And the energy application plan of amendment is sent to the electric motor car being traveling on network.
In one embodiment, energy application plan provides for route selection, timetable, vehicle structure, or mobile spy The instruction of at least one levied, to be performed by the electric motor car being traveling on network.
In one embodiment, the movement controlling electric motor car includes distributing at network specific for vehicle maximum power The electric motor car of upper traveling, the specific maximum power of described vehicle passes through each electric motor car from electrical network demand.
In one embodiment, based on distributing to the maximum power of each electric motor car, electric motor car generates each electric motor car The energy application plan of course.
In one embodiment, the available quantity of monitoring electric energy includes that on monitoring electrical network, the available quantity of electric energy is relative to the time Change.
In one embodiment, the available quantity of monitoring electric energy includes monitoring available quantity of electric energy on a part of electrical network, and The movement of the electric motor car in the sub-network being traveling in route that control is powered by this part electrical network so that electrical energy demands is less than being somebody's turn to do The available quantity of electric energy in part.
In one embodiment, the movement controlling electric motor car includes creating network energy consumption plan, network energy consumption Energy expenditure parameter is distributed to the electric motor car that is traveling on network to prevent electric motor car from exceeding the available of electric energy on electrical network by plan Amount.
A kind of network planner system is provided, comprising:
Power network monitoring equipment, what it was configured to monitor on electrical network to one or more load supplyings simultaneously electric energy can Consumption, the described available quantity of electric energy represent can be consumed simultaneously and less than the amount of electric energy of electrical network ability;Described electrical network configures The one or more conductive paths becoming the Network stretch of route by traveling over along multiple electric motor cars transmit electric energy for Being delivered to electric motor car to power electric motor car, electric motor car has vehicle-mounted stroke planner system;
And one or more processor, it is configured to and the stroke planner system in power network monitoring equipment and electric motor car Communicate to control the movement of electric motor car so that the electrical energy demands of electric motor car is less than the available quantity of electric energy on electrical network.
In one embodiment, one or more processors are configured to create network energy consumption plan, and its distribution can be led to Cross the specific maximum power of vehicle of each electric motor car demand being traveling on network, to prevent the electrical energy demands of electric motor car from surpassing Cross the available quantity of electric energy on electrical network.
In one embodiment, one or more processors are configured to create network energy consumption plan, and it revises traveling The route of the one or more electric motor cars on network, timetable, at least one in vehicle structure, or moving characteristic, in case Only the electrical energy demands of electric motor car exceedes the available quantity of electric energy on electrical network.
In one embodiment, at least one during moving characteristic includes as follows: speed, acceleration, position, traveling side To, use regenerative braking to provide electric energy for electrical network, or in order to consume use alternative energy source immediately rather than draw electric energy from electrical network.
In one embodiment, receive route, timetable, repairing of at least one in vehicle structure, or moving characteristic The one or more electric motor cars changed automatically carry out described amendment.
In one embodiment, one or more processors be configured to receive from stroke planner system by stroke counter Drawing the vehicle specific energy application plan of device system creation, it is specific that it describes the vehicle that each electric motor car advances along route in detail Energy requirement.
In one embodiment, one or more processors are configured to one or more electronic based on be traveling on network The stroke of car is replanned, and other electric motor car additional enters at network uplink, or the energy requirement of anticipated electric motor car is in future tense Between exceed at least one in the available quantity of the electric energy of future time to revise one or more energy application plan.
In one embodiment, one or more processors are configured to receive from the stroke planner system in electric motor car The energy application plan of at least one plan route, for the route of the proposition of each electric motor car, current energy demand, currently Performance characteristic, or current route feature.
In one embodiment, electric motor car is rail vehicle, and route is track.
In one embodiment, for the available quantity of the electric energy of one or more load supplyings is made in peak energy on electrical network With fewer than during the non-peak energy use time during the time.
A kind of network planner system is provided, comprising:
Power network monitoring equipment, it is configured to monitor is the available of electric energy on the electrical network of one or more load supplyings simultaneously Amount, the available quantity of electric energy represent can be consumed simultaneously and less than the amount of electric energy of electrical network ability;
Energy requirement monitoring device, its electric energy being configured to monitor the multiple electric motor cars on the network being traveling in route needs Asking, the network of this route includes one or more conductive path extended along route, for being sent to electronic from electrical network by electric energy Car is to power to electric motor car;And
One or more processors, its movement being configured to control electric motor car so that the electrical energy demands of electric motor car is less than The available quantity of electric energy on electrical network, wherein, one or more processors are configured through amendment by the electric motor car being traveling on network The energy application plan submitted to, or send each electric motor car specific for vehicle to electric motor car to the maximum power of electrical network demand In at least one control the movement of electric motor car.
Accompanying drawing explanation
Subject matter described herein can obtain preferably by reading the detailed description of following non-limiting example Understand, with reference to accompanying drawing, wherein:
Fig. 1 is the schematic diagram of the vehicle network according to embodiment;
Fig. 2 illustrates that the electricity according to embodiment is driven;
Fig. 3 is the network planner system according to embodiment;
Fig. 4 is the chart of the electric car being shown on network energy application plan within a period of time;
Fig. 5 is the chart of the energy application plan within a period of time illustrating Fig. 4 according to embodiment;
Fig. 6 is the chart of the energy application plan of the Fig. 4 according to embodiment amendment;
Fig. 7 is the chart of the energy application plan of the Fig. 5 according to embodiment amendment;
Fig. 8 is the flow chart of an embodiment of the method controlling the electrical energy demands that network is got on the bus.
Detailed description of the invention
Foregoing summary and the detailed description of the following detailed description of the invention about present subject matter, by combining Accompanying drawing can be better understood.About scope, accompanying drawing illustrates the programme diagram of the functional module of each embodiment, functional module Need not represent the differentiation between hardware and/or circuit.It is therefoie, for example, one or more functional modules (such as, processor or Memorizer) can a single hardware (such as, general uniprocessor, microprocessor, random access memory, hard disk etc. Similar) middle enforcement.In the same manner, program can be independent program, can combine with the subprogram in operating system, Ke Yishi Function in the software kit installed etc. is similar.Each embodiment is not limited to the device shown in accompanying drawing and means.
Herein, narration element or step use odd number and should be understood to be not excluded for a plurality of before titled with " " Element or step, state clearly unless this eliminating has.It addition, " embodiment " mentioned of the present invention is not meant to represent Eliminating also includes the other embodiments of the technical characteristic quoted.And, on the contrary, unless stated clearly, embodiment " includes ", " comprise ", or " having " (and various forms) element or multiple element, it has specific performance, it may include not having of other There is this element of this life energy.
System described herein can include or represent that hardware and relevant instruction (are such as stored in tangible and non-transitory meter Calculation machine readable storage medium storing program for executing such as computer hard disc, the software on ROM, RAM etc.), it performs operations described herein.Hardware can Including circuit, it includes and/or is connected with one or more logical device, such as microprocessor, processor, controller etc..These Equipment can be the equipment that can be purchased off the shelf, and it performs operate as described herein according to above-mentioned instruction.Additionally or alternatively, one These equipment individual or multiple could be for performing the hardware circuitry with logic circuit of these operations.
Used herein, term " Vehicular system " includes one or more vehicle, and it generates pull strength along route Advance.Unless other explanation (as non-motor-car), term " vehicle " merely relates to motor-car, and it provides pull strength to advance along route Vehicular system.Term " by ... composition " can relate to a group of one or more vehicle, it mechanically and/or logically connects It is connected together and advances along route.Vehicular system can include being linked together by a group or two groups or multiple groups.According to herein In the various aspects of present subject matter, group can limit based on one or more the description below: being mechanically connected, wherein vehicle exists In group mechanically connected and at least adjacent with other vehicle in group;Electrical connection, wherein vehicle electrical connects and can pass between vehicle Power transmission energy;And/or operation/function connect, plurality of vehicle is controlled with coordination mode, as distribution power operated some Pattern.In an embodiment, the rail vehicle in context, locomotive crew includes that multiple mechanical connection (and may electrically connect) exists Locomotive together, the most each locomotive is connected and adjacent with other locomotive of at least one in group.Such as, one group of vehicle, or car Group, it may include be mutually mechanically connected, and/or by one or more circuits and/or wireless connections communicate with common With the pull strength and/or the two or more vehicles of brake force that control vehicle in this group.
Although reference orbit Vehicular system describes and illustrates the one or more embodiment, this rail vehicle system includes Train, locomotive, and other rail vehicle, not every embodiment is limited to this.Such as, one or more embodiments also may be used For common vehicle, such as non-high-speed vehicle (if not being expected to be and/or do not allow the vehicle being traveling on highway), agricultural vehicle, Motorcycle and other transmission vehicle, and/or marine vessel.
In distributed power operates, term " guiding vehicle " relates to the control of the one or more vehicles in Vehicular system Operation, it is not necessary to represent at the front end of Vehicular system or the vehicle of the leading end of Vehicular system.Such as, the vectoring aircraft in train Car can be not arranged in the front end of train.Term " remote vehicle " relates to the vehicle in addition to guiding vehicle in Vehicular system. Such as, remote vehicle can include the locomotive being controlled by pilot engine in train.Term " remotely " need not between preset space length Or distance.Such as, remote vehicle can directly be connected with guiding vehicle.Vehicular system can have guiding group, and it includes being mechanically connected In the guiding vehicle of one or more remote vehicles, and also can have one or more long-range group, it forms the complete of remote vehicle Portion, the diverse location being positioned in Vehicular system.Some Vehicular system can have the single vehicle in train, itself and other car Spaced apart by one or more non-driven vehicles (e.g., the lorry in rail vehicle system or passenger vehicle).Vehicle group also can be led to Cross non-driven convoy spacing to open.
Fig. 1 is the schematic diagram of vehicle network 100 according to embodiments of the present invention.The vehicle network 100 illustrated can be relatively A part for big vehicle network.Vehicle network 100 includes by route 103, route 104, route 105, route 106 and route 107 Multiple routes 102 of composition.Preferably, vehicle network 100 can include more or less than 5 route 103-107, as shown in Figure 1. Some route 102 can intersect with other route 102 in network 100.Such as, route 103 intersects with route 106 and 107, road Line 104 intersects with route 105 and 106, and route 105 intersects with route 104,106 and 107.Multiple Vehicular systems 108 can be simultaneously It is traveling on the network 100 of route 102.Such as, as it is shown in figure 1, Vehicular system 109 is advanced along route 103, Vehicular system 110 Advancing along route 106, Vehicular system 111 is advanced along route 104, and Vehicular system 112 is advanced along route 105.Although showing in FIG Go out four Vehicular systems 108, but network 100 can include an arbitrarily Vehicular system 108.Each Vehicular system 108 can include One or more with other motor-car and/or non-motor-car or load vehicle be not (if being provided that power but due to one or more purposes And consume the vehicle of electric energy) connected motor-car.Non-motor-car is configurable to along route 102 loading and/or manned.Each vehicle system The system 108 one or more routes 102 along vehicle network 100 row between beginning/start position and target/final position Advance in journey.
Route 102 can include one or more conductive path 114 extended along route 102.Conductive path 114 can be from power supply 116 transmit electric energy.Power supply 116 can be one or more power station, such as coal power station, nuclear power station, and/or natural gas power station.Preferably Ground, power supply 116 can represent other energy one or more, as the renewable sources of energy (e.g., wind energy, water energy, solar energy, geothermal energy, and its It is for generating the energy of electric current).Term used herein " electric energy " can relate to electric current, voltage, electrical power (such as wattage), etc. Deng.Term used herein " electric current " relates to the speed that electric energy transmits, and includes direct current (as voltage is constant) and/or exchange (such as time dependent voltage).The electric energy transmitted along conductive path 114 by power supply 116 can form at least some of electrical network 118.118 electric energy of electrical network assign to one or more load from power supply 116 by conductive path 114.Preferably, electrical network 118 can Powered by more than one power supply 116.
Electrical network 118 has electrical network ability, and it represents for simultaneously to the electricity more than or on the electrical network 118 powered of multi load The available quantity of energy.Electrical network ability is limited by transmitting hardware, as by conductive path 114 and/or provide one or many of electric energy The available quantity of the individual transmissible electric energy of power supply 116, one or more power supplys 116 have by fuel, and power station size etc. limits Production capacity.Term " ability " relates to the availability of energy transmission (such as electric current), and available horsepower (e.g., wattage) can electricity consumption Pressure etc..
In one embodiment, the load only from electrical network 118 power demand is to load on bearing of Vehicular system 108 Carry.So, electrical network capability list is shown as the electricity of the one or more load supplyings on the Vehicular system 108 advanced on network 100 The available quantity of energy.Selectively, electrical network 118 can provide electric energy with to Vehicular system 108 and other load supplying, as in city City, the residential load in cities and towns, and/or rural area, commercial loads etc..So, for the load supplying on Vehicular system 108 Electrical network 118 on the available quantity of electric energy can reduce, owing to being change at the electricity of other loading demand of different time.Such as, The time is used, such as afternoon or at dusk, the available quantity for the electric energy to Vehicular system 108 power supply potentially can be relatively at the peak of a day Few, owing to non-vehicle (such as house) loading demand is bigger.
Here used, exceed or on electrical network of overdrawing, the available quantity of electric energy is synonym with exceeding electrical network ability, because of Available quantity for electric energy is partly limited by electrical network ability.Such as, if electrical network ability is 50 megawatts (MW) and at time txNeed That want is 30MW, then, at time txOn electrical network, the available quantity of electric energy is 20MW.If Vehicular system is at time txNeed 25MW, This demand by exceed the available quantity (if 25MW is more than 20MW) of electric energy and electrical network ability (as 25MW is equal to 55MW plus 30MW, its More than 50MW).Therefore, exceed the available quantity of electric energy on electrical network to mean to have exceeded electrical network ability.So, expression " exceedes electricity The available quantity of online electric energy " and " exceeding electrical network ability " here can exchange use.And, " on monitoring electrical network, electric energy can Consumption " and " monitoring electrical network ability " here can also exchange use.
In an embodiment, the electro-motive vehicle in Vehicular system 108 draws electricity by conductive path 114 from electrical network 118 Energy.The term being used herein " draws " action relating to consuming the electric energy provided by conductive path.The term being used herein " demand " relates more specifically to electric motor car in usage amount or the rate at present or needing (such as demand) electric energy in the future.Such as, electronic The demand factor of the electric energy of car with can be identical or slightly different by the actual rate drawn of conductive path.
The electric energy drawn is used for the one or more load supplyings on Vehicular system 108, as generated the negative of driving force Carry, compressor load, passenger load etc..All travelings Vehicular system on network 100, such as Vehicular system 109-112, can Needing electric energy from electrical network 118 in the same time mutually, it deducts the available quantity of electric energy on electrical network 118, approximates Vehicular system 108 and exists The electricity that this hours cumulative draws.If power supply 116 can not meet the electrical energy demands of Vehicular system 108, one or more vehicles System 108 may stop along route 102 due to electric energy deficiency, and this will postpone other Vehicular system 108 multiple by shadow On the route rung or about.It is it addition, if the demand of electric energy has exceeded electrical network ability simultaneously, the most Individual route 102 may produce power-off, so also results in delay.
In an embodiment, the Vehicular system 108 being traveling on the network of route 102 includes being traveling on the network of track Rail vehicle.Such as, rail vehicle can include one or more electric locomotive or locomotive crew, and it is with one or more non-electrical (e.g., Diesel oil, gasoline etc.) locomotive and/or one or more non-driven rail vehicle, as passenger vehicle and/or lorry are connected.It addition, conduction Path 114 can include electric tracks (such as three or four rail systems) and/or cable messenger.
The electrical energy demands of each Vehicular system 108 on network 100 of advancing represents and is drawn to allow Vehicular system 108 The amount (and being converted to power) of the electric energy advanced along route 102 during stroke.Such as, electric locomotive can require more than 6MW Power or more.In stroke, the electric energy in all moment demands is not fixing, and is traveling in two in same routes 102 Individual different vehicle system 108 is not the amount needing identical electric energy.
The energy requirement of Vehicular system 108 changes, such as the selection of route, vehicle structure, Yi Jiyi according to many factors Dynamic characteristic.The feature of route of energy requirement of impact may include the gradient of route, the flexibility of route, weather condition (as Wind speed and direction), the number of times (the station number as in stroke) stopping and starting, etc..Such as, the vehicle on route 105 it is traveling in System 112 may along many slopes or mountain area advance, and it enters mountain area and is traveling in level land than Vehicular system 109 and needs more electricity Energy.Vehicle structure feature includes the motor-car in Vehicular system 108 and the quantity of non-motor-car and form, the type of goods and quantity (such as coal, passenger, goods etc.), the rate of showing up on Vehicular system 108 or absence rate, the length of Vehicular system 108, motor-car relative to The layout of non-motor-car, etc..Multiple listed features affecting weight, and the distribution of weight of Vehicular system.Generally, vehicle system System 108 also can increase along with the increase of weight, the demand of electric energy.Mobility includes speed and the acceleration of Vehicular system 108 Degree, actively provides the quantity of the electric motor car of power, and the use of regenerative braking and/or alternative energy source (e.g., diesel vehicle, the sun Cell panel, etc.) substitute the electric flux that electrical network needs.Generally, Vehicular system 108 is the fastest in speed, the situation that acceleration is the biggest During lower operation, and need more electrical energy demands when using more electric motor car, although regenerative braking and/or alternative energy source can subtract Few electrical energy demands.
Network 100 can farther include network planner system 120.Network planner system 120 can not be in vehicle system On system 108, as in dispatching station.In an alternative embodiment, network planner system 120 can a vehicle system in the network 100 On system 108.Network planner system 120 includes communication system 122.Communication system 122 can include for be traveling in network 100 On Vehicular system 108 carry out the antenna of radio communication.In an embodiment, network planner system 120 can be configured to monitoring net The energy requirement of the Vehicular system 108 on network 100.It addition, network planner system 120 can be configured to control on network 100 The energy requirement of Vehicular system 108 draws over electrical network ability preventing electric motor car.
Fig. 2 illustrates electric drive vehicle 200 according to embodiments of the present invention.Electric drive vehicle 200 is also known as electricity herein Motor-car 200, it can be a part for Vehicular system 108, as shown in Figure 1.Electric motor car 200 is advanced along route 202.Although individually Illustrate, but electric motor car 200 can be connected to before or after other power car and/or non-powered car to limit Vehicular system 108.Electric motor car 200 can be configured to attract electric energy with to electric motor car 200 or many from conductive path 204 along route 202 Individual load supplying, thus provide pull strength to promote other vehicle in vehicle 200 and same vehicle system.Electric motor car 200 wraps Including driving subsystem 224, it includes for driving the one or more motors providing pull strength.Conductive path 204 can be with conductive path Footpath 114 similar (as shown in Figure 1).As in figure 2 it is shown, conductive path 204 can be known in the art three track or four Rail system.Selectively, conductive path 204 can be as cable messenger on electronic 200 and/or on its side.
Electric motor car 200 can include that locator element 206 is to determine the position of electric motor car 200.Locator element 206 can be GPS sensor, or include such as GPS sensor, video determines, line unit, and radio frequency automatic shooting is standby identifies (RF AEI) label Deng sensing system.The wireless communication system 208 provided allows to lead between train and/or remote location such as dispatching station Letter.Wireless communication system 208 can include that transceiver (not shown), antenna 210, with relevant circuit are to allow off-board communication Transmission and reception.Communication can include the information about travel plans and website.Electric motor car 200 may also include routing characteristics's element 212 to provide the information about route, including the gradient, height above sea level and flexibility information.Routing characteristics's element 212 can include vehicle-mounted Route database 214.Data base 214 stores the information about the route advanced before, the information of the current route carried out, with And the information of the route in the future of plan, including the selection sent by different routes.It addition, sensor 216 may be mounted to that electricity Draw from the present energy on electrical network with detection vehicle 200 on motor-car 200.It addition, sensor 216 can detect Vehicular system The weight of 108 (as shown in Figure 1), the air throttle of electric motor car 200 adjusts, the speed of vehicle 200, and the power of electric motor car 200, Etc..
In an embodiment, electric motor car 200 includes stroke planner system 218.The trip planner system 218 configures accepted theory Bright each input signal about current and/or plan stroke, and generate stroke plan.Stroke plan may indicate that or determine Each pull strength of different electric motor cars 200 in Vehicular system and/or brake force are used for the different piece of the stroke of Vehicular system Or difference parts.Such as, in distribution power Vehicular system, stroke plan may be included in the various piece of stroke for vehicle system The different air throttle guiding vehicle and remote vehicle of system adjusts and/or braking adjusts.Such as, generate stroke plan can subtract Few energy expenditure (electric energy as drawn from electrical network) and set up desired journey time, simultaneously hard by safety and regulation restriction Hold.Stroke plan also results in vehicle 200 and consumes less fuel/generate less discharge, compared to the identical time (or In the buffering of relatively small number of time of same time period, such as one of the percentage of whole journey time, 3 percent, 5 percent, Or other relatively small number of percentage ratio) march to the same vehicle of identical destination along same routes, but with the speed limit of route (as Path velocity) advance for.
Stroke plan is based on trip profile, and it includes relating to following information, electric motor car 200, Vehicular system, road Line, the geographic basis extended including route, and each target in stroke, the energy such as time restriction and restriction draws/disappears Consumption.The information of trip profile can pass through locator element 206, routing characteristics's element 212, route database 214, and/or sensing Device 216 is collected.Other information can be collected by external source, in the different electric motor cars in identical or different Vehicular system Sensor, and the message transmitted from sending point and/or line unit.
Trip profile can based on or include, vehicle data, route data, run-length data, and/or update vehicle data, Route data, and/or run-length data.Vehicle data includes the goods loaded on the information about electric motor car 200 and/or Vehicular system The information of thing.Such as, vehicle data can represent particulars of goods (as about transported goods information) and/or information of vehicles (as Model quantity, fuel efficiency, maker, power, etc. about electric motor car and/or other power car and non-dynamic in Vehicular system Power car).Route data includes the information of the route currently advanced about Vehicular system and/or advance in the future.Such as, route number According to the information of the position that can include about the destroyed part of route, it is being repaired or is building, the flexibility of route and/or slope Degree, the gps coordinate of route, etc..Run-length data includes the information of the stroke that Vehicular system i.e. will start.Based on from starting point to The stroke that terminal selects, run-length data can such as be included in starting station that stroke starts and/or in the terminus that stroke terminates Site information, restricted information (as the working region determined and/or route are repaired), and/or operation/mobile message is (as each is gathered around Speed/the throttle limit in stifled region, slow order, working region, etc.).
In an alternative embodiment, stroke planner system 218 can not be positioned in electric motor car 200, as in starting point. In the case of this selection, from sensor 216, locator element 206, routing characteristics's element 212, route database 214 etc. Deng the input information about trip profile, off-board stroke planner system can be sent to by wireless communication system 208, its Described in information be interpreted to generate stroke plan, be transferred back to electric motor car 200 the most again.
Stroke planner system 218 farther includes processor 220, and it operationally receives trip profile information.Generally, In various embodiments, processor 220 can include processing circuit, such as one or more fields programmable gate array (FPGA), spy Determine application integrated circuit (ASIC), or microprocessor.Processor 220 can be configured to perform one or more in various embodiments Algorithm is to implement described function.One or more algorithms can include the aspect of described embodiment, or retouches the most in detail State, or the step as method describes in detail.Such as, processor 220 can perform algorithm to explain the information received and to calculate Stroke plan.Stroke plan can be based upon the model of the vehicle behavior that electric motor car 200 is advanced along route and set up, and simplifies according to it The scheme of nonlinear difference equation that obtains of the physical model of hypothesis.In an embodiment, stroke planner system 218 includes Software application optimizes software application such as the stroke provided by General Electric, controls the electric motor car in Vehicular system in stroke The driving operation of 200.
Electric motor car 200 can farther include controller component 222.Controller 222 is configured to control electric motor car 200 by it Stroke counter paddle into.Controller component 222 can be preferably the integrated component of stroke planner system 218, as shown in Figure 2. In an embodiment, controller 222 makes vehicle automatically operate decision.Such as, controller 222 is based on the behaviour specified by stroke plan Making adjustments generation control signal, it communicates with one or more driving subsystems 224 of the electric motor car 200 of Vehicular system, So that the operation regulation of stroke plan is followed in electric motor car 200 automatically.Selectively, or additionally, control signal can be with one Or the vehicle-mounted outut device of multiple electric motor car 200 communicates, wherein outut device is configured to notify appointed operation regulation The operator of one or more vehicles 200.Then, operator can manually perform the operation regulation specified to follow stroke counter Draw.
In an embodiment, stroke plan includes energy application plan.Electric motor car 200 edge is described in energy application plan in detail The electric energy of route traveling demand.Energy application plan can be the extension of stroke plan.Such as, when stroke plan is based on stroke letter The result instruction controller 222 determined in Dang and/or operator, during as selected what route and/or what speed to advance, energy Application plan calculates electric motor car 200 and performs the electricity that stroke plan will need from electrical network in Vehicular system.Such as stroke counter Standardized sample, energy application plan is generated by processor 220 in stroke planner system 218, as by using in software Algorithm.Also sample as standardized in stroke counter, energy application plan is that a kind of calculating to planned routes is estimated, because many variablees can shadow Ring the actual energy drawn from electrical network in stroke.
Fig. 3 is the network planner system 300 according to embodiment.Network planner system 300 can be the net shown in Fig. 1 Network planner system 120.Network planner system 300 includes communication system 302.Communication system 302 can include that transceiver (does not shows Go out), antenna 304, and interlock circuit, it allows communication to be sent to the Vehicular system advanced in network 100 (shown in Fig. 1) Electric motor car on 108 (shown in Fig. 1) or receive from it communication.Communication can use radio communication, WI-FI, microwave signal etc. Etc. being wirelessly transferred.Preferably, wired connection, as broadband network (WAN) can be used, it addition, or as an alternative, can use Radio communication by antenna 304.In an embodiment, wireless communication system 302 is configured to receive the car in automatic network 100 The stroke plan of system 108, including energy application plan.Such as, the stroke plan of once electric motor car 200 (as shown in Figure 2) Device system 218 (as shown in Figure 2) calculates the stroke plan of the following stroke of plan, and stroke plan is by from communication system 208 (as shown in Figure 2) by communication system 302 communication to network planner system 300.Preferably, communication system 302 can be used for Communicate with off-board position, as remotely sent position, the website in line unit, and/or each network 100.It addition, it is logical Communication system 302 can allow network planner system 300 remotely with the network of adjacent paths or the net of the sub-network of adjacent paths Network planner system communicates.
Network planner system 300 also includes power network monitoring equipment 306.Power network monitoring equipment 306 is configured to monitoring at electricity The available quantity of the upper electric energy of net 118 (shown in Fig. 1).Power network monitoring equipment 306 can include that sensor and/or other device are real to detect Voltage time on the basis of and/or electric current.Such as, such as circuit tester, transformator, the device that current transformer etc. is similar to can be used for detecting electrical network 118 operational circumstances.Power network monitoring equipment 306 can detect electrical network ability in real time, and such network planner system 300 can follow the trail of electricity The available quantity of electric energy on net 118, it is that Vehicular system 108 is traveling on network 100 (the most as shown in Figure 1) electricity needed, and Do not result in overdraw.Selectively, or additionally, power network monitoring equipment 306 can receive from power supply about current electrical network The real-time update of ability measurement, electric energy is supplied to electrical network 118 by this power supply, and such as power supply 116 (shown in Fig. 1), or other is persistently supervised Survey the power supply of electrical network 118.Power network monitoring equipment 306 records renewal or the record of available electrical energy, such as daily record, estimates in the future to determine The available quantity of electric energy.Such as, if the available quantity of electric energy adds and subtracts 2MW at the noon of one week every day at 30MW on electrical network, such Two day noon, the anticipated available quantity of electric energy was expected to be at least 28MW.
Preferably, the available quantity of monitoring electric energy includes the available quantity monitoring the electric energy of the specific part of electrical network, can be instead Or other, monitor whole electrical network.The movement that the electric motor car advanced in the sub-network of route is driven by the part of electrical network is subject to Control, so that electrical energy demands is not over the available quantity of the electric energy in this part.Preferably, power network monitoring equipment 306 can The record of electrical network 118 operational circumstances that is that storage is measured and/or that receive is in internal memory (not shown) and/or network planner system In the memorizer 308 of system 300.Memorizer 308 can be hard disk, server, CD, DVD, flash memory (such as USB flash memory), floppy disk, with Machine memorizer (RAM), read only memory (ROM), etc..Preferably, network planner system 300 can store data and deposits in outside On storage equipment (not shown), it addition, or alternately, memorizer 308.
Network planner system 300 farther includes energy requirement monitoring device 310.Energy requirement monitoring device 310 is joined It is set to monitor the energy requirement of the Vehicular system 108 (the most as shown in Figure 1) on network 100.In an embodiment, by analyzing from net The energy application plan that the electric motor car 200 (as shown in Figure 2) of the Vehicular system 108 on network 100 receives, energy requirement monitoring sets Standby 310 monitoring energy requirements,.Such as, the energy application plan received by communication system 302, as the one of stroke plan Part or the extension as single stroke plan, be sent to energy requirement monitoring device 310.Energy requirement monitoring device 310 can configure pairing energy application plan sues for peace or amounts to, thus calculates special time and/or time period at network 100 On electrical energy demands.Used herein, electrical energy demands can relate to the electrical energy demands of the single motor car on network and/or multiple electricity The accumulation electrical energy demands of motor-car.Cumlative energy requirement representation special time Vehicular system 108 advance on network 100 from Total electric energy of the needs of electrical network.
Because energy application plan can calculate before being traveling in the stroke of plan, by ask energy application plan and meter The energy requirement calculated can represent at the energy requirement that specific future time is anticipated.Such as, in time X, energy requirement monitoring device 310 can have energy application plan describes in detail for anticipated between time X+1 and X+10 of single Vehicular system 108 Energy expenditure.Accordingly, it is capable to demand monitoring device 310 can be configured to calculate the anticipated energy requirement at time X+5, example As, the calculated single energy requirement of energy requirement received at time X+5 by summation.Further, in scope X+1 With the anticipated energy requirement between X+10 can be calculated and preferably relative to temporal mapping.Then anticipated energy requirement with In the same time or comparing through the electrical network ability that identical time range is predetermined mutually, exceeding electrical network ability to determine whether there is Possibility.
It addition, energy requirement monitoring device 310 can be configured to the vehicle system that monitoring is traveling on network 100 (shown in Fig. 1) The current energy demand of the electric motor car 200 (shown in Fig. 2) in system 108 (shown in Fig. 1).Such as, electric motor car 200 also can send in real time Data are to network planner system 300, and it is collected by sensor 216 (shown in Fig. 2), and detection is at operating time current energy demand And/or the present energy drawn from electrical network.Such as, electric motor car 200 can be configured to periodically to transmit real-time power demand data to Network planner system 300, such as every 10 seconds, per minute, or every 5 minutes.Energy requirement monitoring device 310 can be configured to receive From the current energy demand of all current travelings electric motor car 200 on network 100, and cohersive and integrated data is current to determine Or the electrical energy demands of reality.Actual power demand exceedes electrical network ability and may result in one or more electric motor car 200 and stop, thus leads Send a telegraph motor-car 200 along the potential electronic component of the delay of route 202 (shown in Fig. 2) and/or path of navigation 204 (shown in Fig. 2) Damage.In order to avoid this thing happens, network planner system 300 is configured to control the movement of electric motor car 200 to prevent Cumlative energy demand exceedes the available power on electrical network 118 (shown in Fig. 1), is next described in greater detail.
In an embodiment, energy requirement monitoring device 310 is configured to compare the actual power demand measured a moment With the energy requirement anticipated at synchronization, determine whether anticipated energy requirement based on the energy application plan received It is in the accurate expection that energy uses the most in the future.For example, it is assumed that it is recited above, based on receive at current time X Energy application plan, it is about being expected to that each vehicle 200 (shown in Fig. 2) between future time X+1 and X+10 uses Amount, energy requirement monitoring device 310 can calculate the anticipated energy requirement at concrete future time X+5.The time assumed is single Position can be the second, minute, or hour.After the X+5 time, based on coming autobiography sensor 216 (Fig. 2 institute on single vehicle 200 Show) real time information that receives, energy requirement monitoring device 310 can calculate the actual power demand at time X+5.At time X+ The actual power demand of 5 should be fairly close to the energy requirement estimated in that moment, and such network planner system 300 can Use anticipated energy requirement to make future time on network 100 about the decision of energy expenditure.
Above-mentioned decision can include, such as, if reduces energy expenditure in the future to prevent the energy requirement of accumulation from exceeding electricity Net ability.If the electrical energy demands of reality is substantially greater than or less than expected energy demand, network planner system 300 can be carried out Regulation.It addition, compare the energy requirement of accumulation, energy requirement monitoring device 310 can be configured on the basis of car and car relative to The energy requirement that actual energy demand is relatively estimated, is the most smart to determine whether the energy application plan of one or more electric motor car True and stroke planner system 218 (shown in Fig. 2) needs to adjust.Adjustment can include calibrating one or more sensor 216, meter Calculate one or more stroke planner systems 218 of single energy application plan, and/or determine the energy application plan of accumulation Network planner system 300.
Network planner system 300 farther includes at least one processor 312.Processor 312 processes by network meter Draw the data that each input of device system 300 receives, such as communication system 302 and each and input/output (I/O) equipment 314 Each input being operably connected.Such as, I/O equipment 314 can receive the input from subscriber equipment, such as keyboard, mouse, hands Carry equipment (phone, board, PDA etc.), and/or graphic user interface on the display device.Processor 312 can include or can To be the element of microprocessor, control the function of network planner system 300.Algorithm can run to explain in processor 312 The information and the conduct output that receive provide result.Such as, result can be the output as operational order, itself and electric motor car 200 (shown in Fig. 2) communicate by using communication system 302.It addition, result can be as chart, figure and/or other The instruction of display on the user display of the operator of network planner system 300.Preferably, result is storable in storage In device 308 or be sent to External memory equipment.
In an embodiment, the processor 312 of network planner system 300 is configured to and one or more electric motor cars 200 Stroke planner system 218 (shown in Fig. 2) on (shown in Fig. 2) communicates to control the movement of electric motor car 200, so that The electrical energy demands of electric motor car 200 is less than the available electrical energy on electrical network.On the one hand, the processor 312 of network control system 300 Control the movement of electric motor car 200, can be along stroke once or many by the upper each electric motor car 200 of distribution network 100 (shown in Fig. 1) The secondary electric energy maximum that can consume.The movement of electric motor car 200 can be controlled, because stroke planner system 218 must set Stroke plan, it is not necessary to more than the maximum power of distribution.The maximum power distributing to each electric motor car 200 can be based at electricity The online available power monitored in this moment, this moment is traveling in the quantity of the electric motor car 200 of network 100, and/or passes through network Planner system 300 receives, by the single stroke counter of each vehicle 200 that one or more processors 312 process Draw and energy application plan determines.Determine maximum power, so that consume all electric motor cars specifying maximum power 200 in this moment not over electrical network ability.
Such as, by there is the Vehicular system 108 (shown in Fig. 1) of one or more electric motor car 200 (shown in Fig. 2) at network During the plan of the stroke on 100 (shown in Fig. 1), processor 312 controls communication system 302 and thinks that stroke sends Vehicular system The utilisable energy of 108.Utilisable energy can quantity based on the Vehicular system 108 on network 100 of advancing and/or its energy make Determine with plan.In an embodiment, all Vehicular systems 108 are allocated identical electric flux at synchronization.Therefore, if Electrical network ability is 100MW, and has 25 Vehicular systems 108 to advance on network 100, and each Vehicular system is by the maximum electricity of distribution Energy is not more than 4MW.
Selectively, in a further embodiment, the processor 312 of network planner system 300 dynamically distributes maximum Power consumption, its can stroke plan/energy application plan based on the vehicle 200 received and different.Such as, if Moment X+5, the stroke plan of the first Vehicular system has fortune 10, first vehicle climbing slope of 000 ton of coal, the first vehicle system The electric motor car of system generally will be advanced along smooth or descending than it at moment X+5 or is possibly even the second car in terminal stopping System is needing bigger electric energy mutually in the same time.So, the processor 312 of network planner system 300 dynamically allocates The electric flux that first Vehicular system has is bigger than the amount that the second Vehicular system distributes in the X+5 moment.Therefore, each electricity is distributed to The electric flux of motor-car 200 may be not equal to the amount of all electric motor cars 200 being traveling on network.It addition, the electricity of distribution can base Changing in the time, such as, at time X+10, the second Vehicular system may be allocated the electric flux bigger than the first Vehicular system. Therefore, by monitoring stroke plan and energy application plan, network planner system 300 can provide the electric flux of distribution to vehicle 200, it is adapted to the specific travel conditions of vehicle 200.
In an embodiment, the electric motor car advanced on network 100 can pass through network meter at the electricity that the concrete time distributes The processor 312 drawing device system 300 proposes in the works in network energy consumption.Network energy consumption plan can provide above-mentioned dividing Join energy information.Such as, energy expenditure plan can consume parameter with single electric motor car 200 AC energy on network 100, To be assigned to each vehicle 200 of the maximum electricity of each vehicle 200 (such as vehicle at each time announcement during stroke Controller or operator).Preferably, network energy consumption plan may also include the whole time period about the letter estimating electrical network ability Breath, and at this anticipated energy requirement of time period vehicle 200.The processor 312 of network planner system 300 can be configured to Display network energy consumption plan is form or each chart and figure to the user near network planner system 300 or passes through Network (such as the Internet) is supplied to long-distance user.Because network planner system 300 can be configured to receive the reality of monitoring information Shi Gengxin, network energy consumption plan may be additionally configured to automatically update constantly or periodically to show up-to-date as about net The information of network capacity and actual energy requirement.
In an embodiment, new electric motor car 200, by the stroke being traveling in network 100, is handed over network planner system 300 Flow these contents, and processor 312 controls communication system 302 responsively to transmit the energy of stroke distribution.The energy of stroke distribution Amount can be deducted known to accumulation electronic in the stroke of network 100 of identical time by the available electrical energy on electrical network The energy requirement of car 200 and determine.Such as, it is not provided that enough energy are to new electricity by this electric flux determining distribution Motor-car 200 with meet its at stroke trip objective the most substantially, processor 312 may recalculate the electric flux of distribution to All vehicles 200, to reduce the energy requirement of accumulation to adapt to the additional new electric motor car 200 that will advance on network 100. The distribution replanned can consume record in the works at the network energy updated.Therefore, in an embodiment, network meter in each period Drawing device system 300 and receive one or more new stroke plan, processor 312 can be revised and distribute to other before and be traveling in network The electric flux of the vehicle 200 on 100, to adapt to the electric motor car 200 added, thus prevents electrical energy demands from exceeding electrical network ability.
It addition, the processor 312 of network planner system 300 can be configured to each period, vehicle 200 is made similar Amendment be that the vehicle 200 advanced on network 100 forms stroke to complete its stroke on network and/or each period Pre-planned.Stroke is pre-planned is the stroke plan updated, and it can be based on each condition, if desired for the stroke replanned Or the calculating of mistake, it causes coarse stroke plan and/or energy application plan.Even, processor 312 may amendment car The energy of the distribution of 200, as long as calculated anticipated energy demand exceedes the threshold value available power on electrical network.Such as, Vehicle 200 in the network 100 of currently advancing can receive real-time update and avoid, to limit power consumption, electrical network ability of overdrawing. The various amendments can made network planner system 300 and/or stroke planner system 218 (shown in Fig. 2) are next being entered Row describes in detail.
Fig. 4 is the chart 400 being shown in network power motor-car through energy application plan after a period of time.Electric motor car can To be electric motor car 200 (shown in Fig. 2), and network can be the network 100 (shown in equal Fig. 2) of route 102.Graph making is energy Relative to the time, (e.g., P=E/t, the quantity of power wherein consumed is equal to the face of curve to there is shown the power consumption of vehicle 200 Long-pending).Time shaft is marked with t1, t2, t3Deng, although coordinate is symbolistic, as minute or hour, including minute or hour group (as t2Can be t1After 30 minutes).Energy axes is marked with E1, E2, E3Deng, although coordinate is symbolistic, such as kilojoule or million Jiao, bag Include the group of kilojoule or million Jiao (such as E1Can be 10,000,000 burnt and E2Can be 20,000,000 Jiao).In graph 400, four energy make to use tricks Draw and be plotted as 402,404,406, and 408.The expection energy of each energy application plan express time section uses, and it is used for The single Vehicular system including one or more electric motor car 200 being traveling on network in stroke in during the shown time. Such as, each energy application plan 402-408 can respectively with the Vehicular system 109 shown in Fig. 1, one of 110,111, and 112 phases Corresponding.Energy application plan can be as the part calculating of stroke plan.
As shown in chart 400, energy application plan is not identical, and it is with stroke timetable, vehicle structure, route, Moving characteristic changes at the electric flux of different time needs with similar impact.Such as, at time t1, only by energy The Vehicular system that application plan 402 and 406 represents is actively to need energy from electrical network, and this may represent makes to use tricks by energy The vehicle drawing 404 and 408 expressions does not starts their planned routes.At time t3, energy application plan 402 is anticipated the highest Energy requirement, followed by plans 404, plans 408, is finally plan 406.Energy application plan 402 may than other plan relatively High energy uses, because such as, Vehicular system structure includes that electric motor car 200 tows the load with maximum weight, its requirement Bigger power advances.Such as, energy application plan 402 can be the train of fortune coal, has long more than one mile, and energy makes Can be the rail vehicles for transporting passengers of the passenger car with 15 or less with plan 408.In other embodiments, by plan 402 time Between t3The route allocation of the Vehicular system around represented can have Vehicular system, and it is climbing slope, can explain needs more Big power.It addition, the higher energy requirement of plan 402 can represent that Vehicular system is with higher than other Vehicular system Speed advance, for tighter timetable.Even if along an energy application plan, described energy requirement can enter in time Row regulation.Such as, energy requirement can reduce based on following situation, reduces to relatively low speed, advances (or slope tailing edge along descending Flat road surface) and/or use alternative energy source such as regenerative braking or diesel powered vehicles to replace at least partly needing to drive vehicle The electric energy of system.
In an embodiment, energy application plan communicates with network planner system 300 (shown in Fig. 3), and network meter Draw the processor 312 rendered energy application plan of device system 300 and determine the expected energy demand 410 of Vehicular system on network. Expected energy demand 410 can by collect or energy requirement that each electric motor car of suing for peace is each and calculate, as made to use tricks at energy Described in Huaing.Expected energy demand 410 is plotted on chart 400 and the available quantity 412 of the also electric energy on electrical network.Available Electricity 412 can be detected by the power network monitoring equipment 306 of network planner system 300.If detection on electrical network The available quantity 412 of electric energy is relatively fixed, and it can suitably be drawn by the processor 312 of network planner system 300 will be at figure in the future Keep fixing (such as energy line E in time period shown in 40010).Fig. 4 illustrates the process by network planner system 300 The process step that device 312 is carried out, but chart 400 or similar chart preferably show the behaviour in network planner system 300 To observe on the display of author.
As shown in the chart 400 of Fig. 4, at time t2To t4, and at t6After, it is contemplated that energy requirement 410 exceedes electrical network and powers on The available quantity 412 of energy.If the electric motor car on network actual draws these power levels in these moment, exist for electrical network of overdrawing Danger, underpower and/or vehicle can be caused to stop.
Fig. 5 is according to the expression energy application plan 402408 of network power motor-car within a period of time shown in embodiment Chart 500.Chart 500 illustrates that the energy application plan 402408 identical with chart 400 and anticipated energy use 410.? In embodiment, the available quantity 502 of the electric energy on electrical network is not fixed value, and is fluctuation in time.Such as, the energy does not produces Raw fixing is supplied to electrical network with identical electric energy.In other embodiments, electrical network is not the network lattice closed, and it only supplies electric energy To the electric motor car on network.Electric energy on electrical network can be used for driving other to load, such as domestic, commercial and industrial, etc., separately At All Other Times, driving electric motor car and other load can the more electric energy of demand for external special time ratio.Such as, on electrical network The available quantity 502 of electric energy can use the time to reduce at the peak energy of every day, then uses the time to increase in off peak.Cause This, as shown in chart 500, the available quantity 502 of electric energy can in time process at E10Fluctuate up and down.Therefore, with the chart of Fig. 4 400 compare, and the expected energy in chart 500 uses quickly (as at t2Exceed the available quantity 502 of electric energy before), but time Between t5And t6There is also more electric energy available quantity.
Fig. 6 is the chart 600 of the energy application plan 402-408 illustrating the Fig. 4 according to embodiment amendment.Referring again to Fig. 4, From time t2To t4, and at t6After, it is contemplated that energy requirement 410 exceedes the available electrical energy 412 on electrical network, and it may overdraw electrical network Ability.Correspondingly, the processor 312 of network planner system 300 (shown in Fig. 3) can be configured to revise one or more traveling The energy application plan of the electric motor car on network, to reduce anticipated electrical energy demands under available electrical energy threshold value 412.Pass through At least one route that change selects, the timetable of stroke, vehicle structure, and moving characteristic, network planner system 300 Processor 312 can revise the energy application plan of planned routes.It should be noted that, listed stroke characteristic is typically described in Stroke is in the works.Accordingly, it is capable to application plan can be modified by amendment stroke plan, affect the energy in stroke and use Mode.
Such as, in figure 6 by changing the timetable amendment energy application plan 408 of stroke.More specifically, replace time Between t2Starting stroke, stroke is moved forwardly at t0Start, and terminal is at t earlier4Rather than t6.When setting out except changing Between, the profile of energy application plan 408 is not revised, it is meant that during stroke, energy uses and keeps identical.By plan 408 The reason changing stroke initial time represented is to utilize time t0And t2Between the utilisable energy not used on electrical network (region as under curve 412 and on curve 410), as shown in the chart 400 of Fig. 4, reduces time t simultaneously3Around The electric energy that will use.
Energy application plan 402 is revised in the chart 600 of Fig. 6.The energy application plan of amendment in chart 600 402 from time t0To t4Need the less electric energy from electrical network, the original plan 402 shown in chart 400 compared to Fig. 4. Reduce electrical energy demands can be accomplished in several ways.Such as, at time t0And t1, electric motor car can use according to the energy of amendment Plan 402, uses less energy to advance with relatively low speed.Selectively, or other, and vehicle structure can also be repaiied Changing, Vehicular system uses the electric motor car of less or bigger fuel efficiency, and the quantity of wagon box and type can change to reduce weight Amount, and/or vehicle layout can be revised, as changed the spacing of electric motor car relative to other vehicle.At t1, in order to accelerate or tiltedly Keeping identical speed on slope, and do not increase electrical energy demands, such as, the plan 402 of amendment may need less electric energy, by depending on Rely other power supply.One possible power supply can drive the one or more diesel powered vehicles in Vehicular system to provide and lead Gravitation, to replace the energy requirement of some or all of electric motor car.Therefore, at time t1And t3, such as, Vehicular system can actual disappear Consuming identical or more net energy to meet operational requirements, although by the use of other energy, electrical energy demands can greatly subtract Few.Other alternative energy source can be the electric energy using storage, such as the electric energy generated by regenerative braking, and is stored in Vehicular system In electrical energy storage in electric energy.Use alternative energy source can reduce expected energy demand 410 to meet power demand.
In the chart 600 of Fig. 6, energy application plan 404 is the most modified, although former to shown in the chart 400 of Fig. 4 The change of the plan 404 come is little.Such as from time t3To time t6, ratio the original plan 404, the plan 404 of amendment is anticipated more Big electrical energy demands, but at time t6After, need less energy at once.Use the plan 404 of amendment, in the whole time period The electric energy that (being expressed as the region under chart 600 upper curve 404) needs can keep being relatively fixed, but in the earlier executed of stroke More work (if desired for more energy), the Vehicular system performing energy application plan 404 will be at time t6Rear use is relatively Few energy, its position on chart 400, energy requirement 410 exceedes utilisable energy 412.Rearrange along stroke One method of live load can be to change route, as by using different routes to come from starting point to destination.Such as, The plan 404 of amendment may indicate that Vehicular system is advanced along the route in hillside and/or mountain area at the first the half of stroke, but along stroke The second half generally cruise descending, and it needs the electric energy more less than different routes.
Energy application plan 406 is not revised with the original plan 406 shown in the chart 400 of Fig. 4 in chart 600. As discussed, the processor 312 of network planner system 300 (shown in Fig. 3) can revise one or more energy application plan, but not The institute needing amendment traveling all vehicles in a network is planned, if the expected energy demand 410 that the plan of amendment produces Less than representing the threshold value of utilisable energy 412 on electricity electrical network.The expected energy demand 410 updated, when it is by being summarised in each Each electrical energy demands of phase and calculate, shown in chart 600.In the above-mentioned time period, the expected energy demand 410 of renewal is can Under energy 412.Therefore, if the Vehicular system being traveling on network performs the energy application plan 402-408 of amendment, will Do not have the danger of overdraw electricity electrical network.
Fig. 7 is the chart 700 of the energy application plan 402408 illustrating the Fig. 5 according to embodiment amendment.Chart 700 illustrates The energy application plan 402-408 of amendment, its amendment is to prevent the energy requirement 410 estimated from exceeding the available quantity of electric energy on electrical network 502, it is fluctuation in whole period.Because the available quantity of electric energy 502 fluctuates, network planner system 300 (shown in Fig. 3) can It is configured to monitor the electrical network ability in the time period, in order to calculate rational anticipated available quantity 502 within the following time period, as Time period shown in Fig. 7.The available quantity 502 of the electric energy in electrical network ability may be at similar to yesterday in time mode ripple every day Dynamic, if the peak energy use time was at the special time of a day.Such as, network planner system 300 can be monitored current every day Or the electrical network ability of reality, and if energy available quantity 502 same way every day fluctuate in certain percentage error, then Network planner system 300 may be made at time in the future section, reasonably pre-in the percentage error calculated of degree of accuracy Meter available quantity 502.Such as, if the available electrical energy 502 with record of monitoring fluctuates every day in the same manner in 10MW, this Sample network planner system 300 can be configured to prevent the expected energy demand of Vehicular system on network from existing in any one period On electrical network within the scope of the 10MW of the anticipated available quantity 502 of electric energy.
The expected energy demand 410 shown in chart 700 of Fig. 7 and the expected energy demand 410 shown in chart 600 of Fig. 6 Similar, both of which is the result of amendment energy application plan.But, in table figur 7, energy application plan 404 is at time t3And t4 Between need less electric energy, and plan 402 at time t4And t5Between need less electric energy to prevent in these phases time Between expected energy demand 410 exceed the electric energy available quantity 502 of reduction.It addition, at time t5And t7Between, plan 404 and 402 equal Can include instructing the more electric energy of needs, each plan in chart 600 is for the electric energy utilized in this time period on electrical network Extra available quantity 502.At time t5And t7Between the region reflection of increase under the curve of expected energy demand 410 repair The plan 404 and 402 changed.
When energy application plan revised by the processor 312 of network planner system 300 (shown in Fig. 3), the energy of amendment Application plan and/or relevant stroke plan are likely to be formed network energy consumption plan.Network energy consumption plan describes in detail The electrical energy demands of electric motor car in a network of advancing, and prevent the electrical energy demands of accumulation from exceeding may the electricity of overdraw electrical network ability The available quantity of energy.Processor 312 (shown in Fig. 3) can control communication system 302 (shown in Fig. 3) with the energy application plan by amendment Send back corresponding electric motor car, thus perform the stroke planner system in electric motor car.The energy application plan of amendment can be Communication system 302 in network planner system 300 and the communication system 208 in independent electric motor car 200 (the most as shown in Figure 2) Between carry out radio communication.The energy application plan of amendment can include the stroke plan of whole amendment, and it describes stroke in detail Instruction, such as route, time, operational circumstances etc..Upon receipt of the energy application plan of amendment, electric motor car 200 can be configured to certainly Perform trip order dynamicly, or by the interference of operator.
Concrete performance characteristic, described operation are described in the energy application plan of above-mentioned energy application plan and amendment in detail Feature anticipated energy ecology based on other electric motor car being traveling on network and anticipated electrical energy demands are in future Stroke performs.In some cases, the processor 312 of network planner system 300 such as can not be repaiied due to time restriction Change each energy application plan.Selectively, the processor 312 of network planner system 300 can be configured to transmit instruction with limit The power consumption of electric motor car processed, and it is not described in detail ensuing corresponding plan.Such as, this instruction can be traveling in network On each electric motor car communicate, in the maximum of electric motor car that one or more concrete periods may need.Such as, above-mentioned Amount can be distributed based on the quantity of the electrical network ability monitored and network power motor-car in a large number.This instruction preferably can include distribution Electric flux, it is received by the stroke planner system in electric motor car, and stroke planner system can automatically calculate and repair The energy application plan changed, it reduces the stroke in the energy requirement of distribution limits and/or the electric energy of retention period needs.Net Network planner system 300 can send instructions to limit power consumption, such as, when actual power has been underestimated in energy application plan Time, it will be required and require that stroke is replanned, when other Vehicular system has been attached in network, in other vehicle system After system has begun to its stroke, when the data updated represent that electrical energy demands will exceed electrical network ability, etc..
Fig. 8 is the flow chart of an embodiment of the method 800 controlling the electrical energy demands that network is got on the bus.Method 800 can Perform at least partially through shown in Fig. 3 and network planner system 300 as herein described.Shown in method 800 and Fig. 1 The network 100 of route combines and is described.802, the capacity of detection electrical network 118.This electrical network ability can represent at electrical network Electric energy available quantity on 118, its electric motor car passed through in the Vehicular system 108 advanced on network 100 is required.Electrical network ability At least one by the voltage and current on measurement electrical network 118 detects.Preferably, electrical network ability can logical by with power supply Other of letter or tracking network capacity is with reference to communicating and being detected.
804, the energy requirement of the Vehicular system 108 that detection is traveling on electrical network 118.Energy requirement can be to be traveling in Total electric energy that Vehicular system 108 on electrical network 118 needed in one or more moment.Electrical energy demands can be by collecting or suing for peace The electrical energy demands of each electric motor car in Vehicular system 108 and determine.Such as, it is contemplated that electrical energy demands each energy can be utilized to make Determining with plan, its expected energy describing each Vehicular system 108 on the stroke of upper network 100 of advancing in detail uses. Determining it addition, the actual power of demand (as drawn) more can be newly arrived by the reality receiving Vehicular system, it is described in detail The current energy demand of network 118 between vehicle and vehicle.
806, it is determined whether energy requirement exceedes electrical network ability.It is available that the electric flux needed exceedes on electrical network 188 Electric flux can cause the interruption in power in electrical network 118 or interrupt at least partially, and/or cause in Vehicular system 108 electronic Car stops, thus causes postponing, and thus can affect the whole network of Vehicular system 108.Energy requirement can be future time Or the anticipated energy requirement of time period, and electrical network ability can be the anticipated electrical network ability in identical time or time period. If energy requirement exceedes electrical network ability, it is put into the 810 of method 800.
810, revise one or more energy application plan to reduce traveling Vehicular system 108 on network 100 Within maybe the electric flux of needs is maintained it in the level of available quantity of electrical network 118 electric energy.Energy application plan can be passed through The one or more processors 312 being configured to control in the network planner system 300 that electric motor car moves are revised, so that electric The energy requirement of motor-car is less than the available quantity of electric energy on electrical network.Network planner system 300 can send network energy consumption meter Drawing, it is that each energy application plan is revised at least some electric motor car on network 100.The energy application plan of amendment can be with Electric motor car communicates, its stroke up enter while perform energy application plan.The energy application plan of amendment can include The route of amendment, timetable, vehicle structure, operational order, etc., it can form a part for stroke plan.Selectively, or Additionally, revising energy application plan, network energy consumption plan can distribute the electric flux of maximum, and it can be to pass through network Each electric motor car on 100 simultaneously or multiple concrete time the electric flux that needs of interim electrical network 118.The maximum of distribution can be passed The stroke planner system in electric motor car, and electric motor car of giving can revise energy application plan and/or vehicle and vehicle basis Stroke plan, to be maintained in the energy parameter of distribution.After amendment plan, prevent energy requirement from exceeding electrical network ability, method 800 come back to 802 and repetition methods 800.
Refer again to 806, if it is determined that energy requirement be not above electrical network ability, then the 808 of access method 800.? 808, owing to determining the risk being not above electrical network ability, therefore perform energy scheduling.Energy scheduling can be each electric motor car On the energy application plan that determines of stroke planner system and/or the network energy that determined by network planner system 300 Consume plan.Implement plan includes communicating to complete stroke according to up-to-date energy application plan with each electric motor car.Example As, the plan of execution can be the energy application plan of amendment, by network planner system in its circulation before method 800 System 300 is modified.After plan is performed, the process of method 800 be back to 802 and method 800 repeat.
One or more embodiment as herein described can have the energy of each Vehicular system that management is traveling on network The technique effect of the ability consumed.The energy expenditure managing each Vehicular system can allow to increase vehicle number (such as vehicle capacity) And/or the size of Vehicular system is increased based on identical power supply.Being consumed by management energy, the vehicle capacity on network can increase And it is not resulted in increasing the high cost of the energy.
In an embodiment, method (e.g., controlling the energy requirement of the vehicle of multiple generation power on network) includes monitoring It it is the available quantity of the electric energy of one or more load supplying on electrical network simultaneously.The available quantity of electric energy represent can be consumed simultaneously and not Exceed the electric flux of electrical network ability.The method also includes that the electric energy monitoring the multiple electric motor cars on the network being traveling in route needs Asking, it includes one or more along route extension conductive path, and electric energy is sent to electric motor car from electrical network by this route.The method is entered One step includes the movement controlling electric motor car, so that the electrical energy demands of electric motor car is less than the available quantity of electric energy on electrical network.
In one aspect, monitoring electrical energy demands includes the energy application plan monitoring each electric motor car.Energy application plan Describe each electric motor car electrical energy demands along course in detail.Monitoring electrical energy demands also includes by according at future time energy Electrical energy demands is sued for peace by amount application plan, determines the anticipated electrical energy demands at future time.
In one aspect, the movement controlling electric motor car includes replanning based on stroke, and other electric motor car additional is at network Upper traveling, or at least one that anticipated energy requirement is in future time exceedes the available quantity of electric energy make to use tricks to revise energy Draw.The movement of control electric motor car also includes the electric motor car that the energy application plan of amendment is sent to be traveling on network.
In one aspect, energy application plan provides for route selection, timetable, vehicle structure, or moving characteristic The instruction of at least one, performs with the electric motor car by being traveling on network.
In one aspect, control the movement of electric motor car and include distributing the vehicle of the electric motor car entered at network uplink Big electric flux, it passes through each electric motor car from electrical network demand.
In one aspect, based on distributing to the electric energy maximum of each electric motor car, electric motor car generates each electric motor car and advances The energy application plan of route.
In one aspect, the available quantity of monitoring electric energy includes that on monitoring electrical network, the available quantity of electric energy is relative to the change of time Change.
In one aspect, the available quantity of monitoring electric energy includes monitoring available quantity of electric energy on a part of electrical network.By one Dividing electrical network to power, the movement of the electric motor car being traveling in the sub-network of route is controlled so that electrical energy demands is less than this part The available quantity of electric energy.
In one aspect, the movement controlling electric motor car includes generating network energy consumption plan.Network energy consumption plan Distribution energy expenditure parameter gives the electric motor car being traveling on network to prevent electric motor car from exceeding the available quantity of electric energy on electrical network.
In one embodiment, it is provided that network planner system include power network monitoring equipment and one or more processor. Power network monitoring equipment is configured to monitor simultaneously for the available quantity of electric energy on the electrical network of one or more load supplyings.Electric energy can Consumption represents the total amount of electric energy, and it can be consumed simultaneously and be less than electrical network ability.Electrical network is configured to by the net along route One or more conductive paths that network extends transmit electric energy, and multiple electric motor cars are traveling on conductive path for being sent to by electric energy Electric motor car is to power to electric motor car.One or more processors are configured to and the stroke counter in power network monitoring equipment and electric motor car Draw device system and communicate to control the movement of vehicle so that the electrical energy demands of electric motor car less than on electrical network electric energy can Consumption.
In one aspect, one or more processors are configured to generate network energy consumption plan, and it distributes concrete car Maximum power, it can be by each electric motor car demand of being traveling on network to prevent the electrical energy demands of electric motor car from exceeding The available quantity of electric energy on electrical network.
In one aspect, one or more processors are configured to generate network energy consumption plan, and its amendment is traveling in The route of the one or more electric motor cars on network, timetable, at least one in vehicle structure, or moving characteristic, to prevent The electrical energy demands of electric motor car exceedes the available quantity of electric energy on electrical network.
In one aspect, moving characteristic includes speed, acceleration, position, direct of travel, and using regenerative braking is that electrical network carries For electric energy, or in order to temporarily consume the electric energy using alternative energy source rather than drawing from electrical network.
In one aspect, receive route, timetable, the amendment of at least one in vehicle structure, or moving characteristic One or more electric motor cars automatically carry out described amendment.
In one aspect, one or more processors are configured to receive the vehicle from stroke planner system Energy application plan, is generated by stroke planner system, and it describes the concrete car of the route advanced along each electric motor car in detail Energy requirement.
In one aspect, one or more processors are configured to revise one or more electric energy application plan, based on row The stroke entering the one or more electric motor cars on network is replanned, and other electric motor car additional enters at network uplink, or anticipated The energy requirement electric energy that exceedes future time at future time available quantity at least one modify.
In one aspect, one or more processors are configured to receive the stroke planner system from electric motor car, extremely The energy application plan of a few plan route, current energy demand, current operation feature, or the current route of each electric motor car Feature.
In one aspect, the first electric motor car that the instruction of one or more processors is traveling on network entered in the very first time First slope, the second electric motor car being traveling on network enters the second slope in the second time, this second time and very first time Difference, with the energy requirement distributed on electrical network according to the time.
In one aspect, at least one current sum of the electric motor car that the monitoring of energy requirement monitoring device is traveling on network Anticipated energy requirement.
In one aspect, at least one electric motor car is connected the route defining along network with one or more load vehicles The Vehicular system advanced.
In one aspect, one or more processors carry out wireless with the electric motor car being traveling on network by communication system Communication.
In one aspect, electric motor car can be rail vehicle, and route is track.
In one aspect, on electrical network for for one or more load supplyings the available quantity of electric energy make at peak energy Use the time few with the time than in off peak.
In one aspect, the electric flux of each electric motor car being traveling on network is distributed to by one or more processors It is not equal to the electric flux of all electric motor cars.
In one embodiment, it is provided that network planner system, it includes power network monitoring equipment, energy requirement monitoring device, With one or more processors.Power network monitoring equipment is configured to monitor electrical network for one or more load supplyings simultaneously and powers on The available quantity of energy.The available quantity of electric energy represents the total amount of electric energy, and it can be consumed simultaneously and be less than electrical network ability.Electrical energy demands Monitoring device is configured to monitor the electrical energy demands of the multiple electric motor cars on the network being traveling in route, and it includes extending along route One or more conductive paths, it is for sending electric energy to electric motor car to drive electric motor car from electrical network.One or more places Reason device is configured to control the movement of vehicle, so that the electrical energy demands of electric motor car is less than the available quantity of electric energy on electrical network. One or more processors are configured to the energy application plan submitted to by amendment by the electric motor car being traveling on network, or will It is electronic to control that each electric motor car of vehicle sends at least one in electric motor car to the maximum power of electrical network demand The movement of car.
Should be appreciated that description above is illustrative, be not restrictive.Such as, above-described embodiment (and/or its side Face) can be used for be combineding with each other.It addition, teaching according to the inventive subject matter can make adaptive position and the multiple of material is repaiied Change, without departing from its scope.The size of material described herein and type are intended to limit the parameter of present subject matter, and it is not meant to Limit, and be one exemplary embodiment.Book many other embodiments to those skilled in the art are aobvious according to the above description And be clear to.The scope of present subject matter should refer to claims and with its claim limit equivalence whole Scope comes together to limit.In the following claims, the term of use " includes " and " wherein " " comprises " with corresponding term " wherein " there is identical clearly english expression.And, in ensuing claim, use term " first ", " the Two ", and " the 3rd " etc. is used only for labelling, and purport is in representing numeral in its target.And, the restriction of following claim It not to write in the way of device adds function, and be not intended to based on 35U.S.C § 112 the 6th section explanation, unless this claim Limit use after there is no the statement of function of further structure plus " be used for ... device " expression.
The description write uses examples to describe each embodiment of present subject matter, and makes people in the art Member can implement the embodiment of present subject matter, including using and using any equipment or system and perform any relevant side Method.The present invention can patentable scope be defined by claim, and can include expecting according to ordinary skill Other example.These other examples the most within the scope of the claims, if they have is different from the literal table of claim The structural detail reached, or they include equivalence structural detail, its literal expression having with claim does not has substance Difference.Each embodiment is not limited to device shown in the drawings and means.
Because said system and method can be made some to change the spirit and model included without departing from present subject matter Enclose, it is meant that the theme shown in all above-mentioned themes or relevant drawings illustrates the expression of the scope of the invention the most in an illustrative manner And should not constitute the restriction to present subject matter.

Claims (20)

1. for the method controlling electrical energy demands, including:
Monitoring is for simultaneously to the available quantity of electric energy on the electrical network of one or more load supplyings, and the described available quantity of electric energy represents Can be consumed simultaneously and be less than the amount of the electric energy of electrical network ability;
The electrical energy demands of multiple electric motor cars that monitoring is traveling on the network of route, the network of described route includes extending along route One or more conductive paths for described electric energy is sent to described electric motor car from electrical network;And
Control the movement of described electric motor car so that the described electrical energy demands of described electric motor car is less than the institute of electric energy on described electrical network State available quantity.
2. method as claimed in claim 1, wherein monitors described electrical energy demands and includes monitoring the energy application plan of each electric motor car, The electrical energy demands that each electric motor car is advanced along route is described in described energy application plan in detail, and by being summarised in future tense Between determine the expected energy demand at future time from the electrical energy demands of energy application plan.
3. method as claimed in claim 2, the movement wherein controlling electric motor car includes replanning based on stroke, adds other electronic Car enters at network uplink, or at least one that anticipated energy requirement is in future time exceedes the available quantity of electric energy is to revise energy Amount application plan;And the energy application plan of amendment is sent to the electric motor car being traveling on network.
4. method as claimed in claim 2, wherein, energy application plan provides and is used for route selection, timetable, vehicle structure, or The instruction of at least one of moving characteristic, to be performed by the electric motor car being traveling on network.
5. method as claimed in claim 1, the movement wherein controlling electric motor car includes each electric motor car to the vehicle of electrical network demand Specific maximum power distributes to the electric motor car entered at network uplink.
6. method as claimed in claim 5, wherein based on distributing to the maximum power of each electric motor car, electric motor car generates each electricity The energy application plan of motor-car course.
7. method as claimed in claim 1, wherein monitor the available quantity of electric energy include monitoring on electrical network the available quantity of electric energy relative to The change of time.
8. method as claimed in claim 1, wherein monitors the available quantity of electric energy and includes monitoring electric energy available on a part of electrical network Amount, and control the movement of electric motor car in the sub-network being traveling in route powered by this part electrical network so that electrical energy demands is not Exceed the available quantity of electric energy in this part.
9. method as claimed in claim 1, the movement wherein controlling electric motor car includes creating network energy consumption plan, network energy The electric motor car that energy expenditure parameter is distributed to be traveling on network by consumption plan is to prevent electric motor car from exceeding electric energy on electrical network Available quantity.
10. a network planner system, including:
Power network monitoring equipment, it is configured to monitor the available of on electrical network to one or more load supplyings simultaneously electric energy Amount, the described available quantity of electric energy represent can be consumed simultaneously and less than the amount of electric energy of electrical network ability;Described electrical network is configured to Electric energy is transmitted for passing by one or more conductive paths of the Network stretch of the route traveled over along multiple electric motor cars Giving electric motor car to power electric motor car, electric motor car has vehicle-mounted stroke planner system;And
One or more processors, it is configured to communicate with the stroke planner system in power network monitoring equipment and electric motor car To control the movement of electric motor car so that the electrical energy demands of electric motor car is less than the available quantity of electric energy on electrical network.
11. network planner systems as claimed in claim 10, wherein one or more processors are configured to create network energy Amount consumes plan, its distribution can the specific maximum power of vehicle of each electric motor car demand by being traveling on network, with The electrical energy demands preventing electric motor car exceedes the available quantity of electric energy on electrical network.
12. network planner systems as claimed in claim 10, wherein one or more processors are configured to create network energy Amount consumes plan, the route of one or more electric motor cars that its amendment is traveling on network, timetable, vehicle structure, or mobile At least one in feature, to prevent the electrical energy demands of electric motor car from exceeding the available quantity of electric energy on electrical network.
13. network planner systems as claimed in claim 12, at least one during wherein moving characteristic includes as follows: speed Degree, acceleration, position, direct of travel, use regenerative braking to provide electric energy for electrical network, or in order to consume use alternative energy source immediately Rather than draw electric energy from electrical network.
14. network planner systems as claimed in claim 12, wherein receive route, timetable, vehicle structure, or move One or more electric motor cars of the amendment of at least one in feature automatically carry out described amendment.
15. network planner systems as claimed in claim 10, wherein one or more processors are configured to reception to be come voluntarily Journey planner system by the vehicle specific energy application plan of stroke planner system creation, its describe in detail each electricity The specific energy requirement of vehicle that motor-car is advanced along route.
16. network planner systems as claimed in claim 15, wherein one or more processors are configured to based on being traveling in The stroke of the one or more electric motor cars on network is replanned, and other electric motor car additional enters at network uplink, or anticipated electricity The energy requirement of motor-car future time exceed at least one in the available quantity of the electric energy of future time revise one or Multiple energy application plans.
17. network planner systems as claimed in claim 10, wherein one or more processors are configured to receive from electricity The energy application plan of at least one plan route of stroke planner system on motor-car, for the proposition of each electric motor car Route, current energy demand, current operation feature, or current route feature.
18. network planner systems as claimed in claim 10, wherein electric motor car is rail vehicle, and route is track.
19. network planner systems as claimed in claim 10, wherein for one or more load supplyings on electrical network The available quantity of electric energy is fewer than during the non-peak energy use time during the peak energy use time.
20. 1 kinds of network planner systems, including:
Power network monitoring equipment, it is configured to monitor simultaneously for the available quantity of electric energy on the electrical network of one or more load supplyings, electricity Can available quantity represent can be consumed simultaneously and less than the amount of electric energy of electrical network ability;
Energy requirement monitoring device, its electrical energy demands being configured to monitor the multiple electric motor cars on the network being traveling in route, should The network of route includes one or more conductive path extended along route, for electric energy is sent to electric motor car with right from electrical network Electric motor car is powered;And
One or more processors, its movement being configured to control electric motor car so that the electrical energy demands of electric motor car is less than electrical network The available quantity of upper electric energy, wherein, one or more processors are configured through revising and are submitted to by the electric motor car being traveling on network Energy application plan, and/or send each electric motor car to electric motor car to the specific maximum power of vehicle of electrical network demand Control the movement of electric motor car.
CN201410363730.8A 2013-05-06 2014-05-06 For controlling the method and system of the energy requirement that network is got on the bus Active CN104149643B (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201361819823P 2013-05-06 2013-05-06
US61/819823 2013-05-06
US14/148,833 US8948940B2 (en) 2013-05-06 2014-01-07 Method and system for controlling energy demand of vehicles on a network
US14/148833 2014-01-07

Publications (2)

Publication Number Publication Date
CN104149643A CN104149643A (en) 2014-11-19
CN104149643B true CN104149643B (en) 2017-01-04

Family

ID=

Similar Documents

Publication Publication Date Title
AU2014202460B2 (en) Method and system for controlling energy demand of vehicles on a network
US11820246B2 (en) Charge control system for mobile energy storage fleet
Wang et al. Integration of plug-in hybrid electric vehicles into energy and comfort management for smart building
CN104125902B (en) System and method for the fuel optimization in hybrid vehicle
CN105216782A (en) Based on the plug-in hybrid-power automobile energy management method of energy predicting
US11719602B2 (en) Vehicle control system
DE102015113701A1 (en) Route-to-empty calculation based on route for a vehicle
CN102589562A (en) Navigation system and method of using vehicle state information for route modeling
Feng et al. A review study on traction energy saving of rail transport
CN103562037B (en) Motor vehicle driven by mixed power and for the method for equipment for charging the battery in operating hybrid vehicle
KR102432480B1 (en) Method and system for navigation of electric transport device based on power guide of energy storage charging pile
US9771001B2 (en) Hybrid electrically powered transportation system utilizing renewable energy stored in supercapacitors
WO2022014155A1 (en) Moving charging system achieved by transporting secondary battery
Ghaviha et al. Speed profile optimization of an electric train with on-board energy storage and continuous tractive effort
Ko et al. Efficient design of an operation profile for wireless charging electric tram systems
CN116324639A (en) Monitoring and predicting method and device for traction power supply system of rail transit
Guo et al. Techno-economic assessment of wireless charging systems for airport electric shuttle buses
CN112232579A (en) Electric power material allocation method based on ant colony algorithm
CN104149643B (en) For controlling the method and system of the energy requirement that network is got on the bus
Du et al. Optimal deployment of dynamic wireless charging lanes for electric vehicles considering the battery charging rate
Pei et al. A multi-objective optimal sizing scheme for hybrid traction power supply systems onboard shunting locomotive
Hederić et al. Modeling of a serial hybrid powertrain for busses in the city of Osijek, Croatia
CN118036987A (en) Hybrid mining card low-energy-consumption scheduling method based on WPT technology
Zhang et al. Route planning algorithm based on dynamic programming for electric vehicles delivering electric power to a region isolated from power grid
Järventausta et al. Development principles of Pirkkala airport environment as microgrid solution

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant