CN104134975B - 基于定值启动的继电仿真保护实现方法及装置 - Google Patents
基于定值启动的继电仿真保护实现方法及装置 Download PDFInfo
- Publication number
- CN104134975B CN104134975B CN201410267214.5A CN201410267214A CN104134975B CN 104134975 B CN104134975 B CN 104134975B CN 201410267214 A CN201410267214 A CN 201410267214A CN 104134975 B CN104134975 B CN 104134975B
- Authority
- CN
- China
- Prior art keywords
- protection
- value
- fault
- failure
- load flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410267214.5A CN104134975B (zh) | 2014-06-16 | 2014-06-16 | 基于定值启动的继电仿真保护实现方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410267214.5A CN104134975B (zh) | 2014-06-16 | 2014-06-16 | 基于定值启动的继电仿真保护实现方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104134975A CN104134975A (zh) | 2014-11-05 |
CN104134975B true CN104134975B (zh) | 2017-11-10 |
Family
ID=51807551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410267214.5A Active CN104134975B (zh) | 2014-06-16 | 2014-06-16 | 基于定值启动的继电仿真保护实现方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104134975B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108683163A (zh) * | 2018-06-19 | 2018-10-19 | 华润新能源(阳江)风能有限公司 | 线路保护装置校验方法及校验装置 |
EP3828655B1 (de) * | 2019-11-28 | 2022-05-18 | Siemens Aktiengesellschaft | Verfahren und vorrichtung zur fehlerursachenbestimmung eines fehlers in einer elektrischen schaltung |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103809460A (zh) * | 2012-11-14 | 2014-05-21 | 国家电网公司 | 监控中心的仿真方法、装置及系统 |
-
2014
- 2014-06-16 CN CN201410267214.5A patent/CN104134975B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103809460A (zh) * | 2012-11-14 | 2014-05-21 | 国家电网公司 | 监控中心的仿真方法、装置及系统 |
Non-Patent Citations (2)
Title |
---|
农村配电网建模及复杂操作任务仿真;罗兴春等;《农村电气化》;20130630(第6期);第43-44页 * |
含分布式电源的配电网故障分析叠加法;王守相等;《电力系统自动化》;20080310;第32卷(第5期);第38-42页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104134975A (zh) | 2014-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101425681B (zh) | 电网系统继电保护在线校核方法 | |
Liu et al. | Mechanical DC circuit breaker model for real time simulations | |
El-Naily et al. | Novel approach for optimum coordination of overcurrent relays to enhance microgrid earth fault protection scheme | |
CN104463707B (zh) | 一种基于故障录波的保护动作信息分析方法 | |
CN105445585B (zh) | 电网一次回路的故障诊断方法和系统 | |
CN110399671A (zh) | 电网的继电保护装置的整定计算方法、装置及终端 | |
Liu et al. | An intelligent coordinated protection and control strategy for distribution network with wind generation integration | |
CN102386616A (zh) | 一种继电保护配合关系仿真校核方法 | |
Vellaithurai et al. | Real time modeling and simulation of cyber-power system | |
CN104134975B (zh) | 基于定值启动的继电仿真保护实现方法及装置 | |
CN104062543A (zh) | 大型变压器零差保护极性验证方法及零差保护校验方法 | |
Silva et al. | Energization simulations of a half-wavelength transmission line when subject to three-phase faults—Application to a field test situation | |
CN104537186A (zh) | 一种模拟特高压直流输电线路雷击暂态过程的方法 | |
CN106532692A (zh) | 一种地区电网计及备自投的静态安全分析方法及装置 | |
Chen | Dynamic contingency re-definition in power system security analysis | |
Martinez‐Velasco | Introduction to electromagnetic transient analysis of power systems | |
Lukowicz et al. | Selection of minimal tripping times for distance protection using fault trees with time dependencies | |
KR20100076188A (ko) | 반파 비한류형 초전도 한류기의 해석모델 설계방법 | |
Luo et al. | Interactive protection system simulation using ATP MODELS and C++ | |
Chen | Contingency re-definition and its application to power system security analysis | |
Calderaro et al. | A Petri net based protection monitoring system for distribution networks with distributed generation | |
Shalash et al. | New reliability index for power system protection based on multi-agent technique | |
CN108718078A (zh) | 基于线路两端测量阻抗变化的交流微电网线路保护算法 | |
CN108169610A (zh) | 一种基于实时数字仿真器的配电网单相接地故障测试方法 | |
Dam et al. | Reliability implications of increased fault currents and breaker failures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 550001 No. 25 Dongtan Lane, Guanshui Road, Nanming District, Guiyang City, Guizhou Province Co-patentee after: Beijing Shenzhen Medium and Young International Educational Technology Co., Ltd. Patentee after: TRAINING AND EVALUATION CENTER, GUIZHOU POWER GRID CORPORATION Address before: 550001 No. 25 Dongtan Lane, Guanshui Road, Nanming District, Guiyang City, Guizhou Province Co-patentee before: BEIJING EEE-TIMES TECHNOLOGY CO., LTD. Patentee before: TRAINING AND EVALUATION CENTER, GUIZHOU POWER GRID CORPORATION |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201126 Address after: 550000 No. 17 Binhe Road, Nanming District, Guizhou, Guiyang Patentee after: GUIZHOU POWER GRID Corp. Address before: 550001, No. 25 East Tan Road, Guiyang Road, Nanming District, Guizhou, China Patentee before: TRAINING AND EVALUATION CENTER, GUIZHOU POWER GRID Corp. Patentee before: Beijing Shenzhen Medium and Young International Educational Technology Co.,Ltd. |
|
TR01 | Transfer of patent right |