CN104122470B - A kind of method for judging the operation of power distribution network ring-type - Google Patents

A kind of method for judging the operation of power distribution network ring-type Download PDF

Info

Publication number
CN104122470B
CN104122470B CN201410362518.XA CN201410362518A CN104122470B CN 104122470 B CN104122470 B CN 104122470B CN 201410362518 A CN201410362518 A CN 201410362518A CN 104122470 B CN104122470 B CN 104122470B
Authority
CN
China
Prior art keywords
node
dimension
power distribution
distribution network
interior joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410362518.XA
Other languages
Chinese (zh)
Other versions
CN104122470A (en
Inventor
姜宁
时燕新
李晓辉
李琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410362518.XA priority Critical patent/CN104122470B/en
Publication of CN104122470A publication Critical patent/CN104122470A/en
Application granted granted Critical
Publication of CN104122470B publication Critical patent/CN104122470B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of method for judging the operation of power distribution network ring-type, using position of the switch information, with node dimension as break-through point, power distribution network loop-net operation can quickly, be reliably judged, the risk of distribution network operation is reduced, the management difficulty of distribution network operation is reduced;The power distribution network that can correctly judge is run in looped network mode;Make use of prior art condition well, it is easy to accomplish.Whether the method for the present invention is simple, easy to operate, compensate at present still without a kind of automatic discrimination power distribution network with the blank of ring-type operation method.

Description

A kind of method for judging the operation of power distribution network ring-type
Technical field
The invention belongs to technical field of power systems, more particularly to a kind of method for judging the operation of power distribution network ring-type.
Background technology
Power distribution network, as power network power supply terminal, is to contact part the most close with power consumer.At present, domestic power distribution network Run in radial or " hand in hand " mode.Radial to operate to single supply power supply mode, transformer station is radial " tree root ", Power consumer is " leaf ";" hand in hand " method of operation is dual power supply mode, and first and last end power supply can be same transformer station Two buses can also be two different transformer stations.Two kinds of methods of operation are non-loop-net operation mode.Power distribution network closed loop Operation can produce circulation to adversely affect scheduling and grid stability in distribution, and the ground short circuit of operation with closed ring is electric Stream is larger to easily cause the harm such as fault spread.Therefore, power distribution network of short duration fortune in a closed loop manner only when Loop Closing Operation is carried out OK, open loop situations are recovered after grid switching operation is finished immediately.Still whether run with ring-type without a kind of automatic discrimination power distribution network at present Method.
The content of the invention
The purpose of the embodiment of the present invention is to provide a kind of method for judging the operation of power distribution network ring-type, it is intended to solved at present still Whether there is no a kind of automatic discrimination power distribution network with the problem of ring-type operation method.
The embodiment of the present invention is achieved in that a kind of method for judging the operation of power distribution network ring-type, the judgement power distribution network ring The method of shape operation is comprised the following steps:
Step one, reads in method of operation information and position of the switch information, and each all switching informations of region transformer station are stored in Sequence A;
Whether step 2, generating structure sequence B, decision node number is not less than 2, terminates to judge if nodes are less than 2;If Nodes are not less than 2;Then calculate each node dimension;
Step 3, determines whether 1 dimension node, if being to occur in that looped network without 1 dimension node, then terminates to judge;If in the presence of 1 dimension node, queue Q is put into by 1 dimension node1
Step 4, will be with Qi-1The 2 dimension nodes that interior joint is connected are put into Qi, i=2;By QiInterior joint is put into Q1, judge whether Have and QiInterior joint be connected 2 dimension nodes, if in the presence of with QiInterior joint is connected 2 dimension nodes, then and+1, return will be with Qi-1Interior joint is connected 2 dimension nodes be put into Qi;If not existing and QiThe connected 2 dimension nodes of interior joint, then carry out next step high;
Step 5, will be with QiAnother node on the associated side of interior joint is put into queue P1, judge P1In whether containing 1 dimension , if there is not 1 dimension node, there is looped network in node, terminates to judge;If occurring 1 dimension node, Q is deleted in B1Interior joint And corresponding side, return to step two.
Further, it is that actual electric network information is converted into computer to be easy to read in method of operation information and position of the switch information The network topological information for the treatment of;Topology information is mainly made up of node and branch.
Further, position of the switch information is obtained by remote measurement, via work station, power distribution automation substation, power distribution automation master Stand last uploading among scheduling system D5000.
What the present invention was provided judges the method that power distribution network ring-type is run, and is prominent with node dimension using position of the switch information Breakpoint, can quickly, reliably judge power distribution network loop-net operation;Power distribution network ring-type can be avoided to run the short circuit current for producing The ill effect that the accident scope that increase is caused expands, causality loss expands, reduces the risk of distribution network operation;Can avoid The circulation that the operation of power distribution network ring-type is produced, reduces power distribution network running wastage, and save energy improves economic benefit, reduces The management difficulty of distribution network operation;The power distribution network that can correctly judge is run in looped network mode;Existing skill is make use of well Art condition, it is easy to accomplish.The method of the present invention is simple, easy to operate, compensate at present still without a kind of automatic discrimination power distribution network Whether with the blank of ring-type operation method.
Brief description of the drawings
Fig. 1 is the method flow diagram of judgement power distribution network ring-type operation provided in an embodiment of the present invention;
Fig. 2 is the particular flow sheet of the embodiment of the method for judgement power distribution network ring-type operation provided in an embodiment of the present invention;
Fig. 3 is data flow figure in the position of the switch provided in an embodiment of the present invention.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described to application principle of the invention.
As shown in figure 1, the method for judging the operation of power distribution network ring-type of the embodiment of the present invention is comprised the following steps:
S101:Method of operation information and position of the switch information are read in, each all switching informations of region transformer station are stored in sequence Row A;
S102:Whether generating structure sequence B, decision node number is not less than 2, terminates to judge if nodes are less than 2;If section Points are not less than 2;Then calculate each node dimension;
S103:1 dimension node is determined whether, if being to occur in that looped network without 1 dimension node, then terminates to judge;If in the presence of 1 Dimension node, queue Q is put into by 1 dimension node1
S104:Will be with Qi-1The 2 dimension nodes that interior joint is connected are put into Qi, i=2;By QiInterior joint is put into Q1, determine whether With QiInterior joint be connected 2 dimension nodes, if in the presence of with QiInterior joint is connected 2 dimension nodes, then and+1, return will be with Qi-1What interior joint was connected 2 dimension nodes are put into Qi;If not existing and QiThe connected 2 dimension nodes of interior joint, then carry out next step high;
S105:Will be with QiAnother node on the associated side of interior joint is put into queue P1, judge P1In whether containing 1 dimension section , if there is not 1 dimension node, there is looped network in point, terminates to judge;If occurring 1 dimension node, Q is deleted in B1Interior joint and Corresponding side, return to step S102;
A uses queue structure, wherein the storage of first storage location is parent node numbering, the storage of the second storage location What is deposited is the Node Switch state, and 0 represents disconnected position, and 1 represents conjunction position;The all child node numberings of the node store storage method successively Ibid;
Operation principle of the invention:Power distribution network is made up of the relevant device such as distribution line and switch, back brake.Influence power network Only circuit and the on off state of the method for operation, circuit build up after putting into operation and hardly change certainly, therefore influence network operation side Only this factor of the position of the switch of formula.No matter switchtype and model, when the switch is closed power by mains side flow into, load Side is flowed out, i.e., the switch links together inlet wire and outlet, and the dimension of the switching node is 2;When the switches are opened, inlet wire with Outlet disconnects, and the node dimension is 1;When power network is run with ring-type, all position of the switch are conjunction position on ring, i.e. each switch The dimension of node is 2;If being switched off on looped network, looped network unlinks therewith, and the switching node dimension is changed into 1;Therefore, as long as After tieing up node whole elimination by network 1 successively, judge whether there is looped network to deposit by judging whether also 2 dimension node presence ;Method particular flow sheet is as shown in Figure 1:
As shown in fig. 1, reading method of operation information and position of the switch information are mainly and are converted into actual electric network information The easy-to-handle network topological information of computer;Topology information is mainly made up of node and branch, it is easy to realized judging with program Method.Sequence A storages are region transformer substation switch information, and information format is that transformer station numbers and switch number, region power transformation Station is the power supply point in power distribution network, and switch therein will be used as root node.The data of structure sequence B storages are made with A interior joints It is all branch node information of root node, i.e. all nodes in B are all directly or indirectly to be connected with respective nodes in A. Sequence B storage switch numbering in the form of chained list, first of chained list is summit switch number, and other positions are and the summit phase Switch number even.The core of the method is that, by all 1 dimension knots removals in topology, do not have if all nodes can be eliminated Looped network, must be with the presence of looped network if the 2 dimension nodes for finally occurring eliminating.
According to existing power distribution automation level, position of the switch information can be obtained, via work station, matched somebody with somebody the present invention by remote measurement Electric automation substation, power distribution automation main station are finally uploaded among scheduling system D5000.Specific position of the switch information data is obtained Take approach as shown in Figure 3.
The present invention power distribution network that can correctly judge is run in looped network mode;Using position of the switch information, tieed up with node It is break-through point to spend, and can quickly, reliably judge power distribution network loop-net operation, reduces power distribution network operation risk, reduces power distribution network Operational management difficulty.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (3)

1. it is a kind of to judge the method that power distribution network ring-type is run, it is characterised in that the method for judgement power distribution network ring-type operation includes Following steps:
Step one, reads in method of operation information and position of the switch information, and each all switching informations of region transformer station are stored in into storage Space A, A use queue structure, wherein the storage of first storage location is parent node numbering, the storage of the second storage location Be the Node Switch state, 0 represents disconnected position, and 1 represents and closes position;The all child node numberings of the node are stored successively, storage method Ibid;
Whether step 2, generating structure sequence B, decision node number is not less than 2, terminates to judge if nodes are less than 2;If node Number is not less than 2;Each node dimension is then calculated using the traversal method of breadth First;
Step 3, determines whether 1 dimension node, if being to occur in that loop-net operation without 1 dimension node, then terminates to judge;If in the presence of 1 dimension node, storage queue Q is put into by 1 dimension node1
Step 4, will be with Qi-1The 2 dimension nodes that interior joint is connected are put into Qi, i=2;By QiInterior joint is put into Q1, determine whether with QiInterior joint be connected 2 dimension nodes, if in the presence of with QiInterior joint connected 2 ties up nodes, then i+1, will be with Qi-1The 2 dimension sections that interior joint is connected Point is put into Qi;If not existing and QiThe connected 2 dimension nodes of interior joint, then carry out next step;
Step 5, will be with QiAnother node on the associated side of interior joint is put into queue P1, judge P1In whether containing 1 dimension node, If there is not 1 dimension node, there is looped network, terminate to judge;If occurring 1 dimension node, Q is deleted in B1Interior joint and correspondence Side, return to step two.
2. the as claimed in claim 1 method for judging the operation of power distribution network ring-type, it is characterised in that reading method of operation information and It by actual electric network information by dispatching system converting is the easy-to-handle network topological information of computer that position of the switch information is;Open up Information is flutterred to be made up of node and branch.
3. it is as claimed in claim 1 to judge the method that power distribution network ring-type is run, it is characterised in that position of the switch information is by remote measurement Obtain, finally uploaded among scheduling system D5000 via work station, power distribution automation substation, power distribution automation main station.
CN201410362518.XA 2014-07-28 2014-07-28 A kind of method for judging the operation of power distribution network ring-type Active CN104122470B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410362518.XA CN104122470B (en) 2014-07-28 2014-07-28 A kind of method for judging the operation of power distribution network ring-type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410362518.XA CN104122470B (en) 2014-07-28 2014-07-28 A kind of method for judging the operation of power distribution network ring-type

Publications (2)

Publication Number Publication Date
CN104122470A CN104122470A (en) 2014-10-29
CN104122470B true CN104122470B (en) 2017-07-04

Family

ID=51767959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410362518.XA Active CN104122470B (en) 2014-07-28 2014-07-28 A kind of method for judging the operation of power distribution network ring-type

Country Status (1)

Country Link
CN (1) CN104122470B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19906276A1 (en) * 1999-02-15 2000-09-21 Heusler Isabellenhuette Method and current measuring module for current monitoring in a power supply system
US7308370B2 (en) * 2005-03-22 2007-12-11 Elster Electricity Llc Using a fixed network wireless data collection system to improve utility responsiveness to power outages
CN103323688B (en) * 2012-03-20 2015-11-25 华北电力科学研究院有限责任公司 A kind of harmonic state estimation method and apparatus of electric system
CN103248041B (en) * 2013-03-29 2015-01-21 国家电网公司 Looped network detection method based on bus depth conflict calculation
CN203481822U (en) * 2013-08-25 2014-03-12 国家电网公司 Closed loop power supply model of medium voltage 10 kilovolt power distribution network

Also Published As

Publication number Publication date
CN104122470A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
Botea et al. Optimal reconfiguration for supply restoration with informed A $^{\ast} $ Search
CN102521398B (en) Modeling method for substation-dispatching center two-level distributed type power grid
CN104318006B (en) A kind of optimization method of virtual terminals of intelligent substation design
AU2014317771A1 (en) Systems and methods for grid operating systems in electric power systems
CN104578153A (en) Recognition method of topological structure of electric network
CN106651635B (en) Distribution network topology self-adaptive protection method based on distributed storage
CN102255380A (en) Intelligent self-adaptive automatic throw-in equipment and method thereof of emergency power supplies in substation
CN105429301B (en) A kind of Intelligent power distribution network self-healing control method based on modal analysis
CN105553807A (en) 10kV low voltage smart power distribution network system with looped network communication structure
CN106505532A (en) A kind of intelligent distributed FA fault handling methods based on main website standby
CN104574204B (en) Intelligent measuring and control device ICD models automatic identification system and method
CN104598691B (en) Network model checking method
CN104820755A (en) Physical loop extension and automatic virtual-real mapping method based on SCD (System Configuration Description) file
CN106910143A (en) Power distribution network artwork multi-edition control method and system
CN106646100B (en) A kind of Fault Locating Method of incomplete observing and controlling power distribution network
CN109086499A (en) A kind of topological automatic mapping method of the configuration of distribution FA on the spot
CN104319886A (en) Power grid wide area protection and control system
CN104122470B (en) A kind of method for judging the operation of power distribution network ring-type
CN108764750A (en) Main distribution network model modeling and topology analyzing method and system
CN112865313A (en) Low-voltage distribution station topology identification system
CN102325165A (en) Binary input/output system based on Zigbee wireless communication and data communication method thereof
CN104601371A (en) Substation communication method
CN104283214A (en) Network reconstruction method for power distribution network
CN109687985A (en) A kind of Substation Process layer network method of automatic configuration and system
CN104953706B (en) A kind of intelligence matches somebody with somebody the integrated information interacting method of electricity consumption

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 300010 Tianjin city Hebei District Wujing Road No. 39

Applicant after: State Grid Corporation of China

Applicant after: State Grid Tianjin Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: State Grid Tianjin Electric Power Company

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant