CN104118241A - Running integration operating panel - Google Patents

Running integration operating panel Download PDF

Info

Publication number
CN104118241A
CN104118241A CN201410349856.XA CN201410349856A CN104118241A CN 104118241 A CN104118241 A CN 104118241A CN 201410349856 A CN201410349856 A CN 201410349856A CN 104118241 A CN104118241 A CN 104118241A
Authority
CN
China
Prior art keywords
spool
gear
base plate
backplate
reel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410349856.XA
Other languages
Chinese (zh)
Other versions
CN104118241B (en
Inventor
秦前锋
高冠群
朱海峰
龙福海
潘雪石
陈波
李甲骏
胡立昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI ZHANGHEWAN XUNENG GENERATING CO Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
HEBEI ZHANGHEWAN XUNENG GENERATING CO Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI ZHANGHEWAN XUNENG GENERATING CO Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical HEBEI ZHANGHEWAN XUNENG GENERATING CO Ltd
Priority to CN201410349856.XA priority Critical patent/CN104118241B/en
Publication of CN104118241A publication Critical patent/CN104118241A/en
Application granted granted Critical
Publication of CN104118241B publication Critical patent/CN104118241B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Transmission Devices (AREA)
  • Supports Or Holders For Household Use (AREA)

Abstract

The invention relates to a running integration operating panel which comprises a base plate, a protective plate, a first reel with a first gear, a second reel with a second gear and a gear conveying belt with a linkage column. The running integration operating panel is provided with the reels and blocking cloth, so that the blocking cloth covers the panel by turning the first reel or the second reel in rainy days or the damp environment, the rainwater immersion problem is effectively solved, and the service life is prolonged. The running integration operating panel is provided with a lamp, so that when light is dim, the lamp serving as a light source is utilized to perform relevant operation, the working efficiency is improved, usage is facilitated, and the working process is accelerated.

Description

The integrated operation panel of a kind of operation
Technical field
The present invention relates to the integrated operation panel of a kind of operation.
Background technology
In operation order implementation, generally need two people to carry out, an operator and a guardian, wherein operator is responsible for the enforcement of detailed programs, whether guardian is responsible for monitoring operation correct, carry out repeatedly the record of time at this process need, need hand-held pen and an operation order, one hand-held table is seen the time, putting back to wrist-watch takes up one's pen and carries out record again, seem that some is in a rush, and the notice that therefore process is disperseed monitoring, in addition certain operations also needs to enter multiple equipment regions and carries out operation, operator also will carry much room key in carrying operation tool, easily make operating personnel in a rush, this is external carries out outdoor operation and runs into rainy weather or operate when rather dark, also for operation is made troubles.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of rationally distributed, easy to operate, rain and sun and can adapts to the integrated operation panel of operation of faint light.
For solving above technical problem, the present invention adopts following technical scheme: the present invention includes base plate, backplate, be provided with the first gear the first spool, be provided with the second spool of the second gear and be provided with the gear conveyer belt that involves post; Described backplate is vertically located at two ends, base plate left and right, and described the first spool is located at backplate front end by bearing, and described the second spool is located in backplate rear end by bearing, and described the first gear all engages with gear conveyer belt with the second gear; Described base plate is provided with groove, flat board and hook from top to bottom successively, in described groove, is provided with electronic watch, and described groove right side is provided with stationary magazine creel.
The present invention also comprises link, baffle plate and spool, described link is located at base plate front center, described baffle plate is located at base plate front end and is connected with backplate is vertical, and described spool is located at backplate two ends parallel with the second spool with the first spool, and described baffle plate middle part is evenly provided with bulb.
Described spool is provided with tilt, and described tilt front end is connected with the post that involves on gear conveyer belt, and the number of described flat board is 2 and parallel being arranged side by side on base plate, and described dull and stereotyped lower end is provided with protects platform.
The number of described the first gear and the second gear be 2 and be symmetrically set in respectively the first spool and the second spool on.
Good effect of the present invention is as follows: the present invention is simple in structure, convenient and practical, make operation and permitted ticket process convenient and swift, office appliance is placed in order, and has improved operating efficiency and accuracy; The present invention is provided with spool and tilt, meets rainy day or wet environment, by turn the first spool or the second spool, tilt is covered, and has effectively solved rainwater immersion, has extended service life; The present invention is provided with bulb, in the time that light is faint, utilizes the light source of bulb to carry out associative operation, has improved operating efficiency, easy to use, has accelerated the progress of work.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is volume Two axle construction schematic diagram of the present invention;
Fig. 3 is base arrangement schematic diagram of the present invention;
Fig. 4 is gear conveyer structure schematic diagram of the present invention;
Fig. 5 is that the present invention involves rod structure schematic diagram;
Fig. 6 is the present invention's bulb structure schematic diagram while removing spool;
In the drawings: 1 link, 2 first spools, 2-1 the first gear, 3 second spools, 3-1 the second gear, 4 backplates, 5 tilts, 6 gear conveyer belts, 6-1 involve post, 7 hooks, 8 electronic watches, 9 grooves, 10 stationary magazine creels, 11 flat boards, 12 and protect platform, 13 baffle plates, 14 bulbs, 15 base plates, 16 spools.
Detailed description of the invention
As shown in Fig. 1,2,3,4,5,6, the present invention includes base plate 15, backplate 4, be provided with the first gear 2-1 the first spool 2, be provided with the second spool 3 of the second gear 3-1 and be provided with the gear conveyer belt 6 that involves post 6-1; Described backplate 4 is vertically located at base plate 15 two ends, left and right, and described the first spool 2 is located at backplate 4 front ends by bearing, and described the second spool 3 is located in backplate 4 rear ends by bearing, and described the first gear 2-1 all engages with gear conveyer belt 6 with the second gear 3-1; Described base plate 15 is provided with groove 9, flat board 11 and hook 7 from top to bottom successively, in described groove 9, is provided with electronic watch 8, and described groove 9 right sides are provided with stationary magazine creel 10.The present invention also comprises link 1, baffle plate 13 and spool 16; Described link 1 is located at base plate 15 front center, and described baffle plate 13 is located at base plate 15 front ends and is connected with backplate 4 is vertical, and described spool 16 is located at backplate 4 two ends parallel with the second spool 3 with the first spool 2, and described baffle plate 13 middle parts are evenly provided with bulb 14.Described spool 16 is provided with tilt 5, and described tilt 5 front ends are connected with the post 6-1 that involves on gear conveyer belt 6, and described dull and stereotyped 11 number is 2 and parallel being arranged side by side on base plate 15, and described dull and stereotyped 11 lower ends are provided with protects platform 12.The number of described the first gear 2-1 and the second gear 3-1 be 2 and be symmetrically set in respectively the first spool 2 and the second spool 3 on.
As shown in Figure 6, the present invention also comprises power supply and switch, and then can power supply is provided and control bulb switch for bulb.
Use time of the present invention, under normal circumstances, because object distributes rationally at base plate 15, only need carry out associative operation according to scheduling; In the time meeting rainy day or wet environment, by turn the first spool 2 or the second spool 3, driven gear conveyer belt 6 moves, because the post 6-1 that involves on gear conveyer belt 6 is connected with the tilt 5 on spool 16, and then tilt is covered to surface of the present invention, solve rainwater or moisture and immersed, extended service life; In the time that light is faint, steep 14 by controlling switch lamp and open, operating personnel utilize the light source of bulb 14 to carry out associative operation.
The above embodiment is only the preferred embodiments of the present invention, and is not the exhaustive of the feasible enforcement of the present invention.For persons skilled in the art, any apparent change of under the prerequisite that does not deviate from the principle of the invention and spirit, it having been done, within all should being contemplated as falling with claim protection domain of the present invention.

Claims (4)

1. the integrated operation panel of operation, is characterized in that: it comprises base plate (15), backplate (4), is provided with first spool (2) of the first gear (2-1), is provided with second spool (3) of the second gear (3-1) and is provided with the gear conveyer belt (6) that involves post (6-1);
Described backplate (4) is vertically located at base plate (15) two ends, left and right, described the first spool (2) is located at backplate (4) front end by bearing, described the second spool (3) is located in backplate (4) rear end by bearing, and described the first gear (2-1) all engages with gear conveyer belt (6) with the second gear (3-1);
Described base plate (15) is provided with groove (9), dull and stereotyped (11) and hook (7) from top to bottom successively, is provided with electronic watch (8) in described groove (9), and described groove (9) right side is provided with stationary magazine creel (10).
2. the integrated operation panel of a kind of operation according to claim 1, is characterized in that: also comprise link (1), baffle plate (13) and spool (16); Described link (1) is located at base plate (15) front center, described baffle plate (13) be located at base plate (15) front end and with vertical connection of backplate (4), described spool (16) is located at backplate (4) two ends parallel with the second spool (3) with the first spool (2), and described baffle plate (13) middle part is evenly provided with bulb (14).
3. the integrated operation panel of a kind of operation according to claim 2, it is characterized in that: described spool (16) is provided with tilt (5), described tilt (5) front end is connected with the post (6-1) that involves on gear conveyer belt (6), the number of described flat board (11) is 2 and parallel being arranged side by side at base plate (15) above, and described flat board (11) lower end is provided with protects platform (12).
4. the integrated operation panel of a kind of operation according to claim 3, is characterized in that: described the first gear (2-1) and the number of the second gear (3-1) be 2 and be symmetrically set in respectively the first spool (2) and the second spool (3) on.
CN201410349856.XA 2014-07-23 2014-07-23 The integrated operation panel of a kind of operation Active CN104118241B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410349856.XA CN104118241B (en) 2014-07-23 2014-07-23 The integrated operation panel of a kind of operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410349856.XA CN104118241B (en) 2014-07-23 2014-07-23 The integrated operation panel of a kind of operation

Publications (2)

Publication Number Publication Date
CN104118241A true CN104118241A (en) 2014-10-29
CN104118241B CN104118241B (en) 2016-08-24

Family

ID=51763977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410349856.XA Active CN104118241B (en) 2014-07-23 2014-07-23 The integrated operation panel of a kind of operation

Country Status (1)

Country Link
CN (1) CN104118241B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487105A (en) * 2017-10-19 2017-12-19 嘉兴御创电力科技有限公司 Waterproof operates ticket-holder

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4903932A (en) * 1988-04-11 1990-02-27 Stewart Jr Isaac Clip board
CN201254004Y (en) * 2008-09-09 2009-06-10 宜昌供电公司变电运行部 Multifunction two ticket folder
CN201863531U (en) * 2010-11-16 2011-06-15 江苏省电力公司金湖县供电公司 Multifunctional rain-proof ticket holder
CN202192910U (en) * 2011-08-17 2012-04-18 福建省厦门超高压输变电局 Rainproof writing clip for operation orders
JP3178546U (en) * 2012-07-07 2012-09-20 山野井商事株式会社 File
CN202593017U (en) * 2012-05-08 2012-12-12 山东电力集团公司莱芜供电公司 Multifunctional operation bill clip
CN203046546U (en) * 2012-12-12 2013-07-10 宁阳县供电公司 Multi-functional operation order clip
CN203188640U (en) * 2013-04-11 2013-09-11 河南省大成建设工程有限公司 Rocker arm roller curtain type dustproof rainproof device
CN203282902U (en) * 2013-05-17 2013-11-13 国家电网公司 Multi-function portable operation folder
CN203496506U (en) * 2013-09-30 2014-03-26 国网上海市电力公司 Operation order writing board for first-aid repair and maintenance of electrical power system
CN103832117A (en) * 2014-03-06 2014-06-04 国家电网公司 Multifunctional operation ticket holder
CN103879176A (en) * 2012-12-21 2014-06-25 黄石供电公司变电运行中心 Multifunctional operation ticket folder
CN203995203U (en) * 2014-07-23 2014-12-10 国家电网公司 The integrated operation panel of a kind of operation

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4903932A (en) * 1988-04-11 1990-02-27 Stewart Jr Isaac Clip board
CN201254004Y (en) * 2008-09-09 2009-06-10 宜昌供电公司变电运行部 Multifunction two ticket folder
CN201863531U (en) * 2010-11-16 2011-06-15 江苏省电力公司金湖县供电公司 Multifunctional rain-proof ticket holder
CN202192910U (en) * 2011-08-17 2012-04-18 福建省厦门超高压输变电局 Rainproof writing clip for operation orders
CN202593017U (en) * 2012-05-08 2012-12-12 山东电力集团公司莱芜供电公司 Multifunctional operation bill clip
JP3178546U (en) * 2012-07-07 2012-09-20 山野井商事株式会社 File
CN203046546U (en) * 2012-12-12 2013-07-10 宁阳县供电公司 Multi-functional operation order clip
CN103879176A (en) * 2012-12-21 2014-06-25 黄石供电公司变电运行中心 Multifunctional operation ticket folder
CN203188640U (en) * 2013-04-11 2013-09-11 河南省大成建设工程有限公司 Rocker arm roller curtain type dustproof rainproof device
CN203282902U (en) * 2013-05-17 2013-11-13 国家电网公司 Multi-function portable operation folder
CN203496506U (en) * 2013-09-30 2014-03-26 国网上海市电力公司 Operation order writing board for first-aid repair and maintenance of electrical power system
CN103832117A (en) * 2014-03-06 2014-06-04 国家电网公司 Multifunctional operation ticket holder
CN203995203U (en) * 2014-07-23 2014-12-10 国家电网公司 The integrated operation panel of a kind of operation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487105A (en) * 2017-10-19 2017-12-19 嘉兴御创电力科技有限公司 Waterproof operates ticket-holder

Also Published As

Publication number Publication date
CN104118241B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN205290734U (en) Automatic tool that presss from both sides of cell -phone shell
SI1763858T1 (en) Lighting apparatus with integrated warning equipment and data collection equipment
CN203995203U (en) The integrated operation panel of a kind of operation
CN104118241A (en) Running integration operating panel
CN204001987U (en) A kind of Internet of Things intelligent security guard fence
CN204376278U (en) A kind of Multifunction electric power overhaul frame
CN205069008U (en) Electric power protector
CN204462948U (en) A kind of computing machine easy to use
CN209070868U (en) A kind of convenient and fast mechanical equipment nameplate of disassembling, assembling and replacing
GB201203214D0 (en) An information sign
CN207587834U (en) Negative electrode lug adhesive tape rubberizing mechanism
CN112777535A (en) High-rise building operation platform
CN207566233U (en) A kind of feed feeds intake mouth protecting device
CN210268721U (en) Portable monitoring control device based on mobile technology
CN210532321U (en) Stage lighting control device
CN210221138U (en) Environmental monitoring supervisory equipment
CN207867090U (en) A kind of waterproof connecting wire protection device
CN205098238U (en) Fire control mobile device
CN205221663U (en) Warning street refuse case
CN213061765U (en) Warning device for communication engineering
CN207153069U (en) A kind of electronic timer
CN110143509B (en) Safety device for electromechanical installation
CN103680322A (en) Electronic shelf label
CN205336443U (en) Indoor mobile surveillance device
CN217333566U (en) Display screen for filling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant