CN104112162A - 一种基于资源的灾难恢复系统经济成本效益评估方法 - Google Patents
一种基于资源的灾难恢复系统经济成本效益评估方法 Download PDFInfo
- Publication number
- CN104112162A CN104112162A CN201410133345.4A CN201410133345A CN104112162A CN 104112162 A CN104112162 A CN 104112162A CN 201410133345 A CN201410133345 A CN 201410133345A CN 104112162 A CN104112162 A CN 104112162A
- Authority
- CN
- China
- Prior art keywords
- mrow
- cost
- msub
- disaster recovery
- stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011084 recovery Methods 0.000 title claims abstract description 86
- 238000000034 method Methods 0.000 title claims description 9
- 238000013461 design Methods 0.000 claims abstract description 26
- 238000010276 construction Methods 0.000 claims abstract description 12
- 238000011156 evaluation Methods 0.000 claims abstract description 12
- 238000012423 maintenance Methods 0.000 claims description 29
- 238000013439 planning Methods 0.000 claims description 16
- 238000007726 management method Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 239000000654 additive Substances 0.000 claims 1
- 230000000996 additive effect Effects 0.000 claims 1
- 238000012043 cost effectiveness analysis Methods 0.000 claims 1
- 238000004458 analytical method Methods 0.000 abstract description 9
- 238000007727 cost benefit analysis Methods 0.000 abstract description 4
- 238000004364 calculation method Methods 0.000 description 3
- 238000012552 review Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410133345.4A CN104112162A (zh) | 2014-04-03 | 2014-04-03 | 一种基于资源的灾难恢复系统经济成本效益评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410133345.4A CN104112162A (zh) | 2014-04-03 | 2014-04-03 | 一种基于资源的灾难恢复系统经济成本效益评估方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104112162A true CN104112162A (zh) | 2014-10-22 |
Family
ID=51708946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410133345.4A Pending CN104112162A (zh) | 2014-04-03 | 2014-04-03 | 一种基于资源的灾难恢复系统经济成本效益评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104112162A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1659522A (zh) * | 2002-04-19 | 2005-08-24 | 电脑联合想象公司 | 灾难恢复方法与系统 |
US20090300409A1 (en) * | 2008-05-30 | 2009-12-03 | Twinstrata, Inc | Method for data disaster recovery assessment and planning |
CN102331930A (zh) * | 2011-07-13 | 2012-01-25 | 北京邮电大学 | 一种信息系统灾难恢复时间目标的计算方法 |
-
2014
- 2014-04-03 CN CN201410133345.4A patent/CN104112162A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1659522A (zh) * | 2002-04-19 | 2005-08-24 | 电脑联合想象公司 | 灾难恢复方法与系统 |
US20090300409A1 (en) * | 2008-05-30 | 2009-12-03 | Twinstrata, Inc | Method for data disaster recovery assessment and planning |
CN102331930A (zh) * | 2011-07-13 | 2012-01-25 | 北京邮电大学 | 一种信息系统灾难恢复时间目标的计算方法 |
Non-Patent Citations (1)
Title |
---|
王颖: "物流业信息系统灾难恢复的规划及实施", 《中国优秀硕士学位论文全文数据库信息科技辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6192545B2 (ja) | 保守作業計画作成システム | |
Soliman et al. | Improving operating theatre efficiency: an intervention to significantly reduce changeover time | |
CN103744749A (zh) | 一种基于预算算法的虚拟机智能备份方法 | |
Andersson et al. | Reduced railway traffic delays using a MILP approach to increase Robustness in Critical Points | |
Yan et al. | Cash transportation vehicle routing and scheduling under stochastic travel times | |
Abdullah et al. | Public tourism infrastructure: challenges in the development and maintenance activities | |
Memon | Structural modelling of cost overrun factors in construction industry | |
CN103955766A (zh) | 大批量定制生产系统的预防维护协同调度优化的方法 | |
CN105023119A (zh) | 一种数据资产可信度的评估方法 | |
CN104112162A (zh) | 一种基于资源的灾难恢复系统经济成本效益评估方法 | |
EP2782053A1 (en) | Temporal series alignment for matching real trips to schedules in public transportation systems | |
Keren et al. | Optimising project performance: the triangular trade-off optimisation approach | |
Lhomme et al. | A methodology to produce interdependent networks disturbance scenarios | |
CN110728043A (zh) | 一种基于预期年平均使用成本的船闸维修计划制定方法 | |
Nyoni et al. | Forecasting the Number of Outpatient visits at Silobela District Hospital in Zimbabwe using Artificial Neural Networks | |
Woo | On multivariate discounted compound renewal sums with time-dependent claims in the presence of reporting/payment delays | |
Saraswati et al. | Simulation model for evaluating intensive care unit capacity | |
Canares | South, East, and Southeast Asia | |
Zhang et al. | A simulation of a police patrol service system with multi-grade time-varying incident arrivals | |
Leidig et al. | Guiding Health Care Policy through Applied Public Health Modeling and Simulation | |
Xie | Analysis on the Strategy for Construction Quality Optimization Management of Municipal Road Engineering Based on Fast Mining Algorithm for Large Cloud Data | |
Miller | Learning Failure Propagation Patterns in Interdependent Network From Observed Post-Disaster Disruptions | |
CN103164189B (zh) | 用于实时数据处理的方法和设备 | |
Cohn et al. | Airline resource scheduling | |
Van Meensel et al. | Performance benchmarking: bridging the gap between frontier analysis research and user-tailored decision support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Jianyi Inventor after: Lei Mingtao Inventor after: Zhu Xiaolu Inventor after: Ma Liya Inventor after: Lv Tao Inventor after: Gu Heng Inventor after: Fu Qunchao Inventor after: Wang Cong Inventor before: Liu Jianyi Inventor before: Lei Mingtao Inventor before: Zhu Xiaolu Inventor before: Ma Liya Inventor before: Lv Tao Inventor before: Wang Cong |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LIU JIANYI LEI MINGTAO ZHU XIAOLU MA LIYA LV TAO WANG CONG TO: LIU JIANYI LEI MINGTAO ZHU XIAOLU MA LIYA LV TAO GU HENG FU QUNCHAO WANG CONG |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141022 |