CN104106014B - Programable display, program - Google Patents
Programable display, program Download PDFInfo
- Publication number
- CN104106014B CN104106014B CN201280069482.5A CN201280069482A CN104106014B CN 104106014 B CN104106014 B CN 104106014B CN 201280069482 A CN201280069482 A CN 201280069482A CN 104106014 B CN104106014 B CN 104106014B
- Authority
- CN
- China
- Prior art keywords
- project
- data
- display
- memory area
- regulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/05—Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/10—Plc systems
- G05B2219/14—Plc safety
- G05B2219/14097—Display of error messages
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Programmable Controllers (AREA)
- Controls And Circuits For Display Device (AREA)
- Digital Computer Display Output (AREA)
- User Interface Of Digital Computer (AREA)
Abstract
The regulation memory area of each project distributing to projects the communication processing section (44) memorizer within connecting equipment (4) reads data and is stored in common storage.Now, in the case of the reading failure of the data relevant with any project, in common storage, error message is deposited for this project.For depositing the project of error message, project process portion (43) shows display view data (47) that makes mistakes corresponding to this item image.
Description
Technical field
The present invention relates to programable display.
Background technology
Programable display is typically connected with the various equipment that are connected such as PLC main body, register, right
Represent that these numerical value of state connecting equipment shows or the project such as lamp, make for user and arbitrarily indicating
The image of the project such as switch show.It addition, project is also referred to screen part etc..Able to programme
The upper image generally showing multiple screen part (project) of the picture (referred to as operating display frame) of display.
Not shown assisting system is at random previously generated for showing this operation display by developer etc.
The data of picture etc. (referred to as picture data etc.), and these data are downloaded to display able to programme from assisting system
Device.
Above-mentioned picture data for each project of above-mentioned projects comprise this project image (switch
Image, the image of lamp) and display position coordinates, also comprise the ground in the regulation region of following external memory storage
The data such as location (distribution storage address).The most also comprise some program etc..
Above-mentioned projects are corresponding, to this knot with the arbitrary structures key element arbitrarily connecting equipment the most respectively
The state of structure key element shows, or receives the switch instruction of this structural element.Such as, homoiothermic is filled
In the case of the temperature measuring value put carries out the project that numerical value shows, at any time by current temperature with numerical value
Show.
For each project of above-mentioned projects, such as, it is periodically executed predetermined processing, thus realizes relating to
The display of above-mentioned various project controls.Predetermined processing refers to: such as, to the memorizer in connection equipment
The data of depositing in the above-mentioned regulation region (distribution memorizer) of equipment (referred to as external memory storage) are read out,
Deposit data based on this, determine the display content of project and show.It addition, connect equipment at any time
Update said external memorizer regulation region deposit data (such as, in above-mentioned register at any time
Update said temperature measured value).
Additionally, following structure: i.e., the data read from said external memorizer are deposited temporarily
In the regulation region of the memory devices (referred to as internal storage) in programable display, deposit based on this
Put data, determine the display content of project and show.
In the case of this example, the predetermined function portion of programable display (it is not shown logical herein
Letter portion) such as it is periodically executed depositing data and being stored in internal storage of reading external memory
Process.Above-mentioned communication unit leads to various equipment that are connected such as the most above-mentioned PLC main body, registers
Letter, obtain the said external memorizer in connection equipment regulation memory area deposit data, should
Data are written to the regulation memory area of above-mentioned internal storage and deposit.Afterwards, able to programme aobvious
Show that the function part (referred to as project display part) that above-mentioned various projects carry out display control of device is the most internal
Portion's memorizer conducts interviews, thus is controlled project display content.
But, deposit being connected between equipment generation communication mistake, external memory storage itself or its regulation
In the case of storage area territory occurs some abnormal (comprising interim exception) etc., the data of said external memorizer obtain
Take process failure sometimes.In this case, due to above-mentioned communication unit can recognize that as communication right
The connection equipment of elephant, therefore, above-mentioned project display part will such as " and the communication between PLC main body occurs
Mistake " etc. the form of notification error show on picture etc., thus promote user to note.
Additionally, such as, patent document 1 discloses that the video from outside at original operation screen
On carry out the situation etc. of overlapping display.
Patent documentation 1: Japanese Patent Laid-Open 2002-140104 publication
Summary of the invention
As it has been described above, in the past, detect and make mistakes with the communication being connected between equipment, thus warn
Accuse display.For being in nothing with the display content of the project connecting device-dependent of the mistake etc. that communicates
The situation (not being currency etc.) of the state that method is trusted alerts.
But, it is not necessary to it is confined to the item that operator cannot be able to trust by seeing this display to determine
Mesh.Such as, " and the communication between register makes a mistake " this display may not necessarily be seen thus sentence
Break and which project (one or more) and be by the project that the state relevant with register shows.Enter one
Step ground, in the case of only the acquisition of the data of the regulation memory area of external memory storage makes a mistake, nothing
The method pair project relevant with this memory area is made mistakes display.
It is an object of the invention to provide a kind of programable display etc., with depositing that any project is associated
When the acquisition of memory data becomes the state that cannot obtain for some reason, this programable display is true
This project fixed and carry out make mistakes display corresponding with the display of this project, so that operator is at a glance
Just can determine abnormal project to show.
The programable display of the present invention is to be connected the programable display that equipment is connected with regulation, tool
There are communications processor element, project display unit and notification unit of makeing mistakes.
Communications processor element reads the data preserved in the memory area connecting equipment of described regulation.
Project display unit is based on the described data read by this communications processor element, described to representing
Projects of the various states connecting equipment of regulation show.
In the case of the reading process failure of the described data carried out at described communications processor element, go out
Wrong notification unit shows the erroneous picture of regulation corresponding to the described project involved by this reading failure.
Accompanying drawing explanation
Fig. 1 is the brief configuration figure of the system entirety of the programable display comprising this example.
Fig. 2 is the structure example of the programable display of this example.
Fig. 3 is the software architecture diagram of native system.
Fig. 4 is operating display frame example during mistake generation.
Fig. 5 is the process functional diagram of the programable display of this example.
Fig. 6 is the concrete example about common storage, and (a) is data structure example, and (b) is that data deposit example.
Fig. 7 is the process chart of communication processing section.
Fig. 8 is the process chart in project process portion.
Fig. 9 (a)~(c) are various data structure diagrams.
Detailed description of the invention
With reference to the accompanying drawings, embodiments of the present invention are illustrated.
Fig. 1 is the brief configuration figure of the system entirety of the programable display 1 comprising this example.
Programable controller system shown in Fig. 1 has various connection equipment 4 and via communication line 6
It is connected the programable display 1 that equipment 4 is connected with various.Further, it is also possible to be configured to able to programme aobvious
Show that device 1 is connected with drawing editing device 5 via communication line 3.But, editing device 5 of painting
Dispensable (only representing an example).
Programable display 1 includes multiple communication interface 2 (COM1), utilizes and each communication interface 2
Communication line 3/ communication line 6 being connected is connected to various connection equipment 4, drawing editing device 5.
Fig. 2 is the structure example of the programable display 1 of this example.
With above-mentioned conventional example substantially in the same manner, programable display 1 has based on above-mentioned picture data etc.
Show the function of operating display frame etc., but also there is following functions: produce particular error
In the case of, show specific markers etc. corresponding to the project relevant to this mistake.Carry out below in detail
Thin elaboration.
The programable display 1 of diagram has display operating control device 10, touch screen 18, display
19 and above-mentioned communication interface 2 etc..
Display operating control device 10 is by CPU11, ROM12 (flash memory etc.), RAM13, communication control
Device 14 processed, graphics controller 15, touch screen controller 16 etc. are constituted, and they are connected to bus 17.
CPU11 is the central processor (fortune that the entirety to display operating control device 10 is controlled
Calculate processor).CPU11 performs to leave program (the example main body described as follows program in ROM12 in advance in
21 etc.), thus carry out regulation computing action (process).Such as, following Fig. 5, Fig. 7, Fig. 8 are performed
The process of explanation in Deng.Various operation results leave such as RAM13 or ROM12 in.
Additionally, ROM12 deposits picture data (the following picture of explanation in above-mentioned background technology
Face data 22) etc..As it has been described above, every for projects such as escribed above switch, lamps of picture data
Individual project have the image of this project, the display data relevant with display such as position coordinates, size, with
And the data etc. relevant with memory access such as above-mentioned distribution storage address (distribution memory area).
The process of above-mentioned CPU11 comprise such as in above-mentioned background technology explanation acquisition " projects
The distribution storage address etc. of each project deposits data " (depositing of the regulation region of said external memorizer
Put data) process etc..The data of this acquisition are stored in temporarily example common storage described as follows 45.
It addition, common storage 45 can be a part for the memory area of above-mentioned RAM13 or ROM12,
It can also be other not shown memorizer.
Additionally, by the process of above-mentioned CPU11, such as at RAM13 (or not shown video-ram)
Such as based on above-mentioned picture data and above-mentioned acquisition data etc. the display object data of upper expansion (drafting).Base
In this drafting, graphics controller 15 shows above-mentioned operating display frame etc. on the display 19.Example
As, if with lamp as example, above-mentioned picture data comprises turn off the light image and bright light image, above-mentioned acquisition number
Becoming above-mentioned display object data according to for " 0 " image of then turning off the light, above-mentioned acquisition data are " 1 " then bright light image
Become above-mentioned display object data.
It addition, display based on above-mentioned picture data and the operating display frame obtaining data etc. processes this
Body can be roughly the same with prior art.In this method, in addition to this display, the most also under display
The specific markers stated (!Deng).
That is, the display content of operating display frame sometimes reflects acquisition data as described above (outside is deposited
The regulation region of reservoir deposit data) content.Such as, in the case of the example of above-mentioned lamp, at certain
It is " 1 " that one moment obtained data, is the most just showing bright light image, is depositing data in this condition and become " 0 ".
But, in the case of this deposits the acquisition failure of data for some reason, originally have to switch over
Turn off the light image, but still maintain display bright light image.
In the method, in this case, display bright light image is maintained.But, with this bright light figure
As corresponding (overlapping with this bright light image or near this bright light image) shows following specific markers
(!Deng).Thus, operator etc. will appreciate that the display of this bright light image there may be mistake and (do not reflects
Present situation;Keep state in the past).
Display 19 is such as made up of liquid crystal panel etc., arranges in an overlapping manner on this liquid crystal panel
Touch screen 18.Showing that aforesaid operations shows picture on the display 19, this operating display frame is substantially
Constitute by multiple item image are arranged in assigned position.But, in the case of this method,
As it has been described above, the most also show specific markers (!Deng)
Additionally, communication controler 14 is via communication interface 2 and not shown PLC main body etc., homoiothermic
Devices etc. i.e. connect equipment 4 and drawing editing device 5 communicates (data transmit-receive etc.).
The position of the pressing operation (touch) carried out operator etc. on touch screen 18 is detected,
CPU11 etc. gather this testing result via touch screen controller 16 and are analyzed.Such as, based on respectively
The above-mentioned display position coordinates of project, the data etc. about size, be analyzed.Such as, if grasping
Work persons etc. touch the display position of the image of above-mentioned switch, then CPU11 etc. analyze as to carry out this switch
Operation.
Fig. 3 illustrates the software architecture diagram of above-mentioned native system.
In programable display 1, by main body program 21, picture data 22, signal procedure 23 etc.
Various program/data leave in the most above-mentioned ROM12 (flash memory etc.).CPU11 is to these program/numbers
According to etc. be read out and perform/with reference to etc., thus to programable display above-mentioned operating display frame etc.
Carry out showing control etc..The various items such as aforesaid operations display picture is shown by above-mentioned numerical value, lamp, switch
Purpose image shows to constitute, and the display content of projects image reflects from respectively connecting equipment
4 (external memory storages;Distribution memory area) form of data (above-mentioned acquisition data) that obtains comes at any time
It is updated.
Substantially, CPU11 is carried out based on main body program 21 and the process of picture data 22, thus aobvious
Show that aforesaid operations shows picture.And, carry out based on signal procedure 23 is connected between equipment 4 with each
Result of communication (above-mentioned acquisition data etc.) etc., the display to each screen part on this operating display frame
Content (numerical value such as temperature shows, the lighting of lamp/extinguishing etc.) is updated at any time.
Above-mentioned picture data 22 is the picture that will such as at random previously generate in drawing editing device 5 side
Data file 32 downloads to programable display 1 data deposited.Additionally, above-mentioned signal procedure 23
Also be by leave in the most in advance drawing editing device 5 side signal procedure file 33 (one part) under
It is downloaded to programable display 1 program deposited.
As it has been described above, substantially, CPU11 is based on main body program 21 and picture data 22 and obtains
Data etc., the display carrying out aforesaid operations display picture controls.Such as, show about numerical value, lamp etc.
Project, reads data from the distribution memory area of this project termly, comes more based on these reading data
The display content of this project new.Or, about projects such as such as switches, if this operation is shown by user
Desired switch on picture carries out touching (if carrying out on/off operation), then carry out switch connection
Image shows/switches off that image shows.Additionally, CPU11 also correspondingly controls even with this switching manipulation
Connect equipment 4.
It addition, above-mentioned distribution memory area is equivalent to the rule of the external memory storage in above-mentioned background technology
Determine memory area (distribution storage address).It addition, below, will be equivalent to depositing of said external memorizer
Reservoir is referred to as " device memory ".Additionally, the memorizer that will be equivalent to above-mentioned internal storage is referred to as " aobvious
Show device memorizer ".
It addition, as it has been described above, above-mentioned " device memory " (external memory storage) is connection equipment 4 is possessed
Memorizer, to projects distribute memorizer.Deposit as it has been described above, based on this distribution memory area
Put the display content that data determine and update projects.
And, as it has been described above, have following structure: the data that will read from this distribution memory area
" display memory " (internal storage) being temporarily stored in programable display 1, based on deposit
Data carry out project display and control.
That is, example each communication processing section 44 described as follows etc. it is handled as follows termly: from connection
The regulation memory area of the memory devices (device memory) in equipment 4 reads data, by this reading number
According to being stored in aforementioned display device memorizer.Afterwards, based on display memory deposit data etc., enter
The display of row aforesaid operations display picture controls.Thus, projects image on operating display frame
Display content reflects up-to-date the depositing in data of the distribution memory area corresponding with this project
Hold.
But, cannot obtain Arbitrary Term purpose distribution memory area for some reason deposits data
In the case of Deng, the display content of this item image is likely not to have reflection latest data (thus reliability
Low).Communication is in the case of mistake is its reason, for the connection as the communication object made a mistake
For all items that equipment 4 is relevant, it is possible to the reliability of its display content is relatively low.As it has been described above,
In the past, even if operator etc. can learn there occurs mistake, it is also difficult to judge the display of which item image
Content reliability is relatively low.Unlike this, according to this method, which project anyone can identify
The display content reliability of image is relatively low.
The signal procedure 23 of programable display 1 is for entering with being connected equipment 4 via communication line 6
The program of row communication.Generally, each machine etc. of connection equipment 4 has intrinsic communication protocol (communication
Regulation), according to this communication procedure, communicate with being connected between equipment 4 at programable display 1.
Accordingly, it would be desirable to each machine etc. of each connection equipment 4 is developed signal procedure 23.It addition, do not say and
Analogy, CPU11 etc. performs signal procedure 23 thus realizes and be connected the process that equipment 4 communicates.
It addition, such as by main body program 21 and drawing editing machine 31 carry out programable display 1 with
Communication (communication function is embedded into drawing editing machine 31) between drawing editing device 5.This and this
Bright not special relation, does not the most illustrate and illustrates.Equipment is i.e. connected for PLC main body etc.
For 4, there is various manufacturer and machine, each manufacturer/machine of each manufacturer/machine has respectively
There is signal procedure alone, according to the manufacturer/machine of connection equipment 4, there is multiple kind upper sometimes
State signal procedure 23.
Generally, in the not shown HD (hard disk) in drawing editing device 5, by signal procedure 23
(each machine of each machine is respectively completed multiple communications of exploitation as multiple signal procedure file 33
Program) store in advance.Afterwards, if user utilizes drawing editing machine 31 select and specify arbitrarily
Connection equipment 4, then drawing editing device 5 is by the signal procedure corresponding with the connection equipment 4 of this selection
File 33 is transferred to programable display 1, and stores as above-mentioned signal procedure 23 process.
Come even by the various settings (generating setting during picture data file 32) of drawing editing machine 31
The device memory connect in equipment 4 conducts interviews.
Such as, user, when generating picture data file 32, configures numerical value display project also in picture
And the arbitrary address to this numerical value display project designated equipment memorizer, thus set programable display 1
Periodically read the data specifying address of device memory and carry out the action shown.In other words,
If this picture data file 32 being downloaded to programable display 1 and using as picture data 22,
Then programable display 1 carries out following action: periodically read the appointment address of device memory
The action (further acquisition data are stored in temporarily the action of display memory) of data;And based on
Obtain the action etc. that data show in picture enterprising line number value.
Moreover, it is achieved that to the access of the said equipment memorizer, obtain depositing and picture of data temporarily
The program of the various process such as display can be the program that such as main body program 21 is comprised, it is also possible to be picture
The program that face data file 32 (picture data 22) is comprised.In a word, the most above-mentioned CPU11 performs this
The program of sample, thus realize above-mentioned various action (or the action illustrated by following Fig. 5, Fig. 7, Fig. 8
Deng).
Or, when generating picture data file 32, such as configuration switch and conduct output in picture
The arbitrary address of memorizer designated equipment memorizer, then when the display operation of pressing programable display 1
During switch on picture, set the action specifying address to write this device memory.
In a word, the process, the renewal of project display content that conduct interviews the said equipment memorizer process
Itself can be roughly the same with prior art.In the method, sometimes enterprising at aforesaid operations display picture
One step show following specific markers (!Deng) (when such as making a mistake with the arbitrary communication being connected equipment 4
Deng).To this, it is described in detail hereinafter with reference to Fig. 4 and accompanying drawing afterwards thereof.
Fig. 4 represents the aforesaid operations display picture of the programable display 1 of this example when there is particular error
Face example.
Above-mentioned particular error is the distribution memory areas from the said equipment memorizer relevant with any project
Data (data acquisition) failure is read in territory, and such as, its reason is to go out with the communication being connected between equipment 4
Wrong etc..The spy pre-registered is shown corresponding to relating to the image of the failed project of this data acquisition
Calibration note is (herein for diagram!Labelling), this is one of the feature of this method.
In the example shown in fig. 4, in the way of overlapping with projects image part of diagram, will rule
One i.e. specific markers of example of fixed erroneous picture (!) show.But, it is not limited to this example,
Such as can show near projects image specific markers (!).In a word, it is configured to: obtain with relating to data
The image of the project taking failure show corresponding show specific markers (!).
It addition, the erroneous picture of regulation can be such as any still image as an example, this is quiet
One example of state image be above-mentioned "!", certainly, it is not limited to this example, can pre-register
Arbitrarily still image.Additionally, the erroneous picture of regulation is not limited to still image, can be animation, photograph
Sheet, text, cartoon etc., or can also be combinations thereof etc..In the present invention will be the most static
Image, the still image pre-registered, also have animation, photo, text, cartoon etc. or they
Combination be defined as regulation erroneous picture (also referred to error image).
In the example presented in the figure, it is shown that 3 kinds of item image, but owing to all items image is shown
Above-mentioned specific markers (!), therefore, user can be identified as the display content of such as 3 item image and all locate
In the state that cannot trust.
Or, although not shown, but such as there is also following situation: correspond only to 3 kinds of item image
In 1 item image show specific markers (!).In the case of this example, can recognize that and be: should
The display content of 1 item image is in the state that cannot trust, but the display of remaining 2 item image
Content is in reliable state.
Fig. 5 is the process functional diagram of the programable display of this example.
CPU11 performs regulated procedure (such as, the aforementioned body journey of storage in the most above-mentioned ROM12
Sequence 21, signal procedure 23 etc.), thus various process function parts shown in realizing the dotted line of such as Fig. 5.
I.e., it is achieved the project generating unit 41 of diagram, project process progress portion 42, project process portion 43, communication
The following process function of the various process function parts such as process portion 44 (44-1,44-2 etc.).
It addition, such as, project generating unit 41, project process progress portion 42 and project process portion 43 by
Main body program 21 realizes.Communication processing section 44 is realized by main body program 21 and signal procedure 23.
Additionally, perform these process functions process time, use above-mentioned picture data 22, diagram go out
Wrong display view data 47.It addition, in this example, display view data 47 of makeing mistakes is to be stored in advance in
The above-mentioned specific markers of ROM12 etc. (in this example is!), but it is not limited to this example.
Project generating unit 41 generates bulleted list 46 based on above-mentioned picture data 22 etc..Such as, with
The form of the part extracting picture data 22 (also adds following process to generate bulleted list 46
End mark 67).
Herein, Fig. 9 (a) illustrates the data structure diagram of bulleted list 46.
The bulleted list 46 of examples shown is by item types 61, coordinate 62, size 63, device name
64, address 65, " data of each item types " 66, each data items of process end mark 67 come
Constitute.In addition to processing end mark 67, remaining may be regarded as same as the prior art, below, enter
Row simple declaration.
The project kind of the item types 61 kind (switch, lamp, numerical value show) to representing this project
Identification information stores.
" data of each item types " 66 to the view data of this project (item image: if item types
For switch then for switching image arbitrarily) etc. additional information etc. store.Above-mentioned coordinate 62, size
63 pairs of data representing this item image display position on picture and size are deposited.These are
Relevant data are shown with the image on the operating display frame of projects.
Additionally, device name 64 is the memorizer distribution information relevant with projects with address 65, phase
When in above-mentioned distribution storage address.That is, 65, the address in memorizer shown in device name 64 table
The memory area shown is the region to this allocation of items (above-mentioned distribution memory area).Such as, if project
Type 61 is lamp, then the flag data etc. lighted indication lamp/extinguish at this memory area is deposited
Put.It addition, the memorizer shown in device name 64 is the said equipment memorizer (arbitrarily connects equipment 4
Interior memorizer).
Project processes progress portion 42 to the display state of projects image that project process portion 43 is carried out more
The progress of new process etc. is managed.That is, project process progress portion 42 calls at project the most termly
Reason portion 43, the process making project process portion 43 carry out the most following Fig. 8 (in other words, is periodically held
The process of row Fig. 8).
Project process portion 43 performs to process as follows: namely be based on above-mentioned bulleted list 46, following share
Memorizer 45 deposit data etc., each project of projects is updated to the display of the image of this project
Content etc. (as the process of project display unit).Now, in the method, always according to situation display spy
Calibration note (!).
That is, project process portion 43 is also handled as follows: corresponding to (showing with project with particular error
The acquisition failure of relevant data;Reason is such as to make mistakes with the communication being connected between equipment 4) have
The image of the project closed shows that (such as with partly overlapping form) shows display view data of makeing mistakes
47 (specific markers (!)) (as the process of notification unit of makeing mistakes).About details, utilize and share shown in Fig. 6
The concrete example depositing data of memorizer 45 is described below.It addition, common storage 45
Be equivalent to aforementioned display device memorizer.
Additionally, (expansion) projects image is drawn in project process portion 43 on RAM13.Now, root
According to project kind, above-mentioned acquisition data are drawn (expansion) the most in the lump on RAM13.Thus, figure
This paint data is shown over the display by controller 15, thus shows above-mentioned display operation screen.?
When project process portion 43 performs the process of the most following Fig. 8 every time, update this paint data at any time.This
Outward, the most also draw above-mentioned specific markers (!) etc., thus sometimes become the most as shown in Figure 4 aobvious
Show.
Communication processing section 44 be corresponding with each of each connection equipment 4 (4-1,4-2) and include logical
Letter process portion 44-1,44-1 (communications processor element).I.e., it is illustrated that communication processing section 44-1 uses and connects
Meet COM1 WAY1 corresponding for equipment 4-1, carry out with being connected equipment 4-1 via communication line 6
Communication, obtain this device memory regulation region (distribution memory area) deposit data.To obtain
Data are written to the regulation region of common storage 45 and deposit.
Similarly, it is illustrated that communication processing section 44-2 uses the COM1 corresponding with connecting equipment 4-2
WAY2, communicates with being connected equipment 4-2 via communication line 6, obtains the rule of this device memory
That determines region (distribution memory area) deposits data.It is written to common storage 45 by obtaining data
Regulation region is also deposited.
The acquisition depositing data of above-mentioned distribution memory area processes and to depositing that common storage is carried out
Putting process itself can be roughly the same with prior art, but in the method, is also handled as follows:
In the case of data acquisition failure, error message be recorded the respective regions of above-mentioned common storage 45.
This respective regions refers to: in the case of the acquisition failure of such as relevant with any project data, with this
That hurdle of following error message 55 of this record on common storage 45 that project is relevant.
Thus, when being carried out drawing modification by above-mentioned project process portion 43 on RAM13 afterwards, for
The project that data acquisition is failed, draw above-mentioned specific markers (!).Thus, on operating display frame,
Corresponding to the image of the failed project of above-mentioned data acquisition show specific markers (!).
Fig. 6 illustrates the concrete example of above-mentioned common storage 45.
Fig. 6 (a) represents the example data structure of common storage 45, and Fig. 6 (b) represents that data deposit example.
In Fig. 6 (a) example shown, common storage 45 deposit data 50 by port 51, equipment
Title 52, address 53, data 54, these each data item of error message 55 are constituted.It addition, it
In, the data item in addition to error message 55 can be roughly the same with prior art.Thus, carry out below
Simple declaration.
Port 51 is the identification information etc. of above-mentioned COM1, substantially identifies as communication object
Connect equipment 4 information.Equipment 52 is to set as the memorizer in the connection equipment 4 of communication object
The identification information of standby (device memory).Address 53 is that the regulation in device memory shown in equipment 52 is deposited
The address in storage area territory, deposits the data obtained from this memory area in data 54.
It addition, can regard as being equivalent to the upper of projects by port 51, device name 52 and address 53
State " distribution storage address ".That is, respectively record corresponding to projects shown in Fig. 6 (b).By picture data
The above-mentioned distribution storage address of each project of the projects comprised in 22 grades is stored in port 51, sets
Standby title 52 and address 53, thus generate each record shown in Fig. 6 (b).It addition, now, shape in advance
Become linking between record and project.Thus, when carrying out the display renewal process etc. of Arbitrary Term purpose,
With reference to the record corresponding with this project in common storage 45.
And, sometimes would indicate that by communication processing section 44 that there occurs that the information of particular error leaves in makes mistakes
In information 55.That is, the data relevant with any project are obtained from above-mentioned distribution memory area, if should
In the case of data acquisition failure, communication processing section 44 would indicate that the information (figure that there occurs particular error
Show " makeing mistakes ") in the error message 55 of this record of this project that is stored in common storage 45.
As it has been described above, 2nd record being recorded as Fig. 6 (b) example shown relevant with a certain project
In the case of, the address connecting the numbering 200 in the memory devices D of equipment 4-1 is that this project " is divided
Join storage address ", it is illustrated that in example, the data of depositing that this " distribution storage address " is currently deposited are
“1000”.But, error message 55 is in the case of " makeing mistakes ", and this numerical value is the most correct.
Such as, in the case of the 1st record of Fig. 6 (b) example shown, it is shown that connect equipment 4-1
Memory devices D in numbering 100 address in deposited data " 12345 ", but this deposits data
It is not necessarily correct information.This is because deposited " to go out in the error message 55 of the 1st record
Wrong ".
That is, communication processing section 44-1 tries from the numbering 100 of memory devices D connecting equipment 4-1
Address acquisition data, but due to communication mistake etc. cause data acquisition failure, therefore, the 1st
The error message 55 of individual record has deposited " makeing mistakes " as shown in Figure.In this case, above-mentioned number
It it not current data according to " 12345 ", it may be possible to legacy data.In the method, in this case,
Such as show at the image recording corresponding project (above-mentioned chain such as can be utilized to fetch differentiation) with the 1st
On, such as on one part overlapping specific markers (!) show.Thus, operator etc. identify
Above-mentioned " 12345 " for just showing on such as picture are not the most correct numerical value.
Such as the process of following Fig. 8, project process portion 43 is such as each item of projects
Mesh performs to process as follows termly: with reference to the respective record of common storage 45, obtain this data 54,
And determine the display content of this item image based on these data 54 and be updated.This process itself can be with
Prior art is roughly the same, but the project process portion 43 of this example is with further reference to error message 45, and base
Process in error message.
That is, if error message 55 is " normally ", then project process portion 43 is only carried out and above-mentioned existing skill
The process that art is identical.On the other hand, relevant with any project situation that error message 55 is " makeing mistakes "
Under, project process portion 43 will make mistakes display view data 47 (specific markers (!)) overlap this project
The display position of image i.e. overlapping the form on such as this item image and carry out showing (such as, as
Fig. 4 example shown shows like that).But, this is an example, is not limited to this example.
Fig. 7 is the process chart of communication processing section 44.
Such as, in Fig. 5 example, each communication processing section 44-1,44-2 are the most periodically (with the fixed cycle)
Perform the process of Fig. 7.
In the process example of Fig. 7, first, with reference to common storage 45, the company generating and itself serving as
Connect equipment 4 relevant memorizer list 101 (step S1).Such as, communication processing section 44-1 carry out
In the case of process, generate the memorizer list 101 relevant with connecting equipment 4-1.
Fig. 9 (b) illustrates the data structure example of this memorizer list 101.
In examples shown, memorizer list 101 by device name 71, address 72, data 73, go out
Wrong these each data item of information 74 are constituted.Such as, the feelings of the example of above-mentioned communication processing section 44-1
Under condition, extract, from common storage 45, all records that port 51 is " WAY1 (circuit 1) ", will be each
The device name 52 of extraction record, address 53, data 54, the information of error message 55 leave in
State in device name 71, address 72, data 73, error message 74, generate and be connected equipment with above-mentioned
Memorizer list 101 relevant for 4-1.It addition, data 73, error message 74 are not necessarily.Can
Deposit expression and process the flag information whether terminated to replace them.
Afterwards, with reference to the memorizer list 101 generated, while repeating step S2~S7
Process, until step S7 be determined to be "No".
That is, untreated record (as processing object record) is read from memorizer list 101, based on this
The content of record, generates memorizer reading order, sets to the connection itself served as via communication line 6
Standby 4 send this order (step S2).Afterwards, wait from the sound for this order connecting equipment 4
Answer (step S3).This order comprises the said equipment title 71, address 72 etc. and determines the letter accessing destination
Breath (distribution storage address), the memory area that connection equipment 4 represents from this distribution storage address reads
Data, the response carrying out replying these reading data processes.But, at digital independent for some reason
And in the case of failure, reply memorizer reading and make mistakes.
Such as in the case of not responding to after the stipulated time from the moment sending mentioned order yet
Situations such as (communication) makeing mistakes, or response contents is in the case of memorizer reads and makes mistakes etc., communication process
Portion 44 is judged to there occurs particular error (step S4, yes), suitable at above-mentioned common storage 45
" makeing mistakes " (step S6) is deposited on the hurdle of the above-mentioned error message 55 in the record processing object record.
On the other hand, in the case of connection equipment 4 carries out normal response (step S4, no), this is rung
Answer the above-mentioned reading data comprised to be stored in above-mentioned common storage 45 and be equivalent to process object record
Record in above-mentioned data 54 hurdle in (step S5).It addition, now, the hurdle of error message 55
In deposited " makeing mistakes " in the case of, removed (or depositing " normally ").
Then, any process of above-mentioned steps S5, S6 is performed, afterwards, to memorizer list 101
In whether there remains untreated record and check, in the case of there remains, (step S7, yes) returns to
Step S2, does not remains (step S7, no) in the case of having and terminates present treatment.
Fig. 8 is the process chart in project process portion 43.
As it has been described above, process the management in progress portion 42 based on project, periodically carry out the process of Fig. 8.
In the process example of Fig. 8, first, the initialization of project process portion 43 project implementation list 46
Process (step S11).Such as, the process end mark 67 of whole lists of bulleted list 46 is set to
" untreated ".Afterwards, repeated execution of steps S12~the process of S19, until following step S19 becomes
Till no.
That is, the arbitrarily record during mark 67 is the record of " untreated " in bulleted list 46 is set to place
Reason object record, with reference to this process object record, obtains its (step such as device name 64, address 65
S12), utilize the respective record of they search common storages 45, and obtain its data (step S13).
I.e., such as, its device name 52 is identical with the said equipment title 64 and address 65 with address 53
Record is exactly above-mentioned respective record.Then, using the data 54 of respective record and error message 55 as
Memorizer information 102 carries out obtaining (step S13).
It addition, memorizer information 102 is made up of data 81 shown in Fig. 9 (c), error message 82, they
It is data 54 and the error message 55 of above-mentioned acquisition.
Then, based on above-mentioned memorizer information 102, it is determined whether there occurs particular error (communication makes mistakes,
Memorizer reads makes mistakes) (step S14).It is that " makeing mistakes " or " normally " enters according to error message 82
Row judges.Certainly, if error message 82 is " makeing mistakes ", then it is judged to there occurs particular error (step
S14, yes), and transfer to step S16.On the other hand, if error message 82 is " normally ", then sentence
It is set to and there is no particular error (step S14, no), and transfer to step S15.
In the case of there is no particular error (step S14, no), carry out display same as the prior art
Process.That is, carry out using data 81 and information (image of project, the seat of above-mentioned process object record
Mark, size etc.) general project drawing modification (such as on RAM13 launch) (step S15).
On the other hand, in the case of there is particular error (step S14, yes), carry out using above-mentioned process
The information of object record and make mistakes display view data 47, paint according to project when makeing mistakes of this method
System processes (step S16, S17).First, carry out decision make mistakes display view data 47 (specific markers (!
Deng)) display position coordinates process (step S16).
Itself there is various ways in the process of this step S16, substantially, based on coordinate 62 (=X, Y),
Utilize the regulation deviant etc. that predetermines, determine specific markers (!) display position coordinates.Such as,
In most cases, coordinate 62 is the coordinate in the upper left corner in item display area, therefore, by specific mark
Note (!) display on the upper right corner of item display area time, such as use size 63 " width ", will
(X+ width, Y) be set to specific markers (!) display position coordinates.
Then, carry out at the coordinate that above-mentioned steps S16 determines, draw (such as launching on RAM13)
Above-mentioned specific markers (!) process (step S17).It addition, before, can enter in the same manner as step S15
Row project drawing modification, but also can not carry out this process.
It addition, as it has been described above, the displays such as the paint data on RAM13 are being shown by graphics controller 15
Show on device.Thus, in above-mentioned process example, on the right side of the image of the project that there occurs particular error
Upper angle display specific markers (!).
So, determine the project that there occurs particular error, and corresponding to the figure of (overlapping or close) this project
As show above-mentioned specific markers (!), thus operator etc. can identify at a glance and can not trust this project
The content etc. of image.
After the process having performed above-mentioned steps S15 or step S16, S17, by bulleted list 46
The mark 67 processing object record is changed to " process terminates " (step S18).
Then, if bulleted list 46 there remains untreated record (step S19, yes), then return
To step S12, if all process terminates (step S19, no), then terminate present treatment.
As mentioned above, according to the programable display 1 etc. of this example, it is associated with any project
The acquisition of memory data when becoming the state that cannot obtain for some reason, determine this project also
Display corresponding to this project carries out the display that makes mistakes, so that operator can determine exception at a glance
Project.
Claims (6)
1. a programable display, this programable display is connected with the connection equipment of regulation, its
It is characterised by,
In advance each project in the projects of the various states that the described regulation of expression connects equipment is divided
Join any memory area of described connection equipment,
Described programable display includes:
Communications processor element, this communications processor element reads for each described project and distributes to this project
Described memory area i.e. distribute the data preserved in memory area;
Project display unit, this project display unit is based on described in being read by this communications processor element
Described projects are shown by data;And
Make mistakes notification unit, this notification unit of makeing mistakes at described communications processor element from described distribution storage
In the case of the reading process failure of data is read in region, all items failed corresponding to this reading comes
Show the erroneous picture of regulation respectively.
2. programable display as claimed in claim 1, it is characterised in that
Also there is common storage,
Described communications processor element will read from described distribution memory area for each described project
Data i.e. read data and are stored in this common storage, in the case of the failure of described digital independent, described
The error message of regulation is stored in this common storage by communications processor element,
Described project display unit shows institute based on the described reading data deposited in this common storage
State project,
All items that described error message is stored in this common storage by described notification unit of makeing mistakes
Mesh, the display corresponding to described projects shows described erroneous picture respectively.
3. programable display as claimed in claim 2, it is characterised in that also include:
Picture data storage unit, in this picture data storage unit for each described project in advance
Deposit its image of expression, display position coordinates and the information of described distribution memory area;And
Erroneous picture memory element, this erroneous picture memory element is previously stored with makeing mistakes of described regulation
Image,
The project that described error message is stored by described notification unit of makeing mistakes, based on described in projects
Display position coordinates, determines the display position of the described erroneous picture of projects respectively.
4. programable display as claimed in claim 2 or claim 3, it is characterised in that
The figure of the project that described erroneous picture is stored by described notification unit of makeing mistakes with described error message
As partially overlapping showing.
5. a programable display, the connection equipment of this programable display and more than 1 is connected,
Show that this image respectively connecting the project of more than 1 of the various states of equipment shows at picture to major general
On, it is characterised in that
In advance to connecting any memory area of equipment described in each described allocation of items,
Described programable display includes:
Communications processor element, this communications processor element reads distribution for each project of described projects
Data are deposited to what the regulation memory area of this project i.e. distributed memory area;
Project display unit, this project display unit is the unit of the image showing described projects, base
Described in reading from described regulation memory area, deposit data, show the image of described project;
And
Make mistakes notification unit, this make mistakes notification unit that carried out by described communications processor element, appoint
In the case of the reading process failure depositing data of the described distribution memory area involved by meaning project,
The erroneous picture of regulation is shown corresponding to the image of project described in this Arbitrary Term purpose.
6. access makes mistakes a Notification Method, and this access Notification Method of makeing mistakes is the visit of programable display
Getting wrong Notification Method, described programable display is connected with the connection equipment of regulation, accesses this rule
The fixed memory area connecting equipment reads the data that described memory area is preserved, and to representing institute
The projects of various states connecting equipment stating regulation show, described access makes mistakes Notification Method
It is characterised by,
In advance to connecting any memory area of equipment described in each described allocation of items, for each institute
State project, if i.e. distributing, to the described memory area distributing to this project, the number preserved in memory area
According to reading failure, then show makeing mistakes of regulation corresponding to the described project involved by this reading failure
Image.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2012/080792 WO2014083646A1 (en) | 2012-11-28 | 2012-11-28 | Programmable indicator and program |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104106014A CN104106014A (en) | 2014-10-15 |
CN104106014B true CN104106014B (en) | 2016-08-24 |
Family
ID=50827320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201280069482.5A Active CN104106014B (en) | 2012-11-28 | 2012-11-28 | Programable display, program |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP5970080B2 (en) |
CN (1) | CN104106014B (en) |
TW (1) | TWI594095B (en) |
WO (1) | WO2014083646A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6481267B2 (en) | 2014-06-27 | 2019-03-13 | オムロン株式会社 | Programmable display |
JP6725934B2 (en) * | 2016-05-25 | 2020-07-22 | ケーズクリエイション合同会社 | Data management device, data management method in the device, data management program, and data management system |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06324723A (en) * | 1993-05-14 | 1994-11-25 | Sharp Corp | Programmable controller |
JPH10320042A (en) * | 1997-05-19 | 1998-12-04 | Toshiba Eng Co Ltd | Plant device operation state display device |
JP3794210B2 (en) * | 1999-07-19 | 2006-07-05 | オムロン株式会社 | Control information display input device and control method thereof |
JP3894421B2 (en) * | 2001-07-02 | 2007-03-22 | 三菱電機株式会社 | Network system |
JP4426492B2 (en) * | 2005-03-30 | 2010-03-03 | Ykk株式会社 | Programmable terminal system |
JP4710548B2 (en) * | 2005-10-27 | 2011-06-29 | 横河電機株式会社 | Field device management device |
CN201707059U (en) * | 2010-03-09 | 2011-01-12 | 杨明恭 | Surface display automatic reading device |
JP2011204202A (en) * | 2010-03-26 | 2011-10-13 | Panasonic Electric Works Sunx Co Ltd | Display device |
JPWO2012050208A1 (en) * | 2010-10-15 | 2014-02-24 | 三洋電機株式会社 | Power management system |
-
2012
- 2012-11-28 CN CN201280069482.5A patent/CN104106014B/en active Active
- 2012-11-28 WO PCT/JP2012/080792 patent/WO2014083646A1/en active Application Filing
- 2012-11-28 JP JP2014549696A patent/JP5970080B2/en active Active
-
2013
- 2013-11-08 TW TW102140702A patent/TWI594095B/en active
Also Published As
Publication number | Publication date |
---|---|
WO2014083646A1 (en) | 2014-06-05 |
TWI594095B (en) | 2017-08-01 |
JP5970080B2 (en) | 2016-08-17 |
JPWO2014083646A1 (en) | 2017-01-05 |
TW201439698A (en) | 2014-10-16 |
CN104106014A (en) | 2014-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105593773B (en) | The system and method entrusted automatically for virtual distributed control system | |
CN103838537A (en) | Control device and information processing apparatus | |
CN103077067B (en) | Dummy machine system time defining method, device and equipment | |
CN112364266A (en) | Seamless navigation method, device, electronic equipment and medium for applet and host application | |
CN110297808A (en) | File modification method, apparatus, computer equipment and the storage medium of container application | |
CN105074587A (en) | System development device, method, and program | |
CN104106014B (en) | Programable display, program | |
RU2294015C2 (en) | Method for automatic modeling of system for controlling process and system for controlling process | |
JP6504237B2 (en) | Shared data definition support system, its support device, program | |
CN103365535B (en) | Information processor and information processing method | |
CN107341074A (en) | One kind upgrades abnormal restorative procedure, upgrading exception prosthetic device and intelligent terminal | |
CN105027012B (en) | Programable controller system, its programable display | |
CN104995590B (en) | Programable display and the storage medium for storing its program | |
CN106126275A (en) | Control method and device for application program data in mobile terminal and mobile terminal | |
JP2012168900A (en) | Programming device and program | |
CN108629477A (en) | Equipment Information Management System | |
CN104106015B (en) | Programable controller system, its programable display, auxiliary device, program | |
JP2005267501A (en) | Storage management method and system | |
CN103518164B (en) | For the method running automated system | |
JP6789776B2 (en) | Information processing equipment, information processing methods and programs | |
CN109545019A (en) | Learn auxiliary device and study householder method | |
CN105009007B (en) | Programable controller system and its mapping editing device | |
CN105612574B (en) | Programable display, program | |
CN106815001A (en) | The detection method and device of profile information | |
CN117009358A (en) | Index data processing method, device, equipment, storage medium and program product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |