CN104097869A - Independent ore bin antifreezing deicing process at mine earth surface in severe cold region - Google Patents

Independent ore bin antifreezing deicing process at mine earth surface in severe cold region Download PDF

Info

Publication number
CN104097869A
CN104097869A CN201410306977.6A CN201410306977A CN104097869A CN 104097869 A CN104097869 A CN 104097869A CN 201410306977 A CN201410306977 A CN 201410306977A CN 104097869 A CN104097869 A CN 104097869A
Authority
CN
China
Prior art keywords
ore
storage bin
ore storage
air
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410306977.6A
Other languages
Chinese (zh)
Other versions
CN104097869B (en
Inventor
杜林�
胡润夫
王靖文
赵岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Zhongkuang Engineering Technology Co.,Ltd.
Original Assignee
CHINA METALLURGICAL MINING ANSHAN METALLURGY DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA METALLURGICAL MINING ANSHAN METALLURGY DESIGN INSTITUTE Co Ltd filed Critical CHINA METALLURGICAL MINING ANSHAN METALLURGY DESIGN INSTITUTE Co Ltd
Priority to CN201410306977.6A priority Critical patent/CN104097869B/en
Publication of CN104097869A publication Critical patent/CN104097869A/en
Application granted granted Critical
Publication of CN104097869B publication Critical patent/CN104097869B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides an independent ore bin antifreezing deicing process at a mine earth surface in a severe cold region. The method comprises the step of performing hot air heating for the interior of an ore bin and ores at an ore outlet by mounting a hot air source and hot air conveying equipment in a sealed ore unloading bin and the ore bin, thus preventing the interior of the ore bin and the ores at the ore outlet from icing or unfreezing the iced ores. Compared with the prior art, the independent ore bin antifreezing deicing process at the mine earth surface in the severe cold region has the beneficial effects that the process method is simple, the investment is less, a high temperature hot air source is introduced, the anti-freezing deicing aim is achieved by a reasonable, scientific and efficient ore bin hot flow arrangement mode, so the ores in the ore bin can be smoothly stored and transferred and the smooth operation of the mining work is ensured.

Description

The antifreeze deicing technique of earth's surface, mine, a kind of severe cold area independence ore storage bin
Technical field
The present invention relates to the antifreeze Optimization Technology of severe cold area ore storage bin, particularly the antifreeze deicing technique of earth's surface, mine, a kind of severe cold area independence ore storage bin.
Background technology
Since the establishment of the nation, along with national economy progressively enters into the motorway of high speed development, the exploitation scale of China's metal, non-metal mine has had the development of advancing by leaps and bounds.All kinds of reconstructions, Newly-built mine spread all over the country, and newly-increased production capacity is nearly 100,000,000 tons every year.China is vast in territory, and various places geology and geomorphology characteristic is completely different, and regional climate varies, and the north and south temperature difference can reach 50 ℃ of left and right, and the underground aqueous ingredients of the western and eastern also differs greatly.Therefore, caused the variety of mine ore ore removal physicochemical character.And the factor that earth's surface ore storage bin is had the greatest impact is exactly its aqueous ingredients and ambient temperature of living in.In high and cold, high altitude region, mine has some months to be under cryogenic conditions every year.Externally temperature is down to 0 ℃ when following, if the aqueous ingredients of ore removal ore, higher than 10%, just Lifting Convey is to very soon can freezing connection behind earth's surface, can produces knot and connect bulk in serious situation, causes wall built-up sticky glutinous, the phenomenons such as the equipment knot end.Cause the stifled ore deposit of transhipment ore storage bin of a large amount of ores of storage simultaneously.The fast processing mode still not had at present, the ore storage bin standby that can only stop production.Ore storage bin is born ore transhipment, storage and is guaranteed the task of transportation continuously, is that ore fells and transports very important link in process.Ore storage bin goes wrong and can not work, and to the production in full ore deposit, can have an immense impact on.Still the maturation process that there is no at present the antifreeze deicing of earth's surface, mine, severe cold area independence ore storage bin.
Summary of the invention
The invention provides the antifreeze deicing technique of earth's surface, mine, a kind of severe cold area independence ore storage bin, this process is simple, small investment, introduce high-temperature hot-air source, by reasonable, science, efficient ore storage bin hot-fluid arrangement, reach the object of freezing preventing and ice melting, make ore storage bin ore to store smoothly and to transport, guaranteed carrying out smoothly of mining activity.
For achieving the above object, the present invention realizes by the following technical solutions:
The antifreeze deicing technique of earth's surface, mine, a kind of severe cold area independence ore storage bin, by sealing unload chamber, ore deposit and ore storage bin in hot air source and hot blast transmission equipment are installed, to in ore storage bin and go out mine mouth ore and carry out hot blast and heat, to prevent in ore storage bin and to go out mine mouth ore, freeze, or icing ore is thawed.
Described sealing unload chamber, ore deposit and ore storage bin in hot air source and the hot blast transmission equipment installed comprise high-temperature hot-air equipment, warm-air pipe, the flexibility parting bead that keeps out the wind, hot blast manifold, high-temperature hot-air equipment is arranged on and unloads indoor railway line one side in ore deposit, at ore storage bin top board place, make an opening through N through hole, warm-air pipe draws by the outlet of high-temperature hot-air equipment N the through hole that is connected to ore storage bin top board, and warm-air pipe outlet is introduced to ore storage bin downwards through through hole, the flexibility parting bead that keeps out the wind is arranged on longitudinal edge of ore storage bin top board, hot blast manifold is drawn outdoor by warm-air pipe, along ore storage bin exterior wall, lay the opening part to vibration ore dumping machine, warm-air pipe and hot blast manifold are done insulation and are processed.
Described heats by hot blast, freeze, or the process that icing ore is thawed comprises to prevent in ore storage bin and to go out mine mouth ore:
1) drying process: adopt when ore aqueous ingredients freezes more greatly and not yet in ore storage bin, according to ore storage bin volume and aqueous ingredients, regulate high-temperature hot-air device temperature and air quantity to make it, after the highest scope of drying efficiency, to be dried.
2) anti-freezing process: adopt while keeping ore not freeze in ore storage bin normal course of operation, high-temperature hot-air device temperature is adjusted to local heating of house temperature, air quantity regulates according to ore storage bin volume, makes equipment continue blowing to ensure that ore storage bin and surrounding space temperature are above zero.
3) thawing technique: adopt when ore or ore storage bin mouth ore have freezed adhesion in ore storage bin, regulate high-temperature hot-air device temperature and air quantity to make it, in the most effective scope of ice-melt, the regional sustained that freezes to be heated, until melt.
Process sequence comprises:
1) process sequence when ore not yet freezes is: dry → antifreeze → ore storage bin mouth thaws.
2) process sequence that ore has freezed is: and thaw in ore storage bin → ore storage bin mouth thaws → is dried → and antifreeze → ore storage bin mouth thaws.
Compared with prior art, the invention has the beneficial effects as follows:
The antifreeze deicing technique of earth's surface, mine, a kind of severe cold area independence ore storage bin, this process is simple, small investment, introduce high-temperature hot-air source, by reasonable, science, efficient ore storage bin hot-fluid arrangement, reach the object of freezing preventing and ice melting, make ore storage bin ore to store smoothly and to transport, guaranteed carrying out smoothly of mining activity.
Accompanying drawing explanation
Fig. 1 is the technology arrangement schematic diagram of the antifreeze deicing of ore storage bin of the present invention.
Fig. 2 is the plan view from above of Fig. 1.
In figure: 1. high-temperature hot-air equipment 2. warm-air pipe 3. flexibilities parting bead 4. hot blast manifolds 5. that keep out the wind unload chamber, ore deposit hermetically-sealed construction 6. mine car 7. ore 8. vibration ore dumping machines 9. and unload chamber, ore deposit 10. ore storage bins
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is further illustrated:
As shown in the figure, the antifreeze deicing technique of earth's surface, mine, a kind of severe cold area independence ore storage bin, by sealing unload chamber, ore deposit 9 and ore storage bin 10 in hot air source and hot blast transmission equipment are installed, to in ore storage bin 10 and go out mine mouth ore and carry out hot blast and heat, to prevent in ore storage bin 10 and to go out mine mouth ore, freeze, or icing ore is thawed.
Sealing unload chamber, ore deposit 9 and ore storage bin 10 in hot air source and the hot blast transmission equipment installed comprise high-temperature hot-air equipment 1, warm-air pipe 2, the flexibility parting bead 3 that keeps out the wind, hot blast manifold 4, high-temperature hot-air equipment 1 is arranged on and unloads chamber, ore deposit 9 inner orbit line one sides, at ore storage bin 10 top board places, make an opening through the individual through hole of N (N > 1), warm-air pipe 2 draws by 1 outlet of high-temperature hot-air equipment the individual through hole of N (N > 1) that is connected to ore storage bin 10 top boards, and warm-air pipe 2 outlets are introduced to ore storage bin 10 downwards through through hole, the flexibility parting bead 3 that keeps out the wind is arranged on longitudinal edge of ore storage bin 10 top boards, hot blast manifold 4 is drawn outdoor by warm-air pipe 2, along ore storage bin 10 exterior walls, lay to the opening part of vibration ore dumping machine 8, warm-air pipe 2 and hot blast manifold 4 are done insulation and are processed.
High-temperature hot-air equipment 1 can be selected various ways, as fuel hot air stove, steam heat-exchange fan, electric calorifier etc., can be according to mine existing resource situation, and that suits measures to local conditions selects most economical failure-free apparatus-form.If Newly-built mine selects electric calorifier plenum system more energy-efficient.This type of hot-air heater volume is little, and programming rate is fast, and heat efficiency is high, energy-conserving and environment-protective, and air quantity and range of temperatures can regulate and control separately, according to ore storage bin actual condition, can be interrupted or continual control use.
Warm-air pipe is selected many straight seam welded steel pipes built on stilts laying in parallel, and caliber and wall thickness are determined according to air quantity, blast.
The flexibility that is arranged on the longitudinal edge of the ore storage bin top board parting bead 3 that keeps out the wind is distinguished and admirable excessive for reducing.
By hot blast, heat, to prevent in ore storage bin and to go out mine mouth ore, freeze, or the process that icing ore is thawed comprise:
1), drying process: adopt when ore aqueous ingredients freezes more greatly and not yet in ore storage bin, according to ore storage bin volume and aqueous ingredients, regulate high-temperature hot-air device temperature and air quantity to make it, after the highest scope of drying efficiency, to be dried.
2), anti-freezing process: adopt while keeping ore not freeze in ore storage bin normal course of operation, high-temperature hot-air device temperature is adjusted to local heating of house temperature, air quantity regulates according to ore storage bin volume, makes equipment continue blowing to ensure that ore storage bin and surrounding space temperature are above zero.
3), thawing technique: adopt when ore or ore storage bin mouth ore have freezed adhesion in ore storage bin, regulate high-temperature hot-air device temperature and air quantity to make it, in the most effective scope of ice-melt, the regional sustained that freezes to be heated, until melt.
Process sequence comprises:
1) process sequence when, ore not yet freezes is: dry → antifreeze → ore storage bin mouth thaws.
2) process sequence that, ore has freezed is: and thaw in ore storage bin → ore storage bin mouth thaws → is dried → and antifreeze → ore storage bin mouth thaws.
During use: select different process sequences according to operating mode, when ore not yet freezes, first ore is dried to processing, start hot-air heater, system operation also promotes rapidly temperature and air quantity, by regulating pipe valve, temperature and air quantity are controlled to the highest scope of drying efficiency, at a high speed, the air-flow of high temperature heats ore, and its moisture content of being with is evaporated rapidly, the ore that drying is processed can be avoided freezing phenomenon.
Next process is that ore is carried out to antifreeze processing, regulate hot-air heater temperature to local heating of house temperature, according to ore storage bin volume adjustment air quantity, make equipment continue blowing to ensure that ore storage bin and surrounding space temperature are above zero, can make the entrained remaining moisture content of ore not freeze, reach antifreeze effect.
Because ore storage bin can not be accomplished to seal completely, contact with outside atmosphere going out mine mouth place ore especially, and the coefficient of volumetric expansion is little, top thermal current is difficult to pass through, easily cause freeze and with equipment adhesion.Hot blast manifold 4 can be drained to hot air the opening part of vibration ore dumping machine 8, directly to freezing ore, forces blowing ice-melt, the object of thawing to reach Hatch Opening.
The in the situation that in ore storage bin, ore just having freezed before dry, antifreeze, first to do the processing of thawing to ore in ore storage bin and ore storage bin mouth ore simultaneously, regulate hot-air heater temperature and air quantity to make it in the most effective scope of ice-melt, to freezing, regional sustained is heated, until melt, in ore storage bin and after ore storage bin mouth ore all thawed, the process sequence in the time of can repeating above-mentioned ore and not yet freeze.

Claims (3)

1. the antifreeze deicing technique of earth's surface, mine, severe cold area independence ore storage bin, it is characterized in that, by sealing unload chamber, ore deposit and ore storage bin in hot air source and hot blast transmission equipment are installed, to in ore storage bin and go out mine mouth ore and carry out hot blast and heat, to prevent in ore storage bin and to go out mine mouth ore, freeze, or icing ore is thawed.
2. the antifreeze deicing technique of earth's surface, mine, a kind of severe cold area according to claim 1 independence ore storage bin, it is characterized in that, described sealing unload chamber, ore deposit and ore storage bin in hot air source and the hot blast transmission equipment installed comprise high-temperature hot-air equipment, warm-air pipe, the flexibility parting bead that keeps out the wind, hot blast manifold, high-temperature hot-air equipment is arranged on and unloads indoor railway line one side in ore deposit, at ore storage bin top board place, make an opening through N through hole, warm-air pipe draws by the outlet of high-temperature hot-air equipment N the through hole that is connected to ore storage bin top board, and warm-air pipe outlet is introduced to ore storage bin downwards through through hole, the flexibility parting bead that keeps out the wind is arranged on longitudinal edge of ore storage bin top board, hot blast manifold is drawn outdoor by warm-air pipe, along ore storage bin exterior wall, lay the opening part to vibration ore dumping machine, warm-air pipe and hot blast manifold are done insulation and are processed.
3. the antifreeze deicing technique of earth's surface, mine, a kind of severe cold area according to claim 1 independence ore storage bin, it is characterized in that, described heats by hot blast, freeze, or the process that icing ore is thawed comprises to prevent in ore storage bin and to go out mine mouth ore:
1) drying process: adopt when ore aqueous ingredients freezes more greatly and not yet in ore storage bin, according to ore storage bin volume and aqueous ingredients, regulate high-temperature hot-air device temperature and air quantity to make it, after the highest scope of drying efficiency, to be dried.
2) anti-freezing process: adopt while keeping ore not freeze in ore storage bin normal course of operation, high-temperature hot-air device temperature is adjusted to local heating of house temperature, air quantity regulates according to ore storage bin volume, makes equipment continue blowing to ensure that ore storage bin and surrounding space temperature are above zero.
3) thawing technique: adopt when ore or ore storage bin mouth ore have freezed adhesion in ore storage bin, regulate high-temperature hot-air device temperature and air quantity to make it, in the most effective scope of ice-melt, the regional sustained that freezes to be heated, until melt.
Process sequence comprises:
1) process sequence when ore not yet freezes is: dry → antifreeze → ore storage bin mouth thaws.
2) process sequence that ore has freezed is: and thaw in ore storage bin → ore storage bin mouth thaws → is dried → and antifreeze → ore storage bin mouth thaws.
CN201410306977.6A 2014-06-30 2014-06-30 A kind of earth's surface, mine, severe cold area independence ore storage bin antifreeze deicing technique Active CN104097869B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410306977.6A CN104097869B (en) 2014-06-30 2014-06-30 A kind of earth's surface, mine, severe cold area independence ore storage bin antifreeze deicing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410306977.6A CN104097869B (en) 2014-06-30 2014-06-30 A kind of earth's surface, mine, severe cold area independence ore storage bin antifreeze deicing technique

Publications (2)

Publication Number Publication Date
CN104097869A true CN104097869A (en) 2014-10-15
CN104097869B CN104097869B (en) 2016-08-24

Family

ID=51666479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410306977.6A Active CN104097869B (en) 2014-06-30 2014-06-30 A kind of earth's surface, mine, severe cold area independence ore storage bin antifreeze deicing technique

Country Status (1)

Country Link
CN (1) CN104097869B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201025057Y (en) * 2006-09-11 2008-02-20 朱晓彦 Device for mine well to recycle and utilize returned wind
CN202303941U (en) * 2011-09-15 2012-07-04 洛阳蓝海实业有限公司 Well opening hot air heating device for coal mine
CN203308495U (en) * 2013-06-09 2013-11-27 山东科技大学 Combined-type cooling system for high-temperature mine
CN203347746U (en) * 2013-07-05 2013-12-18 煤炭工业济南设计研究院有限公司 Mineshaft anti-freezing device by return air heat energy
CN103604212A (en) * 2013-11-25 2014-02-26 北京矿大节能科技有限公司 Large-temperature-difference wellhead heater and operation mode thereof
CN203515644U (en) * 2013-10-17 2014-04-02 中国矿业大学 Warming and humidifying device in mine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201025057Y (en) * 2006-09-11 2008-02-20 朱晓彦 Device for mine well to recycle and utilize returned wind
CN202303941U (en) * 2011-09-15 2012-07-04 洛阳蓝海实业有限公司 Well opening hot air heating device for coal mine
CN203308495U (en) * 2013-06-09 2013-11-27 山东科技大学 Combined-type cooling system for high-temperature mine
CN203347746U (en) * 2013-07-05 2013-12-18 煤炭工业济南设计研究院有限公司 Mineshaft anti-freezing device by return air heat energy
CN203515644U (en) * 2013-10-17 2014-04-02 中国矿业大学 Warming and humidifying device in mine
CN103604212A (en) * 2013-11-25 2014-02-26 北京矿大节能科技有限公司 Large-temperature-difference wellhead heater and operation mode thereof

Also Published As

Publication number Publication date
CN104097869B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104871747A (en) Low-temperature grain storage method for low-temperature barn
CN203824204U (en) Anti-freezing refrigerator air channel structure
CN207934926U (en) A kind of system that cool-down dehumidification being carried out to mine using liquid nitrogen
CN203997593U (en) The antifreeze deicing equipment of a kind of severe cold area earth's surface, mine independence ore storage bin
CN104097869A (en) Independent ore bin antifreezing deicing process at mine earth surface in severe cold region
CN203638801U (en) Constant temperature flue gas thawing apparatus
CN108779947A (en) Refrigeration and/or freezing equipment
CN204342003U (en) Converter under a kind of full working scope dry method dust wet cooling tower cinder air-transport system
CN207033481U (en) Underground coal mine heat sink
CN203561095U (en) Anti-freezing system of solar water heater
CN109610401A (en) Water conservancy and hydropower gate upstream face anti-freezing device
CN215099533U (en) Pulverized coal storage and supply device
CN104404199A (en) Converter one-time dry method dedusting evaporating cooling tower crude ash pneumatic conveying method under full-working condition
CN204373255U (en) A kind of air cooled heat pump
CN2732576Y (en) Heating and insulating equipment of railway transportation self-overturning locomotive
CN205002478U (en) Energy -conserving freezer that cold volume was recycled
CN209465434U (en) A kind of animal fat pipe dredging device
CN104444369B (en) A kind of converter dry method dust wet cooling tower cinder pneumatic conveying method under full working scope
CN215721368U (en) Anti-freezing water pipe, anti-freezing device and system
CN204938445U (en) External blower type railway goods defrozing silo hot blast thaws system
CN206269609U (en) A kind of desulfurization preheating device of the brickmaking kiln for gangue as raw material
CN207842594U (en) A kind of refrigerating vehicle cold leakage alarm system
CN207344855U (en) A kind of concrete heat-insulating turns hopper
CN207531405U (en) Circulation samming refrigeration system in a kind of silo
CN104404198A (en) Control method for converter one-time dry method dedusting evaporating cooling tower crude ash pneumatic conveying system under full-working condition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200710

Address after: 114000 No. 261, Yue Ling Road, high tech Zone, Anshan, Liaoning (F block of R & D center)

Patentee after: Liaoning Zhongkuang Engineering Technology Co.,Ltd.

Address before: 114045 No. 158 Qianshan East Road, Qianshan District, Liaoning, Anshan

Patentee before: ANSHAN METALLURGICAL DESIGN AND RESEARCH INSTITUTE CO., LTD. OF CHINA METALLURGICAL MINING Corp.