CN104091975A - 一种锂电池高效配组方法 - Google Patents
一种锂电池高效配组方法 Download PDFInfo
- Publication number
- CN104091975A CN104091975A CN201410350290.2A CN201410350290A CN104091975A CN 104091975 A CN104091975 A CN 104091975A CN 201410350290 A CN201410350290 A CN 201410350290A CN 104091975 A CN104091975 A CN 104091975A
- Authority
- CN
- China
- Prior art keywords
- battery
- capacity
- parallel group
- cell parallel
- cell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- WHXSMMKQMYFTQS-UHFFFAOYSA-N Lithium Chemical compound [Li] WHXSMMKQMYFTQS-UHFFFAOYSA-N 0.000 title claims abstract description 16
- 229910052744 lithium Inorganic materials 0.000 title claims abstract description 16
- 230000002950 deficient Effects 0.000 claims description 6
- 238000001514 detection method Methods 0.000 abstract 1
- 230000002035 prolonged effect Effects 0.000 abstract 1
- 229910052799 carbon Inorganic materials 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/4221—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells with battery type recognition
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/04—Construction or manufacture in general
- H01M10/0404—Machines for assembling batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Battery Mounting, Suspending (AREA)
Abstract
Description
串数 | 每串平均容量 | 每串平均容量与串总平均容量差额 |
1串 | 10148 | -44 |
2串 | 10153 | -39 |
3串 | 10161 | -31 |
4串 | 10168 | -24 |
5串 | 10185 | -7 |
6串 | 10206 | 14 |
7串 | 10219 | 27 |
8串 | 10238 | 46 |
9串 | 10246 | 54 |
串总平均容量 | 10192 | 0 |
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410350290.2A CN104091975B (zh) | 2014-07-22 | 2014-07-22 | 一种锂电池高效配组方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410350290.2A CN104091975B (zh) | 2014-07-22 | 2014-07-22 | 一种锂电池高效配组方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104091975A true CN104091975A (zh) | 2014-10-08 |
CN104091975B CN104091975B (zh) | 2016-09-07 |
Family
ID=51639671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410350290.2A Active CN104091975B (zh) | 2014-07-22 | 2014-07-22 | 一种锂电池高效配组方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104091975B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104409779A (zh) * | 2014-11-20 | 2015-03-11 | 合肥国轩高科动力能源股份公司 | 锂离子电池模块的配组方法 |
CN106058279A (zh) * | 2016-05-29 | 2016-10-26 | 合肥国轩高科动力能源有限公司 | 一种锂电池pack配组方法 |
CN108196195A (zh) * | 2017-12-27 | 2018-06-22 | 银隆新能源股份有限公司 | 电池组装方法、装置及设备 |
CN108777329A (zh) * | 2018-06-05 | 2018-11-09 | 湖北锂诺新能源科技有限公司 | 锂电池配组方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1026759A1 (en) * | 1998-12-11 | 2000-08-09 | Chaz G. Haba | Battery network with compounded interconnections |
JP2006223026A (ja) * | 2005-02-08 | 2006-08-24 | Wiz Energy Technology Co Ltd | ポータブル複合型電池の管理システム |
CN201130695Y (zh) * | 2007-12-11 | 2008-10-08 | 天津力神电池股份有限公司 | 锂离子电池组 |
CN102340022A (zh) * | 2011-09-16 | 2012-02-01 | 奇瑞汽车股份有限公司 | 一种动力型电池及其制造方法 |
CN103390775A (zh) * | 2012-05-08 | 2013-11-13 | 浙江南博电源科技有限公司 | 一种磷酸铁锂二次电池的配组方法 |
-
2014
- 2014-07-22 CN CN201410350290.2A patent/CN104091975B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1026759A1 (en) * | 1998-12-11 | 2000-08-09 | Chaz G. Haba | Battery network with compounded interconnections |
JP2006223026A (ja) * | 2005-02-08 | 2006-08-24 | Wiz Energy Technology Co Ltd | ポータブル複合型電池の管理システム |
CN201130695Y (zh) * | 2007-12-11 | 2008-10-08 | 天津力神电池股份有限公司 | 锂离子电池组 |
CN102340022A (zh) * | 2011-09-16 | 2012-02-01 | 奇瑞汽车股份有限公司 | 一种动力型电池及其制造方法 |
CN103390775A (zh) * | 2012-05-08 | 2013-11-13 | 浙江南博电源科技有限公司 | 一种磷酸铁锂二次电池的配组方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104409779A (zh) * | 2014-11-20 | 2015-03-11 | 合肥国轩高科动力能源股份公司 | 锂离子电池模块的配组方法 |
CN104409779B (zh) * | 2014-11-20 | 2016-08-17 | 合肥国轩高科动力能源有限公司 | 锂离子电池模块的配组方法 |
CN106058279A (zh) * | 2016-05-29 | 2016-10-26 | 合肥国轩高科动力能源有限公司 | 一种锂电池pack配组方法 |
CN106058279B (zh) * | 2016-05-29 | 2018-06-05 | 合肥国轩高科动力能源有限公司 | 一种锂电池pack配组方法 |
CN108196195A (zh) * | 2017-12-27 | 2018-06-22 | 银隆新能源股份有限公司 | 电池组装方法、装置及设备 |
CN108777329A (zh) * | 2018-06-05 | 2018-11-09 | 湖北锂诺新能源科技有限公司 | 锂电池配组方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104091975B (zh) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103611692B (zh) | 一种磷酸铁锂动力电池一致性配组筛选方法 | |
CN106154165B (zh) | 一种大容量电池储能系统性能的评估方法和评估系统 | |
CN103579700B (zh) | 一种锂离子电池分选配组方法 | |
CN102544606B (zh) | 基于聚类分析的锂电池单元配组方法 | |
CN107511340B (zh) | 一种锂离子动力电池分选配组方法 | |
CN103872395B (zh) | 一种锂离子动力电池梯次利用的配组方法 | |
CN101924247B (zh) | 一种锂离子电池配组方法 | |
CN104037461B (zh) | 车用动力锂离子电池配组方法 | |
CN104269574B (zh) | 一种电池组分选方法 | |
CN104014491A (zh) | 一种并联锂离子电池的筛选方法 | |
US20180183245A1 (en) | Improved maintenance method of power battery pack | |
CN102903977A (zh) | 一种锂电池的配组方法 | |
CN103633695A (zh) | 一种改进的锂电池组均衡方法及其均衡电路 | |
CN107377422B (zh) | 一种单体电池的分选方法 | |
CN103487758B (zh) | 一种锂离子电池配组方法 | |
CN104091975A (zh) | 一种锂电池高效配组方法 | |
CN203086213U (zh) | 一种快速充电器及带有该充电器的移动电源 | |
CN108226806B (zh) | 荷电自放电检测方法及电池检测装置 | |
CN107597621B (zh) | 一种提升三元锂离子电池组一致性的筛选方法和配组方法 | |
CN105280969B (zh) | 一种缩小串联电池组之间放电压差的磷酸铁锂电池配组方法 | |
CN105680108A (zh) | 一种锂离子电池的筛选方法 | |
CN106207284A (zh) | 一种提升磷酸铁锂电池分容容量一致性的方法 | |
CN102638081A (zh) | 智能矩阵电池充放电管理系统及管理方法 | |
CN104409779B (zh) | 锂离子电池模块的配组方法 | |
CN103176138A (zh) | 一种电池组维护检测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 230000 Yaohai Industrial Zone, Hefei New District, Anhui, No. D weft Road, No. 7 Applicant after: Hefei Guoxuan High-Tech Power Energy Co.,Ltd. Address before: 230000, No. 7 D Road, Yaohai Industrial Zone, new station area, Anhui, Lu'an, China Applicant before: Hefei Guoxuan High-Tech Power Energy Co.,Ltd. |
|
CB02 | Change of applicant information |
Address after: 230000 Yaohai Industrial Zone, Hefei New District, Anhui, No. D weft Road, No. 7 Applicant after: Gotion High-tech Co., Ltd. Address before: 230000 Yaohai Industrial Zone, Hefei New District, Anhui, No. D weft Road, No. 7 Applicant before: Hefei Guoxuan High-Tech Power Energy Co.,Ltd. |
|
COR | Change of bibliographic data | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Yu Inventor after: Wang Feng Inventor after: Zhang Jiangwei Inventor after: Meng Lingkui Inventor after: Xu Xiaoming Inventor before: Li Yu Inventor before: Wang Feng Inventor before: Chen Ping Inventor before: Meng Lingkui Inventor before: Xu Xiaoming |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |