CN104087890B - Method for preparing ceramic coating lining of mud pump cylinder sleeve - Google Patents

Method for preparing ceramic coating lining of mud pump cylinder sleeve Download PDF

Info

Publication number
CN104087890B
CN104087890B CN201410344130.7A CN201410344130A CN104087890B CN 104087890 B CN104087890 B CN 104087890B CN 201410344130 A CN201410344130 A CN 201410344130A CN 104087890 B CN104087890 B CN 104087890B
Authority
CN
China
Prior art keywords
powder
ceramic
spraying
cylinder sleeve
coating layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410344130.7A
Other languages
Chinese (zh)
Other versions
CN104087890A (en
Inventor
吴恒
王长路
张立勇
陈正宇
张军顺
黄首峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU RESEARCH INSTITUTE OF ADVANCED EQUIPMENT & INFORMATION INDUSTRY TECHNOLOGY Co Ltd
Original Assignee
ZHENGZHOU RESEARCH INSTITUTE OF ADVANCED EQUIPMENT & INFORMATION INDUSTRY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU RESEARCH INSTITUTE OF ADVANCED EQUIPMENT & INFORMATION INDUSTRY TECHNOLOGY Co Ltd filed Critical ZHENGZHOU RESEARCH INSTITUTE OF ADVANCED EQUIPMENT & INFORMATION INDUSTRY TECHNOLOGY Co Ltd
Priority to CN201410344130.7A priority Critical patent/CN104087890B/en
Publication of CN104087890A publication Critical patent/CN104087890A/en
Application granted granted Critical
Publication of CN104087890B publication Critical patent/CN104087890B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a method for preparing a ceramic coating lining of a mud pump cylinder sleeve and belongs to the fields of wear-resistant and corrosion-resistant ceramic materials and ceramic coatings. According to the method, Al2O3, ZrO2 and TiO2 are taken as raw materials, a ceramic spraying powder material is prepared through centrifugal spraying granulation and plasma arc spheroidization, and the powder material is sprayed to the internal surface of the cylinder sleeve by adopting a plasma spraying technology, so as to form a ceramic lining; meanwhile, in order to relieve the thermal mismatch between a coating layer and a base body and improve the bond strength of the coating layer, a Ni-Al or Ni-Cr-Al metal transition layer is sprayed to the surface of the workpiece; and after spraying is ended, the coating layer is subjected to pore sealing treatment by adopting a pore sealing agent, so that the compactness of the coating layer is improved, and a lubricating action for the polishing treatment of the coating layer is provided. The mud pump cylinder sleeve prepared by the method is excellent in corrosion resistance and wear resistance and long in service life; the method is simple in preparation process and low in cost and is particularly applicable to the preparation of high-performance ceramic coatings of key components, which work under the conditions of strong corrosion and strong wear, of petroleum and geological drilling machinery.

Description

Method for preparing mud slurry pump cylinder jacket ceramic coating liner
Technical field
The present invention relates to a kind of method for preparing mud slurry pump cylinder jacket ceramic coating liner, belong to wear-and corrosion-resistant pottery material Material and field of ceramic coatings, the method is especially suitable for oil, geological drilling mechanical key part deep-etching, height under strong abrasive conditions The preparation of performance ceramic coating.
Background technology
Slush pump is oil, the corollary equipment in geological drilling rig, and cylinder sleeve is the core part of slush pump, for storing mud Slurry, bears mud pressure, makes reciprocating piston move reciprocatingly to complete suction, the function of spoil disposal slurry in cylinder sleeve.Because of its military service Working condition severe (pump pressure 17~35mpa, 100~120 times/min of piston jig frequency, 70~170 DEG C of friction Temperature Rise, ph value 10~12, mud sand content 3%~5%), cylinder sleeve needs to bear in acid-base value corrosion and medium in medium abrasive material under high-voltage high-speed Mechanical wear, when corrosion, wear amount reaches 0.3-0.5mm, cause mud leak, pump pressure decline so that cylinder sleeve is scrapped.Cylinder sleeve As the consumable accessory of slush pump, change very frequent, this not only causes serious manpower and materials to waste, and affects drilling well and enter Degree.Therefore, solve high pressure resistant, wear-resistant, the anticorrosive problem of this cylinder sleeve of mud, improve its service life, existing huge warp Ji benefit, can improve drilling efficiency again.
In prior art, in order to solve mud slurry pump cylinder jacket inner wall corrosion, wear problem, the approach of main employing has five Kind: first, ordinary carbon steel carburizing-Quenching Treatment, although this cylinder sleeve preparation process is simple, cost is relatively low, and case hardness is relatively Low (hrc55 about), wear-resistant, corrosion resistance is poor all poor, and its service life only has 200-300 hour;Second, The internal integrated poured rich chromium cast iron inner sleeve of carbon steel, or inner-outer sleeve is with taper fit formation bi-metal liner, liner high-chromium alloy Cast iron tool is preferably wear-resisting, corrosion-resistant, and in more than hrc60, compared with monometallic cylinder sleeve, it is little that its life-span reaches 300-500 to hardness When, but still can not meet the needs of modern drilling, meanwhile, numerous and diverse more than the preparation technology program of this cylinder sleeve;3rd, 45# Steel inner surface of cylinder liner electrodeposited chromium or iron-nickel-tungsten, coating is corrosion-resistant preferably, and surface accuracy is higher, does not substantially need secondary Rubbing down is processed, but the method thickness of coating is limited, and anti-wear performance is general, and bond strength is not high, easily takes off in use Fall, its service life is limited;4th, inlay tungsten-cobalt, stellite inside cylinder sleeve, the performance indications of this cylinder sleeve substantially meet Require, service life is longer;5th, inside carbon steel, direct insert wear-resistant ceramic inner sleeve, because ceramic hardness is high, wear-resisting resistance to Corrosive nature is excellent, and the cylinder sleeve life-span was more than more than 1000 hours;But the 4th and the 5th this two classes cylinder sleeve overall price is higher, and deposits In endoporus processing difficulties, it is extremely difficult to given size, in assembling process, cooperation tension, liner Crushing Problem easily occur;Separately Outward, using the cylinder sleeve of insert technique, easily occur in use taking out bucket.
Content of the invention
The purpose of the present invention exactly provides one kind to be used for preparing for the weak point in the presence of above-mentioned prior art The method of mud slurry pump cylinder jacket ceramic coating liner.
The general thought of the present invention is: with al2o3、zro2、tio2Raw material, by centrifugal spray granulation, plasma arc nodularization Prepare ceramic spraying powder, then, using plasma spraying technology by powder spray to inner surface of cylinder liner formed ceramic-lined, Meanwhile, coating and the direct thermal mismatching of matrix are alleviated in order to improve, before ceramic coated powder, in workpiece surface spraying ni- Al or ni-cr-al transition zone, after spraying terminates, carries out sealing pores using hole sealing agent, improves the compactness of coating to coating, And process offer lubrication for the rubbing down of coating.
The particular technique measure of the present invention is as follows:
The method for preparing mud slurry pump cylinder jacket ceramic coating liner of the present invention comprises the steps:
A, weigh raw material by weight percentage, wherein: al2o370-85%、zro210-20%、tio25-10%, puts into Carry out ball milling mixing in ball grinder;
B, the powder after ball milling mixing is poured into agitator, add by ratio of weight and the number of copies afterwards water, binding agent, dispersant, Slurry made by defoamer;Wherein: material: water=1:1.2-1.5, material: binding agent=100:0.5-1, material: dispersant=100:0.3- 0.6, material: defoamer=100:0.2-0.5;
C, by slurry importing centrifugal spray drying comminutor be prepared into reunion powder;
D, using plasma spraying equipment flame stream, spheroidising is carried out to reunion powder;
E, the powder after spheroidising is carried out disperseing, rinses, settles, sieves and obtain dusty spray;
F, Workpiece painting surface is carried out and sandblasting roughening treatment;
G, using plasma spraying equipment in workpiece surface spraying prime coat;
H, using plasma spraying equipment in workpiece surface spraying ceramic topcoats;
I, ceramic coating is carried out sealing pores, surface polishing, that is, obtain mud slurry pump cylinder jacket ceramic coating liner.
More specifically:
Put in step a of the present invention carry out in ball grinder ball milling mixing time be 3-5 hour.
Described al2o3For α-al2o3The al that content is more than 90%2o3Powder, described zro2It is containing 5-8%y2o3Zro2Powder Material, described tio2For rutile-type tio2The tio that content is more than 90%2Powder.
Any one in polyvinyl alcohol, methylcellulose, carboxycellulose or ethyl cellulose taken from by described binding agent; Described dispersant takes from any one of sodium salt or ammonium salt;Described defoamer is taken from higher alcohols, tributyl phosphate or alkoxy type Any one.
Centrifugal spray granulation technological parameter in described step c: leaving air temp is 120-150 DEG C, EAT is 220- 280 DEG C, centrifugal spray disc spin speed is 4500-6000 rev/min.
Powder plasma spheroidization handling process parameter in described step d: electric current is 600-750a, voltage is 70-90a, Main gas ar flow is 80-100l/min, auxiliary gas h2Flow is 20-30l/min, and powder sending quantity is 80-120g/min.
The ceramic spraying powder that particle diameter is -150/+325 mesh is taken to make spraying powder in step e.
Described step f, before spraying, goes to degrease using organic solvent cleaning workpiece surface, then uses Brown Alundum or stone Sand carries out blasting treatment to surface of the work, increases surface roughness, and sandblasting air pressure is 0.3-0.5mpa.
The zro of described step h2Toughness reinforcing al2o3-tio2Ceramic topcoats spraying parameter: electric current is 500-650a, electricity Press as 70-85a, main gas (ar) flow is 60-80l/min, auxiliary throughput is 15-25l/min, powder sending quantity is 30-45g/min, Spray distance is 80-120cm.
The prime coat thickness of described step g is 50-100 μm, and ceramic topcoats thickness is 250-400 μm.
The ceramic hole sealing agent in described step i, ceramic coating being carried out with sealing pores takes from vinyl, phenolic resin, ring Any one in oxygen tree fat or paraffin.
Beneficial effects of the present invention are as follows:
Because the ceramic coating liner that the present invention is prepared using plasma spraying technology not only has the high hard of ceramic cylinder jacket Degree, high abrasion, decay resistance, its service life is suitable with ceramic cylinder jacket, and this cylinder sleeve one-shot forming is it is not necessary to secondary dress Join, it is to avoid a series of bad problem occurring in inner-outer sleeve assembling process, meanwhile, Coating Surface Roughness little it is only necessary to simple Single rubbing down can be to use, meanwhile, and sprayed on material is cheap, preparation process is simple, and overall price/performance ratio is high.
Brief description
The structural representation of the ceramic coating liner mud slurry pump cylinder jacket that Fig. 1 provides for the present invention.
In figure sequence number: 1- cylinder sleeve matrix, 2- is ceramic-lined.
Specific embodiment
The present invention is further described below with reference to embodiment:
The method for preparing mud slurry pump cylinder jacket ceramic coating liner of the present invention comprises the steps:
A, weigh raw material by weight percentage, wherein: al2o370-85%、zro210-20%、tio25-10%, puts into Carry out ball milling mixing 3-5 hour in ball grinder;Described al2o3For α-al2o3The al that content is more than 90%2o3Powder, described zro2For Containing 5-8%y2o3Zro2Powder, described tio2For rutile-type tio2The tio that content is more than 90%2Powder;
B, the powder after ball milling mixing is poured into agitator, add by ratio of weight and the number of copies afterwards water, binding agent, dispersant, Defoamer stirring 1-3 hour makes slurry;Wherein: material: water=1:1.2-1.5, material: binding agent=100:0.5-1, material: dispersant= 100:0.3-0.6, material: defoamer=100:0.2-0.5;Described binding agent takes from polyvinyl alcohol, methylcellulose, carboxylated fiber Any one in element or ethyl cellulose;Described dispersant takes from any one of sodium salt or ammonium salt;Described defoamer is taken from Any one in higher alcohols, tributyl phosphate or alkoxy type;
C, by slurry importing centrifugal spray drying comminutor be prepared into reunion powder;Wherein technological parameter is as follows: goes out wind-warm syndrome Spend for 120-150 DEG C, EAT is 220-280 DEG C, centrifugal spray disc spin speed is 4500-6000 rev/min;
D, using plasma spraying equipment flame stream, spheroidising is carried out to reunion powder;Wherein powder plasma spheroidization Handling process parameter is as follows: electric current is 600-750a, and voltage is 70-90a, and main gas ar flow is 80-100l/min, auxiliary gas h2Stream Measure as 20-30l/min, powder sending quantity is 80-120g/min;
E, the powder after spheroidising is carried out disperseing, rinses, settles, sieving, take the pottery that particle diameter is -150/+325 mesh Spraying powder made by spraying powder;
F, Workpiece painting surface is carried out and sandblasting roughening treatment;Before spraying, using acetone or other are organic molten Go to degrease in agent cleaning workpiece surface, then with Brown Alundum or quartz sand, surface of the work is carried out with blasting treatment, increases surface thick Rugosity, sandblasting air pressure is 0.3-0.5mpa;
G, ni-al the or ni-cr-al bottoming for 50-100 μm in workpiece surface spraying thickness using plasma spraying equipment Layer, to alleviate the thermal mismatching of ceramic coating and matrix, sprays work parameter: electric current is 450-550a, voltage is 60-75a, main gas (ar) flow is 65-80l/min, and auxiliary throughput is 10-15l/min, and powder sending quantity is 25-35g/min, and spray distance is 80- 120cm;
H, using plasma spraying equipment in workpiece surface spraying ceramic topcoats;The prime coat thickness of described step g is 50- 100 μm, ceramic topcoats thickness is 250-400 μm;
I, ceramic coating is carried out sealing pores, surface polishing, that is, obtain mud slurry pump cylinder jacket ceramic coating liner;Described The ceramic hole sealing agent that ceramic coating is carried out with sealing pores takes from appointing in vinyl, phenolic resin, epoxy resin or paraffin Meaning is a kind of;The preferential hole sealing agent selected of the present invention is microcrystalline wax, and treatment temperature is 60-90 DEG C, using microcrystalline wax sealing of hole, no The only packing hole of coating, meanwhile, is that rubbing down processes and provides lubrication.
The specific embodiment of the present invention is as follows:
Embodiment 1
A) weigh 70% al by weight percentage2o3Powder, 20% contain 8%y2o3Zro2Powder, 10% tio2Powder Material, puts into and carries out ball milling mixing in ball grinder 3 hours;
B) powder after ball milling mixing is poured into agitator, add water, binding agent, dispersant, froth breaking by ratio of weight and the number of copies Agent stirring makes slurry in 1 hour;Wherein: material: water=1:1.2, material: binding agent=100:0. 5, material: dispersant=100:0. 3; Material: defoamer=100:0.2;Described water is distilled water or deionized water;Described binding agent is polyvinyl alcohol;Described dispersant For the basic sodium sulfonate of dodecane;Described defoamer is tributyl phosphate;
C) peristaltic pump is utilized to import in centrifugal spray drying granulation by slurry, by technological parameter: leaving air temp is 120 DEG C, EAT is 220 DEG C, and centrifugal spray disc spin speed is 4500 revs/min, is prepared into reunion powder;
D) utilize the flame stream of plasma spraying equipment, by technological parameter: electric current is 600a, voltage is 70a, main gas (ar) stream Measure as 80l/min, auxiliary gas (h2) flow is 20l/min, powder sending quantity is 80g/min, carries out spheroidising to reunion powder;
E) powder after spheroidising is carried out disperseing, rinses, settles, sieving, take the pottery that particle diameter is -150/+325 mesh Spraying powder made by spraying powder;
F), before spraying, go to degrease using acetone cleaning workpiece surface, then with Brown Alundum, surface of the work is sprayed Sand is processed, and increases surface roughness, and sandblasting air pressure is 0.3mpa;
G) the ni-al layer being 50 μm in workpiece surface spraying thickness using plasma spraying equipment, to alleviate ceramic coating With the thermal mismatching of matrix, spray work parameter: electric current is 450a, voltage is 60a, main gas (ar) flow is 65l/min, auxiliary throughput For 10l/min, powder sending quantity is 25g/min, and spray distance is 80cm;
H) ceramic coating being 250 μm in prime coat surface spraying thickness using plasma spraying equipment, to improve cylinder sleeve Wear-resisting, decay resistance, spraying parameter: electric current be 500a, voltage be 70a, main gas (ar) flow be 60l/min, auxiliary Throughput is 15l/min, and powder sending quantity is 30g/min, and spray distance is 80cm;
I) to the workpiece after coating, carry out sealing pores with microcrystalline wax, treatment temperature is 60 DEG C, then carry out at rubbing down Reason.
The ceramic coating liner cylinder sleeve of preparation under this process conditions, tests on drilling mud pump, and its service life reaches 1500 hours.
Embodiment 2
A) by weight percentage, weigh 75% al2o3Powder, 20% contain 5%y2o3Zro2Powder, 5% tio2Powder Material, puts into and carries out ball milling mixing in ball grinder 4 hours;
B) powder after ball milling mixing is poured into agitator, add water, binding agent, dispersant, froth breaking by ratio of weight and the number of copies Agent stirring makes slurry in 1 hour;Wherein: material: water=1:1.3, material: binding agent=100:0.6, material: dispersant=100:0.4;Material: Defoamer=100:0.3;Described water is distilled water or deionized water;Described binding agent is methylcellulose;Described dispersant is Ammonium polymethacrylate salt;Described froth breaking is agent tributyl phosphate;
C) peristaltic pump is utilized to import in centrifugal spray drying granulation by slurry, by technological parameter: leaving air temp is 130 DEG C, EAT is 240 DEG C, and centrifugal spray disc spin speed is 5000 revs/min, is prepared into reunion powder;
D) utilize the flame stream of plasma spraying equipment, by technological parameter: electric current is 700a, voltage is 80a, main gas (ar) stream Measure as 90l/min, auxiliary gas (h2) flow be 25l/min, powder sending quantity be 90g/min, spheroidising is carried out to reunion powder;
E) powder after spheroidising is carried out disperseing, rinses, settles, sieving, take the pottery that particle diameter is -150/+325 mesh Spraying powder made by spraying powder;
F), before spraying, go to degrease using acetone cleaning workpiece surface, then with Brown Alundum, surface of the work is sprayed Sand is processed, and increases surface roughness, and sandblasting air pressure is 0.4mpa;
G) the ni-al prime coat being 70 μm in workpiece surface spraying thickness using plasma spraying equipment, to alleviate pottery Coating and the thermal mismatching of matrix, spray work parameter: electric current is 500a, voltage is 65a, main gas (ar) flow is 70l/min, auxiliary gas Flow is 14l/min, and powder sending quantity is 30g/min, and spray distance is 90cm;
H) ceramic coating being 300 μm in prime coat surface spraying thickness using plasma spraying equipment, to improve cylinder sleeve Wear-resisting, decay resistance, spraying parameter: electric current be 550a, voltage be 75a, main gas (ar) flow be 70l/min, auxiliary Throughput is 20l/min, and powder sending quantity is 35g/min, and spray distance is 90cm;
I) to the workpiece after coating, carry out sealing pores with microcrystalline wax, treatment temperature is 70 DEG C, then carry out at rubbing down Reason.
The ceramic coating liner cylinder sleeve of preparation under this process conditions, tests on drilling mud pump, and its service life reaches 1600 hours.
Embodiment 3
A) by weight percentage, weigh 80% al2o3Powder, 10% contain 7%y2o3Zro2Powder, 10% tio2 Powder, puts into and carries out ball milling mixing in ball grinder 5 hours;
B) powder after ball milling mixing is poured into agitator, add water, binding agent, dispersant, froth breaking by ratio of weight and the number of copies Agent stirring makes slurry in 2 hours;Wherein: material: water=1:1.4, material: binding agent=100:0.7, material: dispersant=100:0.5;Material: Defoamer=100:0.4;Described water is distilled water or deionized water;Described binding agent is polyvinyl alcohol;Described dispersant is poly- Methacrylic acid ammonium salt;Described defoamer is tributyl phosphate;
C) peristaltic pump is utilized to import in centrifugal spray drying granulation by slurry, by technological parameter: leaving air temp is 140 DEG C, EAT is 260 DEG C, and centrifugal spray disc spin speed is 5500 revs/min, is prepared into reunion powder;
D) utilize the flame stream of plasma spraying equipment, by technological parameter: electric current is 750a, voltage is 90a, main gas (ar) stream Measure as 100l/min, auxiliary gas (h2) flow be 30l/min, powder sending quantity be 120g/min, spheroidising is carried out to reunion powder;
E) powder after spheroidising is carried out disperseing, rinses, settles, sieving, take the pottery that particle diameter is -150/+325 mesh Spraying powder made by spraying powder;
F) spray before, go to degrease using acetone or other organic solvent cleaning workpiece surfaces, then use Brown Alundum or Quartz sand carries out blasting treatment to surface of the work, increases surface roughness, and sandblasting air pressure is 0.5mpa;
G) the ni-al prime coat being 100 μm in workpiece surface spraying thickness using plasma spraying equipment, to alleviate pottery Coating and the thermal mismatching of matrix, spray work parameter: electric current is 550a, voltage is 75a, main gas (ar) flow is 80l/min, auxiliary gas Flow is 15l/min, and powder sending quantity is 35g/min, and spray distance is 100cm;
H) ceramic coating being 400 μm in prime coat surface spraying thickness using plasma spraying equipment, to improve cylinder sleeve Wear-resisting, decay resistance, spraying parameter: electric current be 650a, voltage be 85a, main gas (ar) flow be 80l/min, auxiliary Throughput is 25l/min, and powder sending quantity is 45g/min, and spray distance is 100cm;
I) to the workpiece after coating, carry out sealing pores with microcrystalline wax, treatment temperature is 80 DEG C, then carry out at rubbing down Reason.
The ceramic coating liner cylinder sleeve of preparation under this process conditions, tests on drilling mud pump, and its service life reaches 1800 hours.
Embodiment 4
A) by weight percentage, weigh 80% al2o3Powder, 15% contain 8%y2o3Zro2Powder, 5% tio2Powder Material, puts into and carries out ball milling mixing 3-5 hour in ball grinder;
B) powder after ball milling mixing is poured into agitator, add water, binding agent, dispersant, froth breaking by ratio of weight and the number of copies Agent stirring makes slurry in 2 hours;Wherein: material: water=1:1.5, material: binding agent=100:1, material: dispersant=100:0.6;Material: disappear Infusion=100:0.5;Described water is distilled water or deionized water;Described binding agent is polyvinyl alcohol;Described dispersant is poly- first Base acrylic acid ammonium salt;Described defoamer is tributyl phosphate;
C) peristaltic pump is utilized to import in centrifugal spray drying granulation by slurry, by technological parameter: leaving air temp is 150 DEG C, EAT is 280 DEG C, and centrifugal spray disc spin speed is 6000 revs/min, is prepared into reunion powder;
D) utilize the flame stream of plasma spraying equipment, by technological parameter: electric current is 700a, voltage is 85a, main gas (ar) stream Measure as 95l/min, auxiliary gas (h2) flow be 28l/min, powder sending quantity be 120g/min, spheroidising is carried out to reunion powder;
E) powder after spheroidising is carried out disperseing, rinses, settles, sieving, take the pottery that particle diameter is -150/+325 mesh Spraying powder made by spraying powder;
F), before spraying, go to degrease using acetone cleaning workpiece surface, then with Brown Alundum, surface of the work is sprayed Sand is processed, and increases surface roughness, and sandblasting air pressure is 0.4mpa;
G) ni-al being 90 μm in workpiece surface spraying thickness using plasma spraying equipment, with alleviate ceramic coating with The thermal mismatching of matrix, sprays work parameter: electric current is 480a, voltage is 70a, main gas (ar) flow is 75l/min, auxiliary throughput is 14l/min, powder sending quantity is 30g/min, and spray distance is 120cm;
H) ceramic coating being 350 μm in prime coat surface spraying thickness using plasma spraying equipment, to improve cylinder sleeve Wear-resisting, decay resistance, spraying parameter: electric current be 600a, voltage be 80a, main gas (ar) flow be 75l/min, auxiliary Throughput is 20l/min, and powder sending quantity is 40g/min, and spray distance is 120cm;
I) to the workpiece after coating, carry out sealing pores with microcrystalline wax, treatment temperature is 90 DEG C, then carry out at rubbing down Reason.
The ceramic coating liner cylinder sleeve of preparation under this process conditions, tests on drilling mud pump, and its service life reaches 2000 hours.

Claims (1)

1. a kind of method for preparing mud slurry pump cylinder jacket ceramic coating liner it is characterised in that: methods described includes following steps Rapid:
A, weigh raw material by weight percentage, wherein: al2o370-85%、zro210-20%、tio25-10%, puts into ball grinder Inside carry out ball milling mixing;Described al2o3For α-al2o3The al that content is more than 90%2o3Powder, described zro2It is containing 5-8% y2o3Zro2Powder, described tio2For rutile-type tio2The tio that content is more than 90%2Powder;
B, the powder after ball milling mixing is poured into agitator, add water, binding agent, dispersant, froth breaking afterwards by ratio of weight and the number of copies Slurry is made in agent;Wherein: material: water=1:1.2-1.5, material: binding agent=100:0.5-1, material: dispersant=100:0.3-0.6, material: Defoamer=100:0.2-0.5;Described binding agent is taken from polyvinyl alcohol, methylcellulose, carboxycellulose or ethyl cellulose Any one;Described dispersant takes from any one of sodium salt or ammonium salt;Described defoamer takes from higher alcohols, tributyl phosphate In any one;
C, by slurry importing centrifugal spray drying comminutor be prepared into reunion powder;Its technological parameter: leaving air temp is 120-150 DEG C, EAT is 220-280 DEG C, and centrifugal spray disc spin speed is 4500-6000 rev/min;
D, using plasma spraying equipment flame stream, spheroidising is carried out to reunion powder;Its technological parameter: electric current is 600- 750a, voltage is 70-90v, and main gas ar flow is 80-100l/min, auxiliary gas h2Flow is 20-30l/min, and powder sending quantity is 80- 120g/min;
E, the powder after spheroidising is carried out disperseing, rinses, settles, sieves and obtain dusty spray;The grain of described dusty spray Footpath is -150/+325 mesh;
F, Workpiece painting surface is carried out and sandblasting roughening treatment;Go oil removing first with organic solvent cleaning workpiece surface Dirt, then carries out blasting treatment with Brown Alundum or quartz sand to surface of the work, increases surface roughness, and sandblasting air pressure is 0.3-0.5mpa;
G, using plasma spraying equipment in workpiece surface spraying prime coat;The thickness of described prime coat is 50-100 μm;
H, using plasma spraying equipment in workpiece surface spraying ceramic topcoats;Its technological parameter: electric current is 500-650a, voltage For 70-85v, main gas ar flow is 60-80l/min, and auxiliary throughput is 15-25l/min, and powder sending quantity is 30-45g/min, spraying Distance is 80-120cm;The thickness of described ceramic topcoats is 250-400 μm;
I, ceramic topcoats are carried out sealing pores, surface polishing, that is, obtain mud slurry pump cylinder jacket ceramic coating liner;Wherein at sealing of hole During reason, ceramic hole sealing agent used takes from any one in vinyl, phenolic resin, epoxy resin or paraffin.
CN201410344130.7A 2014-07-18 2014-07-18 Method for preparing ceramic coating lining of mud pump cylinder sleeve Expired - Fee Related CN104087890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410344130.7A CN104087890B (en) 2014-07-18 2014-07-18 Method for preparing ceramic coating lining of mud pump cylinder sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410344130.7A CN104087890B (en) 2014-07-18 2014-07-18 Method for preparing ceramic coating lining of mud pump cylinder sleeve

Publications (2)

Publication Number Publication Date
CN104087890A CN104087890A (en) 2014-10-08
CN104087890B true CN104087890B (en) 2017-01-25

Family

ID=51635644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410344130.7A Expired - Fee Related CN104087890B (en) 2014-07-18 2014-07-18 Method for preparing ceramic coating lining of mud pump cylinder sleeve

Country Status (1)

Country Link
CN (1) CN104087890B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868440A (en) * 2017-11-25 2019-06-11 中国地质大学(北京) A kind of preparation method of the wear-resisting modified layer of the anti-mud drum in drilling bit steel body surface

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846307B (en) * 2015-04-30 2017-07-25 苏州统明机械有限公司 Refractory ceramics coating and its spraying method for Metal Substrate thermal spraying
CN106039848A (en) * 2016-07-26 2016-10-26 云南汇能科技有限公司 Gas and liquid separating device for yellow phosphorus tail gas combustion boiler
CN107299310A (en) * 2017-02-28 2017-10-27 扬州大学 A kind of preparation method for strengthening water pump vane Ceramic Coating Prepared By Plasma Spraying On The Surface
CN107130202B (en) * 2017-04-27 2019-10-29 中国科学院兰州化学物理研究所 A kind of preparation method of the ceramic base composite coating of sea water resistance cavitation erosion
CN108624784B (en) * 2018-05-16 2019-09-17 浙江天泉表面技术有限公司 A kind of composite coating and spraying method of environmental protection self-healing wind power equipment
CN111892401B (en) * 2020-07-28 2021-11-19 湘潭大学 Ultrahigh-temperature ceramic coating, composite material thereof and preparation method
CN111962004B (en) * 2020-07-29 2022-12-02 成都拓维高科光电科技有限公司 Composite ceramic powder for prolonging service life of stainless steel in strong corrosive gas environment and preparation method thereof
CN113549859A (en) * 2021-06-22 2021-10-26 河南科技大学 Composite ceramic coating for insulating bearing of wind driven generator and preparation method thereof
CN113755780A (en) * 2021-08-09 2021-12-07 中国船舶重工集团公司第七二五研究所 Composite coating for titanium alloy gasket and preparation method thereof
CN113719449A (en) * 2021-08-17 2021-11-30 濮阳市友盛石油机械制造有限公司 Slurry pump spray coating type cylinder sleeve and preparation method thereof
CN114669390A (en) * 2022-03-29 2022-06-28 北京理工大学 Method for screening plasma spheroidized powder
CN114522794A (en) * 2022-03-29 2022-05-24 北京理工大学 Screening method for reducing content of crushed powder in plasma spheroidized powder
CN114700165A (en) * 2022-03-29 2022-07-05 北京理工大学 Screening method for obtaining complete spherical plasma spheroidized powder

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080057275A1 (en) * 2006-08-31 2008-03-06 Paul Richard Grzesik Method and apparatus for minimizing oxidation pitting of refractory metal vessels
US20090176110A1 (en) * 2008-01-08 2009-07-09 General Electric Company Erosion and corrosion-resistant coating system and process therefor
CN102776466A (en) * 2012-08-10 2012-11-14 昆山乔锐金属制品有限公司 Preparation method for composite coating by using stainless steel as base material
CN103484857B (en) * 2013-10-09 2015-12-09 河北工业大学 Metallic matrix ceramic coating is prepared the method for nano modification amorphous ceramic coating

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868440A (en) * 2017-11-25 2019-06-11 中国地质大学(北京) A kind of preparation method of the wear-resisting modified layer of the anti-mud drum in drilling bit steel body surface

Also Published As

Publication number Publication date
CN104087890A (en) 2014-10-08

Similar Documents

Publication Publication Date Title
CN104087890B (en) Method for preparing ceramic coating lining of mud pump cylinder sleeve
US4486938A (en) Process of remanufacturing pump cylinder liners
CN101603595B (en) Mechanical sealing element and manufacture method thereof
CN104513944B (en) A kind of rare earth mixing with nano composite ceramic coat and its preparation process
CN101947714A (en) Integral processing method for refabrication of waste oil tube
CN104162676B (en) A kind of fracturing pump valve body, valve seat vacuum cladding surface reinforcing method
CN105177489A (en) Method for enhancing corrosion and wear resistance of metal member surface
CN104152837A (en) Concrete pump truck conveying pipe and spraying device and preparation method thereof
CN103060707B (en) Coating material for replacing hard chromium plating and laser-cladding preparation method thereof
CN203991000U (en) The spray equipment that can be used for interior gunning concrete carrier pipe
CN106756727A (en) A kind of robot automation's spraying coating process of grinding roller wear-resistant coating
CN104389780A (en) High-pressure pump, plunger and surface enhancing processing technique for plunger
CN101569976A (en) Restoration technique of cylinder block inner bore surface of abandoned hydraulic cylinder
CN109253080B (en) Long-life composite coating plunger for plunger pump
CN106282883A (en) A kind of metallic nickel Ni60 base boron nitride and the preparation method of alloy detonation flame spraying wear-resistant coating
CN102615580A (en) Method for machining special honing piston rings
CN102225530A (en) New process for reproduction of main control valve
CN204878031U (en) A carborundum wear -resistant coating structure for sediment stuff pump
CN103789714A (en) Preparation method of protective coating on surface of hydraulic transmission component
CN100441737C (en) High temperature corrosion and wear resistant technical process for oil-well pump cylinder plunger valve
CN110643924A (en) Metal-based ceramic reinforced inner hole coating and preparation method and spraying method thereof
CN204572437U (en) New-type mortar pump liner
CN106246532A (en) A kind of pottery nylon composite cylinder jacket and manufacture method thereof
CN105201894A (en) Slurry pump adopting novel abrasion-resistant structure
CN204746863U (en) Deep or light separator of high abrasion formula

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125

Termination date: 20190718