CN104074119B - Butt up against stone surface modification atomising device and the control method thereof in asphalt mixing building - Google Patents

Butt up against stone surface modification atomising device and the control method thereof in asphalt mixing building Download PDF

Info

Publication number
CN104074119B
CN104074119B CN201410287196.7A CN201410287196A CN104074119B CN 104074119 B CN104074119 B CN 104074119B CN 201410287196 A CN201410287196 A CN 201410287196A CN 104074119 B CN104074119 B CN 104074119B
Authority
CN
China
Prior art keywords
atomizing nozzle
nozzle device
electronic switch
stone
delivery pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410287196.7A
Other languages
Chinese (zh)
Other versions
CN104074119A (en
Inventor
虞将苗
傅翼飞
吴焯雅
黄鸿浩
陈剑华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huayun Tongda (guangdong) Road Technology Co Ltd
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201410287196.7A priority Critical patent/CN104074119B/en
Publication of CN104074119A publication Critical patent/CN104074119A/en
Application granted granted Critical
Publication of CN104074119B publication Critical patent/CN104074119B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

本发明公开了一种对接于沥青拌合楼的石料表面改性雾化装置及其操控方法,该装置包括控制单元、原料桶、输送泵、第一电子开关、第二电子开关、第一雾化喷头装置和第二雾化喷头装置;输送泵通过第一管道和第二管道分别与第一雾化喷头装置和第二雾化喷头装置连通;第一管道和第二管道上分别设置有第一电动阀门和第二电动阀门;第一雾化喷头装置设置于筛分仓上部;第二雾化喷头装置设置于搅拌缸上;输送泵和第一电动阀门通过第一电子开关与电源连接;输送泵和第二电动阀门通过第二电子开关与电源连接;第一电子开关和第二电子开关分别与控制单元连接。本发明对石料进行两次表面改性,能达到较大的比表面积,使石料表面改性剂充分均匀分布在石料表面。

The invention discloses a stone surface modification atomization device connected to an asphalt mixing plant and a control method thereof. The device includes a control unit, a raw material barrel, a delivery pump, a first electronic switch, a second electronic switch, a first fog atomizing nozzle device and the second atomizing nozzle device; the delivery pump communicates with the first atomizing nozzle device and the second atomizing nozzle device respectively through the first pipeline and the second pipeline; the first pipeline and the second pipeline are respectively provided with the first An electric valve and a second electric valve; the first atomizing nozzle device is arranged on the upper part of the screening bin; the second atomizing nozzle device is arranged on the mixing tank; the delivery pump and the first electric valve are connected to the power supply through the first electronic switch; The delivery pump and the second electric valve are connected to the power supply through the second electronic switch; the first electronic switch and the second electronic switch are respectively connected to the control unit. The invention carries out surface modification twice on the stone material, which can achieve a larger specific surface area, so that the surface modifier of the stone material is fully and evenly distributed on the surface of the stone material.

Description

对接于沥青拌合楼的石料表面改性雾化装置及其操控方法Stone Surface Modification Atomization Device Connected to Asphalt Mixing Plant and Its Control Method

技术领域technical field

本发明涉及一种对接于沥青拌合楼的石料表面改性装置,特别涉及一种对接于沥青拌合楼的石料表面改性雾化装置及其操控方法。The invention relates to a stone surface modification device connected to an asphalt mixing plant, in particular to a stone surface modification atomization device connected to an asphalt mixing plant and a control method thereof.

背景技术Background technique

石料是沥青混凝土公路建设的重要原材料,但完全符合各项性能要求的高品质石料十分稀缺,为此提出了对石料表面改性的方法,针对石料所欠缺的性能进行改性处理,改善其缺陷。如花岗岩等酸性石料石质致密坚硬、耐磨性强,可充分发挥石料间嵌挤作用,能满足沥青路面表面层的耐磨及承载能力要求,但由于与沥青的界面粘结力较弱,往往在沥青路面表面层的应用中会有所限制,特别是在有水的作用下沥青膜发生脱落而出现坑槽、松散等早期损害。然而,在某些地区工程应用中,能满足路面使用要求的玄武岩和辉绿岩等碱性及中性优质石料已濒临匮乏,成为极度稀缺资源,因此采取对储量丰富且价格较低的酸性石料如花岗岩进行表面改性的方法,将其作为高等级公路沥青表面层石料具有较大的技术应用前景。Stone is an important raw material for the construction of asphalt concrete roads, but high-quality stone that fully meets the performance requirements is very scarce. For this reason, a method for modifying the surface of the stone is proposed, and the performance that the stone lacks is modified to improve its defects. . Such as granite and other acidic stones are dense and hard, with strong wear resistance, which can fully exert the intercalation effect between stones and meet the requirements of wear resistance and bearing capacity of the surface layer of asphalt pavement. However, due to the weak interface adhesion with asphalt, There are often limitations in the application of the surface layer of asphalt pavement, especially when the asphalt film falls off under the action of water and early damage such as potholes and looseness occurs. However, in engineering applications in some areas, alkaline and neutral high-quality stone materials such as basalt and diabase that can meet the requirements of pavement are on the verge of scarcity and have become extremely scarce resources. Therefore, acidic stone materials with abundant reserves and low prices are adopted For example, the surface modification method of granite has great technical application prospects as a high-grade highway asphalt surface layer stone.

在对石料表面进行改性处理时,为了提高石料表面改性的效率和均匀程度,同时也为了降低原材料成本,则需要对液态石料表面改性剂进行雾化、发泡等处理,使能达到较大的比表面积。而目前石料表面改性剂尚处于新型产品阶段,市场上缺乏合适的装置与操控方法,因而如何对石料表面改性剂进行处理使得其能有效利用是一项极为关键的技术。When modifying the stone surface, in order to improve the efficiency and uniformity of the stone surface modification, and to reduce the cost of raw materials, it is necessary to atomize and foam the liquid stone surface modifier to achieve Larger specific surface area. At present, the stone surface modifier is still in the new product stage, and there is a lack of suitable devices and control methods in the market. Therefore, how to treat the stone surface modifier so that it can be used effectively is a very critical technology.

发明内容Contents of the invention

本发明的目的在于克服现有技术的缺点与不足,提供一种对接于沥青拌合楼的石料表面改性雾化装置,该装置能够对接与沥青拌合楼,能够在沥青拌合楼筛分仓和搅拌缸中对石料进行两次表面改性,使石料表面改性剂充分均匀分布在石料表面,从而改善石料的各项性能。The purpose of the present invention is to overcome the shortcomings and deficiencies of the prior art, and provide a stone surface modification atomization device that is connected to the asphalt mixing plant. The device can be connected to the asphalt mixing plant and can be screened in the asphalt mixing plant. The surface modification of the stone is carried out twice in the bin and the mixing tank, so that the surface modifier of the stone is fully and evenly distributed on the surface of the stone, thereby improving various properties of the stone.

本发明的另一目的在于提供一种对接于沥青拌合楼的石料表面改性雾化装置的操控方法。Another object of the present invention is to provide a control method for a stone surface modification atomization device connected to an asphalt mixing plant.

本发明的第一目的通过以下技术方案实现:对接于沥青拌合楼的石料表面改性雾化装置,包括控制单元、用于放置石料表面改性剂的原料桶、输送泵、第一电子开关、第二电子开关、第一雾化喷头装置和第二雾化喷头装置;The first object of the present invention is achieved through the following technical solutions: the stone surface modification atomization device connected to the asphalt mixing plant, including a control unit, a raw material bucket for placing stone surface modifiers, a delivery pump, and a first electronic switch , the second electronic switch, the first atomizing nozzle device and the second atomizing nozzle device;

所述输送泵的一端与原料桶连通;所述输送泵的另一端通过第一管道与第一雾化喷头装置连通,所述输送泵的另一端还通过第二管道与第二雾化喷头装置连通;所述第一管道上设置有第一电动阀门,第二管道上设置有第二电动阀门;One end of the delivery pump communicates with the raw material barrel; the other end of the delivery pump communicates with the first atomizing nozzle device through the first pipeline, and the other end of the delivery pump communicates with the second atomizing nozzle device through the second pipeline connected; the first pipeline is provided with a first electric valve, and the second pipeline is provided with a second electric valve;

所述第一雾化喷头装置设置于沥青拌合楼筛分仓上部;所述第二雾化喷头装置设置于沥青拌合楼搅拌缸上;The first atomizing nozzle device is set on the upper part of the screening bin of the asphalt mixing plant; the second atomizing nozzle device is set on the mixing tank of the asphalt mixing plant;

所述输送泵和第一电动阀门通过第一电子开关与电源连接;所述输送泵和第二电动阀门通过第二电子开关与电源连接;所述第一电子开关和第二电子开关分别与控制单元连接,通过控制单元控制第一电子开关和第二电子开关的工作状态。The delivery pump and the first electric valve are connected to the power supply through the first electronic switch; the delivery pump and the second electric valve are connected to the power supply through the second electronic switch; the first electronic switch and the second electronic switch are respectively connected to the control The units are connected, and the working states of the first electronic switch and the second electronic switch are controlled by the control unit.

优选的,所述第一雾化喷头装置和第二雾化喷头装置均包括多方向的多个雾化喷头,其中第一雾化喷头装置中各方向的雾化喷头都对着筛分仓,第二雾化喷头装置中各方向的雾化喷头都对着搅拌缸内部。Preferably, the first atomizing nozzle device and the second atomizing nozzle device both include a plurality of multi-directional atomizing nozzles, wherein the atomizing nozzles in each direction in the first atomizing nozzle device are all facing the screening chamber, The atomizing nozzles in all directions in the second atomizing nozzle device are all facing the inside of the mixing tank.

更进一步的,所述第二雾化喷头装置中的各个雾化喷头均匀嵌于盖板中,所述盖板贴于沥青拌合楼搅拌缸的内壁上。Furthermore, each atomizing nozzle in the second atomizing nozzle device is evenly embedded in the cover plate, and the cover plate is attached to the inner wall of the mixing tank of the asphalt mixing plant.

优选的,所述第一管道上设置有与控制单元连接的第一电子流量计,所述第二管道上设置有与控制单元连接的第二电子流量计。Preferably, the first pipeline is provided with a first electronic flowmeter connected to the control unit, and the second pipeline is provided with a second electronic flowmeter connected with the control unit.

优选的,该雾化装置还包括与控制单元连接的第三电子开关;其中所述输送泵、第一电动阀门和第二电动阀门与第三电子开关均为串联关系。Preferably, the atomizing device further includes a third electronic switch connected to the control unit; wherein the delivery pump, the first electric valve, the second electric valve and the third electronic switch are all connected in series.

更进一步的,所述控制单元主要由控制箱和沥青拌合楼的总控制系统组成,第一电子开关、第二电子开关和第三电子开关均设置在控制箱内;并且所述第一电子开关、第二电子开关和第三电子开关均与控制单元中的沥青拌合楼的总控制系统连接;沥青拌合楼的总控制系统还连接有报警装置。Furthermore, the control unit is mainly composed of a control box and the overall control system of the asphalt mixing plant, the first electronic switch, the second electronic switch and the third electronic switch are all arranged in the control box; and the first electronic The switch, the second electronic switch and the third electronic switch are all connected with the general control system of the asphalt mixing plant in the control unit; the general control system of the asphalt mixing plant is also connected with an alarm device.

本发明的第二目的通过以下技术方案实现:一种对接于沥青拌合楼的石料表面改性雾化装置的操控方法,包括以下步骤:The second object of the present invention is achieved through the following technical solutions: a method for controlling the atomization device for modifying the stone surface connected to the asphalt mixing plant, comprising the following steps:

S1、控制单元控制第一电子开关闭合,输送泵和第一电动阀门开启,输送泵从原料桶中抽取石料表面改性剂,石料表面改性剂通过第一管道输送至第一雾化喷头装置;同时石料进入到沥青拌合楼筛分仓中,第一雾化喷头装置对着筛分仓中的石料进行喷雾,对石料表面进行第一次改性,完成对石料表面进行第一次改性;S1. The control unit controls the first electronic switch to be closed, the delivery pump and the first electric valve are opened, the delivery pump extracts the stone surface modifier from the raw material barrel, and the stone surface modifier is transported to the first atomizing nozzle device through the first pipeline At the same time, the stone material enters the screening chamber of the asphalt mixing building, and the first atomizing nozzle device sprays the stone material in the screening chamber to modify the surface of the stone material for the first time, and completes the first modification of the stone material surface. sex;

S2、待输送泵和第一电动阀门运行时间t1后,控制单元控制第一电子开关断开,输送泵和第一电动阀门关闭,第一雾化喷头装置停止喷雾;S2. After the delivery pump and the first electric valve run for a time t1, the control unit controls the first electronic switch to be disconnected, the delivery pump and the first electric valve are closed, and the first atomizing nozzle device stops spraying;

S3、待第一雾化喷头装置停止喷雾后,启动沥青拌合楼的搅拌电机,然后控制单元控制第二电子开关闭合,输入泵和第二电动阀门启动,输送泵从原料桶中抽取石料表面改性剂,石料表面改性剂通过第二管道输送至第二雾化喷头装置,第二雾化喷头装置对着搅拌缸进行喷雾,待第二雾化喷头装置喷雾时间t2后,沥青拌合楼将步骤S1中经过筛分仓筛分并完成第一次表面改性后的石料倒入搅拌缸,第二雾化喷头装置对着搅拌缸中的石料进行喷雾,对石料表面进行第二次改性;S3. After the first atomizing nozzle device stops spraying, start the mixing motor of the asphalt mixing plant, then the control unit controls the second electronic switch to close, the input pump and the second electric valve start, and the delivery pump extracts the surface of the stone from the raw material barrel Modifier, the stone surface modifier is transported to the second atomizing nozzle device through the second pipeline, and the second atomizing nozzle device sprays against the mixing tank. After the second atomizing nozzle device sprays for t2, the asphalt mixing The building will pour the stone material that has been screened by the screening chamber and completed the first surface modification in step S1 into the mixing tank. modified;

S4、待输送泵和第二电动阀门运行时间t3后,控制单元控制第二电子开关断开,输送泵和第二电动阀门关闭,第二雾化喷头装置停止喷雾,完成对石料表面进行第二次改性。S4. After the delivery pump and the second electric valve have been running for t3, the control unit controls the second electronic switch to be disconnected, the delivery pump and the second electric valve are closed, the second atomizing nozzle device stops spraying, and the second spraying on the stone surface is completed. secondary modification.

优选的,在所述步骤S1中,设置在第一管道中的第一电子流量计检测第一雾化喷头装置喷入到筛分仓中的石料表面改性剂的量;在所述步骤S3中,设置在第二管道中的第二电子流量计检测第二雾化喷头装置喷入到搅拌缸中的石料表面改性剂的量。Preferably, in the step S1, the first electronic flowmeter arranged in the first pipeline detects the amount of the stone surface modifier sprayed into the screening bin by the first atomizing nozzle device; in the step S3 Among them, the second electronic flow meter arranged in the second pipeline detects the amount of the stone surface modifier sprayed into the mixing tank by the second atomizing nozzle device.

更进一步的,当所述步骤S1中第一电子流量计检测到第一雾化喷头装置的石料表面改性剂喷入量少于或超出预设流量时,或当第二电子流量计检测到第二雾化喷头装置的石料表面改性剂喷入量少于或超出预设流量时,控制单元连接的报警装置报警,同时控制单元控制第三电子开关断开,输送泵、第一电动阀门和第二电动阀门均断电关闭。Furthermore, when the first electronic flowmeter in the step S1 detects that the injection amount of the stone surface modifier of the first atomizing nozzle device is less than or exceeds the preset flow rate, or when the second electronic flowmeter detects When the amount of stone surface modifier sprayed by the second atomizing nozzle device is less than or exceeds the preset flow rate, the alarm device connected to the control unit will alarm, and at the same time, the control unit will control the third electronic switch to be disconnected, and the delivery pump and the first electric valve will be disconnected. Both the electric valve and the second electric valve are powered off and closed.

优选的,其特征在于,所述控制单元根据石料的用量对时间t1、t2和t3进行设定。Preferably, it is characterized in that the control unit sets the times t1, t2 and t3 according to the amount of stone used.

本发明相对于现有技术具有如下的优点及效果:Compared with the prior art, the present invention has the following advantages and effects:

(1)本发明石料表面改性雾化装置对接与沥青拌合楼,通过设置在沥青拌合楼筛分仓上部的第一雾化喷头装置和设置在沥青拌合楼搅拌缸上的第二雾化喷头装置对进入沥青拌合楼的石料进行两次表面改性,能达到较大的比表面积,使得石料表面改性剂充分均匀分布在石料表面,提高了石料的各项性能指标。(1) The stone surface modification atomization device of the present invention is docked with the asphalt mixing plant, through the first atomizing nozzle device arranged on the upper part of the screening bin of the asphalt mixing plant and the second atomizing nozzle device arranged on the mixing tank of the asphalt mixing plant The atomizing nozzle device performs two surface modifications on the stone entering the asphalt mixing plant, which can achieve a larger specific surface area, so that the surface modifier of the stone is fully and evenly distributed on the surface of the stone, and various performance indicators of the stone are improved.

(2)本发明通过第一电子流量计和第二电子流量计检测第一雾化喷头装置和第二雾化喷头装置的喷雾量,使得控制单元能够实时掌握石料在第一次表面改性以及第二次表面改性时所使用的石料表面改性剂。当第一电子流量计或第二电子流量计检测到石料表面改性剂喷入量少于或超出预设流量或者出现紧急情况时,报警装置报警,并且控制单元控制第三电子开关断开,此时输送泵、第一电动阀门和第二电动阀门均断电关闭,整个雾化装置停止工作,从而避免出现一些故障影响本发明装置的使用。(2) The present invention detects the spray amount of the first atomizing nozzle device and the second atomizing nozzle device by the first electronic flowmeter and the second electronic flowmeter, so that the control unit can grasp the first surface modification and the first surface modification of the stone in real time. Stone surface modifier used in the second surface modification. When the first electronic flowmeter or the second electronic flowmeter detects that the injection amount of the stone surface modifier is less than or exceeds the preset flow rate or an emergency occurs, the alarm device will give an alarm, and the control unit will control the third electronic switch to be disconnected, At this time, the delivery pump, the first electric valve and the second electric valve are all powered off and closed, and the entire atomization device stops working, thereby avoiding some failures affecting the use of the device of the present invention.

(3)本发明中的第一雾化喷头装置和第二雾化喷头装置均包含有多方向的多个喷头,通过多方向的多个喷雾喷头可以实现石料表面更加均匀的喷雾,使石料表面改性剂在形成微米级雾滴后能快速均匀覆盖石料表面。(3) The first atomizing nozzle device and the second atomizing nozzle device in the present invention all include a plurality of nozzles with multiple directions, and more uniform spraying on the stone surface can be realized by a plurality of multidirectional spray nozzles, making the surface of the stone more uniform. The modifier can quickly and evenly cover the stone surface after forming micron-sized droplets.

附图说明Description of drawings

图1是本发明雾化装置的结构示意图。Fig. 1 is a schematic structural view of the atomization device of the present invention.

具体实施方式detailed description

下面结合实施例及附图对本发明作进一步详细的描述,但本发明的实施方式不限于此。The present invention will be further described in detail below in conjunction with the embodiments and the accompanying drawings, but the embodiments of the present invention are not limited thereto.

实施例Example

如图1所示,本实施例公开了一种对接于沥青拌合楼的石料表面改性雾化装置,包括控制单元、用于放置石料表面改性剂的原料桶2、输送泵1、第一电子开关23、第二电子开关24、第三电子开关25、第一雾化喷头装置8和第二雾化喷头装置13;输送泵1的一端与原料桶2与连通;输送泵1的另一端通过第一管道51与第一雾化喷头装置8连通,输送泵1另一端还通过第二管道52与第二雾化喷头装置13连通;第一管道上设置有第一电动阀门6,第二管道设置有第二电动阀门3;As shown in Figure 1, this embodiment discloses a stone surface modification atomization device connected to an asphalt mixing plant, including a control unit, a raw material barrel 2 for placing a stone surface modifier, a delivery pump 1, a first An electronic switch 23, a second electronic switch 24, a third electronic switch 25, the first atomizing nozzle device 8 and the second atomizing nozzle device 13; one end of the delivery pump 1 communicates with the raw material barrel 2; the other of the delivery pump 1 One end is communicated with the first atomizing nozzle device 8 through the first pipeline 51, and the other end of the delivery pump 1 is also communicated with the second atomizing nozzle device 13 through the second pipeline 52; the first pipeline is provided with the first electric valve 6, the second The second pipeline is provided with a second electric valve 3;

输送泵1和第一电动阀门6通过第一电子开关23与电源连接;输送泵1和第二电动阀门3通过第二电子开关24与电源连接;在本实施例中输送泵、第一电动阀门6和第一电子开关23串联后连接电源;输送泵1、第二电动阀门3和第二电子开关24串联后连接电源,第三电子开关25与输送泵1、第一电动阀门6和第二电动阀门3均为串联关系;第一电动阀门6和第一电子开关23与第二电动阀门3和第二电子开关24为并联关系。第一电子开关23、第二电子开关24和第三电子开关25分别与控制单元连接,通过控制单元控制第一电子开关23、第二电子开关24和第三电子开关25的工作状态,第三电子开关25设置在输送泵1与电源之间,其中在正常工作情况下,第三电子开关25始终处于闭合状态。当控制单元控制第一电子开关闭合时,输送泵和第一电动阀门接通电源;当控制单元控制第二电子开关闭合时,输送泵和第二电动阀门接通电源;当控制单元控制第三电子开关断开时,输送泵、第一电动阀门和第二电动阀门均断电。The delivery pump 1 and the first electric valve 6 are connected to the power supply through the first electronic switch 23; the delivery pump 1 and the second electric valve 3 are connected to the power supply through the second electronic switch 24; in this embodiment, the delivery pump, the first electric valve 6 and the first electronic switch 23 are connected in series to the power supply; the transfer pump 1, the second electric valve 3 and the second electronic switch 24 are connected in series to the power supply, and the third electronic switch 25 is connected to the transfer pump 1, the first electric valve 6 and the second The electric valves 3 are all connected in series; the first electric valve 6 and the first electronic switch 23 are connected in parallel with the second electric valve 3 and the second electronic switch 24 . The first electronic switch 23, the second electronic switch 24 and the third electronic switch 25 are respectively connected with the control unit, and the operating states of the first electronic switch 23, the second electronic switch 24 and the third electronic switch 25 are controlled by the control unit, and the third electronic switch The electronic switch 25 is arranged between the delivery pump 1 and the power supply, wherein under normal working conditions, the third electronic switch 25 is always in a closed state. When the control unit controls the first electronic switch to be closed, the delivery pump and the first electric valve are powered on; when the control unit controls the second electronic switch to be closed, the delivery pump and the second electric valve are powered on; when the control unit controls the third When the electronic switch is turned off, the delivery pump, the first electric valve and the second electric valve are all powered off.

其中本实施例原料桶2中的石料表面改性剂可以通过第一管道51进入到第一雾化喷头装置8,也可以通过第二管道52进入到第二雾化喷头装置13;第一雾化喷头装置8和第二雾化喷头装置13均包括多方向的多个雾化喷头;其中第一雾化喷头装置8设置于沥青拌合楼筛分仓10上部,通过第一雾化喷头装置8的各个雾化喷头向沥青拌合楼筛分仓10喷入石料表面改性剂。第二雾化喷头装置13中的各个雾化喷头均匀嵌于盖板14中,盖板14贴于沥青拌合楼搅拌缸15内壁上,其中第一雾化喷头装置8中各方向的雾化喷头都对着筛分仓10,第二雾化喷头装置13中各方向的雾化喷头都朝向搅拌缸15内部,能够将石料表面改性剂喷入到筛分仓以及搅拌缸15内部。其中盖板14的位置在搅拌缸15内壁距离缸口较近的位置,即设置于内壁上半部分位置。当然本实施例中第二雾化喷头装置的各个雾化喷头也可以设置于搅拌缸其他位置,例如安装在搅拌缸的缸口边缘位置上,只要各个雾化喷头安装后不影响石料进入搅拌缸即可Wherein the stone surface modifier in the raw material barrel 2 of this embodiment can enter the first atomizing nozzle device 8 through the first pipeline 51, and can also enter the second atomizing nozzle device 13 through the second pipeline 52; Both the atomizing nozzle device 8 and the second atomizing nozzle device 13 include a plurality of atomizing nozzles in multiple directions; wherein the first atomizing nozzle device 8 is arranged on the upper part of the screening bin 10 of the asphalt mixing plant, and the first atomizing nozzle device Each atomizing nozzle of 8 sprays the stone material surface modifier into the screening bin 10 of the asphalt mixing plant. Each atomizing nozzle in the second atomizing nozzle device 13 is evenly embedded in the cover plate 14, and the cover plate 14 is attached to the inner wall of the mixing tank 15 of the asphalt mixing plant. The nozzles are all facing the screening bin 10, and the atomizing nozzles in all directions in the second atomizing nozzle device 13 are all facing the inside of the mixing tank 15, so that the stone surface modifier can be sprayed into the screening bin and the inside of the mixing tank 15. Wherein the position of the cover plate 14 is at the position where the inner wall of the mixing tank 15 is closer to the cylinder mouth, that is, it is arranged on the upper half of the inner wall. Of course, each atomizing nozzle of the second atomizing nozzle device in this embodiment can also be arranged at other positions of the mixing tank, such as being installed on the edge of the cylinder mouth of the mixing tank, as long as the installation of each atomizing nozzle does not affect the stone material entering the mixing tank can

本实施例的控制单元主要由控制箱19和沥青拌合楼的总控制系统20组成,沥青拌合楼的总控制系统20带有人机交互界面21。其中第一电子开关23、第二电子开关24和第三电子开关25均设置在控制箱19内,并且与沥青拌合楼的总控制系统信号19连接;在正常工作情况下,第三电子开关25始终处于闭合状态。本实施例中当需要对沥青拌合楼筛分仓10中的石料进行表面改性时,沥青拌合楼的总控制系统20启动控制箱内的第一电子开关23,使得输送泵1和第一电动阀门6接通电源,输送泵1从原料桶中抽取石料表面改性剂,并且通过第一管道51输送给第一雾化喷头装置8中,通过第一雾化喷头装置8向沥青拌合楼筛分仓10中喷入石料表面改性剂。当需要对沥青拌合楼搅拌缸15中的石料进行表面改性时,沥青拌合楼的总控制系统20启动控制箱17内的第二电子开关24,使得输送泵1和第二电动阀门3启动,输送泵1从原料桶中抽取石料表面改性剂,并且通过第二管道52输送给第二雾化喷头装置13中,通过第二雾化喷头装置13向沥青拌合楼搅拌缸15中喷入石料表面改性剂。本实施例装置首先通过第一雾化喷头装置8向沥青拌合楼筛分仓10中的石料喷入石料表面改性剂,对石料进行第一次表面改性,然后通过第二雾化喷头装置13向沥青拌合楼搅拌缸15中的石料喷入石料表面改性剂,对石料进行第二次表面改性。The control unit of this embodiment is mainly composed of a control box 19 and a general control system 20 of the asphalt mixing plant, and the general control system 20 of the asphalt mixing plant has a man-machine interface 21 . Wherein the first electronic switch 23, the second electronic switch 24 and the third electronic switch 25 are all arranged in the control box 19, and are connected with the general control system signal 19 of the asphalt mixing plant; 25 is always closed. In this embodiment, when it is necessary to modify the surface of the stone in the screening bin 10 of the asphalt mixing plant, the overall control system 20 of the asphalt mixing plant activates the first electronic switch 23 in the control box, so that the delivery pump 1 and the second An electric valve 6 is powered on, and the delivery pump 1 extracts the stone surface modifier from the raw material barrel, and transports it to the first atomizing nozzle device 8 through the first pipeline 51, and sends it to the asphalt mixing device 8 through the first atomizing nozzle device 8. The aggregate surface modifier is sprayed into the screening bin 10 of the combined building. When it is necessary to modify the surface of the stone in the mixing tank 15 of the asphalt mixing plant, the overall control system 20 of the asphalt mixing plant starts the second electronic switch 24 in the control box 17, so that the delivery pump 1 and the second electric valve 3 Start, the delivery pump 1 extracts the stone surface modifier from the raw material barrel, and transports it to the second atomizing nozzle device 13 through the second pipeline 52, and sends it to the mixing tank 15 of the asphalt mixing plant through the second atomizing nozzle device 13 Spray stone surface modifier. The device in this embodiment first sprays the stone surface modifier into the stone in the screening bin 10 of the asphalt mixing plant through the first atomizing nozzle device 8, and then performs surface modification on the stone for the first time, and then passes through the second atomizing nozzle device 8 The device 13 sprays the stone surface modifier into the stone in the mixing tank 15 of the asphalt mixing plant to carry out the second surface modification on the stone.

本实施例第一管道51上设置有与控制单元中沥青拌合楼的总控制系统20连接的第一电子流量计7,通过第一电子流量计7检测第一雾化喷头装置8喷入到沥青拌合楼筛分仓10中的量;本实施例第二管道52上设置有与控制单元沥青拌合楼的总控制系统20连接的第二电子流量计4,通过第二电子流量计4检测第二雾化喷头装置13喷入到沥青拌合楼搅拌缸15中的量;从而通过第一电子流量计7和第二电子流量计4准确控制石料表面改性剂的用量。同时第一电子流量计7和第二电子流量计4检测到的流量参数可以通过沥青拌合楼的总控制系统20的人机交互界面进行显示。In this embodiment, the first pipeline 51 is provided with the first electronic flowmeter 7 connected to the total control system 20 of the asphalt mixing plant in the control unit, and the first atomizing nozzle device 8 is sprayed into the air by the first electronic flowmeter 7. The amount in the screening bin 10 of the asphalt mixing plant; the second pipeline 52 in this embodiment is provided with a second electronic flowmeter 4 connected to the control unit of the overall control system 20 of the asphalt mixing plant, through which the second electronic flowmeter 4 Detect the amount of the second atomizing nozzle device 13 sprayed into the mixing tank 15 of the asphalt mixing plant; thereby accurately control the amount of the stone surface modifier through the first electronic flow meter 7 and the second electronic flow meter 4 . At the same time, the flow parameters detected by the first electronic flowmeter 7 and the second electronic flowmeter 4 can be displayed through the man-machine interface of the overall control system 20 of the asphalt mixing plant.

另外在本实施例的控制单元中还连接有报警装置,当第一电子流量计检测到第一雾化喷头装置喷入到沥青拌合楼筛分仓中的量超过少于或超出预设流量,或者当第二电子流量计检测到第二雾化喷头装置喷入到沥青拌合楼搅拌缸中的量超过少于或超出预设流量时,报警装置报警,控制单元控制第三电子开关25断开,使得输送泵、第一电动阀门和第二电动阀门均断电,从而停止向第一雾化喷头装置或第二雾化喷头装置输送材料。In addition, an alarm device is also connected to the control unit of this embodiment. When the first electronic flowmeter detects that the amount sprayed into the screening bin of the asphalt mixing plant by the first atomizing nozzle device is less than or exceeds the preset flow rate , or when the second electronic flowmeter detects that the amount sprayed into the mixing tank of the asphalt mixing plant by the second atomizing nozzle device is less than or exceeds the preset flow rate, the alarm device will alarm, and the control unit will control the third electronic switch 25 Disconnecting, so that the delivery pump, the first electric valve and the second electric valve are all de-energized, thereby stopping the delivery of materials to the first atomizing nozzle device or the second atomizing nozzle device.

本实施例还公开了一种对接于沥青拌合楼的石料表面改性雾化装置的操控方法,包括以下步骤:This embodiment also discloses a control method for a stone surface modification atomization device connected to an asphalt mixing plant, including the following steps:

S1、通过沥青拌合楼的总控制系统中的定时器设定第一电子开关23的闭合时间,使得输送泵和第一电动阀门开启后的工作时间为5秒;控制单元控制第一电子开关闭合,输送泵和第一电动阀门开启,输送泵从原料桶中抽取石料表面改性剂,石料表面改性剂通过第一管道输送至第一雾化喷头装置;同时3吨石料进入到沥青拌合楼筛分仓中,第一雾化喷头装置对着筛分仓中的石料进行喷雾,对石料表面进行第一次改性;同时第一管道上的中的第一电子流量计检测第一雾化喷头装置8喷入到筛分仓中的石料表面改性剂的量;通过第一电子流量计7准确控制1千克石料表面改性剂喷入到筛分仓10中;S1. Set the closing time of the first electronic switch 23 through the timer in the general control system of the asphalt mixing plant, so that the working time after the delivery pump and the first electric valve are opened is 5 seconds; the control unit controls the first electronic switch Closed, the delivery pump and the first electric valve are opened, the delivery pump extracts the stone surface modifier from the raw material barrel, and the stone surface modifier is transported to the first atomizing nozzle device through the first pipeline; at the same time, 3 tons of stone enters the asphalt mixing In the screening chamber of the building, the first atomizing nozzle device sprays the stone in the screening chamber to modify the surface of the stone for the first time; at the same time, the first electronic flowmeter in the first pipeline detects the first The amount of the stone surface modifier sprayed into the screening bin by the atomizing nozzle device 8; accurately controlling 1 kg of the stone surface modifier to be sprayed into the screening bin 10 through the first electronic flowmeter 7;

S2、待输送泵1和第一电动阀门6运行时间5秒后,控制单元控制第一电子开关23断开,输送泵1和第一电动阀门6关闭,第一雾化喷头装置8停止喷雾;S2. After the delivery pump 1 and the first electric valve 6 have been running for 5 seconds, the control unit controls the first electronic switch 23 to be disconnected, the delivery pump 1 and the first electric valve 6 are closed, and the first atomizing nozzle device 8 stops spraying;

S3、待第一雾化喷到装置停止喷雾后,沥青拌合楼的总控制系统打开沥青拌合楼的热骨料仓顶部仓门9,使完成筛分且经过一次表面改性后的石料进入沥青拌合楼热骨料仓11的A、B、C、D各仓中。通过沥青拌合楼的总控制系统20中的定时器设定第二电子开关24的闭合时间,使得输送泵1和第二电动阀门3开启后的工作时间为10秒;沥青拌合楼的总控制系统20启动搅拌缸的搅拌电机16,同时沥青拌合楼的总控制系统20控制第二电子开关24闭合,输送泵1和第二电动阀门3开启,输送泵1从原料桶中抽取石料表面改性剂,石料表面改性剂通过第二管道52输送至第二雾化喷头装置13;第二雾化喷头装置13对搅拌缸内部15进行喷雾,待第二雾化喷头装置13喷雾2秒后,沥青拌合楼的总控制系统20控制热骨料下部仓门12打开,将热骨料仓A、B、C、D四仓石料按30:30:30:10的质量比将总重为3吨的石料下落至搅拌缸15中,在搅拌叶片带动下,全部石料表面被石料表面改性剂覆盖,实现石料二次表面改性;同时第二管道52上的第二电子流量计4检测第二雾化喷头装置13喷入到搅拌缸中的石料表面改性剂的量;通过第二电子流量计7准确控制2千克石料表面改性剂喷入到筛分仓10中;S3. After the first atomization spraying device stops spraying, the general control system of the asphalt mixing plant opens the top door 9 of the hot aggregate bin of the asphalt mixing plant, so that the aggregates that have been screened and have undergone a surface modification Enter the A, B, C, and D warehouses of the hot aggregate warehouse 11 of the asphalt mixing plant. The closing time of the second electronic switch 24 is set by the timer in the total control system 20 of the asphalt mixing plant, so that the working time after the delivery pump 1 and the second electric valve 3 is opened is 10 seconds; The control system 20 starts the mixing motor 16 of the mixing tank, and at the same time, the overall control system 20 of the asphalt mixing plant controls the second electronic switch 24 to close, the delivery pump 1 and the second electric valve 3 are opened, and the delivery pump 1 extracts the surface of the stone from the raw material barrel Modifier, the stone surface modifier is transported to the second atomizing nozzle device 13 through the second pipeline 52; the second atomizing nozzle device 13 sprays the inside 15 of the mixing cylinder, and waits for the second atomizing nozzle device 13 to spray for 2 seconds Finally, the general control system 20 of the asphalt mixing plant controls the opening of the lower bin door 12 of the hot aggregate, and the stone materials in the four bins A, B, C, and D of the hot aggregate bins are mixed according to the mass ratio of 30:30:30:10. 3 tons of stones fall into the mixing tank 15, driven by the stirring blades, the entire surface of the stones is covered by the surface modifier of the stones, realizing secondary surface modification of the stones; at the same time, the second electronic flowmeter 4 on the second pipeline 52 Detect the amount of the stone surface modifier sprayed into the mixing tank by the second atomizing nozzle device 13; accurately control 2 kg of the stone surface modifier to be sprayed into the screening bin 10 through the second electronic flowmeter 7;

S4、待输送泵1和第二电动阀门3运行时间10秒后,控制单元控制第二电子开关24断开,输送泵和第二电动阀门与电源断开,第二雾化喷头装置13停止喷散石料表面改性剂,从沥青拌合楼搅拌缸15的第一入口26和第二入口27分别中加入沥青和粉料,并搅拌沥青、石料、粉料等混合料30至45秒。待搅拌结束后,沥青拌合楼的总控制系统20控制搅拌缸底部仓门17打开,混合料落入待料车18。S4. After the delivery pump 1 and the second electric valve 3 have been running for 10 seconds, the control unit controls the second electronic switch 24 to be disconnected, the delivery pump and the second electric valve are disconnected from the power supply, and the second atomizing nozzle device 13 stops spraying. Bulk stone surface modifier, add asphalt and powder from the first inlet 26 and second inlet 27 of the mixing tank 15 of the asphalt mixing plant, and stir the asphalt, stone, powder and other mixtures for 30 to 45 seconds. After the mixing is finished, the general control system 20 of the asphalt mixing plant controls the bottom door 17 of the mixing tank to open, and the mixture falls into the waiting car 18 .

在本实施例中当步骤S1第一电子流量计7检测到第一雾化喷头装置8的石料表面改性剂喷入量少于或超出预设流量时,或者当步骤S3第二电子流量计4检测到第二雾化喷头装置13的石料表面改性剂喷入量少于或超出预设流量时,或者出现紧急情况时,报警装置中红灯闪烁报警,并且控制单元控制第三电子开关25断开,此时输送泵1、第一电动阀门6和第二电动阀门3均断电关闭,整个雾化装置停止工作。In this embodiment, when the first electronic flowmeter 7 in step S1 detects that the injection amount of the stone surface modifier of the first atomizing nozzle device 8 is less than or exceeds the preset flow rate, or when the second electronic flowmeter in step S3 4. When it is detected that the amount of stone surface modifier sprayed into the second atomizing nozzle device 13 is less than or exceeds the preset flow rate, or when an emergency occurs, the red light in the alarm device flashes to give an alarm, and the control unit controls the third electronic switch 25 is disconnected, at this moment, the delivery pump 1, the first electric valve 6 and the second electric valve 3 are all powered off and closed, and the whole atomizing device stops working.

本实施例中的第一电子流量计7和第二电子流量计4所检测到的石料表面改性剂的流量参数可以通过沥青拌合楼的总控制系统20的人机交互界面21进行显示。The flow parameters of the stone surface modifier detected by the first electronic flowmeter 7 and the second electronic flowmeter 4 in this embodiment can be displayed through the man-machine interface 21 of the general control system 20 of the asphalt mixing plant.

本实施例中要对石料进行第一次表面改性时,即当第一雾化喷头装置喷雾时,输送泵和第一电动阀门6开启后工作的时间根据石料进行第一次表面改性时所需要的石料表面改性剂的用量进行设定。同理对石料进行第二次表面改性时,即当第二雾化喷头装置13喷雾时,输送泵1和第二电动阀门3开启后工作的时间根据石料进行第二次表面改性时所需要的石料表面改性剂的用量进行设定。In this embodiment, when the first surface modification is to be carried out on the stone, that is, when the first atomizing nozzle device sprays, the working time of the delivery pump and the first electric valve 6 is carried out according to the first surface modification of the stone. The required amount of stone surface modifier is set. Similarly, when carrying out the second surface modification of stone materials, that is, when the second atomizing nozzle device 13 is spraying, the working time after the delivery pump 1 and the second electric valve 3 are opened is based on the time when the stone materials are subjected to the second surface modification. The required amount of stone surface modifier is set.

上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。The above-mentioned embodiment is a preferred embodiment of the present invention, but the embodiment of the present invention is not limited by the above-mentioned embodiment, and any other changes, modifications, substitutions, combinations, Simplifications should be equivalent replacement methods, and all are included in the protection scope of the present invention.

Claims (8)

1.对接于沥青拌合楼的石料表面改性雾化装置,其特征在于,包括控制单元、用于放置石料表面改性剂的原料桶、输送泵、第一电子开关、第二电子开关、第一雾化喷头装置和第二雾化喷头装置;1. The stone surface modification atomization device connected to the asphalt mixing plant is characterized in that it includes a control unit, a raw material barrel for placing the stone surface modifier, a delivery pump, a first electronic switch, a second electronic switch, The first atomizing nozzle device and the second atomizing nozzle device; 所述输送泵的一端与原料桶连通;所述输送泵的另一端通过第一管道与第一雾化喷头装置连通,所述输送泵的另一端还通过第二管道与第二雾化喷头装置连通;所述第一管道上设置有第一电动阀门,第二管道上设置有第二电动阀门;One end of the delivery pump communicates with the raw material barrel; the other end of the delivery pump communicates with the first atomizing nozzle device through the first pipeline, and the other end of the delivery pump communicates with the second atomizing nozzle device through the second pipeline connected; the first pipeline is provided with a first electric valve, and the second pipeline is provided with a second electric valve; 所述第一雾化喷头装置设置于沥青拌合楼筛分仓上部;所述第二雾化喷头装置设置于沥青拌合楼搅拌缸上;The first atomizing nozzle device is set on the upper part of the screening bin of the asphalt mixing plant; the second atomizing nozzle device is set on the mixing tank of the asphalt mixing plant; 所述输送泵和第一电动阀门通过第一电子开关与电源连接;所述输送泵和第二电动阀门通过第二电子开关与电源连接;所述第一电子开关和第二电子开关分别与控制单元连接,通过控制单元控制第一电子开关和第二电子开关的工作状态;The delivery pump and the first electric valve are connected to the power supply through the first electronic switch; the delivery pump and the second electric valve are connected to the power supply through the second electronic switch; the first electronic switch and the second electronic switch are respectively connected to the control The unit is connected, and the working state of the first electronic switch and the second electronic switch is controlled by the control unit; 所述第一雾化喷头装置和第二雾化喷头装置均包括多方向的多个雾化喷头,其中第一雾化喷头装置中各方向的雾化喷头都对着筛分仓,第二雾化喷头装置中各方向的雾化喷头都对着搅拌缸内部;The first atomizing nozzle device and the second atomizing nozzle device all include a plurality of multi-directional atomizing nozzles, wherein the atomizing nozzles in each direction in the first atomizing nozzle device are all facing the screening chamber, and the second atomizing nozzle device The atomizing nozzles in all directions in the atomizing nozzle device are facing the inside of the mixing tank; 该雾化装置还包括与控制单元连接的第三电子开关;其中所述输送泵、第一电动阀门和第二电动阀门与第三电子开关均为串联关系。The atomizing device also includes a third electronic switch connected to the control unit; wherein the delivery pump, the first electric valve, the second electric valve and the third electronic switch are all connected in series. 2.根据权利要求1所述的对接于沥青拌合楼的石料表面改性雾化装置,其特征在于,所述第二雾化喷头装置中的各个雾化喷头均匀嵌于盖板中,所述盖板贴于沥青拌合楼搅拌缸的内壁上。2. The stone material surface modification atomization device docked on the asphalt mixing plant according to claim 1, wherein each atomization nozzle in the second atomization nozzle device is evenly embedded in the cover plate, so The cover plate is pasted on the inner wall of the mixing tank of the asphalt mixing plant. 3.根据权利要求1所述的对接于沥青拌合楼的石料表面改性雾化装置,其特征在于,所述第一管道上设置有与控制单元连接的第一电子流量计,所述第二管道上设置有与控制单元连接的第二电子流量计。3. The stone material surface modification atomization device docked to the asphalt mixing plant according to claim 1, characterized in that, the first pipeline is provided with a first electronic flowmeter connected to the control unit, and the first The second pipeline is provided with a second electronic flowmeter connected with the control unit. 4.根据权利要求1所述的对接于沥青拌合楼的石料表面改性雾化装置,其特征在于,所述控制单元主要由控制箱和沥青拌合楼的总控制系统组成,第一电子开关、第二电子开关和第三电子开关均设置在控制箱内;并且所述第一电子开关、第二电子开关和第三电子开关均与控制单元中的沥青拌合楼的总控制系统连接;沥青拌合楼的总控制系统还连接有报警装置。4. The stone surface modification atomization device docked in the asphalt mixing plant according to claim 1, characterized in that the control unit is mainly composed of a control box and the total control system of the asphalt mixing plant, the first electronic The switch, the second electronic switch and the third electronic switch are all arranged in the control box; and the first electronic switch, the second electronic switch and the third electronic switch are all connected with the general control system of the asphalt mixing plant in the control unit ; The overall control system of the asphalt mixing plant is also connected with an alarm device. 5.一种对接于沥青拌合楼的石料表面改性雾化装置的操控方法,其特征在于,包括以下步骤:5. A control method for a stone surface modification atomization device connected to an asphalt mixing plant, characterized in that it comprises the following steps: S1、控制单元控制第一电子开关闭合,输送泵和第一电动阀门开启,输送泵从原料桶中抽取石料表面改性剂,石料表面改性剂通过第一管道输送至第一雾化喷头装置;同时石料进入到沥青拌合楼筛分仓中,第一雾化喷头装置对着筛分仓中的石料进行喷雾,对石料表面进行第一次改性,完成对石料表面进行第一次改性;S1. The control unit controls the first electronic switch to be closed, the delivery pump and the first electric valve are opened, the delivery pump extracts the stone surface modifier from the raw material barrel, and the stone surface modifier is transported to the first atomizing nozzle device through the first pipeline At the same time, the stone material enters the screening chamber of the asphalt mixing building, and the first atomizing nozzle device sprays the stone material in the screening chamber to modify the surface of the stone material for the first time, and completes the first modification of the stone material surface. sex; S2、待输送泵和第一电动阀门运行时间t1后,控制单元控制第一电子开关断开,输送泵和第一电动阀门关闭,第一雾化喷头装置停止喷雾;S2. After the delivery pump and the first electric valve run for a time t1, the control unit controls the first electronic switch to be disconnected, the delivery pump and the first electric valve are closed, and the first atomizing nozzle device stops spraying; S3、待第一雾化喷头装置停止喷雾后,启动沥青拌合楼的搅拌电机,然后控制单元控制第二电子开关闭合,输入泵和第二电动阀门启动,输送泵从原料桶中抽取石料表面改性剂,石料表面改性剂通过第二管道输送至第二雾化喷头装置,第二雾化喷头装置对着搅拌缸进行喷雾,待第二雾化喷头装置喷雾时间t2后,沥青拌合楼将步骤S1中经过筛分仓筛分并完成第一次表面改性后的石料倒入搅拌缸,第二雾化喷头装置对着搅拌缸中的石料进行喷雾,对石料表面进行第二次改性;S3. After the first atomizing nozzle device stops spraying, start the mixing motor of the asphalt mixing plant, then the control unit controls the second electronic switch to close, the input pump and the second electric valve start, and the delivery pump extracts the surface of the stone from the raw material barrel Modifier, the stone surface modifier is transported to the second atomizing nozzle device through the second pipeline, and the second atomizing nozzle device sprays against the mixing tank. After the second atomizing nozzle device sprays for t2, the asphalt mixing The building will pour the stone material that has been screened by the screening chamber and completed the first surface modification in step S1 into the mixing tank. modified; S4、待输送泵和第二电动阀门运行时间t3后,控制单元控制第二电子开关断开,输送泵和第二电动阀门关闭,第二雾化喷头装置停止喷雾,完成对石料表面进行第二次改性。S4. After the delivery pump and the second electric valve have been running for t3, the control unit controls the second electronic switch to be disconnected, the delivery pump and the second electric valve are closed, the second atomizing nozzle device stops spraying, and the second spraying on the stone surface is completed. secondary modification. 6.根据权利要求5所述的对接于沥青拌合楼的石料表面改性雾化装置的操控方法,其特征在于,在所述步骤S1中,设置在第一管道中的第一电子流量计检测第一雾化喷头装置喷入到筛分仓中的石料表面改性剂的量;在所述步骤S3中,设置在第二管道中的第二电子流量计检测第二雾化喷头装置喷入到搅拌缸中的石料表面改性剂的量。6. The method for controlling the atomization device for modifying the surface of stones connected to the asphalt mixing plant according to claim 5, characterized in that, in the step S1, the first electronic flowmeter installed in the first pipeline Detect the amount of the stone surface modifier sprayed into the screening chamber by the first atomizing nozzle device; in the step S3, the second electronic flowmeter arranged in the second pipeline detects The amount of stone surface modifier added to the mixing tank. 7.根据权利要求6所述的对接于沥青拌合楼的石料表面改性雾化装置的操控方法,其特征在于,当所述步骤S1中第一电子流量计检测到第一雾化喷头装置的石料表面改性剂喷入量少于或超出预设流量时,或当第二电子流量计检测到第二雾化喷头装置的石料表面改性剂喷入量少于或超出预设流量时,控制单元连接的报警装置报警,同时控制单元控制第三电子开关断开,输送泵、第一电动阀门和第二电动阀门均断电关闭。7. The control method of the stone surface modification atomization device connected to the asphalt mixing plant according to claim 6, characterized in that, when the first electronic flowmeter detects the first atomization nozzle device in the step S1 When the injection amount of the stone surface modifier is less than or exceeds the preset flow rate, or when the second electronic flowmeter detects that the injection amount of the stone surface modifier of the second atomizing nozzle device is less than or exceeds the preset flow rate , the alarm device connected to the control unit gives an alarm, and at the same time the control unit controls the third electronic switch to be disconnected, and the delivery pump, the first electric valve and the second electric valve are all powered off and closed. 8.根据权利要求5所述的对接于沥青拌合楼的石料表面改性雾化装置的操控方法,其特征在于,所述控制单元根据石料的用量对时间t1、t2和t3进行设定。8. The control method of the stone surface modification atomization device docked to the asphalt mixing plant according to claim 5, characterized in that the control unit sets the time t1, t2 and t3 according to the amount of stone used.
CN201410287196.7A 2014-06-24 2014-06-24 Butt up against stone surface modification atomising device and the control method thereof in asphalt mixing building Active CN104074119B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410287196.7A CN104074119B (en) 2014-06-24 2014-06-24 Butt up against stone surface modification atomising device and the control method thereof in asphalt mixing building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410287196.7A CN104074119B (en) 2014-06-24 2014-06-24 Butt up against stone surface modification atomising device and the control method thereof in asphalt mixing building

Publications (2)

Publication Number Publication Date
CN104074119A CN104074119A (en) 2014-10-01
CN104074119B true CN104074119B (en) 2016-01-20

Family

ID=51595696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410287196.7A Active CN104074119B (en) 2014-06-24 2014-06-24 Butt up against stone surface modification atomising device and the control method thereof in asphalt mixing building

Country Status (1)

Country Link
CN (1) CN104074119B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105890953B (en) * 2016-06-08 2019-11-15 华南理工大学 Spraying device and control method for asphalt pavement regeneration protection agent
CN106948242B (en) * 2017-05-18 2022-11-01 中铁十局集团西北工程有限公司 Modification device of stone film
CN114455873B (en) * 2022-01-17 2023-01-24 西安理工大学 Device and method for improving performance of acidic aggregate based on surface treatment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0430007A (en) * 1990-05-23 1992-02-03 Nikko Co Ltd Stuck object removing method of drier for regenerating asphalt pavement waste material
CN2687167Y (en) * 2003-07-11 2005-03-23 刘振清 Combustion system using inferior coal tar intead of road bitumen mixing stone fuel
CN202337939U (en) * 2011-12-12 2012-07-18 长安大学 Asphalt air-atomizing and filling device of stirring equipment
CN203977253U (en) * 2014-06-24 2014-12-03 华南理工大学 Butt up against the building stones surface modification atomising device in asphalt mixing building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0430007A (en) * 1990-05-23 1992-02-03 Nikko Co Ltd Stuck object removing method of drier for regenerating asphalt pavement waste material
CN2687167Y (en) * 2003-07-11 2005-03-23 刘振清 Combustion system using inferior coal tar intead of road bitumen mixing stone fuel
CN202337939U (en) * 2011-12-12 2012-07-18 长安大学 Asphalt air-atomizing and filling device of stirring equipment
CN203977253U (en) * 2014-06-24 2014-12-03 华南理工大学 Butt up against the building stones surface modification atomising device in asphalt mixing building

Also Published As

Publication number Publication date
CN104074119A (en) 2014-10-01

Similar Documents

Publication Publication Date Title
CN101235252B (en) A kind of multifunctional liquid rubber spray paint, preparation method, application method and special equipment
CN205255264U (en) Novel concrete mixer
CN106425887A (en) A front and back mixed ice particle gas jet device and method
CN203096565U (en) Plant mixing type cold recycling mixing unit
CN106012760B (en) A kind of the cold in-plant recycling mixing apparatus and mixing method of asphalt
CN104074119B (en) Butt up against stone surface modification atomising device and the control method thereof in asphalt mixing building
CN103806363A (en) Efficient foamed asphalt foaming device
CN104264571A (en) RA resin asphalt spreader and cleaning device thereof
CN203684042U (en) Synchronous macadam spreader
CN203977253U (en) Butt up against the building stones surface modification atomising device in asphalt mixing building
CN205576702U (en) Road construction pavement material sprinkler
CN205775734U (en) A kind of SPRR flusher
CN204195995U (en) A kind of green building moves mortar mixing plant
CN203816821U (en) Atomizing device for surface modification of stones in laboratory
CN206216879U (en) A kind of prestressed reinforced concrete tie releasing agent automatic spray apparatus
CN201195349Y (en) Plant-mixed cold asphalt concrete regeneration equipment
CN104141273B (en) A kind of building stones surface modification foam device and control method for asphalt mixing building
CN204509944U (en) For the Novel atomized device of stone surface modification
CN203700909U (en) Intermittent asphalt foaming device
CN105890953B (en) Spraying device and control method for asphalt pavement regeneration protection agent
CN103740057A (en) Reactive resin adhesive and synchronous rubble scattering machine
CN201873924U (en) Device for adding liquid state warm mixing agent for producing asphalt mixture
CN204059152U (en) A kind of stone surface modified foaming device for asphalt mixing building
CN205719701U (en) A kind of for the protectant flusher of asphalt pavement regeneration
CN204551209U (en) Based on the pavement maintenance truck of foamed asphalt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190128

Address after: 510640 No. five, 381 mountain road, Guangzhou, Guangdong, Tianhe District

Co-patentee after: Guangzhou South China University of Technology science and Technology Park Co., Ltd.

Patentee after: Yu Jiangmiao

Address before: 510640 No. five, 381 mountain road, Guangzhou, Guangdong, Tianhe District

Patentee before: South China University of Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190419

Address after: 528313 Shunde Machinery City, Foshan City, Guangdong Province, 22 419 Rooms, No. 18 Xingye 4 Road, Guanglong Industrial Park, Chencun Town, Shunde District, Guangdong Province

Patentee after: Huayun Tongda (Guangdong) Road Technology Co., Ltd.

Address before: 510640 No. five, 381 mountain road, Guangzhou, Guangdong, Tianhe District

Co-patentee before: Guangzhou South China University of Technology science and Technology Park Co., Ltd.

Patentee before: Yu Jiangmiao

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Surface modification atomizing device for stone materials butted to pitch mixing floor and control method thereof

Effective date of registration: 20200119

Granted publication date: 20160120

Pledgee: Bank of China Limited by Share Ltd Shunde branch

Pledgor: GUANGDONG GT-TECH ROAD MATERIAL TECHNOLOGY Co.,Ltd.

Registration number: Y2020980000149