CN104065019A - Wire pay-off rack - Google Patents

Wire pay-off rack Download PDF

Info

Publication number
CN104065019A
CN104065019A CN201410242957.7A CN201410242957A CN104065019A CN 104065019 A CN104065019 A CN 104065019A CN 201410242957 A CN201410242957 A CN 201410242957A CN 104065019 A CN104065019 A CN 104065019A
Authority
CN
China
Prior art keywords
connecting rod
brace summers
brace
upper side
transverse slat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410242957.7A
Other languages
Chinese (zh)
Inventor
魏彦乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Net Mengjin County Henan Electric Co
State Grid Corp of China SGCC
Original Assignee
State Net Mengjin County Henan Electric Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Net Mengjin County Henan Electric Co, State Grid Corp of China SGCC filed Critical State Net Mengjin County Henan Electric Co
Priority to CN201410242957.7A priority Critical patent/CN104065019A/en
Publication of CN104065019A publication Critical patent/CN104065019A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a wire pay-off rack, and relates to a wire pay-off device; two supporting beams (10) are arranged at intervals, outer parts of two ends of the two supporting beams (10) are respectively provided with a wheel (9), two ends of a connecting rod (8) are respectively connected to one end of the corresponding supporting beam (10), the two supporting beams (10) and the connecting rod (8) form a U-shaped structure, two ends of a pull rod (3) are respectively connected to the other end of the corresponding supporting beam (10), the middle parts of the upper part surfaces of the two supporting beams (10) are respectively provided with a bracket, the upper part surfaces of the two brackets are respectively provided with a pit (1); according to the wire pay-off rack, the two supporting beams and the connecting rod are arranged to be the U-shaped structure, thus being applicable to using in a way of having a crane or manually lifting a wire coil, and greatly facilitating construction.

Description

A kind of wire payoff rack
[technical field]
The present invention relates to a kind of wire actinobacillus device, especially relate to a kind of wire payoff rack.
[background technology]
Known, quickening along with urban construction, various enterprises and institutions and residential block are for the demand of electric power also rapid growth, laying task increasing due to cable, original wire wire barrow can not meet construction demand, be a very difficult task by the cable relieving being wrapped on drum; In construction, need cable to decontrol, in unwrapping wire, because cable is very heavy, need several individuals by dilatory, drum also rolls thereupon, very painstaking.
[summary of the invention]
In order to overcome the deficiency in background technology, the invention discloses a kind of wire payoff rack, the present invention is set to U-shaped structure by two brace summers and connecting rod, can adapt to and have loop wheel machine or by manually holding up the mode of upper drum to use, greatly facilitate construction needs.
For achieving the above object, the present invention adopts following technical scheme:
A kind of wire payoff rack, comprise brace summer, wheel, connecting rod, support and pull bar, two brace summer intervals arrange, outside, two ends at two brace summers is respectively equipped with wheel, the two ends of connecting rod connect respectively one end of two brace summers, by two brace summers and connecting rod, form U-shaped structure, and the two ends of pull bar connect the other end of two brace summers, the upper side middle part of described two brace summers is respectively equipped with support, and described in two, support upper side is respectively equipped with semicircle depression.
Described wire payoff rack, is respectively equipped with jack on the other end top of two brace summers, and the inserting column that bottom, pull bar two ends arranges connects the jack of two brace summers.
Described wire payoff rack, is provided with handspike in the outside of connecting rod.
Described wire payoff rack, described support comprises bearing diagonal, transverse slat, in the upper side of transverse slat, be provided with semicircle depression, two bearing diagonal upper ends that are "eight" shape connect respectively the two ends of transverse slat, and the lower end of two bearing diagonals connects respectively in the upper side at close two ends of brace summer.
Owing to having adopted technique scheme, the present invention has following beneficial effect:
Wire payoff rack of the present invention, by two brace summers and connecting rod are made into U-shaped structure, with time utilize handspike the present invention to be pushed to the drum bottom of slinging, the axle at drum middle part is placed in the semicircle depression on two transverse slat tops, then by pull bar, is fixed the other end of two brace summers; The present invention is set to U-shaped structure by two brace summers and connecting rod, can adapt to and have loop wheel machine or by manually holding up the mode of upper drum to use, greatly facilitate construction needs.
[accompanying drawing explanation]
Fig. 1 is structural representation of the present invention;
In figure: 1, semicircle depression; 2, bearing diagonal; 3, pull bar; 4, jack; 5, inserting column; 6, handspike; 7, transverse slat; 8, connecting rod; 9, wheel; 10, brace summer.
[embodiment]
By the following examples, can explain in more detail the present invention, the present invention is not limited to the following examples, discloses object of the present invention and is intended to protect all changes and improvements in the scope of the invention;
Wire payoff rack described in 1 by reference to the accompanying drawings, comprise brace summer 10, wheel 9, connecting rod 8, support and pull bar 3, two brace summer 10 intervals arrange, outside, two ends at two brace summers 10 is respectively equipped with wheel 9, the two ends of connecting rod 8 connect respectively one end of two brace summers 10, in the outside of connecting rod 8, be provided with handspike 6, by two brace summers 10 and connecting rod 8, form U-shaped structure, other end top at two brace summers 10 is respectively equipped with jack 4, the inserting column 5 that pull bar 3 bottoms, two ends arrange connects the jack 4 of two brace summers 10, the upper side middle part of described two brace summers 10 is respectively equipped with support, described support comprises bearing diagonal 2, transverse slat 7, upper side at transverse slat 7 is provided with semicircle depression 1, two bearing diagonal 2 upper ends that are "eight" shape connect respectively the two ends of transverse slat 7, the lower end of two bearing diagonals 2 connects respectively in the upper side at close two ends of brace summer 10.
Implement wire payoff rack of the present invention, make and require: described brace summer 10, bearing diagonal 2, connecting rod 8 are answered user's steel pipe manufacturing, described transverse slat 7 is used Plate Welding better, with time utilize handspike 6 opening between the other end of two brace summers 10 to be pushed to the drum bottom " if can use the mode of manually lifting that drum is raised without crane " of slinging, during the two ends bottom of semicircle on transverse slat 7 depression 1 in drum middle part axle, putting down the axle that drum makes drum is placed in the semicircle depression 1 on two transverse slat 7 tops, firm in order to ensure two brace summers 10 of the present invention, use the jack 4 of two brace summer 10 other ends of inserting column 5 connections of pull bar 3 bottoms, two ends, then by handspike 6, drum is pushed to correct position and angle, utilize fragment of brick fixedly after wheel 9, just can implement line laying work.
Part not in the detailed description of the invention is prior art, does not therefore give detailed description.

Claims (4)

1. a wire payoff rack, comprise brace summer (10), wheel (9), connecting rod (8), support and pull bar (3), it is characterized in that: two brace summers (10) interval arranges, in the outside, two ends of two brace summers (10), be respectively equipped with wheel (9), the two ends of connecting rod (8) connect respectively one end of two brace summers (10), by two brace summers (10) and connecting rod (8), form U-shaped structure, the two ends of pull bar (3) connect the other end of two brace summers (10), the upper side middle part of described two brace summers (10) is respectively equipped with support, described in two, support upper side is respectively equipped with semicircle depression (1).
2. wire payoff rack according to claim 1, is characterized in that: on the other end top of two brace summers (10), be respectively equipped with jack (4), the inserting column (5) that pull bar (3) bottom, two ends arranges connects the jack (4) of two brace summers (10).
3. wire payoff rack according to claim 1, is characterized in that: in the outside of connecting rod (8), be provided with handspike (6).
4. wire payoff rack according to claim 1, it is characterized in that: described support comprises bearing diagonal (2), transverse slat (7), upper side at transverse slat (7) is provided with semicircle depression (1), two bearing diagonal (2) upper ends that are "eight" shape connect respectively the two ends of transverse slat (7), and the lower end of two bearing diagonals (2) connects respectively in the upper side at close two ends of brace summer (10).
CN201410242957.7A 2014-06-04 2014-06-04 Wire pay-off rack Pending CN104065019A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410242957.7A CN104065019A (en) 2014-06-04 2014-06-04 Wire pay-off rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410242957.7A CN104065019A (en) 2014-06-04 2014-06-04 Wire pay-off rack

Publications (1)

Publication Number Publication Date
CN104065019A true CN104065019A (en) 2014-09-24

Family

ID=51552608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410242957.7A Pending CN104065019A (en) 2014-06-04 2014-06-04 Wire pay-off rack

Country Status (1)

Country Link
CN (1) CN104065019A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105406405A (en) * 2015-11-26 2016-03-16 国网河南孟津县供电公司 Sliding device for cable operation
CN107539353A (en) * 2017-08-15 2018-01-05 镇江恒创纺织机械有限公司 A kind of transporter of portable yarn disk
CN112246896A (en) * 2020-10-21 2021-01-22 芜湖巨科电气设备有限公司 Copper line send traditional thread binding putting

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002193555A (en) * 2000-12-27 2002-07-10 Fujikura Ltd Feeder cable reeling device for movable equipment and cable reel
CN201732678U (en) * 2010-07-29 2011-02-02 保定天威集团有限公司 In-place rotating wire unwinding vehicle
CN101969185A (en) * 2010-09-25 2011-02-09 河南省电力公司南阳供电公司 Circuit hydraulic laying tailer
CN102820630A (en) * 2012-09-05 2012-12-12 中铁建电气化局集团第五工程有限公司 Manual paying-off support
CN103588050A (en) * 2013-11-25 2014-02-19 重庆恒泰线缆(集团)有限公司 Coil containing rack for coiled steel wire rope

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002193555A (en) * 2000-12-27 2002-07-10 Fujikura Ltd Feeder cable reeling device for movable equipment and cable reel
CN201732678U (en) * 2010-07-29 2011-02-02 保定天威集团有限公司 In-place rotating wire unwinding vehicle
CN101969185A (en) * 2010-09-25 2011-02-09 河南省电力公司南阳供电公司 Circuit hydraulic laying tailer
CN102820630A (en) * 2012-09-05 2012-12-12 中铁建电气化局集团第五工程有限公司 Manual paying-off support
CN103588050A (en) * 2013-11-25 2014-02-19 重庆恒泰线缆(集团)有限公司 Coil containing rack for coiled steel wire rope

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105406405A (en) * 2015-11-26 2016-03-16 国网河南孟津县供电公司 Sliding device for cable operation
CN107539353A (en) * 2017-08-15 2018-01-05 镇江恒创纺织机械有限公司 A kind of transporter of portable yarn disk
CN112246896A (en) * 2020-10-21 2021-01-22 芜湖巨科电气设备有限公司 Copper line send traditional thread binding putting

Similar Documents

Publication Publication Date Title
CN104065019A (en) Wire pay-off rack
CN202687622U (en) Portable power cable and wire pay-off device
CN204030452U (en) A kind of cable unwrapping wire special-purpose vehicle
CN203241594U (en) Pneumatic lifting device for buried type optical cable cross-connecting box
CN102794592A (en) Adjustable automatic displacement device for steel member
CN204847572U (en) Support frame that cable laying used
CN203624728U (en) Steel wire winding mechanism
CN202906350U (en) Cable laying frame reel paying-off tool
CN202181742U (en) Iron holding type cross beam
CN204304325U (en) Cable disk wire-unfolding rack
CN204843932U (en) Clamp down on type screw -thread steel anchor clamps
CN105054597B (en) A kind of folding metal shelf
CN204818554U (en) Crane end beam centre gripping frock
CN104882267B (en) Method for adding angle ring to transformer coil assembly
CN206552953U (en) A kind of wire-unfolding rack
CN205023720U (en) Beehive transport is pressed from both sides
CN202780359U (en) Automatic shifting device for adjustable steel component
CN207234292U (en) High-tension cable laying tool
CN203497843U (en) High-voltage ground wire coiler
CN205419272U (en) Vertical drum seat
CN203356487U (en) Steel wire straightening device
CN203522018U (en) Novel wire-laying support
CN202756771U (en) Anti-subsidence pipe support device
CN203996311U (en) Oxygen bottle acetylene cylinder waggon
CN203947842U (en) Push rod fastening devices

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140924