CN104047631B - A kind of solid filling separate material pipe - Google Patents

A kind of solid filling separate material pipe Download PDF

Info

Publication number
CN104047631B
CN104047631B CN201410291424.8A CN201410291424A CN104047631B CN 104047631 B CN104047631 B CN 104047631B CN 201410291424 A CN201410291424 A CN 201410291424A CN 104047631 B CN104047631 B CN 104047631B
Authority
CN
China
Prior art keywords
intermediate layer
decker
overcoat
pipe
commissioning pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410291424.8A
Other languages
Chinese (zh)
Other versions
CN104047631A (en
Inventor
张强
张吉雄
巨峰
邓雪杰
周楠
齐文跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410291424.8A priority Critical patent/CN104047631B/en
Publication of CN104047631A publication Critical patent/CN104047631A/en
Priority to PCT/CN2015/081322 priority patent/WO2015196934A1/en
Application granted granted Critical
Publication of CN104047631B publication Critical patent/CN104047631B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of solid filling separate material pipe disclosed by the invention, including being located at the three-decker commissioning pipe fed intake in boring, three-decker commissioning pipe and feed intake boring between poured concrete, three-decker commissioning pipe is followed successively by overcoat, intermediate layer and wearing layer inside from outward.Overcoat and intermediate layer are seamless steel pipe, and the outer wall in intermediate layer is close to overcoat inwall, and the two employing is welded to connect;Wearing layer uses high-abrasive material spun casting on the inwall of intermediate layer.The present invention can realize solid filling material and throw in conveying continuously from ground to down-hole, three-decker commissioning pipe structure can guarantee that the longer length of service and relatively low use cost, provides new way for solving colliery and non-coal mine solid filling exploitation attal transportation problem.

Description

A kind of solid filling separate material pipe
Technical field
The present invention relates to a kind of solid filling separate material pipe, especially one and ground solid material is thrown to down-hole, for coal The tubing of attal conveying in ore deposit and metal mine filling mining.
Background technology
The exploitation of traditional coal and non-coal resource can cause surface collapse, and level of ground water declines, discharge waste pollution environment etc. A series of problem.The appearance of filling mining method well solves these problems, particularly solid filling and exploits, can not only Enough control goaf strata movement, the solid waste such as mining area such as spoil, mine tailing, flyash can also be processed simultaneously, it is to avoid this The destruction that environment is caused by a little solid waste in accumulation on ground surface.In today that solid filling production technique reaches its maturity, the most sharp By advanced technological means, it is achieved solid material from ground to down-hole from tens of rice to the continuative transport of the upper km discrepancy in elevation, it is ensured that fill Fill out the continuous controlled supply of material, be the difficult problem needing solution at present badly.
Summary of the invention
Technical problem: it is an object of the invention to for problem present in prior art, it is provided that a kind of simple in construction, safe and efficient, Service year limit for length, the solid filling separate material pipe that using effect is good.
Technical scheme: the solid filling separate material pipe of the present invention, including being located at the three-decker commissioning pipe fed intake in boring, three Rotating fields commissioning pipe and feed intake boring between poured concrete, three-decker commissioning pipe is followed successively by overcoat, centre inside from outward Layer and wearing layer.
Described overcoat and intermediate layer are seamless steel pipe, and overcoat thickness is not less than 14mm, and intermediate layer thickness is not less than 12mm, the outer wall in intermediate layer is close to the inwall of overcoat, and the two welds together.
Described wearing layer uses high chromium nickel molybdenum rare alloy abrasion resistance material spun casting on the inwall of intermediate layer, and thickness is 15mm~65mm.
Beneficial effect: the present invention can realize being delivered to the ground safe and efficient input of solid filling material in solid filling is exploited Down-hole, is applicable to carry the scope of tens meters of supreme kms of the discrepancy in elevation, and the particularity of commissioning pipe structure may insure that solid filling thing Material throws in the safe and reliable of transfer passage, the abrasion to input transfer passage of the opposing solid material, extends the use longevity of transfer passage Life.Present configuration is simple, and strong adaptability has application value widely.
Accompanying drawing explanation
Fig. 1 is solid filling separate material pipe structural representation of the present invention.
Fig. 2 is the sectional view of solid filling separate material pipe of the present invention.
In figure: 1-ground, 2-feeds intake boring, 3-commissioning pipe, 4-overcoat, 5-intermediate layer, 6-wearing layer, 7-concrete.
Detailed description of the invention
Below in conjunction with the accompanying drawings embodiments of the invention are further described:
As it is shown in figure 1, the solid filling separate material pipe of the present invention, mainly it is made up of the commissioning pipe 3 of three-decker, three-layered node The commissioning pipe 3 of structure is installed on and is fed intake in boring 2 by what constructed vertically downward to down-hole in ground 1, the commissioning pipe of three-decker 3 with Feed intake and poured concrete seven between boring 2, by the concrete poured, the commissioning pipe 3 of three-decker is fixed, formed Attal is thrown in by ground the passage being delivered to down-hole.
As in figure 2 it is shown, the structure of commissioning pipe 3 is divided into 3 layers, it is followed successively by overcoat 4, intermediate layer 5 and wearing layer 6 inside from outward. Overcoat 4 and intermediate layer 5 are seamless steel pipe, and overcoat 4 thickness is not less than 14mm, and intermediate layer 5 thickness is not less than 12mm, The outer wall in intermediate layer is close to overcoat inwall, and the two employing is welded to connect.Wearing layer 6 uses high chromium nickel molybdenum rare alloy wear-resisting material Material spun casting is on the inwall of intermediate layer 5, and thickness is determined jointly according to the drilling depth that feeds intake, solid filling thruput and character Fixed, generally 15mm~65mm.
Described it is installed on the three-decker commissioning pipe 3 fed intake in boring 2, it is possible to achieve solid filling material is from ground to down-hole Continuously, safe efficient transport, its rub proofness is high, and good reliability can obtain the longer length of service in process of production, Thus reduce the use cost of enterprise.

Claims (1)

1. a solid filling separate material pipe, it is characterized in that: it includes being located at the three-decker commissioning pipe (3) fed intake in boring (2), three-decker commissioning pipe (3) and feed intake and poured concrete (7) between boring (2), three-decker commissioning pipe (3) is followed successively by overcoat (4), intermediate layer (5) and wearing layer (6) inside from outward;By the concrete poured, three-decker commissioning pipe (3) is fixed, is formed and attal is thrown in by ground the passage being delivered to down-hole;Described overcoat (4) and intermediate layer (5) are seamless steel pipe, and overcoat (4) thickness is 14mm, and intermediate layer (5) thickness is 12mm, and the outer wall of intermediate layer (5) is close to the inwall of overcoat (4), and the two welds together;Described wearing layer (6) uses high chromium nickel molybdenum rare alloy abrasion resistance material spun casting on intermediate layer (5) inwall, and thickness is 15mm.
CN201410291424.8A 2014-06-25 2014-06-25 A kind of solid filling separate material pipe Expired - Fee Related CN104047631B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410291424.8A CN104047631B (en) 2014-06-25 A kind of solid filling separate material pipe
PCT/CN2015/081322 WO2015196934A1 (en) 2014-06-25 2015-06-12 Solid filling material feeding pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410291424.8A CN104047631B (en) 2014-06-25 A kind of solid filling separate material pipe

Publications (2)

Publication Number Publication Date
CN104047631A CN104047631A (en) 2014-09-17
CN104047631B true CN104047631B (en) 2016-11-30

Family

ID=

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD284136A7 (en) * 1987-07-06 1990-11-07 Sdag Wismut PIPE FOR OFFSET, ESPECIALLY FOR THE CENTRAL OFFSET WITH DIRECT SUBSTITUTES IN PARTIAL SUBSTITUTION
CN101634000A (en) * 2009-08-07 2010-01-27 何汉欣 Nickel-containing cast steel with high chromium and application thereof
CN201517424U (en) * 2009-09-15 2010-06-30 河北金牛能源股份有限公司 Adhesive solid material big falling deep block-resistant transmission equipment
CN102061938A (en) * 2010-12-10 2011-05-18 天地科技股份有限公司 Filling process for recovering coal pillars by filling goaf with paste
CN102889097A (en) * 2012-09-20 2013-01-23 河北煤炭科学研究院 System for feeding coal mine solid filling material
CN202745931U (en) * 2012-06-20 2013-02-20 鄂托克前旗长城煤矿有限责任公司 Underground backfilling and conveying system for ground gangue of coal mine
CN103603680A (en) * 2013-11-14 2014-02-26 山西潞安环保能源开发股份有限公司 One-well two-bin type quick conveying method for deep tunnel guniting and concreting materials

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD284136A7 (en) * 1987-07-06 1990-11-07 Sdag Wismut PIPE FOR OFFSET, ESPECIALLY FOR THE CENTRAL OFFSET WITH DIRECT SUBSTITUTES IN PARTIAL SUBSTITUTION
CN101634000A (en) * 2009-08-07 2010-01-27 何汉欣 Nickel-containing cast steel with high chromium and application thereof
CN201517424U (en) * 2009-09-15 2010-06-30 河北金牛能源股份有限公司 Adhesive solid material big falling deep block-resistant transmission equipment
CN102061938A (en) * 2010-12-10 2011-05-18 天地科技股份有限公司 Filling process for recovering coal pillars by filling goaf with paste
CN202745931U (en) * 2012-06-20 2013-02-20 鄂托克前旗长城煤矿有限责任公司 Underground backfilling and conveying system for ground gangue of coal mine
CN102889097A (en) * 2012-09-20 2013-01-23 河北煤炭科学研究院 System for feeding coal mine solid filling material
CN103603680A (en) * 2013-11-14 2014-02-26 山西潞安环保能源开发股份有限公司 One-well two-bin type quick conveying method for deep tunnel guniting and concreting materials

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
固体充填采煤物料垂直输送技术开发与工程应用;巨峰;《中国博士学位论文全文数据库 工程科技Ⅰ辑》;20121015(第10期);B021-22 *

Similar Documents

Publication Publication Date Title
CN103527195B (en) A kind of separative production and separative delivery gangue refill goaf, thick dirt band coal seam method
CN103089266B (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN106321103B (en) A kind of solid filling collaboration artificial ore pillar recycling room formula coal column method
CN103362510B (en) Sublevel-drilling bench-combination ore-removal sublevel-room mining method
CN102086765B (en) High-sublevel multi-layer mining method of ultrathin copper ore body
CN104373126A (en) Method and equipment for filling gangue by aid of drilling and production process
CN105421198B (en) A kind of method that open coal mine builds ramp
CN105317438A (en) Middle pre-mining slicing top-coal breaking coal mining method for super high seams
CN109403974A (en) A kind of mine, which picks up, unloads pumping and fills lasting exploit design method
CN203822359U (en) Distribution structure for gas extraction holes of coal face
CN106437825A (en) Gas extraction method adopting high-level drilling on full-mechanized caving mining face of high gas mine
CN104074516B (en) A kind of brill formula coal-winning machine filling drill bit
CN104047631B (en) A kind of solid filling separate material pipe
CN104153782B (en) Progressive caving mining method
CN108915680A (en) Girdle bastard coal sorts fully mechanized mining and fully mechanized mining system
CN105804752A (en) Overburden separation bed grouting subsidence reducing process in coal mine strip mining
CN101845965B (en) Pressure discharge method for anti-blocking chamber of feeding well
CN116537786A (en) Mining method for filling and replacing coal pillars without lifting gangue
CN101338675A (en) Open-cast side shrouded beneficial mineral open well combined mining method
CN204326956U (en) A kind of reaming reacting cycle cluster type down-hole hammer
CN104047631A (en) Solid filling material delivery tube
CN106194170A (en) A kind of coal mining machine roller of band spiral coal guide plate
CN103362547B (en) Feed intake under a kind of coal mine filling recovery well snubber
CN105804747B (en) A kind of ultra-thin coal seam waterpower bores the mining method that pops
CN102251798A (en) Hole distribution method for long-acting extraction of ground coal bed gas

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 221116 Research Institute of China University of Mining and Technology,, Jiangsu

Applicant after: China University of Mining & Technology

Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China University of Mining & Technology

CB03 Change of inventor or designer information

Inventor after: Zhang Qiang

Inventor after: Zhang Jixiong

Inventor after: Ju Feng

Inventor after: Deng Xuejie

Inventor after: Zhou Nan

Inventor after: Qi Wenyue

Inventor before: Zhang Jixiong

Inventor before: Deng Xuejie

Inventor before: Ju Feng

Inventor before: An Baifu

GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20210625