Summary of the invention
The object of this invention is to provide a kind of mesophase pitch melt spinning method, guaranteeing under the prerequisite of mesophase pitch mobility, effectively avoid mesophase pitch to decompose and produce bubble in long-time fusion process.
The technical solution adopted in the present invention is:
A mesophase pitch melt spinning method, is characterized in that:
By following steps, realized:
Step 1: take softening point between 270-280 ℃, middle phase content is 100% petroleum mesophase pitch is raw material, use mortar that mesophase pitch is ground, and filter out mesophase pitch powder by 80 object standard screens;
Step 2: mesophase pitch powder is imported in melting kettle, pass into nitrogen as protective atmosphere, temperature control is heated to 300-320 ℃, and mesophase pitch is heated to molten condition;
Step 3: open motor with the rotating speed stirring molten asphalt of 10-30r/min, to reach in still, conduct heat evenly, and fully melting, the time of stirring is 1-2h;
Step 4: opening vavuum pump, is to carry out deaeration under the environment of-0.09 ~-0.05MPa in negative pressure of vacuum, and the deaeration time is 0.5-1h;
Step 5: conveyance conduit, measuring pump and filament spinning component temperature control are heated to 300-340 ℃;
Step 6: pass into nitrogen, open ball valve, and open measuring pump, pressure is 0.2-0.4MPa, extrudes flow carry out melt spinning under the environment of 6-12cc/min before pump;
Step 7: by air aspirator device by the monofilament boundling drawing-off of extruding, and by up-coiler receive silk a top cylinder.
The present invention has the following advantages:
Method involved in the present invention adopts spinning under melting under low temperature, high temperature, is guaranteeing under the prerequisite of mesophase pitch mobility, avoids mesophase pitch to decompose and produce bubble in long-time fusion process, affects final precursor performance and stability of spinning process.Have following characteristics: 1. mesophase pitch temperature is even, fibre diameter is stable and be convenient to control; 2. avoid mesophase pitch high temperature Using Coke-oven, stop up spinneret orifice, improved stability of spinning process; 3. reduce the bubble in mesophase pitch melt, be convenient to obtain high-strength asphalt base carbon fibre; 4. technique is simple, and equipment cost is low, easy and simple to handle, is convenient to realize industrialization.
The specific embodiment
Below in conjunction with the specific embodiment, the present invention will be described in detail.
A kind of mesophase pitch melt spinning method the present invention relates to, be deficiency for mesophase pitch scale spining technology, be difficult to realize industrialized shortcoming, a kind of mesophase pitch melt-spinning technology providing, adopt the process route of spinning under melting under low temperature, high temperature, guaranteeing under the prerequisite of mesophase pitch mobility, avoid mesophase pitch to decompose and produce bubble in long-time fusion process, affect final precursor performance and stability of spinning process.Specifically by following steps, realized:
Step 1: take softening point between 270-280 ℃, middle phase content is 100% petroleum mesophase pitch is raw material, use mortar that mesophase pitch is ground, and filter out mesophase pitch powder by 80 object standard screens;
Step 2: mesophase pitch powder is imported in melting kettle, pass into nitrogen as protective atmosphere, temperature control is heated to 300-320 ℃, and mesophase pitch is heated to molten condition;
Step 3: open motor with the rotating speed stirring molten asphalt of 10-30r/min, to reach in still, conduct heat evenly, and fully melting, the time of stirring is 1-2h;
Step 4: opening vavuum pump, is to carry out deaeration under the environment of-0.09 ~-0.05MPa in negative pressure of vacuum, and the deaeration time is 0.5-1h;
Step 5: conveyance conduit, measuring pump and filament spinning component temperature control are heated to 300-340 ℃;
Step 6: pass into nitrogen, open ball valve, and open measuring pump, pressure is 0.2-0.4MPa, extrudes flow carry out melt spinning under the environment of 6-12cc/min before pump;
Step 7: by air aspirator device by the monofilament boundling drawing-off of extruding, and by up-coiler receive silk a top cylinder.
Embodiment 1:
Step 1: take softening point between 270-280 ℃, middle phase content is 100% petroleum mesophase pitch is raw material, use mortar that mesophase pitch is ground, and filter out mesophase pitch powder by 80 object standard screens;
Step 2: mesophase pitch powder is imported in melting kettle, pass into nitrogen as protective atmosphere, temperature control is heated to 300 ℃, and mesophase pitch is heated to molten condition;
Step 3: open motor with the rotating speed stirring molten asphalt of 10r/min, to reach in still, conduct heat evenly, and fully melting, the time of stirring is 1h;
Step 4: open vavuum pump, carry out deaeration under the environment that is-0.09MPa in negative pressure of vacuum, the deaeration time is 0.5h;
Step 5: conveyance conduit, measuring pump and filament spinning component temperature control are heated to 300 ℃;
Step 6: pass into nitrogen, open ball valve, and open measuring pump, pressure is 0.2MPa, extrudes flow carry out melt spinning under the environment of 6cc/min before pump;
Step 7: by air aspirator device by the monofilament boundling drawing-off of extruding, and by up-coiler receive silk a top cylinder.
With this spinning process, carry out spinning, the continuous spinning time is 90min, without fracture of wire, occurs, and spinning drawing multiple is 225 times, and string diameter is 20 μ m.
Embodiment 2:
Step 1: take softening point between 270-280 ℃, middle phase content is 100% petroleum mesophase pitch is raw material, use mortar that mesophase pitch is ground, and filter out mesophase pitch powder by 80 object standard screens;
Step 2: mesophase pitch powder is imported in melting kettle, pass into nitrogen as protective atmosphere, temperature control is heated to 310 ℃, and mesophase pitch is heated to molten condition;
Step 3: open motor with the rotating speed stirring molten asphalt of 20r/min, to reach in still, conduct heat evenly, and fully melting, the time of stirring is 1.5h;
Step 4: open vavuum pump, carry out deaeration under the environment that is-0.07MPa in negative pressure of vacuum, the deaeration time is 0.7h;
Step 5: conveyance conduit, measuring pump and filament spinning component temperature control are heated to 320 ℃;
Step 6: pass into nitrogen, open ball valve, and open measuring pump, pressure is 0.3MPa, extrudes flow carry out melt spinning under the environment of 9cc/min before pump;
Step 7: by air aspirator device by the monofilament boundling drawing-off of extruding, and by up-coiler receive silk a top cylinder.
With this spinning process, carry out spinning, the continuous spinning time is 90min, without fracture of wire, occurs, and spinning drawing multiple is 56.25 times, and string diameter is 40 μ m.
Embodiment 3:
Step 1: take softening point between 270-280 ℃, middle phase content is 100% petroleum mesophase pitch is raw material, use mortar that mesophase pitch is ground, and filter out mesophase pitch powder by 80 object standard screens;
Step 2: mesophase pitch powder is imported in melting kettle, pass into nitrogen as protective atmosphere, temperature control is heated to 320 ℃, and mesophase pitch is heated to molten condition;
Step 3: open motor with the rotating speed stirring molten asphalt of 30r/min, to reach in still, conduct heat evenly, and fully melting, the time of stirring is 2h;
Step 4: open vavuum pump, carry out deaeration under the environment that is-0.05MPa in negative pressure of vacuum, the deaeration time is 1h;
Step 5: conveyance conduit, measuring pump and filament spinning component temperature control are heated to 340 ℃;
Step 6: pass into nitrogen, open ball valve, and open measuring pump, pressure is 0.4MPa, extrudes flow carry out melt spinning under the environment of 12cc/min before pump;
Step 7: by air aspirator device by the monofilament boundling drawing-off of extruding, and by up-coiler receive silk a top cylinder.
With this spinning process, carry out spinning, the continuous spinning time is 30min, and in spinning process, fracture of wire frequency is 1.3 times/min, the long 120m of continuous spinning, and spinning drawing multiple is 36 times, string diameter is 50 μ m.
It is cited that content of the present invention is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solution of the present invention by reading description of the present invention, is claim of the present invention and contains.