CN104032827A - Dredging drill for blowdown pipelines - Google Patents

Dredging drill for blowdown pipelines Download PDF

Info

Publication number
CN104032827A
CN104032827A CN201410267312.9A CN201410267312A CN104032827A CN 104032827 A CN104032827 A CN 104032827A CN 201410267312 A CN201410267312 A CN 201410267312A CN 104032827 A CN104032827 A CN 104032827A
Authority
CN
China
Prior art keywords
drill
drilling rod
drill bit
fairlead
rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410267312.9A
Other languages
Chinese (zh)
Other versions
CN104032827B (en
Inventor
冯政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xingye Municipal Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410267312.9A priority Critical patent/CN104032827B/en
Publication of CN104032827A publication Critical patent/CN104032827A/en
Application granted granted Critical
Publication of CN104032827B publication Critical patent/CN104032827B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a dredging drill for blowdown pipelines. A full-hydraulic non-excavation guide drill machine is modified to form the dredging drill, and the dredging drill structurally comprises a base plate, a drill machine, a drill rod, a drill bit and a guide sleeve. The drill machine is fixedly hinged onto the base plate; an angle of a drill body of the drill machine can be changed by a hydraulic cylinder for starting and stopping the drill machine, the guide sleeve is arranged at the front end of the drill body of the drill machine, and the drill rod can flexibly rotate in the guide sleeve and can flexibly access the guide sleeve. The dredging drill has the advantages that the flexible drill rod is connected onto a power head of the drill machine, the drill bit is connected onto a connector at the tail end of the drill rod and can enter silt in sewers via the guide sleeve, the drill machine can be started, water can be injected for the drill bit at high pressures, the dredging drill is matched with a suction sewage truck, and accordingly dredging operation can be completed.

Description

Blow-off line desilting is bored
Technical field
A kind of blow-off line desilting is bored, and belongs to drainage dredging apparatus field.
Background technology
In the blowdown pipe network in city, the situation that blow-off line stops up because of alluvial can be found everywhere, although there is a lot of dredging machinery, not ideal, need new dredging device.
Summary of the invention
The application's object is to provide a kind of blow-off line desilting to bore, and it converts with the all-hydraulic non-dredging guiding driller of band grouting pump (or water jet pump), and the structure after repacking is made up of chassis, brill body, drilling rod, drill bit and fairlead.
The running gear of former non-dredging guiding driller and positioner are laid down need not, rig part is arranged on the chassis of flat truck, the brill body front end (with one end of drill bit) of rig and the afterbody crossbeam of flat truck are hinged and connected integral by hinge means, rig is fixed on the chassis of automobile with this; The brill body of rig can rotate around the hinge axis of hinge means.Hold after one's death and be respectively equipped with earring seats between chassis at the brill of rig, hydraulic cylinder is installed between earring seats, hydraulic cylinder adopts Earrings type hydraulic cylinder, and the two ends of hydraulic cylinder are hinged and connected integral by the pin in earring seats and brill body, chassis respectively.Open and close hydraulic cylinder and can make the brill body of rig complete the Angulation changes vertically erecting from keeping flat, meet the job requirements of pipe dredging with this.
Front end at the brill body of rig is provided with fairlead, the center of circle of fairlead is on the longitudinal axis of drilling rod, fairlead is made up of straight tube, sleeve pipe and bend pipe, the epimere of straight tube and brill body are connected as a body, bend pipe is one section and is the excessive obtuse angle bend pipe of circular arc (obtuse angle is generally 100---between 130 °), bend pipe can be made several different angles, according to the space size choice for use of catch pit port.Respectively be provided with one section of screw thread in one end of straight tube and bend pipe, straight tube, bend pipe and supporting sleeve pipe are connected as a body by screw thread.The internal diameter of fairlead is greater than the external diameter of drilling rod, and drilling rod can flexible rotating and turnover in fairlead.Change the sleeve pipe of different length and adjust the length that is threaded into sleeve pipe, can change the entire length of fairlead, to adapt to the desilting requirement of different depth sewer.
Jointed rod on the unit head of rig, drilling rod adopts wrapping wire sebific duct to replace original steel drilling rod, so that drilling rod meets the requirement that distortion is restored.Joint to drilling rod is reequiped, and method is: the joint of former drilling rod is cut, and welding flange on former joint welds one section of pipe on flange, makes the joint after repacking become convex-concave font.When connection, the pipe of joint is nested in the wrapping wire sebific duct of drilling rod, then tightens fixingly with tube bank, drilling rod and joint sealing after connection are connected as a body.
On the end fitting of drilling rod, connect drill bit, the diameter of drill bit is less than the internal diameter of fairlead, drill bit be shaped as triangular scraper shape, on drill bit, be provided with hole, the high pressure liquid or the gas that come from drilling rod can enter in drill bit, and penetrate by hole.Root at drill bit is provided with joint, and drill bit can be connected as a body by joint and drill rod thread.
When use, blow-off line desilting is bored and arrived at by the catch pit port of blow-off line, after opening inspection well cover, empty the mud in sedimentation basin under catch pit port, operating hydraulically operated cylinder makes to bore body and rises, the lower end aligned catch pit port of the brill body after rise, install and adjust fairlead, make the bend pipe of fairlead in the state parallel with sewer, be beneficial to drilling rod running flexibly in fairlead.Drilling rod with drill bit is installed on unit head, open rig and drive bit, make drill bit entering in the sewer of silting by fairlead progressively in rotation, open water jet pump (or grouting pump) penetrates clear water pressure injection after drill bit from hole, after stirring mud, the clear water penetrating is diluted to the sedimentation basin of mud flow catch pit port, in pond, place the soil pick-up pump head of suction-type sewer scavenger, just can be having transported after silt slurry entrucking, constantly continued access drilling rod, just can complete the dredging operation of blow-off line.Facts have proved, this machine operates steadily, dependable performance, and dredging effect is fine, from be the mechanization that has realized dredging operation at all, has solved a great problem in dredging operation.
Brief description of the drawings
Front view is bored in Fig. 1, blow-off line desilting
1, chassis, 2, bore body, 3, drilling rod, 4, drill bit, 5, joint, 6, fairlead, 7, straight tube, 8, sleeve pipe, 9, bend pipe, 10, unit head, 11, hydraulic cylinder, 12, hole, 13, hinge axis, 14, pin, 15, screw thread.
Detailed description of the invention
As shown in Figure 1, a kind of blow-off line desilting is bored, and it converts with the all-hydraulic non-dredging guiding driller of band grouting pump (or water jet pump), and the structure after repacking is made up of chassis 1, brill body 2, drilling rod 3, drill bit 4 and fairlead 6.
The running gear of former non-dredging guiding driller and positioner are laid down need not, rig part is arranged on the chassis 1 of flat truck, brill body 2 front ends (with one end of drill bit) of rig and the afterbody crossbeam of flat truck are hinged and connected integral by hinge means, rig is fixed on the chassis 1 of automobile with this; The brill body 2 of rig can rotate around the hinge axis of hinge means 13.Between brill body 2 rear ends of rig and chassis 1, be respectively equipped with earring seats, hydraulic cylinder 11 is installed between earring seats, hydraulic cylinder 11 adopts Earrings type hydraulic cylinder, and the two ends of hydraulic cylinder 11 are hinged and connected integral by the pin 14 in earring seats and brill body 2, chassis 1 respectively.Open and close hydraulic cylinder 11 and can make the brill body 2 of rig complete the Angulation changes vertically erecting from keeping flat, meet the job requirements of pipe dredging with this.
Front end at the brill body 2 of rig is provided with fairlead 6, the center of circle of fairlead 6 is on the longitudinal axis of drilling rod 3, fairlead 6 is made up of straight tube 7, sleeve pipe 8 and bend pipe 9, the epimere of straight tube 7 and brill body 2 are connected as a body, bend pipe 9 is one section and is the excessive obtuse angle bend pipe of circular arc (obtuse angle is generally 100---between 130 °), bend pipe 9 can be made several different angles, according to the space size choice for use of catch pit port.Respectively be provided with one section of screw thread 15 in one end of straight tube 7 and bend pipe 9, straight tube 7, bend pipe 9 and supporting sleeve pipe 8 are connected as a body by screw thread 15.The internal diameter of fairlead 6 is greater than the external diameter of drilling rod 3, and drilling rod 3 can be in the interior flexible rotating of fairlead 6 and turnover.Change the sleeve pipe 8 of different length and adjust screw thread 15 length that screws in sleeve pipe 8, can change the entire length of fairlead 6, to adapt to the desilting requirement of different depth sewer.
Jointed rod 3 on the unit head 10 of rig, drilling rod 3 adopts wrapping wire sebific duct to replace original steel drilling rod, so that drilling rod 3 meets the requirement that distortion is restored.Joint to drilling rod 3 is reequiped, and method is: the joint 5 of former drilling rod is cut, and welding flange on former joint 5 welds one section of pipe on flange, makes the 5 one-tenth convex-concave fonts of joint after repacking.When connection, the pipe of joint 5 is nested in the wrapping wire sebific duct of drilling rod 3, then tightens fixingly with tube bank, 5 sealings of the drilling rod 3 after connection and joint are connected as a body.
On the end fitting 5 of drilling rod 3, connect drill bit 4, the diameter of drill bit 4 is less than the internal diameter of fairlead 6, drill bit 4 be shaped as triangular scraper shape, on drill bit 4, be provided with hole 12, from drilling rod 3 and the high pressure liquid or the gas that come can enter in drill bit 4, and penetrate by hole 12.Be provided with joint 5 at the root of drill bit 4, drill bit 4 can be connected as a body by joint 5 and drilling rod 3 screw threads.
When use, blow-off line desilting is bored and arrived at by the catch pit port of blow-off line, after opening inspection well cover, empty the mud in sedimentation basin under catch pit port, operating hydraulically operated cylinder 11 makes to bore body 2 and rises, the lower end aligned catch pit port of the brill body 2 after rise, install and adjust fairlead 6, make the bend pipe of fairlead 6 in the state parallel with sewer, be beneficial to drilling rod 3 in the interior flexible running of fairlead 6.Drilling rod 3 with drill bit 4 is installed on unit head 10, opening rig drives drill bit 4 to rotate, make drill bit 4 passing through in sewer that fairlead 6 enters into silting progressively in rotation, open water jet pump (or grouting pump) penetrates clear water pressure injection after drill bit 4 from hole 12, after stirring mud, the clear water penetrating is diluted to the sedimentation basin of mud flow catch pit port, in pond, place the soil pick-up pump head of suction-type sewer scavenger, just can be having transported after silt slurry entrucking, constantly continued access drilling rod 3, just can complete the dredging operation of blow-off line.Facts have proved, this machine operates steadily, dependable performance, and dredging effect is fine, from be the mechanization that has realized dredging operation at all, has solved a great problem in dredging operation.

Claims (1)

1. a blow-off line desilting is bored, feature is: it is with converting with the all-hydraulic non-dredging guiding driller of grouting pump, and the structure after repacking is made up of chassis (1), brill body (2), drilling rod (3), drill bit (4) and fairlead (6);
The running gear of former non-dredging guiding driller and positioner are laid down need not, rig part is arranged on the chassis (1) of flat truck, brill body (2) front end of rig and the afterbody crossbeam of flat truck are hinged and connected integral by hinge means, rig is fixed on the chassis (1) of automobile with this; The brill body (2) of rig can rotate around the hinge axis of hinge means (13); Between brill body (2) rear end of rig and chassis (1), be respectively equipped with earring seats, hydraulic cylinder (11) is installed between earring seats, hydraulic cylinder (11) adopts Earrings type hydraulic cylinder, and the two ends of hydraulic cylinder (11) are hinged and connected integral by the pin in earring seats (14) and brill body (2), chassis (1) respectively; Open and close hydraulic cylinder (11) and can make the brill body (2) of rig complete the Angulation changes vertically erecting from keeping flat, meet the job requirements of pipe dredging with this;
Front end at the brill body (2) of rig is provided with fairlead (6), the center of circle of fairlead (6) is on the longitudinal axis of drilling rod (3), fairlead (6) is made up of straight tube (7), sleeve pipe (8) and bend pipe (9), the epimere of straight tube (7) and brill body (2) are connected as a body, bend pipe (9) is one section and is the excessive obtuse angle bend pipe of circular arc, bend pipe (9) can be made several different angles, according to the space size choice for use of catch pit port; One end at straight tube (7) and bend pipe (9) is respectively provided with one section of screw thread (15), and straight tube (7), bend pipe (9) and supporting sleeve pipe (8) are connected as a body by screw thread (15); The internal diameter of fairlead (6) is greater than the external diameter of drilling rod (3), and drilling rod (3) can flexible rotating and turnover in fairlead (6); Change the sleeve pipe (8) of different length and adjust screw thread (15) length that screws in sleeve pipe (8), can change the entire length of fairlead (6), to adapt to the desilting requirement of different depth sewer;
At the upper jointed rod (3) of unit head (10) of rig, drilling rod (3) adopts wrapping wire sebific duct to replace original steel drilling rod, so that drilling rod (3) meets the requirement that distortion is restored; Joint to drilling rod (3) is reequiped, method is: the joint of former drilling rod (5) is cut, at the upper welding flange of former joint (5), on flange, weld one section of pipe, make the joint (5) after repacking become convex-concave font; When connection, the pipe of joint (5) is nested in the wrapping wire sebific duct of drilling rod (3), then tightens fixingly with tube bank, the drilling rod (3) after connection and joint (5) seal and are connected as a body;
The upper drill bit (4) that connects of end fitting (5) in drilling rod (3), the diameter of drill bit (4) is less than the internal diameter of fairlead (6), drill bit (4) be shaped as triangular scraper shape, on drill bit (4), be provided with hole (12), from drilling rod (3) and come high pressure liquid or gas can enter in drill bit (4), and by hole (12) penetrate; Be provided with joint (5) at the root of drill bit (4), drill bit (4) can be connected as a body by the screw thread of joint (5) and drilling rod (3).
CN201410267312.9A 2014-06-07 2014-06-07 Blow-off line desilting is bored Active CN104032827B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410267312.9A CN104032827B (en) 2014-06-07 2014-06-07 Blow-off line desilting is bored

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410267312.9A CN104032827B (en) 2014-06-07 2014-06-07 Blow-off line desilting is bored

Publications (2)

Publication Number Publication Date
CN104032827A true CN104032827A (en) 2014-09-10
CN104032827B CN104032827B (en) 2015-08-26

Family

ID=51463799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410267312.9A Active CN104032827B (en) 2014-06-07 2014-06-07 Blow-off line desilting is bored

Country Status (1)

Country Link
CN (1) CN104032827B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517954A (en) * 2018-06-11 2018-09-11 天津市鼎风逸宸科技发展有限公司 A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment
CN111519747A (en) * 2020-04-30 2020-08-11 中国电建集团华东勘测设计研究院有限公司 River channel hidden culvert sludge collector and jet assembly
CN114086657A (en) * 2021-12-08 2022-02-25 中拓建设有限公司 Town road sewage is silt intelligent cleaning device for well

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4291429A (en) * 1979-10-03 1981-09-29 Robert Servadio Drill attachment
EP0084027A1 (en) * 1981-07-27 1983-07-27 PEREZ, Thomas Pipe cleaning apparatus
US5452967A (en) * 1994-03-22 1995-09-26 Fuller; Frank E. Pipe laying system and method
CN2262062Y (en) * 1995-08-21 1997-09-10 杜健民 Drainage pipeline cleaning vehicle
CN2326357Y (en) * 1998-05-28 1999-06-30 张大保 Alkali-cleaning-up machine for U-shaped pipeline
US6792820B2 (en) * 2001-03-29 2004-09-21 Earth Tool Company, L.L.C. Method and accessories for pipe replacement
CN201250448Y (en) * 2008-08-21 2009-06-03 安阳市万通机械有限公司武汉分公司 Dredging winch
CN202430797U (en) * 2011-12-27 2012-09-12 石德群 Water pressure type pipeline cleaner
CN203924327U (en) * 2014-06-07 2014-11-05 冯政 Blow-off line desilting is bored

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4291429A (en) * 1979-10-03 1981-09-29 Robert Servadio Drill attachment
EP0084027A1 (en) * 1981-07-27 1983-07-27 PEREZ, Thomas Pipe cleaning apparatus
US5452967A (en) * 1994-03-22 1995-09-26 Fuller; Frank E. Pipe laying system and method
CN2262062Y (en) * 1995-08-21 1997-09-10 杜健民 Drainage pipeline cleaning vehicle
CN2326357Y (en) * 1998-05-28 1999-06-30 张大保 Alkali-cleaning-up machine for U-shaped pipeline
US6792820B2 (en) * 2001-03-29 2004-09-21 Earth Tool Company, L.L.C. Method and accessories for pipe replacement
CN201250448Y (en) * 2008-08-21 2009-06-03 安阳市万通机械有限公司武汉分公司 Dredging winch
CN202430797U (en) * 2011-12-27 2012-09-12 石德群 Water pressure type pipeline cleaner
CN203924327U (en) * 2014-06-07 2014-11-05 冯政 Blow-off line desilting is bored

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517954A (en) * 2018-06-11 2018-09-11 天津市鼎风逸宸科技发展有限公司 A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment
CN108517954B (en) * 2018-06-11 2024-06-25 天津科环逸宸科技发展有限公司 Pipeline is twisted and is irritated and pipeline mediation mechanical equipment
CN111519747A (en) * 2020-04-30 2020-08-11 中国电建集团华东勘测设计研究院有限公司 River channel hidden culvert sludge collector and jet assembly
CN114086657A (en) * 2021-12-08 2022-02-25 中拓建设有限公司 Town road sewage is silt intelligent cleaning device for well

Also Published As

Publication number Publication date
CN104032827B (en) 2015-08-26

Similar Documents

Publication Publication Date Title
NO314733B1 (en) Device by a hydraulic cutting tool
CN104141470A (en) Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine
CN104032827B (en) Blow-off line desilting is bored
CN203924327U (en) Blow-off line desilting is bored
CN104088359B (en) The method of manufacture and use thereof that blow-off line desilting is bored
CN103032629B (en) Pushing device of self-compaction reinforcing and anti-seepage pilot pipe and use method thereof
JP5487265B2 (en) Soil sample collection device
CN106801588A (en) The semiclosed mud pressure keeping circulation technology of artesian water earth-boring construction
CN105421457B (en) Spiral pile tube fetches earth machine
CN205225131U (en) Hole digger is prevented spouting by sleeve pipe
CN204094186U (en) High pressure manual hole making drill
RU2005137965A (en) METHOD FOR PRODUCING USEFUL FOSSILS, IN PARTICULAR PEAT, AND A COMPLEX FOR ITS IMPLEMENTATION
CN205369518U (en) Clear stifled device of city sewer pipe
CN204609769U (en) Long auger expands end the complete sets of equipment
CN103382928A (en) Hydraulic manual pump
CN210858628U (en) Quick opening, drainage and plugging device for oil-water pipeline
CN203285375U (en) Blocking gauge cutter
CN207179004U (en) A kind of underwater Management of Pipeline Mechanical Equipment connector
CN206617382U (en) Spring-compressed throttle type buffer lift hydraulic jack
CN206093330U (en) Pipe clamp for drilling under pressure of pipeline
CN108625780B (en) Eccentric positioning device suitable for radial drilling
CN103867153A (en) Sand setting cylinder of helicoid hydraulic motor
CN201443319U (en) Automatic hydraulic pressure regulation device for drill bit of ground anchor machine
CN204827210U (en) Hand -held type well -points dewatering instrument of punching and work systems
CN114964880B (en) Submarine soil sampler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: WENZHOU XINGYE MUNICIPAL CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: FENG ZHENG

Effective date: 20150720

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xuan Qianjin

Inventor after: Zhang Mao

Inventor after: Yuan Gang

Inventor after: Wu Chaohui

Inventor before: Feng Zheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: FENG ZHENG TO: XUAN QIANJIN ZHANG MAO YUAN GANG WU CHAOHUI

TA01 Transfer of patent application right

Effective date of registration: 20150720

Address after: 325000, room 454, 402 Tian Tian Road, Ouhai, Zhejiang, Wenzhou

Applicant after: WENZHOU XINGYE MUNICIPAL CONSTRUCTION Co.,Ltd.

Address before: Room 1, unit 34, building 235000, Li Yuan new village, Huaibei, Anhui, China

Applicant before: Feng Zheng

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 402, 454 Wutian Avenue, Ouhai, Wenzhou, Zhejiang 325000

Patentee after: ZHEJIANG XINGYE MUNICIPAL ENGINEERING Co.,Ltd.

Address before: Room 402, 454 Wutian Avenue, Ouhai, Wenzhou, Zhejiang 325000

Patentee before: WENZHOU XINGYE MUNICIPAL CONSTRUCTION Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Dredging drill for sewage pipeline

Effective date of registration: 20221102

Granted publication date: 20150826

Pledgee: Wenzhou Financing Guarantee Co.,Ltd.

Pledgor: ZHEJIANG XINGYE MUNICIPAL ENGINEERING Co.,Ltd.

Registration number: Y2022110000290