CN104022909B - The method for processing business switched, device and system based on XAUI link - Google Patents

The method for processing business switched, device and system based on XAUI link Download PDF

Info

Publication number
CN104022909B
CN104022909B CN201410293348.4A CN201410293348A CN104022909B CN 104022909 B CN104022909 B CN 104022909B CN 201410293348 A CN201410293348 A CN 201410293348A CN 104022909 B CN104022909 B CN 104022909B
Authority
CN
China
Prior art keywords
link
pcs
sublayers
xaui
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410293348.4A
Other languages
Chinese (zh)
Other versions
CN104022909A (en
Inventor
齐国民
赵战伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XFusion Digital Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201410293348.4A priority Critical patent/CN104022909B/en
Publication of CN104022909A publication Critical patent/CN104022909A/en
Application granted granted Critical
Publication of CN104022909B publication Critical patent/CN104022909B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The embodiment of the present invention provides a kind of method for processing business switched based on XAUI link, device and system.This method includes:Detecting working traffic processing single board default or primary XAUI link failures, and working traffic processing veneer is switched to standby traffic processing veneer, and when primary XAUI link are switched on standby XAUI link, the interface in the 10GE physical layers on service interface board that working traffic processing veneer is connected by XAUI link between XGXS sublayers and PCS/PMA sublayers is isolated;Bell idles is generated, and bell idles is sent to the opposite equip. being connected with service interface board by PCS/PMA sublayers, service interaction is carried out between service interface board and opposite equip. to realize.

Description

The method for processing business switched, device and system based on XAUI link
Technical field
The present embodiments relate to the communication technology, more particularly to a kind of business processing side switched based on XAUI link Method, device and system.
Background technology
Carrier ethernet is except requiring to possess flexibility and scalability, carrier grade service quality (Quality of Service;Referred to as:QoS), telecommunications level security, carrier class operation management maintainance (Operation Administration and Maintenance;Referred to as:OAM) the characteristic such as managerial ability and standardization business, also require possess the reliable of carrier class Property, it is desirable to 50ms pretection switch can be realized in the case of link, node failure.At present, much possesses the electricity of 10GE interfaces Letter equipment is most of to use 1 in order to meet high reliability request:1 hot-standby mode.Fig. 1 is in the prior art using 1:1 The configuration diagram of the system of hot-standby mode, as shown in figure 1, the system includes service processing board and service interface board, wherein, Service processing board carries out hot double copies, i.e. working traffic process plate and standby traffic process plate, and service processing board and business connect Per second 10,000,000,000 Attachment Unit Interface (10Gps Attachment Unit Interface are used between oralia;Referred to as:XAUI) Link (link).Wherein, solid line represents primary XAUI link in Fig. 1, and dotted line represents standby XAUI link.
Specifically, when working traffic process plate goes wrong and is switched to standby traffic process plate, due to service interface board (subcard) response speed that serdes mux/Demux switching speeds and switching time, system switch over above, XAUI link It is same to link up processing procedures, CDR synchronized trackings recovery code stream, code again from connection (link up) to (link down) is disconnected The time delay influence such as step and XAUI code character synchronization process, therefore so that XAUI link switching result in business between standby usage 10GE physical layers (10G Ethernet physical layer in interface board (subcard);Referred to as:10GE PHY) in XGMII expand Open up sublayer (XGMII Extender Sublayer;Referred to as:XGXS) layer generates the pattern of mistake, so that being connect with business The opposite equip. of oralia connection produces link-local mistake (local link fault) and port link down, and then causes Service disconnection and a large amount of packet losses.
The content of the invention
The embodiment of the present invention provides a kind of method for processing business switched based on XAUI link, device and system, with solution Certainly XAUI link switchings result in service interface board (subcard) XGXS layers in 10GE physical layers between standby usage in the prior art The problem of generating the pattern of mistake, and causing service disconnection and a large amount of packet losses.
The embodiment of the present invention provides a kind of method for processing business switched based on XAUI link on one side, including:
Working traffic processing single board default or primary XAUI link failures are being detected, and by the working traffic When managing veneer and be switched to standby traffic processing veneer, and primary XAUI link are switched on standby XAUI link, by institute State working traffic processing veneer pass through the XAUI link connections service interface board on 10GE physical layers in XGXS sublayers and Interface between PCS/PMA sublayers is isolated;
Bell idles is generated, and the bell idles is sent to by the PCS/PMA sublayers and connected with the service interface board The opposite equip. connect, service interaction is carried out between the service interface board and the opposite equip. to realize.
In the possible implementation of in the first aspect the first, the generation bell idles, and the bell idles is passed through The PCS/PMA sublayers are sent to opposite equip., including:
Trigger the PCS/PMA sublayers and send the idle code word of generation into the opposite equip..
With reference to the on one side, second in the first aspect may be in implementation, the generation bell idles, and will The bell idles is sent to opposite equip. by the PCS/PMA sublayers, including:
Trigger the module of giving out a contract for a project certainly in the 10GE physical layers and generate the idle code word, and pass through PCS/PMA Layer sends the idle code word to the opposite equip..
With reference to one side the first or second may implementation, in the first aspect the third may In implementation, in addition to:
Detecting the working traffic processing veneer successful switch to standby traffic processing veneer, and the master During with XAUI link successful switch to the standby XAUI link, stop triggering the PCS/PMA sublayers transmission sky Not busy code word is into the opposite equip., or the module generation idle code word of giving out a contract for a project certainly in the triggering 10GE physical layers, And the idle code word is sent to the opposite equip. by the interface between the PCS/PMA sublayers;
Interface in the 10GE physical layers between XGXS sublayers and PCS/PMA sublayers is attached.
With reference to one side the first into the third any possible implementation, the in the first aspect the 4th In the possible implementation of kind, in addition to:
When detecting primary XAUI link exceptions, to the opposite equip. transmission link state instruction code word.
Second aspect of the embodiment of the present invention provides a kind of business processing device switched based on XAUI link, including:
Detection module, for detect primary XAUI link whether failure;
Module is switched, for detecting that working traffic processing single board default, or the detection module detect During the primary XAUI link failures, working traffic processing veneer is switched to standby traffic processing veneer, and will be main It is switched to XAUI link on standby XAUI link;
Processing module, for the working traffic to be handled into service interface board of the veneer by the XAUI link connections On 10GE physical layers in interface between XGXS sublayers and PCS/PMA sublayers isolated;
Link pattern control module, sent for generating bell idles, and by the bell idles by the PCS/PMA sublayers The opposite equip. of the service interface board connection is given, enters industry between the service interface board and the opposite equip. to realize Business interaction.
In the possible implementation of in second aspect the first, the link pattern control module includes:
Status control unit, be connected with the module of switching, for detect it is described switch module will be described primary When service processing board is switched on standby traffic processing veneer, send enabled indication signal to send pattern control unit and Cell fifo;
The transmission pattern control unit, is connected with the status control unit and the PCS/PMA sublayers respectively, It is described right to be sent to for when receiving the enabled indication signal, triggering the PCS/PMA sublayers by the idle code word In end equipment;
The cell fifo, it is connected respectively with the status control unit and the transmission pattern control unit, is used for When receiving the enabled indication signal, the historical data in the cell fifo is emptied, and writes completely described idle code word, with And close read-write operation.
In terms of with reference to second, in second of possible implementation in second aspect, in addition to:
From module of giving out a contract for a project, for generating idle code word;
The link pattern control module includes:
Status control unit, be connected with the module of switching, for detect it is described switch module will be described primary When service processing board is switched on standby traffic processing veneer, send enabled indication signal to send pattern control unit and Cell fifo;
The transmission pattern control unit, is connected with the status control unit and the PCS/PMA sublayers respectively, Module of giving out a contract for a project certainly for when receiving the enabled indication signal, triggering in the 10GE physical layers generates the bell idles Word, and the idle code word is sent to the opposite equip. by the PCS/PMA sublayers;
The cell fifo, it is connected respectively with the status control unit and the transmission pattern control unit, is used for When receiving the enabled indication signal, the historical data in the cell fifo is emptied, and writes completely described idle code word, with And close read-write operation.
With reference to second aspect the first or second may implementation, in second aspect the third may In implementation, the status control unit be additionally operable to detect it is described switch module by the working traffic handle veneer into Work(is switched to standby traffic processing veneer, and the primary XAUI link successful switch is on the standby XAUI link When, termination instruction signal is sent to transmission pattern control unit and cell fifo;
The transmission pattern control unit, be additionally operable to stop to trigger the PCS/PMA sublayers send the idle code word to In the opposite equip., or the module generation idle code word of giving out a contract for a project certainly in the triggering 10GE physical layers, and pass through institute The interface stated between PCS/PMA sublayers sends the idle code word to the opposite equip.;
The cell fifo, it is additionally operable to cut with smooth state as data buffering between XGXS sublayers and PCS/PMA sublayers Change;
Then the processing module is additionally operable to the interface in the 10GE physical layers between XGXS sublayers and PCS/PMA sublayers It is attached.
With reference to second aspect the first into the third any possible implementation, the in second aspect the 4th In the possible implementation of kind, the processing module is additionally operable to, when detecting primary XAUI link exceptions, trigger the transmission code Type control unit is to the opposite equip. transmission link state instruction code word.
The 3rd aspect of the embodiment of the present invention provides a kind of transaction processing system switched based on XAUI link, including Service processing board, service interface board and the business processing device as described above that switch based on XAUI link.
The embodiment of the present invention, by detecting working traffic processing single board default or primary XAUI link failures, and Working traffic processing veneer is switched to standby traffic processing veneer, and primary XAUI link are switched to standby XAUI When on link, working traffic is handled to XGXS in the 10GE physical layers on the service interface board that veneer connected by XAUI link Interface between sublayer and PCS/PMA sublayers is isolated, and regenerates bell idles, and the bell idles is passed through into PCS/PMA sublayers The opposite equip. being connected with the service interface board is sent to, business is carried out between the service interface board and the opposite equip. to realize Interaction.Due to the interface in 10GE physical layers between XGXS sublayers and PCS/PMA sublayers being isolated, and by by generation Bell idles is sent to opposite equip. by PCS/PMA sublayers, therefore, switches caused XAUI link exceptions or other reasonses Caused XAUI link are isolated extremely, so that the link between service interface board and opposite equip. keeps normal connection, Link will not be caused to disconnect and influence business, and then solve XAUI link switchings between standby usage in the prior art and result in XGXS layers generate the pattern of mistake in 10GE physical layers in service interface board (subcard), and cause service disconnection and a large amount of packet losses The problem of.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is in the prior art using 1:The configuration diagram of the system of 1 hot-standby mode;
Fig. 2 is the service interface board (subcard) that the method for processing business of the invention that switch based on XAUI link is based on Configuration diagram;
Fig. 3 is the flow chart of the method for processing business embodiment one of the invention that switch based on XAUI link;
Fig. 4 is the flow chart of the method for processing business embodiment two of the invention that switch based on XAUI link;
Fig. 5 is the flow chart of the method for processing business embodiment three of the invention that switch based on XAUI link;
Fig. 6 is the structural representation of one embodiment of the business processing device of the invention that switch based on XAUI link;
Fig. 7 is the structural representation of another embodiment of the business processing device of the invention that switch based on XAUI link Figure;
Fig. 8 is the structural representation of another embodiment of the business processing device of the invention that switch based on XAUI link Figure.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 2 is the service interface board (subcard) that the method for processing business of the invention that switch based on XAUI link is based on Configuration diagram, as shown in Fig. 2 the service interface board includes:Serdes multiplex/demultiplex electronic switch (Serdes Mux/ Demux) 11,10GE physical layers 12 and optical module/photoelectric conversion module (optics) 13;Wherein, Serdes Mux/demux11 Veneer is handled with working traffic to be connected, or list is handled by standby XAUI link and standby traffic by primary XAUI link Plate connects.Serdes Mux/demux11 are also connected by XAUI link interfaces with 10GE physical layers 12.Optics13 passes through Link is connected with opposite equip..
10GE physical layers 12 include:XGXS sublayers 121, PCS sublayers 122 and PMA sublayers 123;In 10GE physical layers just In normal mode of operation, the interface between XGXS sublayers 121 and PCS/PMA sublayers normally connects.
Fig. 3 is the flow chart of the method for processing business embodiment one of the invention that switch based on XAUI link, in above-mentioned figure On the basis of the configuration diagram of service interface board (subcard) shown in 2, as shown in figure 3, the method for the present embodiment can include:
Step 101, working traffic processing single board default or primary XAUI link failures are being detected, and this is primary Service processing board is switched to standby traffic processing veneer, and primary XAUI link are switched on standby XAUI link When, XGXS is sub in the 10GE physical layers on service interface board that working traffic processing veneer is passed through into the XAUI link connections Layer is isolated with the interface between PCS/PMA sublayers.
In the present embodiment, under 10GE physical layer normal mode of operation, i.e., the service interface board passes through primary XAUI Link is connected with working traffic processing veneer, meanwhile, XGXS sublayers and PCS/PMA in the 10GE physical layers on service interface board Interface between layer normally connects, normal by that can be carried out between primary XAUI link and 10GE physical layers so as to realize Normal service interaction can be carried out between connection, i.e. working traffic processing veneer and service interface board.
When detecting working traffic processing single board default or primary XAUI link failures, business needs to switch, business chain Road needs to be switched to standby XAUI link from primary XAUI link, i.e. working traffic processing veneer is switched to standby traffic processing During veneer, the 10GE physical layers on service interface board enter protected mode, i.e., by connecing between XGXS sublayers and PCS/PMA sublayers Mouth is isolated, and by this isolation, working traffic processing single board default or primary XAUI link failures will not connect to business PCS/PMA sublayers in oralia have an impact, thus switch XAUI caused by caused XAUI link exceptions or other reasonses Link is isolated extremely, so as to reach the effect of isolation.
Step 102, generation bell idles, and the bell idles is sent to and the service interface board by the PCS/PMA sublayers The opposite equip. of connection, service interaction is carried out between the service interface board and the opposite equip. to realize.
In the present embodiment, the bell idles of generation is sent to opposite equip. by the PCS/PMA sublayers, industry can be caused The link connections being engaged between interface board and opposite equip. keep connection, and link connections will not be caused to disconnect and influence business.
The present embodiment, by detecting working traffic processing single board default or primary XAUI link failures, and will be main Standby traffic processing veneer is switched to service processing board, and primary XAUI link are switched on standby XAUI link When, working traffic is handled in the 10GE physical layers on the service interface board that veneer connected by XAUI link XGXS sublayers with Interface between PCS/PMA sublayers is isolated, and regenerates bell idles, and the bell idles is sent to by PCS/PMA sublayers The opposite equip. being connected with the service interface board, service interaction is carried out between the service interface board and the opposite equip. to realize. Due to the interface in 10GE physical layers between XGXS sublayers and PCS/PMA sublayers being isolated, and by by the free time of generation Code is sent to opposite equip. by PCS/PMA sublayers, and therefore, switching caused XAUI link exceptions or other reasonses causes XAUI link be isolated extremely, will not so that link between service interface board and opposite equip. keeps normal connection Cause link to disconnect and influence business, and then solve XAUI link switchings between standby usage in the prior art and result in business XGXS layers generate the pattern of mistake in 10GE physical layers in interface board (subcard), and cause asking for service disconnection and a large amount of packet losses Topic.
Several specific embodiments are used below, and the technical scheme of embodiment of the method shown in Fig. 2 is described in detail.
Fig. 4 is the flow chart of the method for processing business embodiment two of the invention that switch based on XAUI link, such as Fig. 4 institutes Show, on the basis of above-mentioned embodiment illustrated in fig. 2, a kind of specific implementation of step 102 is:
Step 201, trigger the PCS/PMA sublayers and send the idle code word into the opposite equip..
Wherein, the idle code word can be specially bell idles (IDLE), or code character (sequence ordered in order Set) etc..
In the present embodiment, idle code word is sent by PCS/PMA sublayers automatically, to cause the PCS/PMA sublayers to refer to IEEE802.3ae standard normal operations, so that the link between service interface board and opposite equip. keeps connection, it will not lead Link is caused to disconnect and influence business.
Preferably, this method can also include:
Step 202, working traffic processing veneer successful switch is being detected to standby traffic processing veneer, and should When primary XAUI link successful switch is on the standby XAUI link, stop triggering the PCS/PMA sublayers sending the bell idles Word is into the opposite equip.;
Step 203, the interface in the 10GE physical layers between XGXS sublayers and PCS/PMA sublayers is attached.
In the present embodiment, when detecting that working traffic processing veneer is switched to standby traffic processing veneer success, Cancel isolating between XGXS sublayers and PCS/PMA sublayers in the 10GE physical layers so that standby traffic processing veneer passes through standby Normally given out a contract for a project with XAUI link and 10GE physical layers, now the link between opposite equip. is still connected, so as to solve Link caused by switching in the prior art of having determined disconnects problem.
Preferably, this method can also include:When detecting primary XAUI link exceptions, sent to the opposite equip. Link State indicates code word.
Fig. 5 is the flow chart of the method for processing business embodiment three of the invention that switch based on XAUI link, in above-mentioned figure On the basis of 2 illustrated embodiments, as shown in figure 5, another specific implementation of step 102 is:
Step 301, the module of giving out a contract for a project certainly triggered in the 10GE physical layers generate the idle code word, and pass through PCS/PMA Layer sends the idle code word to the opposite equip..
In the present embodiment, the idle code word is generated by the module of giving out a contract for a project certainly in the 10GE physical layers, and passes through this PCS/PMA sublayers send the idle code word to the opposite equip., to cause the PCS/PMA sublayers to refer to IEEE802.3ae standards Normal operation, so that the link between service interface board and opposite equip. keeps connection, link will not be caused to disconnect and shadow The business of sound.Wherein, the idle code word can be specially bell idles (IDLE), or code character (sequence ordered in order Set) etc..
Preferably, this method can also include:
Step 302, detecting working traffic processing veneer successful switch to standby traffic processing veneer, and the master During with XAUI link successful switch to the standby XAUI link, stop triggering the module life of giving out a contract for a project certainly in the 10GE physical layers Into the idle code word, and by the interface between the PCS/PMA sublayers the idle code word is sent to the opposite equip..
Step 203, the interface in the 10GE physical layers between XGXS sublayers and PCS/PMA sublayers is attached.
In the present embodiment, detect the working traffic processing veneer be switched to standby traffic processing veneer success, with And the primary XAUI link are when being switched on the standby XAUI link success, cancel in the 10GE physical layers XGXS sublayers with Isolation between PCS/PMA sublayers so that standby traffic handles veneer and carried out just by standby XAUI link and 10GE physical layers Normal gives out a contract for a project, and now the link between opposite equip. is still connected, so as to solve switch in the prior art caused by chain Road disconnects problem.
Preferably, this method can also include:When detecting primary XAUI link exceptions, sent to the opposite equip. Link State indicates code word.
Fig. 6 is the structural representation of one embodiment of the business processing device of the invention that switch based on XAUI link, As described in Figure 6, the device includes:Detection module 21, switch module 22, processing module 23 and link pattern control module 24;Its In, detection module 21 be used for detect primary XAUI link whether failure;Module 22 is switched to be used to detect that the primary processing is single Plate failure, or when the detection module 21 detects the primary XAUI link failures, working traffic processing veneer is switched to Standby traffic handles veneer, and primary XAUI link are switched on standby XAUI link;Processing module 23 is used for should XGXS sublayers and PCS/ in the 10GE physical layers on service interface board that working traffic processing veneer passes through the XAUI link connections Interface between PMA sublayers is isolated;Link pattern control module 24 is used to generate bell idles, and the bell idles is passed through into this PCS/PMA sublayers are sent to the opposite equip. being connected with the service interface board, to realize the service interface board and the opposite equip. Between carry out service interaction.
In the present embodiment, switching module 22 can refer to according to the working condition of working traffic veneer and standby traffic veneer Show and switch whether module 22 is switched to working traffic processing veneer on standby traffic processing veneer to trigger.Specifically, advocate peace Standby traffic veneer sends the working condition instruction of working traffic veneer and standby board to module 22 is switched, if working traffic list Board status is abnormal, i.e., can not support during normal business processing, it is necessary to be switched to the standby traffic veneer of Hot Spare, now to update Working condition is indicated, is indicated with to switch module 22 according to the working condition of renewal, and working traffic processing veneer is switched to Standby traffic handles veneer, and switches primary XAUI link and be switched on standby XAUI link.
In addition, switch the link that module 22 can also detect the primary XAUI link of work at present according to detection module 21 State come determine a need for by working traffic processing veneer be switched to standby traffic processing veneer on.Specifically, detection module The primary XAUI link of 21 detection works at present Link State, specifically, can include:Serdes CDR lock states, Whether each XAUI lane 8B/10B code sync states and 4 lane code words aligns.Detection module 21 detect work as During the primary XAUI link failures of preceding work, can trigger switch module 22 by the working traffic processing veneer be switched to it is standby With service processing board, and switch primary XAUI link and be switched on standby XAUI link.
It should also be noted that, working traffic processing veneer is switched to standby traffic processing list switching module 22 Plate, and when switching primary XAUI link and being switched on standby XAUI link, can also be sent to link pattern control module 24 Enabled control signal, to indicate that the idle code word of generation is sent to by link pattern control module 24 by PCS/PMA sublayers Opposite equip..Meanwhile switch module 22 and will also enable control signal and be sent to processing module 23, module 23 for processing is by business Interface in 10GE physical layers on interface board between XGXS sublayers and PCS/PMA sublayers is isolated.
In the present embodiment, the reality of method shown in Fig. 2 can be performed by being somebody's turn to do the business processing device switched based on XAUI link The technical scheme of example is applied, its realization principle and beneficial effect are similar, and here is omitted.
Fig. 7 is the structural representation of another embodiment of the business processing device of the invention that switch based on XAUI link Figure, on the basis of above-mentioned embodiment illustrated in fig. 6, as shown in fig. 7, the link pattern control module 24 includes:State control is single Member 241, send pattern control unit 242 and cell fifo 243;Wherein, status control unit 241 is switched module 22 with this and is connected Connect, for detect this switch module 22 by the working traffic processing veneer be switched to standby traffic processing veneer on when, hair Enabled indication signal is sent to transmission pattern control unit 242 and cell fifo 243;Send pattern control unit 242 respectively with this Status control unit 241 and the PCS/PMA sublayers are connected, for when receiving the enabled indication signal, triggering should The idle code word is sent in the opposite equip. by PCS/PMA sublayers;Cell fifo 243 respectively with the status control unit 241 It is connected with the transmission pattern control unit 242, for when receiving the enabled indication signal, emptying the cell fifo 243 In historical data, and write the full idle code word, and close read-write operation.
In the present embodiment, module 22 is switched by working traffic processing veneer conversion when status control unit 241 detects When handling veneer for standby traffic, status control unit 241 sends enabled indication signal and gives the transmission He of pattern control unit 242 Cell fifo 243, pattern control unit 242 is sent when receiving the enabled indication signal, triggering the PCS/PMA sublayers should Idle code word is sent in the opposite equip.;Cell fifo 243 empties the cell fifo when receiving the enabled indication signal Historical data in 243, and write the full idle code word, and close read-write operation, so as to isolate caused by XAUI link switch XAUI link abnormalities caused by link abnormality or other reasonses, and then avoid the code that XGXS layers provide mistake Word causes 10GE physical layers operation irregularity and linkdown.
Alternatively, the status control unit 241 is additionally operable to detecting that this switches module 22, and working traffic processing is single When plate successful switch is on standby traffic processing veneer, termination instruction signal is sent to sending pattern control unit 242 and FIFO Unit 243;The transmission pattern control unit 242, is additionally operable to stop to trigger the PCS/PMA sublayers that to send the idle code word right to this In end equipment;The cell fifo 243, it is additionally operable to as data buffering between XGXS sublayers and PCS/PMA sublayers with smooth state Switching;Then the processing module 23 is additionally operable to carry out the interface in the 10GE physical layers between XGXS sublayers and PCS/PMA sublayers Connection.
Alternatively, the processing module 23 is additionally operable to when detecting primary XAUI link exceptions, triggers the transmission pattern control Unit 242 processed is to the opposite equip. transmission link state instruction code word.
In the present embodiment, the reality of method shown in Fig. 3 can be performed by being somebody's turn to do the business processing device switched based on XAUI link The technical scheme of example is applied, its realization principle is similar, and here is omitted.
Fig. 8 is the structural representation of another embodiment of the business processing device of the invention that switch based on XAUI link Figure, on the basis of above-mentioned embodiment illustrated in fig. 6, as shown in figure 8, the device can also include:From module 25 of giving out a contract for a project, for giving birth to Into idle code word;Then link pattern control module 24 includes:Status control unit 244, send pattern control unit 245 and FIFO Unit 246;Wherein, status control unit 244 is switched module 22 with this and is connected, for detect that this switches module 22 should When working traffic processing veneer is switched on standby traffic processing veneer, sends enabled indication signal and give transmission pattern control unit And cell fifo;Pattern control unit 245 is sent, is connected respectively with the status control unit 244 and the PCS/PMA sublayers Connect, for when receiving the enabled indication signal, the module 25 of giving out a contract for a project certainly triggered in the 10GE physical layers to generate the bell idles Word, and the idle code word is sent to the opposite equip. by the PCS/PMA sublayers;Cell fifo 246, controlled respectively with the state Unit 244 is connected with the transmission pattern control unit 245, for when receiving the enabled indication signal, emptying the FIFO Historical data in unit, and the full idle code word is write, and close read-write operation.
Alternatively, the status control unit 244 is additionally operable to detecting that this switches module 22, and working traffic processing is single Plate successful switch handles veneer, and the primary XAUI link successful switch on the standby XAUI link to standby traffic When, termination instruction signal is sent to transmission pattern control unit 245 and cell fifo 246;The transmission pattern control unit 245, It is additionally operable to stop triggering the module 25 of giving out a contract for a project certainly in the 10GE physical layers and generates the idle code word, and passes through the PCS/PMA sublayers Between interface send the idle code word to the opposite equip.;The cell fifo 246, is additionally operable to as XGXS sublayers and PCS/ Data buffering is switched with smooth state between PMA sublayers;Then the processing module 23 is additionally operable to XGXS in the 10GE physical layers Interface between layer and PCS/PMA sublayers is attached.
Alternatively, the processing module 23 is additionally operable to when detecting primary XAUI link exceptions, triggers the transmission pattern control Unit processed is to the opposite equip. transmission link state instruction code word.
In the present embodiment, the reality of method shown in Fig. 4 can be performed by being somebody's turn to do the business processing device switched based on XAUI link The technical scheme of example is applied, its realization principle is similar, and here is omitted.
Present invention also offers a kind of processing system of switching based on XAUI link, including service processing board, business interface Plate and the business processing device switched based on XAUI link, wherein, should the business processing the switched dress based on XAUIlink Any shown business processing devices switched based on XAUI link of above-mentioned Fig. 6 to Fig. 8 are set to, and Fig. 2 can be performed to 4 Any described method, its realization principle is similar, and here is omitted.
Alternatively, detection module, switch module and link pattern control module and can be built in service interface board.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above-mentioned each method embodiment can lead to The related hardware of programmed instruction is crossed to complete.Foregoing program can be stored in a computer read/write memory medium.The journey Sequence upon execution, execution the step of including above-mentioned each method embodiment;And foregoing storage medium includes:ROM, RAM, magnetic disc or Person's CD etc. is various can be with the medium of store program codes.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (11)

  1. A kind of 1. method for processing business switched based on XAUI link, it is characterised in that including:
    Working traffic processing single board default or primary XAUI link failures are being detected, and working traffic processing is single Plate is switched to standby traffic processing veneer, and when primary XAUI link are switched on standby XAUI link, by the master XGXS sublayers and PCS/ in the 10GE physical layers on service interface board for passing through the XAUI link connections with service processing board Interface between PMA sublayers is isolated;
    Bell idles is generated, and the bell idles is sent to what is be connected with the service interface board by the PCS/PMA sublayers Opposite equip., service interaction is carried out between the service interface board and the opposite equip. to realize.
  2. 2. according to the method for claim 1, it is characterised in that the generation bell idles, and the bell idles is passed through into institute State PCS/PMA sublayers and be sent to opposite equip., including:
    Trigger the PCS/PMA sublayers and send the idle code word of generation into the opposite equip..
  3. 3. according to the method for claim 1, it is characterised in that the generation bell idles, and the bell idles is passed through into institute State PCS/PMA sublayers and be sent to opposite equip., including:
    Trigger the module of giving out a contract for a project certainly in the 10GE physical layers and generate the idle code word, and by the PCS/PMA sublayers to The opposite equip. sends the idle code word.
  4. 4. according to the method in claim 2 or 3, it is characterised in that also include:
    Working traffic processing veneer successful switch is being detected to standby traffic processing veneer, and it is described primary When XAUI link successful switch is on the standby XAUI link, stop triggering the PCS/PMA sublayers sending the free time Code word is into the opposite equip., or the module generation idle code word of giving out a contract for a project certainly in the triggering 10GE physical layers, and The idle code word is sent to the opposite equip. by the PCS/PMA sublayers;
    Interface in the 10GE physical layers between XGXS sublayers and PCS/PMA sublayers is attached.
  5. 5. method according to any one of claims 1 to 3, it is characterised in that also include:
    When detecting primary XAUI link exceptions, to the opposite equip. transmission link state instruction code word.
  6. A kind of 6. business processing device switched based on XAUI link, it is characterised in that including:
    Detection module, for detect primary XAUI link whether failure;
    Switch module, for detect working traffic handle single board default, or the detection module detect it is described primary During XAUI link failures, working traffic processing veneer is switched to standby traffic processing veneer, and by primary XAUI Link is switched on standby XAUI link;
    Processing module, for the working traffic to be handled on service interface board of the veneer by the XAUI link connections Interface in 10GE physical layers between XGXS sublayers and PCS/PMA sublayers is isolated;
    Link pattern control module, for generating bell idles, and by the bell idles by the PCS/PMA sublayers be sent to The opposite equip. of the service interface board connection, to realize progress business friendship between the service interface board and the opposite equip. Mutually.
  7. 7. device according to claim 6, it is characterised in that the link pattern control module includes:
    Status control unit, it is connected with the module of switching, for described switching module by the working traffic detecting When handling veneer and be switched to standby traffic processing veneer, and primary XAUI link are switched on standby XAUI link, hair Enabled indication signal is sent to transmission pattern control unit and cell fifo;
    The transmission pattern control unit, is connected with the status control unit and the PCS/PMA sublayers, is used for respectively When receiving the enabled indication signal, the PCS/PMA sublayers are triggered the idle code word are sent to the opposite end setting In standby;
    The cell fifo, it is connected respectively with the status control unit and the transmission pattern control unit, for connecing When receiving the enabled indication signal, the historical data in the cell fifo is emptied, and writes completely described idle code word, Yi Jiguan Close read-write operation.
  8. 8. device according to claim 6, it is characterised in that also include:
    From module of giving out a contract for a project, for generating idle code word;
    The link pattern control module includes:
    Status control unit, it is connected with the module of switching, for described switching module by the working traffic detecting When handling veneer and be switched to standby traffic processing veneer, and primary XAUI link are switched on standby XAUI link, hair Enabled indication signal is sent to transmission pattern control unit and cell fifo;
    The transmission pattern control unit, is connected with the status control unit and the PCS/PMA sublayers, is used for respectively When receiving the enabled indication signal, the module of giving out a contract for a project certainly triggered in the 10GE physical layers generates the idle code word, And the idle code word is sent to the opposite equip. by the PCS/PMA sublayers;
    The cell fifo, it is connected respectively with the status control unit and the transmission pattern control unit, for connecing When receiving the enabled indication signal, the historical data in the cell fifo is emptied, and writes completely described idle code word, Yi Jiguan Close read-write operation.
  9. 9. the device according to claim 7 or 8, it is characterised in that the status control unit is additionally operable to detecting State and switch module and working traffic processing veneer successful switch will detected to standby traffic processing veneer, Yi Jisuo When stating primary XAUI link successful switch to the standby XAUI link, send termination instruction signal and controlled to pattern is sent Unit and cell fifo;
    The transmission pattern control unit, it is additionally operable to stop triggering the PCS/PMA sublayers transmission idle code word described in In opposite equip., or the module generation idle code word of giving out a contract for a project certainly in the triggering 10GE physical layers, and by described PCS/PMA sublayers send the idle code word to the opposite equip.;
    The cell fifo, it is additionally operable to smooth state switch as data buffering between XGXS sublayers and PCS/PMA sublayers;
    Then the processing module is additionally operable to carry out the interface in the 10GE physical layers between XGXS sublayers and PCS/PMA sublayers Connection.
  10. 10. according to any described device of claim 7 to 8, it is characterised in that the processing module is additionally operable to detecting master During with XAUI link exceptions, the transmission pattern control unit is triggered to the opposite equip. transmission link state instruction code word.
  11. 11. a kind of transaction processing system switched based on XAUI link, it is characterised in that connect including service processing board, business Oralia and the business processing device switched based on XAUI link as described in above-mentioned claim 6 to 10 is any.
CN201410293348.4A 2014-06-25 2014-06-25 The method for processing business switched, device and system based on XAUI link Active CN104022909B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410293348.4A CN104022909B (en) 2014-06-25 2014-06-25 The method for processing business switched, device and system based on XAUI link

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410293348.4A CN104022909B (en) 2014-06-25 2014-06-25 The method for processing business switched, device and system based on XAUI link

Publications (2)

Publication Number Publication Date
CN104022909A CN104022909A (en) 2014-09-03
CN104022909B true CN104022909B (en) 2018-02-13

Family

ID=51439491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410293348.4A Active CN104022909B (en) 2014-06-25 2014-06-25 The method for processing business switched, device and system based on XAUI link

Country Status (1)

Country Link
CN (1) CN104022909B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI709757B (en) * 2019-07-24 2020-11-11 儀騰科技有限公司 Fiber-optics communication component test device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100349405C (en) * 2003-07-15 2007-11-14 中兴通讯股份有限公司 An apparatus for implementing disaster recovery of 10G Ethernet port
CN101114913A (en) * 2007-08-28 2008-01-30 福建星网锐捷网络有限公司 Modularized switch
US8493974B1 (en) * 2008-05-28 2013-07-23 L-3 Communications Protocol-independent switch system and method
CN103248501A (en) * 2012-02-01 2013-08-14 中兴通讯股份有限公司 Service protection switching method and PON equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100349405C (en) * 2003-07-15 2007-11-14 中兴通讯股份有限公司 An apparatus for implementing disaster recovery of 10G Ethernet port
CN101114913A (en) * 2007-08-28 2008-01-30 福建星网锐捷网络有限公司 Modularized switch
US8493974B1 (en) * 2008-05-28 2013-07-23 L-3 Communications Protocol-independent switch system and method
CN103248501A (en) * 2012-02-01 2013-08-14 中兴通讯股份有限公司 Service protection switching method and PON equipment

Also Published As

Publication number Publication date
CN104022909A (en) 2014-09-03

Similar Documents

Publication Publication Date Title
JP3738826B2 (en) Automatic disconnection in loop
CN101001192B (en) Method, system and equipment for protecting ring network link
EP2206293B1 (en) System and method for signal failure detection in a ring bus system
CN107508640B (en) Double-ring redundant self-healing optical fiber network construction method based on optical fiber channel technology
CN100479411C (en) Processing method for node link switching of the distributed system and its device
CN101702663A (en) Method for updating ring network topology information, device and system thereof
CN102917286A (en) Hand-in-hand protection switching method and system in EPON (Ethernet Passive Optical Network)
EP1708379A1 (en) Communication system having backup function for several series devices and method for carrying out the function of switching
EP2874351B1 (en) Control method and device for protecting connectivity between ethernet ring network nodes, and first node
US7804768B2 (en) Method for redundant linking lines and wide area network node device
CN102318267A (en) Data communication method, communication equipment and communication system
CN103428114A (en) ATCA (advanced telecom computing architecture) 10-gigabit switching board and system
CN105871674A (en) Ring protection link fault protection method, device and system
CN107729190A (en) A kind of I/O path failure metastasis treating method and system
CN105915426A (en) Failure recovery method and device of ring network
CN102244589B (en) Method and opposite terminal apparatus for processing link fault in virtual switch unit system
US7836208B2 (en) Dedicated redundant links in a communicaton system
CN201766606U (en) Network switching device based on physical layer state detection and fault screening strategy
CN100586101C (en) Switching between layer 2 switches as destination
CN104022909B (en) The method for processing business switched, device and system based on XAUI link
CN104796200A (en) Relay system and switching device
CN103414591A (en) Method and system for fast converging when port failure is recovered
CN101340315B (en) End-to-end Ethernet protection method and communication apparatus adopting the same
CN207992997U (en) I2C bus systems
CN107154871B (en) VOIP business master-slave conversion system and method based on distributed DSP

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211223

Address after: 450046 Floor 9, building 1, Zhengshang Boya Plaza, Longzihu wisdom Island, Zhengdong New Area, Zhengzhou City, Henan Province

Patentee after: Super fusion Digital Technology Co.,Ltd.

Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen

Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd.