CN104018853A - Guiding traction device for all-section needle beam trolley and all-section needle beam trolley - Google Patents

Guiding traction device for all-section needle beam trolley and all-section needle beam trolley Download PDF

Info

Publication number
CN104018853A
CN104018853A CN201410298152.4A CN201410298152A CN104018853A CN 104018853 A CN104018853 A CN 104018853A CN 201410298152 A CN201410298152 A CN 201410298152A CN 104018853 A CN104018853 A CN 104018853A
Authority
CN
China
Prior art keywords
sprocket wheel
piece
wheel single
needle beam
section needle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410298152.4A
Other languages
Chinese (zh)
Other versions
CN104018853B (en
Inventor
王祥军
龚俊
曾志其
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Heavy Equipment Co Ltd
Original Assignee
Hunan Wuxin Heavy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wuxin Heavy Equipment Co Ltd filed Critical Hunan Wuxin Heavy Equipment Co Ltd
Priority to CN201410298152.4A priority Critical patent/CN104018853B/en
Publication of CN104018853A publication Critical patent/CN104018853A/en
Application granted granted Critical
Publication of CN104018853B publication Critical patent/CN104018853B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a guiding traction device for an all-section needle beam trolley. The device comprises a reducing motor, a traveling frame connecting beam, a chain wheel, a chain and the like, wherein the chain wheel comprises a first chain wheel single piece, a second chain wheel single piece and a third chain wheel single piece, and the first and second chain wheel single pieces are arranged on the traveling frame connecting beam; the chain is sequentially contacted with the first, second and third chain wheel single pieces. The guiding traction device for the all-section needle beam trolley provided by the invention has the beneficial effects that (1) the integral structure is concise; (2) the reducer is used to replace a winch, so that the all-section needle beam trolley is conveniently controlled to travel and meanwhile, the all-section needle beam trolley travels more smoothly, stably and safely on a slope with great gradient (greater than 10 degrees). The invention further discloses the all-section needle beam trolley which is suitable for the construction state of an inclined shaft with great gradient (greater than 10 degrees) and can smoothly, stably and safely travel.

Description

Guiding draw-gear and full section needle beam trolley for a kind of full section needle beam trolley
Technical field
The present invention relates to tunnel construction equipment technical field, especially, relate to guiding draw-gear for a kind of full section needle beam trolley.
Background technology
Inclined shaft in tunnel inclined shaft engineering is for there being pressure circular tunnel, conventional construction method generally adopts " combined steel formwork+all round victory frame " and " steel form carrier " to carry out concrete pouring construction, adopt and manually set up the constructure scheme that all round victory frame installation reinforcing combined steel formwork carries out concreting and a minute base plate, limit crown two-step pouring, its advantage is: take these two kinds of modes to carry out concrete pouring construction technology maturation, constructor easily grasps, skilled operation; Its shortcoming is: complicated construction technique, potential safety hazard are large, workmanship is wayward, and input cost is higher, and construction speed is slow, affects the construction period.
The shortcoming of above-mentioned conventional construction method is particularly evident in heavy grade slope construction, such as the inclined shaft gradient is that 10 ° (are angle be 10 °) between heavy grade inclined shaft and horizontal plane, digging diameter are that diameter is in the situation of 7.5m, total length 160m after 9m, lining cutting, for example, according to traditional concrete pouring construction scheme (: combined steel formwork+full hall frame, steel form carrier), be difficult to organize and implement, and the safety of cannot ensuring the quality of products, and affect the construction period, be difficult to guarantee the realization of engineering inclined shaft engineering overall goal.
Current needle beam trolley is due to its guiding and trailer system is only applicable to move horizontally and light grade construction, while walking on heavy grade, have and block motionless phenomenon, and it has certain landslide phenomenon during the rotating break-in of hoist engine in work progress, hoist engine is the asynchronous wire rope disorder cable that causes when work.
Summary of the invention
The guiding draw-gear for full section needle beam trolley that provides a kind of structure to simplify, be applicable to heavy grade slope construction operating mode is provided the first object of the present invention, make full section needle beam trolley on the slope of heavy grade (angle is greater than 10 °), walk more smooth-going, stable and safety, concrete technical scheme is as follows:
A guiding draw-gear for full section needle beam trolley, comprises reducing motor, walking frame tie-beam, walking guide wheel group, sprocket wheel, chain and limit base;
Described walking frame tie-beam is arranged on the beam frame of full section needle beam trolley by the guide wheel group of walking described in two groups;
Described reducing motor is arranged on described walking frame tie-beam, and the side of being located thereon;
Described sprocket wheel comprises the first sprocket wheel single-piece, the second sprocket wheel single-piece and the 3rd sprocket wheel single-piece, and described the first sprocket wheel single-piece and the second sprocket wheel single-piece are set up in parallel from front to back on described walking frame tie-beam; Described the 3rd sprocket wheel single-piece is arranged on described reducing motor, and is positioned at the top of described the first sprocket wheel single-piece and the second sprocket wheel single-piece;
Described chain contacts with the soffit of the soffit of described the first sprocket wheel single-piece, the upper surface of described the 3rd sprocket wheel single-piece and described the second sprocket wheel single-piece successively, and its two ends are separately positioned on two needle beam truss sheets of full section needle beam trolley;
The front end of described limit base is arranged in described walking guide wheel group, and its rear end is arranged on walking frame tie-beam, and is positioned at the rear of described reducing motor.
Preferred in above technical scheme, described reducing motor is arranged on described walking frame tie-beam by bolt.
Preferred in above technical scheme, described the second sprocket wheel single-piece and the 3rd sprocket wheel single-piece are directive wheel.
Preferred in above technical scheme, the structural similarity of the structure of described the first sprocket wheel single-piece and described the second sprocket wheel single-piece.
Preferred in above technical scheme, described the 3rd sprocket wheel single-piece is arranged on described reducing motor by flat key.
Apply guiding draw-gear for full section needle beam trolley of the present invention, concrete beneficial effect is as follows: (1) overall structure is simplified; (2) adopt reductor to substitute hoist engine, be convenient to control the walking of full section needle beam trolley, make simultaneously full section needle beam trolley on the slope of heavy grade (angle is greater than 10 °), walk more smooth-going, stablize and safety; (3) between reducing motor and walking frame tie-beam, adopt bolt to be fixed, between the 3rd sprocket wheel single-piece and reducing motor, adopt flat key to fix, installation and removal are convenient, and steadiness is good; (4) first sprocket wheel single-pieces, the second sprocket wheel single-piece and the 3rd sprocket wheel single-piece adopt close structure, and parts easily obtain, the maintenance cost of Denging is low.
The second object of the present invention is to provide a kind of full section needle beam trolley, comprise guiding draw-gear for above-mentioned full section needle beam trolley, be applicable to heavy grade (angle is greater than 10 °) slope construction operating mode, walk more smooth-going, stable and safety, have and greatly simplify its construction technology, reduce its difficulty of construction, improve its construction quality, accelerate its construction speed, shorten its construction period, save manpower and time cost etc. advantage, practical.
Except object described above, feature and advantage, the present invention also has other object, feature and advantage.Below with reference to figure, the present invention is further detailed explanation.
Accompanying drawing explanation
The accompanying drawing that forms the application's a part is used to provide a further understanding of the present invention, and schematic description and description of the present invention is used for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the guiding draw-gear annexation figure in use for full section needle beam trolley of the preferred embodiment of the present invention 1;
Fig. 2 is the top view of Fig. 1;
1-reducing motor, 2-walking frame tie-beam, the 3-guide wheel group of walking, 4-sprocket wheel, 41-the first sprocket wheel single-piece, 42-the second sprocket wheel single-piece, 43-the 3rd sprocket wheel single-piece, 5-chain, 6-limit base, 7-beam frame, 8-needle beam truss sheet.
The specific embodiment
Below in conjunction with accompanying drawing, embodiments of the invention are elaborated, but the multitude of different ways that the present invention can limit and cover according to claim is implemented.
Embodiment 1:
A guiding draw-gear for full section needle beam trolley, refers to Fig. 1 and Fig. 2, specifically comprises reducing motor 1, walking frame tie-beam 2, walking guide wheel group 3, sprocket wheel 4, chain 5 and limit base 6, and overall structure is simplified.
Described walking frame tie-beam 2 is arranged on the beam frame of full section needle beam trolley by the guide wheel group 3 of walking described in two groups.
Described reducing motor 1 is arranged on described walking frame tie-beam 2 by bolt, and the side of being located thereon, good stability.
Described sprocket wheel 4 comprises the first sprocket wheel single-piece 41, the second sprocket wheel single-piece 42 and the 3rd sprocket wheel single-piece 43, and described the first sprocket wheel single-piece 41 and the second sprocket wheel single-piece 42 are set up in parallel from front to back on described walking frame tie-beam 2; Described the 3rd sprocket wheel single-piece 43 is arranged on described reducing motor 1 by flat key, and is positioned at the top of described the first sprocket wheel single-piece 41 and the second sprocket wheel single-piece 42.
Described chain 5 contacts with the soffit of the soffit of described the first sprocket wheel single-piece 41, the upper surface of described the 3rd sprocket wheel single-piece 43 and described the second sprocket wheel single-piece 42 successively, and its two ends are separately positioned on two needle beam truss sheets of full section needle beam trolley, the combination of described chain 5, the first sprocket wheel single-piece 41, the second sprocket wheel single-piece 42 and the 3rd sprocket wheel single-piece 43, can drive whole system more smooth-going and stably advance.
The front end of described limit base 6 is arranged in described walking guide wheel group 3, and its rear end is arranged on walking frame tie-beam 2, and is positioned at the rear of described reducing motor 1.
Described the second sprocket wheel single-piece 42 and the 3rd sprocket wheel single-piece 43 are directive wheel, the structural similarity of described the first sprocket wheel single-piece 41 and described the second sprocket wheel single-piece 42 or the 3rd sprocket wheel single-piece 43, and parts easily obtain, maintenance waits cost low.
Apply guiding draw-gear for full section needle beam trolley of the present invention, the beneficial effect having is as follows: (1) overall structure is simplified; (2) adopt reductor to substitute hoist engine, be convenient to control the walking of full section needle beam trolley, make simultaneously full section needle beam trolley on the slope of heavy grade (angle is greater than 10 °), walk more smooth-going, stablize and safety; (3) between reducing motor and walking frame tie-beam, adopt bolt to be fixed, between the 3rd sprocket wheel single-piece and reducing motor, by flat key, fix, installation and removal are convenient, and steadiness is good; (4) first sprocket wheel single-pieces, the second sprocket wheel single-piece and the 3rd sprocket wheel single-piece adopt close structure, and parts easily obtain, the maintenance cost of Denging is low.
Embodiment 2:
A kind of full section needle beam trolley, comprise the guiding draw-gear for full section needle beam trolley described in embodiment 1, be applicable to heavy grade (angle is greater than 10 °) slope construction operating mode, walk more smooth-going, stable and safety, have and greatly simplify its construction technology, reduce its difficulty of construction, improve its construction quality, accelerate its construction speed, shorten its construction period, save manpower and time cost etc. advantage, practical.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (6)

1. a guiding draw-gear for full section needle beam trolley, is characterized in that: comprise reducing motor (1), walking frame tie-beam (2), walking guide wheel group (3), sprocket wheel (4), chain (5) and limit base (6);
Described walking frame tie-beam (2) is arranged on the beam frame of full section needle beam trolley by the guide wheel group (3) of walking described in two groups;
It is upper that described reducing motor (1) is arranged on described walking frame tie-beam (2), and the side of being located thereon;
Described sprocket wheel (4) comprises the first sprocket wheel single-piece (41), the second sprocket wheel single-piece (42) and the 3rd sprocket wheel single-piece (43), and described the first sprocket wheel single-piece (41) and the second sprocket wheel single-piece (42) are set up in parallel from front to back on described walking frame tie-beam (2); It is upper that described the 3rd sprocket wheel single-piece (43) is arranged on described reducing motor (1), and be positioned at the top of described the first sprocket wheel single-piece (41) and the second sprocket wheel single-piece (42);
Described chain (5) contacts with the soffit of the soffit of described the first sprocket wheel single-piece (41), the upper surface of described the 3rd sprocket wheel single-piece (43) and described the second sprocket wheel single-piece (42) successively, and its two ends are separately positioned on two needle beam truss sheets of full section needle beam trolley;
It is upper that the front end of described limit base (6) is arranged on described walking guide wheel group (3), and it is upper that its rear end is arranged on walking frame tie-beam (2), and be positioned at the rear of described reducing motor (1).
2. guiding draw-gear for full section needle beam trolley according to claim 1, is characterized in that: described reducing motor (1) is arranged on described walking frame tie-beam (2) by bolt.
3. guiding draw-gear for full section needle beam trolley according to claim 1, is characterized in that: described the second sprocket wheel single-piece (42) and the 3rd sprocket wheel single-piece (43) are directive wheel.
4. guiding draw-gear for full section needle beam trolley according to claim 3, is characterized in that: the structural similarity of the structure of described the first sprocket wheel single-piece (41) and described the second sprocket wheel single-piece (42).
5. guiding draw-gear for full section needle beam trolley according to claim 1, is characterized in that: described the 3rd sprocket wheel single-piece (43) is arranged on described reducing motor (1) by flat key.
6. a full section needle beam trolley, is characterized in that: comprise the guiding draw-gear for full section needle beam trolley as described in claim 1-5 any one.
CN201410298152.4A 2014-06-26 2014-06-26 A kind of tunneling boring needle beam trolley guiding draw-gear and tunneling boring needle beam trolley Active CN104018853B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410298152.4A CN104018853B (en) 2014-06-26 2014-06-26 A kind of tunneling boring needle beam trolley guiding draw-gear and tunneling boring needle beam trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410298152.4A CN104018853B (en) 2014-06-26 2014-06-26 A kind of tunneling boring needle beam trolley guiding draw-gear and tunneling boring needle beam trolley

Publications (2)

Publication Number Publication Date
CN104018853A true CN104018853A (en) 2014-09-03
CN104018853B CN104018853B (en) 2016-01-20

Family

ID=51435812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410298152.4A Active CN104018853B (en) 2014-06-26 2014-06-26 A kind of tunneling boring needle beam trolley guiding draw-gear and tunneling boring needle beam trolley

Country Status (1)

Country Link
CN (1) CN104018853B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106348219A (en) * 2016-11-29 2017-01-25 湖南五新隧道智能装备股份有限公司 Arm frame installing seat and high-altitude operation vehicle
CN106567720A (en) * 2016-10-28 2017-04-19 江苏大学 Traveling control device and control method for tunnel lining formwork trolley

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03194063A (en) * 1989-12-21 1991-08-23 Okabe Co Ltd Running type form timbering
CN202064962U (en) * 2011-04-13 2011-12-07 都江堰现代机械制造有限责任公司 Rail type full round needle beam trolley
CN102536267A (en) * 2012-03-07 2012-07-04 中国水利水电第五工程局有限公司 Method for performing large-gradient deviated well construction by using full-section needle beam trolley and needle beam trolley
CN202402042U (en) * 2011-12-30 2012-08-29 广汉金达隧道机械有限公司 Hoisting traction device of oversize full-circle needle beam type hydraulic steel mould trolley
CN203978447U (en) * 2014-06-26 2014-12-03 湖南五新重型装备有限公司 Guiding draw-gear and full section needle beam trolley for a kind of full section needle beam trolley

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03194063A (en) * 1989-12-21 1991-08-23 Okabe Co Ltd Running type form timbering
CN202064962U (en) * 2011-04-13 2011-12-07 都江堰现代机械制造有限责任公司 Rail type full round needle beam trolley
CN202402042U (en) * 2011-12-30 2012-08-29 广汉金达隧道机械有限公司 Hoisting traction device of oversize full-circle needle beam type hydraulic steel mould trolley
CN102536267A (en) * 2012-03-07 2012-07-04 中国水利水电第五工程局有限公司 Method for performing large-gradient deviated well construction by using full-section needle beam trolley and needle beam trolley
CN203978447U (en) * 2014-06-26 2014-12-03 湖南五新重型装备有限公司 Guiding draw-gear and full section needle beam trolley for a kind of full section needle beam trolley

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567720A (en) * 2016-10-28 2017-04-19 江苏大学 Traveling control device and control method for tunnel lining formwork trolley
CN106567720B (en) * 2016-10-28 2018-08-21 江苏大学 A kind of traveling control device and control method for working jumbo for tunnel lining
CN106348219A (en) * 2016-11-29 2017-01-25 湖南五新隧道智能装备股份有限公司 Arm frame installing seat and high-altitude operation vehicle

Also Published As

Publication number Publication date
CN104018853B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN103742192A (en) Fully-mechanized-coal-mining-face mechanization withdrawing method
CN105347188A (en) Traction type arch-bridge crane of crane carriage
CN202415018U (en) Portable rotating lifting machine
CN109973130A (en) Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor
CN104018853A (en) Guiding traction device for all-section needle beam trolley and all-section needle beam trolley
CN216586541U (en) Device for quickly cutting pile head through earth model method CFG pile cap
CN103758542B (en) Anchor bar of waterproof plate in tunnels lays dolly
CN203978447U (en) Guiding draw-gear and full section needle beam trolley for a kind of full section needle beam trolley
CN203321581U (en) Material conveying device for inclined shaft
CN204126284U (en) LNG storage tank outer tank vertical prestressing steel strand tension suspension bracket
CN203767735U (en) Automatic cable dragging device for heading machine
CN203702187U (en) Tunnel waterproof plate laying trolley
CN209740531U (en) Single-rail cable transportation trolley
CN104386602A (en) Inclined roadway trackless auxiliary transportation method and device
CN202451169U (en) Guide and traction system for full-section needle-beam trolley during construction in large slope inclined shaft
CN203805916U (en) Rope regulation device for bent portions of underground rail
CN204001778U (en) New mobile type Semi-automatic combination formula steel stranded wire penetrating adapter all-in-one
CN113863304A (en) Device for quickly cutting pile head of CFG pile cap by earth model method
CN204172741U (en) A kind of vehicular oil engine handing device and use the vehicle of this mechanism
CN203998694U (en) Hand operated monorail hoist conveying arrangement
CN202402042U (en) Hoisting traction device of oversize full-circle needle beam type hydraulic steel mould trolley
CN201169499Y (en) Portable crane
CN201619987U (en) Reinforcement trolley hoist traction device of side top arch at steep slope section
CN103683164A (en) Small mobile device used for cable of coal mining machine
CN204643692U (en) Vertical group formula Winch rope arranger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Panpan economic and Technological Development Zone of Hunan province Changsha City Road 410100 18-1

Applicant after: HUNAN WUXIN TUNNEL INTELLIGENT EQUIPMENT CO., LTD.

Address before: Panpan economic and Technological Development Zone of Hunan province Changsha City Road 410100 18-1

Applicant before: Hunan Wuxin Heavy Equipment Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant