CN104018811B - A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method - Google Patents

A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method Download PDF

Info

Publication number
CN104018811B
CN104018811B CN201410226724.8A CN201410226724A CN104018811B CN 104018811 B CN104018811 B CN 104018811B CN 201410226724 A CN201410226724 A CN 201410226724A CN 104018811 B CN104018811 B CN 104018811B
Authority
CN
China
Prior art keywords
slag
annular
slag forming
led
drilling machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410226724.8A
Other languages
Chinese (zh)
Other versions
CN104018811A (en
Inventor
赵林
张佐鑫
卢晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN201410226724.8A priority Critical patent/CN104018811B/en
Publication of CN104018811A publication Critical patent/CN104018811A/en
Application granted granted Critical
Publication of CN104018811B publication Critical patent/CN104018811B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of upright opening drill hole of drilling machine operation lead slag forming device and lead slag forming method, annular lead slag pipe, be uniformly arranged on annular and lead the bracing frame of slag pipe bottom, be uniformly arranged on annular and lead the handle on slag pipe top and formed.The upright opening drill hole of drilling machine operation adopting the present invention is led the carrying out of slag forming device and is led slag forming, after rig operation, directly form the short slag muck of a ring annular groove, can specification formed slag muck, effectively prevent stone soil slag drop back boring in affect blast hole depth, simultaneously facilitate discharge rainwater, instead of heap operation of manually skimming, effectively reduce labor strength, improve the working performance of rig.

Description

A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method
Technical field
The present invention relates to a kind of upright opening drill hole of drilling machine technical field of operation, especially relate to a kind of upright opening drill hole of drilling machine operation and lead slag forming device and lead slag forming method.
Background technology
After rotary drill bore operation, centered by boring periphery formed one about high be 0.5 meter, diameter be the circular stone soil slag muck of 1.5 meters, affect blast hole depth in holing to prevent stone soil slag from dropping back and rainwater enters big gun hole in a large number, taked manually to take off slag muck in the past, reducing slag muck height and open up gutter and leave 2-4 osculum, image is called ant cave slagging-off method.The shortcoming of this method is to increase the workload of worker, affects again the working performance of rig simultaneously.
Summary of the invention
It is an object of the invention to provide a kind of slag muck that can form specification in upright opening drill hole of drilling machine operation process, effectively prevent stone soil slag from dropping back in boring, affecting blast hole depth, reduce labor strength, slag forming device led by the upright opening rig of the working performance improving rig.
It is a further object to provide and a kind of adopt upright opening rig to lead the method that slag forming device carries out leading slag forming.
It is an object of the invention to be realized by following technical proposals:
Slag forming device is led in a kind of upright opening drill hole of drilling machine operation of the present invention, annular lead slag pipe, be uniformly arranged on annular and lead the bracing frame of slag pipe bottom, is uniformly arranged on annular and leads the handle on slag pipe top and formed.
Described bracing frame is three bracing frames.
Being three handles at described handle, be additionally provided with the chain that rises and falls on described handle, the described chain that rises and falls is connected with lowering or hoisting gear.
What slag forming device was led in a kind of upright opening drill hole of drilling machine operation of the present invention leads slag forming method, it is characterised in that comprise the following steps:
1) chain one end of rising and falling is connected on handle, and the other end is connected with lowering or hoisting gear with starting, startup lowering or hoisting gear, puts down upright opening drill hole of drilling machine operation and leads the annular of slag forming device and lead slag pipe, makes three bracing frames steadily contact ground,
2) rig starts operation, carries out leading slag forming under the effect that annular leads slag pipe and bracing frame from the stone soil slag of big gun hole upwards splash in rig operation process,
3) rig operation is mentioned annular led slag pipe by the chain that rises and falls after completing, thus forming a ring annular groove the slag muck with guiding gutter, completes to lead slag forming operation.
The invention have the advantage that
Present configuration is simple, make processing ease, safeguard that cleaning is convenient, when rig operation, the short slag muck forming an astragal annular groove under the effect that the annular of slag forming device leads slag pipe is led at the rotary drill bore operation of the present invention, and being arranged on slag muck and yet forms both guiding gutter due to bracing frame, can specification formed slag muck, effectively prevent stone soil slag drop back boring in affect blast hole depth, three bracing frames make slag vertebra form guiding gutter, it is easy to discharge rainwater, instead of heap operation of manually skimming, effectively reduce labor strength, improve the working performance of rig.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the top view of Fig. 1.
Detailed description of the invention
The specific embodiment of the present invention is further illustrated below in conjunction with accompanying drawing.
As shown in Figure 1, a kind of rotary drill bore operation of the present invention leads slag forming device, slag pipe 2 is led by annular, it is uniformly arranged on annular and leads the bracing frame 1 of slag pipe 2 bottom, being uniformly arranged on the conduction chain handle 3 that annular leads slag pipe 2 top and formed the conduction chain 4 being connected with conduction chain handle 3, described conduction chain 4 is connected with observation port hoist cylinder after rig.Annular leads the setting of slag pipe 2, can form a specification slag muck with annular groove when slag muck molding;
Bracing frame 1 of the present invention is three bracing frames.
Conduction chain handle 3 of the present invention is three conduction chain handles, solves the stability when placing or propose and accuracy.
The present invention is a kind of adopts what rotary drill bore operation led slag forming device to lead slag forming method, it is characterised in that comprise the following steps:
1) chain 4 one end of rising and falling is connected on handle 3, and the other end is connected with lowering or hoisting gear with starting, startup lowering or hoisting gear, falls upright opening drill hole of drilling machine operation and leads the annular of slag forming device and lead slag pipe, makes three bracing frames steadily contact ground,
2) rig starts operation, carries out leading slag forming under the effect that annular leads slag pipe and bracing frame from the stone soil slag of big gun hole upwards splash in rig operation process,
3) rig operation is mentioned annular led slag pipe by the chain that rises and falls after completing, thus forming a ring annular groove the slag muck with guiding gutter, completes to lead slag forming operation.
Present configuration is simple, processing ease, safeguard that cleaning is convenient, after rig operation, directly form the short slag muck of a ring annular groove, can specification formed slag muck, effectively prevent stone soil slag drop back boring in affect blast hole depth, simultaneously facilitate discharge rainwater, instead of heap operation of manually skimming, effectively reduce labor strength, improve the working performance of rig.

Claims (3)

1. slag forming device is led in a upright opening drill hole of drilling machine operation, it is characterised in that is led slag pipe by annular, is uniformly arranged on annular and leads the bracing frame of slag pipe bottom, is uniformly arranged on annular and leads the handle on slag pipe top and formed;
Being three handles at described handle, be additionally provided with the chain that rises and falls on described handle, the described chain that rises and falls is connected with lowering or hoisting gear.
2. slag forming device is led in upright opening drill hole of drilling machine operation according to claim 1, it is characterised in that described bracing frame is three bracing frames.
3. what slag forming device was led in the upright opening drill hole of drilling machine operation described in a claim 1 leads slag forming method, it is characterised in that comprise the following steps:
1) chain one end of rising and falling is connected on handle, and the other end is connected with lowering or hoisting gear with starting, startup lowering or hoisting gear, puts down upright opening drill hole of drilling machine operation and leads the annular of slag forming device and lead slag pipe, makes three bracing frames steadily contact ground,
2) rig starts operation, carries out leading slag forming under the effect that annular leads slag pipe and bracing frame from the stone soil slag of big gun hole upwards splash in rig operation process,
3) rig operation is mentioned annular led slag pipe by the chain that rises and falls after completing, thus forming a ring annular groove the slag muck with guiding gutter, completes to lead slag forming operation.
CN201410226724.8A 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method Active CN104018811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410226724.8A CN104018811B (en) 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410226724.8A CN104018811B (en) 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method

Publications (2)

Publication Number Publication Date
CN104018811A CN104018811A (en) 2014-09-03
CN104018811B true CN104018811B (en) 2016-07-06

Family

ID=51435772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410226724.8A Active CN104018811B (en) 2014-05-27 2014-05-27 A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method

Country Status (1)

Country Link
CN (1) CN104018811B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150323Y (en) * 1992-12-23 1993-12-22 唐山钢铁(集团)公司 Slag bridge for gear wheel drilling machine
CN2789718Y (en) * 2005-03-28 2006-06-21 刘万华 Mine blasting hole broken bits fending conic bucket
CN202165011U (en) * 2011-07-28 2012-03-14 华北电网有限公司 Combined type digging drill machine
CN202611746U (en) * 2012-06-17 2012-12-19 鞍钢集团矿业公司 Dust collecting cover for down-the-hole drill
CN202810670U (en) * 2012-09-19 2013-03-20 鞍钢集团矿业公司 Air-type slag stopping device of drilling machine
CN203867525U (en) * 2014-05-27 2014-10-08 鞍钢集团矿业公司 Slag guiding forming device for drilling conducted by vertical-hole drilling rig

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1382794A4 (en) * 2001-04-26 2005-07-20 Furukawa Co Ltd Step tube rod, and drilling machine
EP2652262B1 (en) * 2010-12-17 2019-10-16 Exxonmobil Upstream Research Company Method for automatic control and positioning of autonomous downhole tools

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150323Y (en) * 1992-12-23 1993-12-22 唐山钢铁(集团)公司 Slag bridge for gear wheel drilling machine
CN2789718Y (en) * 2005-03-28 2006-06-21 刘万华 Mine blasting hole broken bits fending conic bucket
CN202165011U (en) * 2011-07-28 2012-03-14 华北电网有限公司 Combined type digging drill machine
CN202611746U (en) * 2012-06-17 2012-12-19 鞍钢集团矿业公司 Dust collecting cover for down-the-hole drill
CN202810670U (en) * 2012-09-19 2013-03-20 鞍钢集团矿业公司 Air-type slag stopping device of drilling machine
CN203867525U (en) * 2014-05-27 2014-10-08 鞍钢集团矿业公司 Slag guiding forming device for drilling conducted by vertical-hole drilling rig

Also Published As

Publication number Publication date
CN104018811A (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN107132071B (en) Ring type water inlet thin-wall soil sampler and use method thereof
CN106596176B (en) Water and soil integrated sampling method
CN105888591A (en) Energy-saving and environment-friendly automatic deep rock sampling device for geological prospecting
CN104330280A (en) Gear type soil sampler and sampling method thereof
CN104389525B (en) Liftable working platform at front end of pile frame and operation method thereof
CN203867525U (en) Slag guiding forming device for drilling conducted by vertical-hole drilling rig
CN104018811B (en) A kind of upright opening drill hole of drilling machine operation is led slag forming device and leads slag forming method
CN204040947U (en) Flow string fetching device
CN106593398A (en) Press-in type isolation well-building method
CN206620430U (en) A kind of municipal works digging apparatus
CN209014309U (en) A kind of soil rapid sampling attachment
CN106988313A (en) Stake holes wall mud-scraping apparatus
CN205352745U (en) Special sampler of geology
CN208350407U (en) A kind of Bridge Foundation soil survey sampler
CN204385717U (en) The portable pneumatic drilling rig of work transmission line soil investigation
CN209327029U (en) A kind of dedicated coring device of Quality of Water Conservancy Projects detection
CN204283297U (en) A kind of fisher salvaging band rod bit
CN209961517U (en) Soil collector applied to polluted soil remediation equipment
CN211205806U (en) Forestry trees are planted and are used soil sampling device
CN207036478U (en) A kind of nematode soil sample collector
CN202215170U (en) Obstacle removal device
CN112539951A (en) Electric soil sampler and soil sampling method thereof
CN201696067U (en) Hinged top beam lifter
CN202990929U (en) Special inner fishing device for steel wire rope dropping into directional inclined shaft
CN204476272U (en) The external convex rope total cost management drill bit of a kind of steel used for geological prospecting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee after: Anshan Iron and Steel Group Mining Co., Ltd.

Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee before: Anshan Iron & Steel Group Mining Co., Ltd.

CP01 Change in the name or title of a patent holder