CN104007341B - A kind of wind energy turbine set relates to net test intelligent test system and method thereof - Google Patents

A kind of wind energy turbine set relates to net test intelligent test system and method thereof Download PDF

Info

Publication number
CN104007341B
CN104007341B CN201410216089.5A CN201410216089A CN104007341B CN 104007341 B CN104007341 B CN 104007341B CN 201410216089 A CN201410216089 A CN 201410216089A CN 104007341 B CN104007341 B CN 104007341B
Authority
CN
China
Prior art keywords
module
signal
amount
digital
wind energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410216089.5A
Other languages
Chinese (zh)
Other versions
CN104007341A (en
Inventor
范子恺
翟学锋
李辰龙
徐钢
顾文
徐泳淼
李淑君
杜先波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tongkong Electric Power System Technology Co Ltd
Changzhou Qi Tai Electric Manufacture Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Jiangsu Fangtian Power Technology Co Ltd
Original Assignee
Changzhou Qi Tai Electric Manufacture Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Jiangsu Fangtian Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Qi Tai Electric Manufacture Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Jiangsu Fangtian Power Technology Co Ltd filed Critical Changzhou Qi Tai Electric Manufacture Co Ltd
Priority to CN201410216089.5A priority Critical patent/CN104007341B/en
Publication of CN104007341A publication Critical patent/CN104007341A/en
Application granted granted Critical
Publication of CN104007341B publication Critical patent/CN104007341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of wind energy turbine set and relate to net test intelligent test system and method thereof, test system includes that dispatch command parsing module, instruction real-time reception module, device start module, analogue collection module, analytical calculation module, clock module, data outputting module and waveform drawing module.Method of testing includes that step (1) receives the target instruction target word signal that dispatching control center issues;(2) the voltage and current signal data of wind energy turbine set are gathered;(3), merit angle value meritorious, idle according to the voltage and current signal calculating wind energy turbine set gathered;(4) by the target instruction target word signal received and collection, data synchronism output under time signal of calculating;(5) draw waveform according to the related data under time coordinate and export.The present invention use unified clock module by target instruction target word signal and collection, the wind energy turbine set signal synchronism output of calculating, can accurately comparison object value, measured value and value of calculation, it is to avoid the skimble-scamble mistake of data, improve wind energy turbine set and relate to net and test accuracy.

Description

A kind of wind energy turbine set relates to net test intelligent test system and method thereof
Technical field
The present invention relates to a kind of wind energy turbine set and relate to net test intelligent test system and method thereof, belong to wind Electric field relates to net experimental technique field.
Background technology
Along with the fast development of World Economics, the demand of the energy is quickly increased by the mankind, energy production The scale development that industry there has also been.Using coal, oil as main primary energy, not only Make human society be faced with the problem that conventional energy resource is exhausted, also cause global warming and day The problem of environmental pollution that benefit is serious, is constituted natural ecosystems, social economy and human health Serious threat.Develop new forms of energy and have become as the weight of the world energy sources strategy of sustainable development Want ingredient.
Currently, wind-power electricity generation is that during regenerative resource develops, technology is the most ripe, most develops The forms of electricity generation of scale and most commercialized development prospect.Wind-power electricity generation alleviate environmental pollution, The outstanding role of the aspect such as readjust the energy structure, promote sustainable development;Additionally, wind-powered electricity generation and fire Electricity, water power, nuclear power are compared, and the construction period is short, instant effect, and therefore wind-powered electricity generation becomes and increases in the world The fastest long clean energy resource, has vast potential for future development.The Chinese government has successively promulgated multinomial The policies and regulations of excitation wind-power electricity generation development, effectively promote the development of China's wind-power electricity generation. The first half of the year in 2010, National Energy Board was the clearest and the most definite: national wind-powered electricity generation planning installation 9000 in 2015 Ten thousand kW(kW Han offshore wind farm 5,000,000), the year two thousand twenty whole nation wind-powered electricity generation planning installation 1.5 hundred million kW (containing offshore wind farm 30,000,000 kW).
Wind-powered electricity generation passes through electrical grid transmission, according to power industry related request and technical specification, wind energy turbine set It is required to carry out a series of wind energy turbine set before formally putting into operation and in operation and relates to net test, to guarantee Wind turbines and the safe and stable operation of electrical network.Wherein, issue according to power scheduling control centre Target instruction target word, meritorious, the test of idle control ability that wind energy turbine set is carried out are even more important.Wind-powered electricity generation It is wind energy turbine set debugging, operating important step that field relates to net test, is also that assessment wind energy turbine set is run State, judge the important evidence of wind farm grid-connected service ability.Carrying out, wind energy turbine set is meritorious, nothing When power control aptitude tests etc. relate to net test, need wind farm data waveform and dispatching down distributing mesh Scale value compares analysis, controls the basis for estimation with regulating power in this, as it.
At present, all kinds of wind energy turbine set relate to net test system can only gather the field data of wind energy turbine set, Provide data and the waveform of on-the-spot relevant parameter;Output it data, waveform and regulation goal again Instruction contrasts, and this test method causes two subject matters: one is cannot in time, directly The relation found out between desired value and measured value seen, is not only related to net test and is made troubles, also Hidden danger can be brought to Wind turbines and power grid security because control and regulation assessment difficulty increases;Two are Relate to net result of the test and there is error even mistake, may asynchronous because of clock disunity, data, The reasons such as amplitude is the most corresponding cause error or the mistake of analysis of experiments result, impact to relate to net test Quality.
Summary of the invention
The deficiency existed for prior art, it is an object of the present invention to provide a kind of wind energy turbine set and relates to net examination Test intelligent test system and method thereof, it is achieved regulation goal data are real-time with field measurement data Comparison exports, and i.e. ensure that the accuracy relating to net result of the test, can intuitively export again the same time Regulation goal data value under coordinate and field measurement data value.
To achieve these goals, the present invention is to realize by the following technical solutions:
A kind of wind energy turbine set of the present invention relates to net test intelligent test system, including
Dispatch command parsing module, for carrying out the parsing of overall process, by one to stipulations message Independent intercepting thread monitors schedules message, and filters out in scheduling controlling in substantial amounts of message The target instruction target word signal that the heart issues, and send to instruction real-time reception module;Resolve remote regulating simultaneously Amount change, will resolve result of variations transmission and start module to device;
Device starts module, for receiving the parsing change knot that dispatch command parsing module sends Really, when result of variations meet setting require time, send enabling signal to instruction real-time reception module With analogue collection module;
Instruction real-time reception module, starts, for receiving device simultaneously, the enabling signal that module sends Meritorious remote regulating amount signal P with dispatch command parsing module0, reactive voltage remote regulating amount signal U0; After receiving enabling signal, the meritorious remote regulating amount signal P that will gather0, reactive voltage remote regulating amount Signal U0Output is to clock module;
Analogue collection module, for receive simultaneously device start the enabling signal that sends of module and The wind energy turbine set electric current I of its exterior1, voltage analog signal U1;When receiving enabling signal After, the wind energy turbine set electric current I that will gather1, voltage analog signal U1Output is to analog digital conversion mould Block;
Analog-to-digital conversion module, for receiving the voltage analog signal that analogue collection module sends U1, wind energy turbine set electric current I1, after the AD conversion unit in module, obtain voltage digital amount U With current digital amount I, export to analytical calculation module and clock module simultaneously;
Analytical calculation module, for being analyzed according to voltage digital amount U and current digital amount I Calculate, drawn work value P, without work value Q and merit angle φ, export to clock module;Analyze The method calculated is that here is omitted for prior art.
Clock module, for receiving the meritorious remote regulating amount letter from instruction real-time reception module respectively Number P0, reactive voltage remote regulating amount signal U0, voltage digital amount U of analog-to-digital conversion module, electricity Streaming digital amount I, analytical calculation module have work value P, without work value Q and merit angle φ, will more than Digital quantity signal is unified under time series, obtains digital signal amount P under time t coordinate0、 U0, U, I, P, Q, φ, and export to data outputting module;
And data outputting module, for by digital signal amount P under time t coordinate0、U0、U、 I, P, Q, φ are exported to its exterior by output interface;
Present invention additionally comprises waveform drawing module, receive under the time t coordinate of clock module output Digital signal amount P0、U0, U, I, P, Q, φ, and according to actual needs with setting, Digital signal amount P under drafting output time t coordinate0、U0, U, I, P, Q, φ ripple Shape.
Said apparatus starts module and includes switching input quantity loop and switching output loop (switching defeated Enter amount loop, switch output loop is available circuit, and annexation between the two is also existing Have technology, the most existing input/output interface), during switch input quantity loop access dispatching controls The target instruction target word signal that the heart issues, switch output loop link order real-time reception module and simulation Amount acquisition module, starts it and receives and acquisition function.
In above-mentioned clock module, digital quantity input port receives instruction real-time reception module, modulus turns Die change block, digital signal amount P of analytical calculation module0、U0, U, I, P, Q, φ, Numbers above semaphore is synchronized, it is achieved unlike signal is under same time coordinate under unified clock Synchronism output.
The method of testing of the present invention, specifically includes following step:
(1) dispatch command parsing module receives and parses through the target that dispatching control center issues and refers to Signal, target instruction target word signal is made to include meritorious remote regulating amount P0With reactive voltage remote regulating amount U0, solve Analysis variable quantity result triggers device and starts module, sends to enabling signal instruct real-time reception simultaneously Module and analogue collection module;
(2), after instruction real-time reception module receives enabling signal, start to receive dispatch command solution The target instruction target word signal that analysis module sends, and it is supplied to clock module;
(3) wind energy turbine set after analogue collection module receives enabling signal, outside acquisition system Electric current I1, voltage analog signal U1, and it is supplied to analog-to-digital conversion module;Analog digital conversion mould Block is to wind energy turbine set electric current I1, voltage analog signal U1Carry out analog digital conversion and obtain voltage digital Amount U and current digital amount I, send to analytical calculation module and clock module simultaneously;Analytical calculation Module has calculated work value P, without work value Q according to voltage digital amount U and current digital amount I With merit angle φ, it is provided that to clock module;
(4) digital quantity signal that above disparate modules is provided by clock module is sat at same clock Unify under mark t, obtain digital signal amount P under time t coordinate0、U0、U、I、P、 Q, φ, then by digital signal amount P under time t coordinate0、U0、U、I、P、Q、φ It is supplied to data outputting module;Data outputting module is exported to its exterior by output interface.
Present invention additionally comprises step (5), waveform drawing module receives the time of clock module output Digital signal amount P under t coordinate0、U0, U, I, P, Q, φ, and according to actual needs with Arrange, digital signal amount P under drafting output time t coordinate0、U0、U、I、P、Q、 φ waveform.
The present invention can carry out wind energy turbine set relate to net test and Intelligent Measurement, it is achieved regulation goal data with The real-time comparison output of field measurement data, both ensure that the accuracy relating to net result of the test, again Can intuitively export the regulation goal data value under same time coordinate and field measurement data value, carry High wind energy turbine set relates to net test accuracy and detection wind energy turbine set is meritorious, the ability of idle control.
Accompanying drawing explanation
Fig. 1 is the system block diagram of the present invention;
Fig. 2 is the enforcement technical scheme figure of the present invention;
Fig. 3 is embodiment of the present invention working-flow figures;
Fig. 4 is certain wind energy turbine set electric hookup;
Fig. 5 is the oscillogram issuing the electric current of desired value, active power manually;
Fig. 6 is that wind field reactive voltage raises curve chart.
Detailed description of the invention
For the technological means making the present invention realize, creation characteristic, reach purpose and be prone to bright with effect White understanding, below in conjunction with detailed description of the invention, is expanded on further the present invention.
Wind energy turbine set relates to net test intelligent test system, as it is shown in figure 1, include:
Dispatch command parsing module, is carried out multiple stipulations messages such as IEC60870-5-104 entirely The parsing of process, is monitored this schedules message by an independent intercepting thread, and at substantial amounts of report Literary composition filters out effective remote regulating message that control centre issues, and sends to instruction real-time reception mould Block;Resolve the change of remote regulating amount simultaneously, result of variations transmission will be resolved and start module to device.
Device starts module, receives the parsing result of variations that dispatch command parsing module sends, When result of variations meet setting require time, issue device enabling signal to instruction real-time reception module With analogue collection module.
Instruction real-time reception module, receives device simultaneously and starts enabling signal and the tune that module sends The digital quantity active voltage remote regulating amount signal P of degree command analysis module0, reactive voltage remote regulating amount letter Number U0;After receiving enabling signal, the P that will gather0、U0Signal exports to clock module.
Analogue collection module, receives device simultaneously and starts enabling signal and the device that module sends Outside wind energy turbine set electric current I1, voltage analog signal U1;After receiving enabling signal, The wind energy turbine set electric current I that will gather1, voltage signal U1Output is to clock module and analytical calculation mould Block.
Analog-to-digital conversion module, receives the analog quantity voltage U that analogue collection module sends1, electricity Stream I1, after the D/A conversion unit in module, obtain voltage digital amount U and current digital amount I, Export to analytical calculation module and clock module simultaneously.
Analytical calculation module, is analyzed calculating according to voltage digital amount U and current digital amount I, Drawn work value P, without work value Q and merit angle φ, output is to clock module.
Clock module, receives the P from instruction real-time reception module respectively0、U0, digital-to-analogue turns U, I of die change block, P, Q, φ of analytical calculation module are unified by numbers above amount signal Under time series, obtain the P under time t coordinate0、U0, U, I, P, Q, φ, and Export to data outputting module and waveform drawing module simultaneously.
Data outputting module, by the digital quantity P under time t coordinate0、U0、U、I、P、Q、 φ is exported to device by output interface.
Waveform drawing module, according to actual needs with setting, draws and under output time t coordinate P0、U0, U, I, P, Q, φ waveform.
Device starts the digital quantity signal that module breaker in middle input quantity loop access dispatching issues, and opens Close output loop link order real-time reception module and analogue collection module respectively, start it and connect Receive and acquisition function.
In clock module, digital quantity input port receives instruction real-time reception module, analog digital conversion mould 7 digital quantity signals of block, analytical calculation module totally 3 modules, synchronize under unified clock Above semaphore, it is achieved unlike signal synchronism output under same time coordinate.
The present invention also provides for a kind of wind energy turbine set and relates to net test intelligent test method, comprises the steps:
(1) command signal that dispatching control center issues is received and parsed through, including meritorious remote regulating Amount and reactive voltage remote regulating amount, variable quantity analysis result triggers device and starts module, opened by device Dynamic signal is sent to instruct real-time reception module and analogue collection module simultaneously;
(2), after instruction real-time reception module receives enabling signal, start to receive dispatch command real Time the regulation goal command signal P that sends of receiver module0、U0, and it is supplied to clock module;
(3), after analogue collection module receives enabling signal, wind, farm site analog quantity is gathered Data voltage U1, electric current I1, and it is supplied to analog-to-digital conversion module.The electricity that analog digital conversion obtains Pressure digital quantity U and current digital amount I send to analytical calculation module and clock module simultaneously.Analyze Computing module calculates meritorious P, idle Q and merit angle φ according to U, I, it is provided that to clock Module;
(4) digital quantity that above disparate modules is provided by clock module is in same clock coordinates t Under merge, unified, by the P under time t coordinate0、U0, U, I, P, Q, φ carry Supply data outputting module and waveform drawing module.Data outputting module and waveform drawing module, According to actual needs with setting, P under output time t coordinate0、U0、U、I、P、Q、φ Related data or waveform.
In step (1), regulation goal instruction remote regulating signal enabling wind energy turbine set relates to net test intelligence Test system, it is achieved a scheduling distant place is opened and controlled wind energy turbine set and relates to net test intelligent test system The functions such as record ripple.
In step (4), by target instruction target word digital quantity signal and the wind, farm site of dispatching down distributing The analog signals and the analysis result thereof that gather synchronize in clock module, it is achieved on-the-spot examination Test the contrast output function of result and regulation goal instruction.
Fig. 2 is for implementing technical scheme figure, and Fig. 3 is embodiment working-flow figure, scheduling Sending regulating command to the EMS of wind energy turbine set, EMS receives instruction and passes through Calculate, be sent to each management system by regulation strategy, be finally handed down to blower fan by management system Group, SVG/SVC(reactive power compensator) perform.Intelligent tester is directly read by message Taking dispatching down distributing instruction curve, test wind energy turbine set is meritorious effectively, intuitively, idle control ability And response time.
Before formal test, consult PORT COM IP, logical with wind energy turbine set EMS producer News port and communication protocol, the conversion coefficient of setting value.Monitoring management machine in position is soft on a tester Corresponding " distant place soft start IP " is arranged to consistent with this parameter by part with " port ".
After program starts, automatically according to the IP set and port and wind energy turbine set energy management system Communication link is found in construction in a systematic way, an independent intercepting thread monitor the message on this link.
Set analog acquisition passage according to field connection situation and calculate passage, remote regulating signal The parameters such as protocol type, data type, informosome address, and according to wind energy turbine set energy management The negotiation result of system manufacturers sets taking advantage of the factor and adding the factor (by taking advantage of the factor and Jia Yin of signal Son converts the data into the setting value of correspondence).
Starting record ripple after being provided with, now the AD collecting thread of tester is started working, record Start the voltage of real-time rendering wind field, electric current, changed power curve on ripple interface, and enter pre- Record pattern, meanwhile, instructs according to remote regulating, parses target set point, also served as one Curve (sample rate gathers consistent with AD) is plotted on same picture, when intercepting thread receives To when being set as the remote regulating instruction triggering signal, automatic triggering following records ripple.Owing to AD gathers Thread is synchronous operation the most side by side with remote regulating instruction intercepting thread, so can be described as on the time Complete Synchronization.After record ripple terminates, by adjusting the most meritorious, the idle electricity of contrast wind energy turbine set The curves such as pressure and regulation goal setting value curve, can conveniently, accurately, timely, intuitively see Each remote regulating amount contrasts with measured value trend, provides foundation for relating to net test.
Fig. 4 is certain wind energy turbine set electric hookup that scheme implements test.
Fig. 5 is the oscillogram issuing the electric current of desired value, active power manually, yellow in figure, Three waveforms green, red represent A, B, C three-phase electricity flow valuve respectively, and blue-colored waveform represents meritorious Performance number, black wave represents the active power desired value that scheduling manually issues.Save regulating mechanism people Operation blower fan under #2 main transformer was manually assigned desired value of once gaining merit every 4 minutes by work, logical Cross Fig. 5 it is found that because Artificial Control assigns instruction, so meeting between the instruction every time assigned There is artificial time error, but blower fan system perform the most accurately saving the regulating command adjusted, The change curve of measured current and active power all can reflect active power by 80% specified Value is down to 20% rated value, then is risen to the rated value of 80% by 20% rated value.
Fig. 6 is that wind field reactive voltage raises curve chart, and wind field voltage is adjusted up process description: 1) A point receives the instruction of scheduling rising 2kV;2) through calculating and the instruction transmission of 6.7s Rear TCR starts to regulate (B point), until SVC is idle is output as 0Mvar(C point);3) When SVC is idle be output as 0Mvar time, start to regulate the idle output of blower fan group, quickly 0Mvar(D point is down in the idle output of perception of blower fan group);4) blower fan group perception is idle defeated Going out after being down to 0Mvar, SVC continues regulation, exports capacitive reactive power, enters the calculating of too much wheel E point is arrived with regulation.Voltage reaches to regulate desired value, and regulation completes;5) E point is received again The instruction of 1.8kV is risen to scheduling;6) through a regulation taking turns SVC, open after arriving F point Begin regulation blower fan group, and blower fan group starts to export capacitive reactive power;7) blower fan output capacitive reactive power reaches After the upper limit, SVC starts again at regulation (G point);8) SVC is after regulation several times, Although grid-connected point voltage does not arrive desired value, but SVC capacitive reactive power the most also reaches in output Limit, therefore stops regulation.
Present invention firstly provides the method utilizing communication packet to trigger test wind energy turbine set response time, Taked wind energy turbine set relate to net test intelligent test device and method, owing to using unified clock Module is by regulation goal command signal and collection, the wind energy turbine set signal synchronism output of calculating, permissible Accurately comparison object value, measured value and value of calculation, it is to avoid the skimble-scamble mistake of data, improves wind Electric field relates to net test accuracy and detection wind energy turbine set is meritorious, the ability of idle control.
The ultimate principle of the present invention and principal character and the present invention excellent has more than been shown and described Point.Skilled person will appreciate that of the industry, the present invention is not restricted to the described embodiments, on State the principle that the present invention is simply described described in embodiment and description, without departing from the present invention On the premise of spirit and scope, the present invention also has various changes and modifications, and these change and change Enter to both fall within scope of the claimed invention.Claimed scope is by appended power Profit claim and equivalent thereof define.

Claims (6)

1. a wind energy turbine set relates to net test intelligent test system, it is characterised in that include
Dispatch command parsing module, for carrying out the parsing of overall process, by one to stipulations message Independent intercepting thread monitors schedules message, and filters out dispatching control center in messages and issue Target instruction target word signal, and send to instruction real-time reception module;Resolve the change of remote regulating amount simultaneously, By meritorious remote regulating amount signal P0, reactive voltage remote regulating amount signal U0Send to device startup module;
Device starts module, meritorious distant for receive that described dispatch command parsing module sends Tune amount signal P0, reactive voltage remote regulating amount signal U0, when result of variations meet setting require time, Send enabling signal to instruction real-time reception module and analogue collection module;
Instruction real-time reception module, starts, for receiving described device simultaneously, the startup that module sends Signal and the meritorious remote regulating amount signal P of dispatch command parsing module0, reactive voltage remote regulating amount signal U0;After receiving enabling signal, the meritorious remote regulating amount signal P that will gather0, reactive voltage Remote regulating amount signal U0Output is to clock module;
Analogue collection module, starts, for receiving described device simultaneously, the startup letter that module sends Number and the wind energy turbine set electric current I of its exterior1, voltage analog signal U1;When receiving startup After signal, the wind energy turbine set electric current I that will gather1, voltage analog signal U1Output to modulus turns Die change block;
Analog-to-digital conversion module, for receiving the voltage analog that described analogue collection module sends Signal U1, wind energy turbine set electric current I1, after the AD conversion unit in module, obtain voltage digital Amount U and current digital amount I, export to analytical calculation module and clock module simultaneously;
Analytical calculation module, for being analyzed according to voltage digital amount U and current digital amount I Calculate, drawn work value P, without work value Q and merit angle φ, export to clock module;
Clock module, for receiving the meritorious remote regulating from described instruction real-time reception module respectively Amount signal P0, reactive voltage remote regulating amount signal U0, the voltage digital of described analog-to-digital conversion module Amount U, current digital amount I, described analytical calculation module have work value P, without work value Q and merit Angle φ, is unified in numbers above amount signal under time series, obtains the number under time t coordinate Word semaphore P0、U0, U, I, P, Q, φ, and export to data outputting module;
And data outputting module, for by digital signal amount P under time t coordinate0、U0、U、 I, P, Q, φ are exported to its exterior by output interface.
Wind energy turbine set the most according to claim 1 relates to net test intelligent test system, and it is special Levy and be,
Also include waveform drawing module, receive under the time t coordinate of described clock module output Digital signal amount P0、U0, U, I, P, Q, φ, and according to actual needs with setting, paint Digital signal amount P under system output time t coordinate0、U0, U, I, P, Q, φ waveform.
Wind energy turbine set the most according to claim 1 relates to net test intelligent test system, and it is special Levy and be,
Described device start module include switch input quantity loop and switch output loop, described in open Closing the target instruction target word signal that input quantity loop access dispatching control centre issues, described switch exports Loop link order real-time reception module and analogue collection module, start it and receive and gather merit Energy.
Wind energy turbine set the most according to claim 1 relates to net test intelligent test system, and it is special Levy and be,
In described clock module, digital quantity input port receives instruction real-time reception module, modulus turns Die change block, digital signal amount P of analytical calculation module0、U0, U, I, P, Q, φ, Numbers above semaphore is synchronized, it is achieved unlike signal is under same time coordinate under unified clock Synchronism output.
Wind energy turbine set the most according to claim 1 relates to the test of net test intelligent test system Method, it is characterised in that specifically include following step:
(1) described dispatch command parsing module receives and parses through the mesh that dispatching control center issues Mark command signal, described target instruction target word signal includes meritorious remote regulating amount P0With reactive voltage remote regulating Amount U0, resolve variable quantity result and trigger described device startup module, enabling signal is sent out simultaneously To described instruction real-time reception module and analogue collection module;
(2), after described instruction real-time reception module receives enabling signal, start to receive described tune The target instruction target word signal that degree command analysis module sends, and it is supplied to clock module;
(3) wind after described analogue collection module receives enabling signal, outside acquisition system Field current I1, voltage analog signal U1, and it is supplied to analog-to-digital conversion module;Described mould Number conversion module is to wind energy turbine set electric current I1, voltage analog signal U1Carry out analog digital conversion to obtain Voltage digital amount U and current digital amount I, send to described analytical calculation module and clock mould simultaneously Block;Described analytical calculation module has calculated according to voltage digital amount U and current digital amount I Work value P, without work value Q and merit angle φ, it is provided that to described clock module;
(4) digital quantity signal that above disparate modules is provided by described clock module is with for the moment Unify under clock coordinate t, obtain digital signal amount P under time t coordinate0、U0、U、I、 P, Q, φ, then by digital signal amount P under time t coordinate0、U0、U、I、P、Q、 φ is supplied to described data outputting module;Described data outputting module is exported by output interface To its exterior.
Wind energy turbine set the most according to claim 5 relates to the test of net test intelligent test system Method, it is characterised in that
Also including step (5), described waveform drawing module receives the time t of clock module output Digital signal amount P under coordinate0、U0, U, I, P, Q, φ, and according to actual needs with Arrange, digital signal amount P under drafting output time t coordinate0、U0、U、I、P、Q、 φ waveform.
CN201410216089.5A 2014-05-21 2014-05-21 A kind of wind energy turbine set relates to net test intelligent test system and method thereof Active CN104007341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410216089.5A CN104007341B (en) 2014-05-21 2014-05-21 A kind of wind energy turbine set relates to net test intelligent test system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410216089.5A CN104007341B (en) 2014-05-21 2014-05-21 A kind of wind energy turbine set relates to net test intelligent test system and method thereof

Publications (2)

Publication Number Publication Date
CN104007341A CN104007341A (en) 2014-08-27
CN104007341B true CN104007341B (en) 2016-10-19

Family

ID=51368093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410216089.5A Active CN104007341B (en) 2014-05-21 2014-05-21 A kind of wind energy turbine set relates to net test intelligent test system and method thereof

Country Status (1)

Country Link
CN (1) CN104007341B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786427B (en) * 2017-02-23 2018-11-06 华北电力大学 Based on the relevant wind power plant current collection line current guard method of waveform
CN110165652A (en) * 2019-06-25 2019-08-23 南方电网科学研究院有限责任公司 Control protection method, device, equipment and storage medium for direct current distribution network
CN113839422B (en) * 2021-11-29 2022-03-18 中国电力科学研究院有限公司 Multi-source data acquisition method for evaluating wind power integration performance, server and intelligent terminal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7536240B2 (en) * 2005-07-22 2009-05-19 Ut-Battelle, Llc Real power regulation for the utility power grid via responsive loads
CN101788622B (en) * 2010-01-07 2012-05-23 四川中鼎科技有限公司 Debugging test method for automatic power-generating control system
CN102759920B (en) * 2012-07-10 2015-07-22 国家电网公司 Wind farm AGC (auto gain control) functional test system and test method thereof
CN202904368U (en) * 2012-07-10 2013-04-24 中国电力科学研究院 Wind farm AGC function test system

Also Published As

Publication number Publication date
CN104007341A (en) 2014-08-27

Similar Documents

Publication Publication Date Title
CN103855721B (en) Wind farm monitoring system accesses system and the information switching method of power network dispatching system
CN103245855B (en) Digital simulation based method and system for testing relay protection function of intelligent substation
CN105137231A (en) Power quality monitoring method and system
CN106374831A (en) Distributed photovoltaic monitoring system with power generation forecasting and monitoring method
CN201789341U (en) Monitoring system of intelligent micro-grid
CN105429291A (en) Correlation method of primary wiring diagram and secondary system logic connecting diagram of intelligent substation
CN202817789U (en) Cloud monitor system for monitoring electric energy quality and electric power system
CN104020374A (en) Intelligent substation secondary equipment site-wide simulation test system
CN110380412B (en) Main and auxiliary integrated online real-time loop closing analysis method based on CIM/SVG
CN104007341B (en) A kind of wind energy turbine set relates to net test intelligent test system and method thereof
CN103762594B (en) Feeder line cyclization dash current based on clock synchronization data matrix calculates method
CN206524629U (en) A kind of low-voltage distribution control system
CN202737580U (en) Intelligent power distribution switch equipment
CN109613354A (en) A kind of power quality wireless monitor system and its monitoring method
CN105513903B (en) A kind of breaker debugging platform
CN102749593B (en) Distributive power supply synchronization detection system and method
US20230336122A1 (en) Hil testing platform for photovoltaic power station, and ppc performance testing method
CN204576919U (en) Alternating current-direct current power grid operating characteristic display equipment based on RTDS real-time digital simulation
CN205178643U (en) Integrated device is observed and controled in protection
CN202720323U (en) Distributive power supply synchronization detection system
CN203025257U (en) Relay protection automatic test system based on IEC61850 standard
CN202651896U (en) Coordinated control system of micro power grid
CN202073650U (en) Controller of diesel generator set
CN106933116A (en) Micro-capacitance sensor emulation debugging method with MATLB interfaces
CN110094295B (en) Wind power centralized monitoring management method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Di Xuefeng

Inventor after: Li Chenlong

Inventor after: Fan Zikai

Inventor after: Du Xianbo

Inventor after: Xu Gang

Inventor after: Gu Wen

Inventor after: Li Shujun

Inventor before: Fan Zikai

Inventor before: Di Xuefeng

Inventor before: Li Chenlong

Inventor before: Xu Gang

Inventor before: Gu Wen

Inventor before: Xu Yongmiao

Inventor before: Li Shujun

Inventor before: Du Xianbo

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20190222

Address after: 211102 Tianyuan science Road, Jiangning Science Park, Nanjing, Jiangsu 19

Co-patentee after: State Grid Jiangsu Electric Power Co., Ltd.

Patentee after: Jiangsu Fangtian Power Technology Co., Ltd.

Co-patentee after: State Grid Corporation of China

Co-patentee after: Changzhou Qi Tai Electric Manufacture company limited

Co-patentee after: BEIJING TONGKONG ELECTRIC POWER SYSTEM TECHNOLOGY CO., LTD.

Address before: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Co-patentee before: Jiangsu Electric Power Company

Patentee before: State Grid Corporation of China

Co-patentee before: Jiangsu Fangtian Power Technology Co., Ltd.

Co-patentee before: Changzhou Qi Tai Electric Manufacture company limited

TR01 Transfer of patent right