Steel clamp molding bundling all-in-one
Art
The invention belongs to package packing machine field, is related to steel and clamps molding bundling all-in-one.
Background technology
During steels strapping, steel are clamped into molding with steel clamping molding machine first, then again with steel material bundler by
Clamp the steels strapping of molding, steel clamping molding machine and two different machines that steel material bundler is for steels strapping service
Device, the mechanism of two machines establish one's own system respectively, and each are equipped with independent power set.
The content of the invention
The present invention is to provide a kind of steel for steels strapping and clamps molding bundling all-in-one, and it is clamped into according to steel
The operation principle of type machine, steel material bundler, by integrated and Combined design, two machines is united two into one, is designed to a machine
Device, it can complete steel simultaneously and clamp molding, two tasks of steels strapping.
The technical solution adopted for the present invention to solve the technical problems is:Steel clamp molding bundling all-in-one a steel
Material baler and casing 20, twist crop 21 and are arranged on 20 end of steel material bundler and casing, under steel material bundler and casing 20
Along portion, the two groups of lateral direction penetrating steels strapping cabinet bulk left walls 17, hole of steels strapping cabinet bulk right wall 18 are made a call to, by two roller shafts
13 are each passed through two groups of through holes and are welded in steels strapping cabinet bulk left wall 17, steels strapping cabinet bulk right wall 18, two rollers
The left and right end of axle 13 respectively fills a set of roller 16, and slideway pedestal 10 is the rectangle steel plate for having lower margin hole, mounted thereon two pieces
Slide groove 19, two pieces slide groove are equivalently-sized, its along 10 longitudinal centre line of slideway pedestal it is left and right it is symmetrical parallel arrangement and notch phase
To four sets of 16 liang of roller, one group of sets are individually placed in 19 groove of slide groove of both sides, are located at two in 10 longitudinal centre line of slideway pedestal
, there is the pusher bar support 11 affixed with slideway pedestal 10 in 13 centre position of roller shaft, and push rod 12 is arranged on pusher bar support 11, push rod
12 boom end bearing pin 14 is hinged with the bracing strut 15 being fixed on roller shaft 13, two U-shape nuts 6, double threaded screws 7, two
Individual locking female 8 constitutes the such as adjustable link rods of Fig. 3, and one end of adjustable link rod is by bearing pin 9 and steels strapping cabinet bulk left wall 17 or steel
Material bundling cabinet bulk right wall 18 is hinged, and the other end of adjustable link rod is hinged with right clamp arm 4 by bearing pin 5, and right clamp arm 4 is affixed
It is integral with right gear 22 on 22 wheel hub of right gear, left clamp arm 1 is fixed on 2 wheel hub of left gear and 2 one-tenth one of left gear
Body, left gear 2 are installed on support 3 by left heart axle 24, and right gear 22 is installed on support 3 by right heart axle 23, left gear 2
It is identical with 22 design parameter of right gear, intermesh.
It is an advantage of the invention that steel clamp molding, steels strapping two procedures once completing, shorten the bundling cycle, carry
High bundling efficiency, reduces equipment cost, is easy to in-site installation.
Description of the drawings
Fig. 1 is the structure principle chart of the present invention.
Fig. 2 is the A-A profiles of Fig. 1.
Fig. 3 is the adjustable link rod figure of the composition of part 5,6,7,8,9 in Fig. 1.
The present invention will be further described below in conjunction with the accompanying drawings.
In the embodiment shown in fig. 1, a slideway pedestal 10, the pusher bar support 11 affixed with slideway pedestal 10 are provided with and push away
Bar 12, boom end bearing pin 14 and the bracing strut 15 of push rod 12 are hinged, and bracing strut 15 is again affixed with roller shaft 13.Can shown in Fig. 3
Link rod, one end is adjusted to be hinged with steels strapping cabinet bulk left wall 17 or steels strapping cabinet bulk right wall 18 by bearing pin 9, the other end leads to
Cross bearing pin 5 to be hinged with right clamp arm 4.Four sets of rollers 16 installed in two 13 ends of roller shaft are in 19 groove of slide groove of both sides
Roll, the movement to steel material bundler and casing 20 plays support and guide effect.When the bar of push rod 12 bounces back, roller shaft 13 is left
Move, drive coupled steel material bundler and casing 20 to move to left, be installed on the stubborn crop of 20 end of steel material bundler and casing
21 also move to left, and steel material bundler and casing 20 move to left adjustable link rod movement shown in promotion Fig. 3, and make the right clamp arm being hinged therewith
4 and the right gear 22 affixed with right clamp arm 4, rotated counterclockwise with right heart axle 23 as the center of circle, meanwhile, it is meshed with right gear 22
Left gear 2 and left clamp arm 1 affixed therewith, rotated clockwise as the center of circle with left heart axle 24, steel clamped into molding gradually,
When steel clamp molding to be completed, installed in the stubborn crop 21 of 20 end of steel material bundler and casing, with steel material bundler and case
Body 20 moves left to the optimum position of steels strapping, and steels strapping starts.Treat that steels strapping is finished, the bar elongation of push rod 12 then may be used
The part of motion, the movement locus produced when bouncing back by the bar of push rod 12, opposite direction revert to home position, a steels strapping
Cycle of operation terminates.
The method of adjustment of adjustable link rod entire length shown in Fig. 3 is to unscrew two locking nuts 8, then rotary screw 7,
In the case of two U-shape nuts 6 are not separated with its connecting piece, can realize that adjustable link rod entire length is elongated or shortened shown in Fig. 3, will
After adjustable link rod entire length is adjusted in place, then locking nut 8 is screwed.By adjusting adjustable link rod entire length shown in Fig. 3,
After realizing that steel are clamped molding, crop 21 is twisted just at steels strapping optimum position.