CN103996994A - Distribution network hot-line work insulation sleeve rod - Google Patents

Distribution network hot-line work insulation sleeve rod Download PDF

Info

Publication number
CN103996994A
CN103996994A CN201410244024.1A CN201410244024A CN103996994A CN 103996994 A CN103996994 A CN 103996994A CN 201410244024 A CN201410244024 A CN 201410244024A CN 103996994 A CN103996994 A CN 103996994A
Authority
CN
China
Prior art keywords
rocking handle
rod
flange
distribution network
insulation sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410244024.1A
Other languages
Chinese (zh)
Inventor
江伟俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410244024.1A priority Critical patent/CN103996994A/en
Publication of CN103996994A publication Critical patent/CN103996994A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

A distribution network hot-line work insulation sleeve rod comprises a lower rod and a rocking handle. The bottom end of a rod body of the lower rod is fixedly connected with the upper end of a core rod. The core rod is arranged in a holding pipe. An upper end opening of the holding pipe is fixedly provided with a flange. A circle of radial protruding ring edge is arranged on an outer shell of the flange. A bearing for fixing the core rod is arranged on an inner cavity. The lower end of the core rod is fixedly connected with the rocking handle. According to the distribution network hot-line work insulation sleeve rod, the holding pipe which does not need to rotate along with the rocking handle is added at the bottom end of the lower rod, the flange with the radial protruding ring edge is fixedly arranged at the upper end opening of the holding pipe in a sleeved mode, so that the contradiction of sleeve rod rocking handle rotating and holding hand loosening in due time in the prior art is overcome, and a series of problems that an existing insulation sleeve rod is always difficult and laboursome in operation, a lead wire cannot be fixed in a proper position, potential safety hazards exist, part of upward pushing force and rocking handle rotating force offset each other, and efficiency is low are readily solved.

Description

A kind of distribution network live line work insulating sleeve bar
Technical field
The present invention relates to a kind of power matching network live line work insulating socket bar.
Background technology
Insulating sleeve bar is electric power system operating personnel important jointer of widely used one in distribution network live line work, and for example, in lead-in wire overlap joint, operating personnel usually adopts insulating sleeve bar to tighten parallel groove clamp, thereby difference lead-in wire is overlapped on main line.Existing insulating sleeve bar is made up of upper boom and two poles of lower beam of column conventionally, approximately 3.3 meters of total lengths, upper boom comprises sleeve, connector and shaft from top to bottom, the top of sleeve is embedded with the counterbore (sleeve size is optional) of receiving hex bolts, and the bottom of upper boom is provided with the connection-peg being connected with lower beam.Lower beam comprises tapered end, shaft and rocking handle from top to bottom, and tapered end is responsible for docking with upper boom connection-peg, realizes firmly and connecting.When operation, first upper boom and lower beam are linked to be to entirety, and keep vertical shape, the top counterbore of upper boom is inserted on the bolt of the parallel groove clamp that is positioned at top, and then, operating personnel grip the bottom of lower beam on the other hand, another hand rotation crank, by the rotation of upper boom and lower club body, bolt is screwed, thereby difference lead-in wire is overlapped on main line.
Before the present invention makes, there are the following problems for this insulating sleeve bar:
1, effort, operating difficulties.
Operating personnel are in live line working, need on hand to wear under the situation of three gloves (lining glove, insulating gloves, kid gloves), the insulating bar afterbody that only relies on single the long 3.3M of left-handed, another hand removes to rotate the rocking handle of this socket bar again, and difficulty is well imagined.In operation process, it is vertical that left hand (hereinafter to be referred as gripping hand) should firmly maintain socket bar, prevent from or fall down, hang on to again the mellow and full socket bar of smooth surface and upwards exert oneself, prevent that it from deviating from from bolt, another hand must rotation crank, and two hands are all suspended in the air, operating difficulties, effort.
2, wire is fixing not in place, has potential safety hazard.
During due to operation, socket bar need to rotate along with rocking handle, therefore exist rocking handle to rotate and grip hand in good time loose this to contradiction, in reality, this contradiction usually causes the arc clip on parallel groove clamp to occur deviation phenomenon, make wire clamp fixing cord not in place, and have potential safety hazard.
3, partly upwards top power and rocking handle rotatory force are cancelled out each other, and efficiency is low.
During due to operation, socket bar needs larger top power to withstand Bing ditch wire clamp on the one hand, and the grip of the larger gripping hand of top power is larger, and the larger socket bar of grip is held more fastening; On the other hand socket bar again along with rocking handle rotate and rotate, it is in good time loose that rotation crank need to grip hand.In brief, grip the hand-tight socket bar of holding, right hand rotational sleeve bar, just a positive and a negative of this group active force, mutually opposing.Certainly will cause gripping the hand portion phenomenon that upwards the rocking handle rotatory force of top power and the right hand is cancelled out each other, and greatly reduce operating efficiency.
Summary of the invention
For solving the problems of the technologies described above, the present invention aims to provide a kind of distribution network live line work insulating sleeve bar, and that this socket bar has is easy to operate, time saving and energy saving, the fastening advantage such as put in place of wire.
For achieving the above object, the present invention has adopted following technical proposals, the structure of this distribution network live line work insulating sleeve bar, comprise lower beam and rocking handle, it is characterized in that: the upper end of the bottom of described shaft and a core bar is fixedly connected, described core bar is arranged in the gripping pipe that a upper port is fixed with flange, has the bearing in a circle radial convex loop limit, inner chamber with fixing described core bar on this flange shell; The lower end of this core bar and described rocking handle are fixed together.When operation, operating personnel's one clenching of the hand grips pipe, another hand rotation crank, and rocking handle drives lower club body through core bar, and upper boom rotation, completes the rotation to parallel groove clamp fastening bolt; Utilize this socket bar lap works that goes between, do not need to follow rocking handle and rotate owing to gripping pipe, therefore do not have rocking handle to rotate, grip hand loose and say.Moreover, use the power that gripping hand tiger's jaw and flange convex ring edge offset, make to maintain all the time a top power upwards and become especially convenient, reliable, guarantee that deviation phenomenon does not occur arc clip.
Furtherly, two of the upper ends level of described core bar is fixed together to bearing pin and the lower beam settled.
Beneficial effect: compared with prior art, the present invention sets up the gripping pipe that need to not rotate with rocking handle owing to having adopted in lower beam bottom, and be fixedly nested with after the flange with radial convex loop limit in gripping pipe upper port, overcome present technology socket bar rocking handle rotate and grip hand in good time loose this to contradiction, make operating difficulties effort, wire that original insulating sleeve bar exists always fixing not in place, there is potential safety hazard, and part upwards top power and rocking handle rotatory force cancel out each other, the low grade of efficiency series of problems is readily solved.
Below in conjunction with accompanying drawing, by embodiment, the invention will be further described.
Brief description of the drawings
Fig. 1 is the structural representation of one embodiment of the invention.Clear for illustrating, in figure, be drawn into the stereochemical structure of parallel groove clamp.
Fig. 2 is the part section structural representation of lower beam 3 in Fig. 1, and this figure is intended to explanation and grips corresponding construction situation in pipe and chamber thereof.
In figure: sleeve 1, counterbore 11, connector 12, upper boom 2, lower beam 3, bearing pin 31, flange 4, convex ring edge 41, grips pipe 5, base 51, rocking handle 6, core bar 7, parallel groove clamp a, wire clip body a1, arc clip a2, pad a3, bolt a4, wire casing a5.
Embodiment
Referring to Fig. 1.This socket bar is made up of upper boom 2 and lower beam 3 etc., approximately 3.3 meters of total lengths, and from top to bottom, upper boom 2 comprises sleeve 1, connector 12 and upper shaft, the top of sleeve 1 is embedded with receives the counterbore 11(sleeve size of hex bolts a4 optional).The bottom of upper shaft is provided with the connection-peg being connected with lower beam 3.From top to bottom, lower beam 3 comprises tapered end, lower shaft, flange 4, grips pipe 5, core bar 7 and rocking handle 6, and tapered end is responsible for and the docking of upper shaft connection-peg, and realizes firmly connection.Flange 4 fixed covers are located at the upper port that grips pipe 5, and the top of its shell has a circle radial convex loop limit 41.The lower shaft bottom of lower beam 3 is fixedly connected through bearing pin 31 with the upper end that is built in gripping pipe 5 internal core rod 7, and core bar 7 is located by the bearing being fixedly installed in flange 4 inner chambers that grip in pipe 5 upper port.The lower end of core bar 7 and rocking handle 6 are fixed together.
When operation, first upper boom 2 and lower beam 3 are linked to be to entirety, and keep vertical shape, the top counterbore 11 of upper boom 2 is inserted on the bolt a4 of the parallel groove clamp a that is positioned at top, then, operating personnel's one clenching of the hand grips convex ring edge 41 bottoms of pipe 5 flanges 4, the tiger's jaw of hand withstands on the bottom of convex ring edge 41, and another hand rotation crank 6, by the rotation of upper boom 2 and lower beam 3 shafts, hex bolts a4 is screwed, thereby difference lead-in wire is overlapped on main line.
The present embodiment is only explanation technology contents of the present invention, and any simple deformation design of making according to the present embodiment, all should include protection scope of the present invention in.

Claims (2)

1. a distribution network live line work insulating sleeve bar, comprise lower beam (3) and rocking handle (6), it is characterized in that: the upper end of the bottom of described lower beam (3) and a core bar (7) is fixedly connected, described core bar (7) is arranged in the gripping pipe (5) that a upper port is fixed with flange (4), has the bearing in a circle radial convex loop limit (41), inner chamber with fixing described core bar (7) on this flange (4) shell; The lower end of this core bar (7) and described rocking handle (6) are fixed together.
2. insulating sleeve bar as claimed in claim 1, is characterized in that: two of the upper ends level of described core bar (7) is fixed together to the bearing pin (31) of settling and lower beam (3).
CN201410244024.1A 2014-06-04 2014-06-04 Distribution network hot-line work insulation sleeve rod Pending CN103996994A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410244024.1A CN103996994A (en) 2014-06-04 2014-06-04 Distribution network hot-line work insulation sleeve rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410244024.1A CN103996994A (en) 2014-06-04 2014-06-04 Distribution network hot-line work insulation sleeve rod

Publications (1)

Publication Number Publication Date
CN103996994A true CN103996994A (en) 2014-08-20

Family

ID=51311069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410244024.1A Pending CN103996994A (en) 2014-06-04 2014-06-04 Distribution network hot-line work insulation sleeve rod

Country Status (1)

Country Link
CN (1) CN103996994A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104669183A (en) * 2015-01-04 2015-06-03 宁波工程学院 Sleeve tool with high-performance spindle
CN107785685A (en) * 2017-10-10 2018-03-09 广州供电局有限公司 High-voltage earthing rod and high-voltage earthing rod operating method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200948560Y (en) * 2006-09-24 2007-09-19 秦永刚 Vertical type crank handle sleeve barrel instrument
CN201185318Y (en) * 2007-12-21 2009-01-21 侯江涛 Cardan joint type hot-line working rod
US20110079118A1 (en) * 2009-10-02 2011-04-07 Tien-I Industrial Co., Ltd Hand tool
CN202231360U (en) * 2011-10-09 2012-05-23 潍坊市寒亭区供电公司 Column type insulator bolt live-line fastening tool
JP2012157149A (en) * 2011-01-26 2012-08-16 Chugoku Electric Power Co Inc:The Compression apparatus for indirect hot line method
CN103111970A (en) * 2013-02-02 2013-05-22 安吉县供电局 Rotating device of sleeve operating arm
CN203288998U (en) * 2013-02-22 2013-11-13 任多森 Electrified pin nut fastening device
CN203895852U (en) * 2014-06-04 2014-10-22 国家电网公司 Distribution network live-working insulating sleeve rod

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200948560Y (en) * 2006-09-24 2007-09-19 秦永刚 Vertical type crank handle sleeve barrel instrument
CN201185318Y (en) * 2007-12-21 2009-01-21 侯江涛 Cardan joint type hot-line working rod
US20110079118A1 (en) * 2009-10-02 2011-04-07 Tien-I Industrial Co., Ltd Hand tool
JP2012157149A (en) * 2011-01-26 2012-08-16 Chugoku Electric Power Co Inc:The Compression apparatus for indirect hot line method
CN202231360U (en) * 2011-10-09 2012-05-23 潍坊市寒亭区供电公司 Column type insulator bolt live-line fastening tool
CN103111970A (en) * 2013-02-02 2013-05-22 安吉县供电局 Rotating device of sleeve operating arm
CN203288998U (en) * 2013-02-22 2013-11-13 任多森 Electrified pin nut fastening device
CN203895852U (en) * 2014-06-04 2014-10-22 国家电网公司 Distribution network live-working insulating sleeve rod

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104669183A (en) * 2015-01-04 2015-06-03 宁波工程学院 Sleeve tool with high-performance spindle
CN104669183B (en) * 2015-01-04 2016-01-20 宁波工程学院 A kind of sleeve barrel tool with high-performance main shaft
CN107785685A (en) * 2017-10-10 2018-03-09 广州供电局有限公司 High-voltage earthing rod and high-voltage earthing rod operating method

Similar Documents

Publication Publication Date Title
CN205713411U (en) A kind of positive lever apparatus adjusting electric pole and cross-arm direction
CN203895852U (en) Distribution network live-working insulating sleeve rod
CN103996994A (en) Distribution network hot-line work insulation sleeve rod
CN204441498U (en) A kind of ground connection pricker easy to plug and special plug-pull tool thereof
CN104795225A (en) Auxiliary device for installing transformer
CN104538752A (en) Grounded drill rod easy to insert and pull and special inserting and pulling tool
CN203787598U (en) Cable distribution box special grounding wire
CN201663250U (en) Turnable grounding wire hook
CN206023043U (en) Insulation ropes installation tool
CN205745794U (en) Anchor ear fixed by the pipeline of a kind of fast demountable
CN205669308U (en) A kind of wall-connecting piece without cutting
CN204068158U (en) Auto lock stockbridge damper
CN206748348U (en) A kind of laborsaving dismounting bar of Quick Release
CN105736828A (en) Safety rope device for pipe connection
CN204886083U (en) Carbon fiber is fastener for wire
CN202224862U (en) Novel cable connector of welding gun
CN203936869U (en) Elbow expansion bolt dismounting new tool
CN202949167U (en) Tool for mounting insulators
CN205716003U (en) A kind of pipeline connects the safety rope device used
CN205212294U (en) Multi -functional insulating sleeve action bars
CN103498848A (en) Quick mounting bolt
CN204354047U (en) A kind of Combined hand wrench power assisting device
CN206245714U (en) A kind of floating junction
CN204538570U (en) Steel spring threading apparatus
CN205521106U (en) Nut dismounting tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140820

RJ01 Rejection of invention patent application after publication