CN103993776B - A kind of awn and assembly method thereof - Google Patents

A kind of awn and assembly method thereof Download PDF

Info

Publication number
CN103993776B
CN103993776B CN201410195648.9A CN201410195648A CN103993776B CN 103993776 B CN103993776 B CN 103993776B CN 201410195648 A CN201410195648 A CN 201410195648A CN 103993776 B CN103993776 B CN 103993776B
Authority
CN
China
Prior art keywords
paulin
paulin part
rod member
pliability
pliability rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410195648.9A
Other languages
Chinese (zh)
Other versions
CN103993776A (en
Inventor
金京九
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOUYI METAL CO Ltd XIAMEN
Original Assignee
YOUYI METAL CO Ltd XIAMEN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YOUYI METAL CO Ltd XIAMEN filed Critical YOUYI METAL CO Ltd XIAMEN
Priority to CN201410195648.9A priority Critical patent/CN103993776B/en
Publication of CN103993776A publication Critical patent/CN103993776A/en
Application granted granted Critical
Publication of CN103993776B publication Critical patent/CN103993776B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Tents Or Canopies (AREA)

Abstract

The invention discloses a kind of awn and assembly method thereof, comprise at least three pliability rod members, upper paulin part and end paulin part; Wherein, in upper paulin part, fix corresponding to the bottom of corner positions and the bight of end paulin part, the center of upper paulin part is corresponding with the center of end paulin part; One end of each pliability rod member is plugged on the junction of upper paulin part and end paulin part as bottom; The other end of each pliability rod member mutually intersects to pass through in the top area of upper paulin part as upper end and laminates into shaped as frame and become hood-shaped with paulin part on strutting and the center of paulin part is dropped in blocked areas, the end of the other end of each pliability rod member is positioned at the central region under paulin part top area, with curved downwards under upper paulin part traction action. Existing structure of the present invention is simple, and the feature of easy accessibility has again support strength stronger, and sunshade area is large, and can make tarpaulin strut the good tension force of formation, reaches the object of good external force resistance intensity.

Description

A kind of awn and assembly method thereof
Technical field
The present invention relates to a kind of awn, particularly relate to a kind of awn and assembly method thereof.
Background technology
Awn is a kind ofly day to get shady device in order to cover, and is widely used in daily life. Typical a kind of awnBe beveled structure, the awn of this structure uses mostly in places such as traffic intersections, because the awn of this structure need to have fixingBase, is therefore not easy to people and converts place use, and in addition, its sunshade area is less is also one of its drawback. Another kind of coolPaulin includes three or four montant, is connected with foldable structure between montant, between the top of each montant, is connected with and can rolls overFolded upper frame, although the awn of this structure does not need firm banking, can utilize many montants to stand in ground,, itsLess stable, in the time having stronger wind, is easily mobilely even thrown, and, be used for supporting the bracing frame of tarpaulinStructure is also comparatively complicated, need to, with more material, also have a bit, and upper frame only has a point to the support of tarpaulin, to tarpaulinStrut intensity a little less than, make the external force resistance insufficient strength of tarpaulin. Another awn, its tarpaulin comprises end paulin part and upper paulin portionPoint, its bracing frame is made up of two pliability rod members, and end paulin part is quadrangle, and upper paulin part has and struts into hood-shaped structure,Four jiaos of four jiaos of the bottoms of upper paulin part and end paulin part fix, two pliability rod members bows respectively, two pliabilitiesThe two ends of rod member are plugged on respectively upper paulin part and end paulin part the junction of four jiaos as bottom, and every pliability rod memberTwo ends are in respectively diagonal angle place, make the diagonal setting of pliability rod member along upper paulin part, and end paulin part plays pliability barThe position-limiting action at the two ends of part, the top of two pliability rod members forms and intersects, its infall be also just in time in paulin part inHeart position, it is hood-shaped that two pliability rod members strut into upper paulin part, although the awn of this structure is simple in structure, particularly props upThe structure of support is very simple, and still, its sunshade area is limit by the length of pliability rod member, and, bracing frame stableProperty a little less than, in addition, this top chi structure to tarpaulin strut intensity also a little less than, make the external force resistance insufficient strength of tarpaulin.
Summary of the invention
The object of the invention is to overcome the deficiency of prior art, a kind of awn and assembly method thereof are provided, existing structure is simple,The feature of easy accessibility, has again support strength stronger, and sunshade area is large, and can make tarpaulin strut the good tension force of formation,Reach the object of good external force resistance intensity.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of awn, comprising:
At least three pliability rod members;
Upper paulin part, has and struts into hood-shaped structure, and its hood-shaped projection in plane has the quantity phase with pliability rod memberConsistent bight, and each bight is evenly distributed with respect to the center of upper paulin part; With
End paulin part, has the bight consistent with the quantity of pliability rod member, and each bight is with respect in end paulin partThe heart is evenly distributed;
Wherein, in upper paulin part, fix the center of upper paulin part corresponding to the bottom of corner positions and the bight of end paulin partThe end of with, the center of paulin part is corresponding; Each pliability rod member matches with upper paulin part respectively, one end of each pliability rod memberBe plugged on the junction of upper paulin part and end paulin part as bottom, the other end of each pliability rod member as upper end in upper paulin portionPoint top area mutually intersect to pass through and laminate into shaped as frame and become hood-shaped and make the center of upper paulin part drop on frame to strut upper paulin partIn shape region, the end of the other end of each pliability rod member is positioned at the central region under paulin part top area, withCurved downwards under upper paulin part traction action.
Described pliability rod member is four, and one end of four pliability rod members is plugged on upper paulin part and end paulin part as bottomJunction, the other end of four pliability rod members mutually intersects to pass through in the top area of upper paulin part as upper end and laminates into wellFont becomes hood-shaped to strut upper paulin part.
Described each pliability rod member respectively with upper paulin part match be upper paulin part be respectively equipped with for socket is corresponding canThe bar shaped pipe box of flexible rod member, each pliability rod member is inserted in respectively in corresponding bar shaped pipe box.
One end of described bar shaped pipe box leans against or points to the corresponding junction of paulin part and end paulin part, another of bar shaped pipe boxEnd is by the top area of upper paulin part and not crossing with the center of upper paulin part, and the end of the other end of bar shaped pipe box is at upper paulinThe end location of the central region under part top area the other end of formation to pliability rod member.
Described bar shaped pipe box is made up of the multistage at interval.
The region, middle and lower part of described upper paulin part is provided with the opening consistent with the quantity of pliability rod member, and described opening is located at phaseBetween the bight of two adjacent upper paulin parts.
Described opening is triangle, and one side of triangle open mouth coincides with base, and the summit of triangle open mouth is located at correspondenceThe end of the other end of bar shaped pipe box.
Paulin part of the described end is whole slab organization.
Paulin part of the described end is frame-shaped construction.
An assembly method for awn, comprises the steps:
A. end paulin part is shakeout on the ground;
B. wherein one end of each pliability rod member is inserted along the bar shaped pipe box of the upper paulin part of correspondence respectively;
C. described wherein one end of each pliability rod member is intersected to pass through in the top area of upper paulin part mutually and laminate into shaped as frameAnd the end that makes described wherein one end of each pliability rod member is engaged in the central region of paulin part;
D. the wherein other end of each pliability rod member is plugged on respectively to the corresponding junction of upper paulin part and end paulin part.
Compared with prior art, the invention has the beneficial effects as follows:
1, be plugged on the junction of upper paulin part and end paulin part as bottom due to one end of pliability rod member of the present invention, anotherOne end mutually intersects to pass through in the top area of upper paulin part as upper end and laminates into shaped as frame, and the end of the other end is positioned at paulinCentral region under part top area, like this, has just increased the sunshade area of awn greatly;
2, because the other end of each pliability rod member of the present invention mutually intersects and wears in the top area of upper paulin part as upper endMore laminate into shaped as frame and become hood-shaped and the center of upper paulin part is dropped in blocked areas to strut upper paulin part, this frame-shaped construction,On the one hand, greatly strengthen the stability of the bracing frame being formed by each pliability rod member, on the other hand, strong to the support of tarpaulinSpend byer force, and can make tarpaulin strut to form good tension force, reach the object of good external force resistance intensity;
3, because the present invention is made up of at least three pliability rod members and upper paulin part, end paulin part, have simple in structurely, tear openFill feature easily.
Below in conjunction with drawings and Examples, the present invention is described in further detail; But a kind of awn of the present invention and assembling side thereofMethod is not limited to embodiment.
Brief description of the drawings
Fig. 1 is D structure schematic diagram of the present invention;
Fig. 2 is front view of the present invention;
Fig. 3 is top view of the present invention;
Fig. 4 is that each pliability rod member of the present invention mutually intersects and passes through the signal that laminates into shaped as frame in the top area of upper paulin partFigure.
Detailed description of the invention
Embodiment
Referring to shown in Fig. 1 to Fig. 4, a kind of awn of the present invention, comprising:
Four pliability rod members, are respectively pliability rod member 11, pliability rod member 12, pliability rod member 13, pliability rod member14; Each pliability rod member can be complete whole piece structure, also can (prior art is existing this by forming after multistage sleeveStructure);
Upper paulin part 2, has and struts into hood-shaped structure, and its hood-shaped projection in plane has the quantity phase with pliability rod memberConsistent bight 21, because pliability rod member is four, the bight 21 of going up paulin part 2 is also four, and four bights 21Center with respect to upper paulin part is evenly distributed; With
End paulin part 3, has the bight consistent with the quantity of pliability rod member 31, same, because pliability rod member is fourRoot, the bight 31 of end paulin part 3 is also four, and four bights 31 are evenly distributed with respect to the center of end paulin part;
Wherein, in upper paulin part 2, fix upper paulin part 2 corresponding to the bottom of corner positions and the bight 31 of end paulin partCenter corresponding with the center of end paulin part 3; Each pliability rod member matches with upper paulin part respectively, each pliability barOne end of part is plugged on the junction of upper paulin part and end paulin part as bottom, that is, one end of four pliability rod members is done respectivelyFor bottom is plugged on the corresponding junction of upper paulin part 2 and end paulin part 3, namely at four angles place, four pliability rod membersThe other end as upper end the top area of upper paulin part mutually intersect pass through laminate into groined type 10 with on strutting paulin part becomeHood-shaped and the center of paulin part is dropped in the blocked areas that groined type 10 surrounds, the other end of four pliability rod membersEnd is positioned at the central region under paulin part top area, with curved downwards under upper paulin part 2 traction action, due to canFlexible rod member has pliability, therefore, easily curved downwards.
Shown in Figure 4, the other end of four pliability rod members mutually intersects and wears in the top area of upper paulin part as upper endMore laminate into groined type 10 and be and form like this, taking wherein one group as example, the other end of pliability rod member 11 passed through flexibleProperty rod member 14, meanwhile, the other end of pliability rod member 11 is also passed through by pliability rod member 12, and pliability rod member 12 laminatesOn pliability rod member 11, form pressure point 41, pliability rod member 11 is laminated on pliability rod member 14, forms pressure point 42,Because the end 111 of the other end of pliability rod member 11 is positioned at the central region under upper paulin part top area, with upperCurved downwards under paulin part 2 traction action, like this, pressure point 41 and lower curved end 111 all make pliability rod member 11 to pressure point42 form active force, are groined type 10 thereby can form firmly shaped as frame.
Described each pliability rod member respectively with upper paulin part match be upper paulin part be respectively equipped with for socket is corresponding can22, four pliability rod members of bar shaped pipe box of flexible rod member (pliability rod member 11, pliability rod member 12, pliability rod member 13,Pliability rod member 14) be inserted in respectively in corresponding bar shaped pipe box 22.
One end 221 of described bar shaped pipe box 22 lean against (represent from the corresponding junction of upper paulin part and end paulin part close to) orPoint to (representing has with the corresponding junction of end paulin part with a certain distance from upper paulin part, as the present embodiment) upper paulin part and end paulinThe corresponding junction of part, the other end of bar shaped pipe box 22 by the top area of upper paulin part and not with the center of upper paulin partIntersect, the end 222 of the other end of bar shaped pipe box is in the central region under paulin part top area and forms pliabilityThe end location of the other end of rod member.
Described bar shaped pipe box 22 can be continuous one, can be to be also made up of the multistage at interval.
The region, middle and lower part of described upper paulin part is provided with the opening consistent with the quantity of pliability rod member 23, described opening 23Be located between the bight of two adjacent upper paulin parts.
Described opening 23 is triangle, and one side of triangle open mouth coincides with base, and establish on the summit 231 of triangle open mouthIn the end of the other end of corresponding bar shaped pipe box.
Paulin part of the described end 3 is frame-shaped construction; Certainly, paulin part can be also full wafer shape structure the described end; End paulin part masterPlay position-limiting action.
The assembly method of a kind of awn of the present invention, comprises the steps:
A. end paulin part 3 is shakeout on the ground;
B. each pliability rod member (is comprised to pliability rod member 11, pliability rod member 12, pliability rod member 13, pliabilityRod member 14) wherein one end insert along the bar shaped pipe box 22 of the upper paulin part of correspondence respectively;
C. each pliability rod member (comprised to pliability rod member 11, pliability rod member 12, pliability rod member 13, pliabilityRod member 14) described wherein one end mutually intersect to pass through in the top area of upper paulin part and laminate into shaped as frame and make each pliabilityThe end of described wherein one end of rod member is engaged in the central region of paulin part;
D. the wherein other end of each pliability rod member is plugged on respectively to the corresponding junction of upper paulin part and end paulin part.
The present embodiment has adopted four pliability rod members, also can adopt three pliability rod members (upper paulin part and end paulin partCorresponding bight be also three), (the corresponding bight of upper paulin part and end paulin part is also also can to adopt five pliability rod membersFive), by that analogy.
A kind of awn of the present invention, because one end of pliability rod member is plugged on the company of upper paulin part and end paulin part as bottomMeet place, the other end mutually intersects to pass through in the top area of upper paulin part as upper end and laminates into shaped as frame, and the end of the other end is fixedThe central region of position under upper paulin part top area, like this, the tarpaulin area that same long pliability rod member supports will be moreGreatly, thus greatly increased the sunshade area of awn; Due to the other end of each pliability rod member as upper end in upper paulin partTop area is mutually intersected to pass through and is laminated into shaped as frame and become hood-shaped and make the center of upper paulin part drop on shaped as frame district to strut upper paulin partIn territory, this frame-shaped construction, as the groined type 10 of the present embodiment, on the one hand, has greatly strengthened by each pliability rod member and has formedThe stability of bracing frame, on the other hand, stronger to the support strength of tarpaulin, and can make tarpaulin strut to form preferablyPower, reaches the object of good external force resistance intensity; Because the present invention is by four pliability rod members and upper paulin part, end paulin part structureBecome, have simple in structure, the feature of easy accessibility.
Above-described embodiment is only used for further illustrating a kind of awn of the present invention and assembly method thereof, but the present invention is not limited toEmbodiment, any simple modification, equivalent variations and modification that every foundation technical spirit of the present invention is done above embodiment,All fall in the protection domain of technical solution of the present invention.

Claims (10)

1. an awn, comprising:
At least three pliability rod members;
Upper paulin part, has and struts into hood-shaped structure, and its hood-shaped projection in plane has the number with pliability rod memberMeasure consistent bight, and each bight is evenly distributed with respect to the center of upper paulin part; With
End paulin part, has the bight consistent with the quantity of pliability rod member, and each bight is with respect to end paulin partCenter be evenly distributed;
Wherein, in upper paulin part, fix corresponding to the bottom of corner positions and the bight of end paulin part, upper paulin partCenter is corresponding with the center of end paulin part; Each pliability rod member matches with upper paulin part respectively, each pliabilityOne end of rod member is plugged on the junction of upper paulin part and end paulin part as bottom;
It is characterized in that:
The other end of each pliability rod member mutually intersects to pass through in the top area of upper paulin part as upper end and laminates intoShaped as frame becomes hood-shaped and the center of upper paulin part is dropped in blocked areas to strut upper paulin part, each pliability rod memberThe end of the other end is positioned at the central region under paulin part top area, with under upper paulin part traction action toLower curved.
2. awn according to claim 1, is characterized in that: described pliability rod member is four, and four canOne end of flexible rod member is plugged on the junction of upper paulin part and end paulin part as bottom, four pliability rod members anotherOne end as upper end the top area of upper paulin part mutually intersect pass through laminate into groined type with on strutting paulin part becomeHood-shaped.
3. awn according to claim 1 and 2, is characterized in that: described each pliability rod member respectively withIt is to be respectively equipped with the bar shaped pipe box for being socketed corresponding pliability rod member, each in upper paulin part that upper paulin part matchesPliability rod member is inserted in respectively in corresponding bar shaped pipe box.
4. awn according to claim 3, is characterized in that: one end of described bar shaped pipe box leans against or points toThe corresponding junction of upper paulin part and end paulin part, the other end of bar shaped pipe box is not by the top area of upper paulin part andCrossing with the center of upper paulin part, the middle part of the end of the other end of bar shaped pipe box under upper paulin part top areaThe end location of region the other end of formation to pliability rod member.
5. awn according to claim 4, is characterized in that: described bar shaped pipe box is made up of the multistage at interval.
6. awn according to claim 1 and 2, is characterized in that: the region, middle and lower part of described upper paulin partBe provided with the opening consistent with the quantity of pliability rod member, described opening be located at adjacent two upper paulin parts bight itBetween.
7. awn according to claim 6, is characterized in that: described opening is triangle, and triangle is openedOne side of mouth coincides with base, and the summit of triangle open mouth is located at the end of the other end of corresponding bar shaped pipe box.
8. awn according to claim 1, is characterized in that: paulin part of the described end is whole slab organization.
9. awn according to claim 1, is characterized in that: paulin part of the described end is frame-shaped construction.
10. an assembly method for awn, is characterized in that: comprise the steps:
A. end paulin part is shakeout on the ground;
B. wherein one end of each pliability rod member is inserted along the bar shaped pipe box of the upper paulin part of correspondence respectively;
C. described wherein one end of each pliability rod member is intersected to pass through in the top area of upper paulin part mutually and laminateBecome shaped as frame and make the end of described wherein one end of each pliability rod member be engaged in the central region of paulin part;
D. the wherein other end of each pliability rod member is plugged on respectively to the corresponding connection of upper paulin part and end paulin partPlace.
CN201410195648.9A 2014-05-09 2014-05-09 A kind of awn and assembly method thereof Expired - Fee Related CN103993776B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410195648.9A CN103993776B (en) 2014-05-09 2014-05-09 A kind of awn and assembly method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410195648.9A CN103993776B (en) 2014-05-09 2014-05-09 A kind of awn and assembly method thereof

Publications (2)

Publication Number Publication Date
CN103993776A CN103993776A (en) 2014-08-20
CN103993776B true CN103993776B (en) 2016-05-18

Family

ID=51308088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410195648.9A Expired - Fee Related CN103993776B (en) 2014-05-09 2014-05-09 A kind of awn and assembly method thereof

Country Status (1)

Country Link
CN (1) CN103993776B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3699986A (en) * 1971-01-06 1972-10-24 Arthur J Kirkham Modular shelter system
US4706696A (en) * 1984-08-10 1987-11-17 Gillis Robert E Orbit tent
CN2403855Y (en) * 1999-12-14 2000-11-01 王炳煌 Fast assembling and disassembling tent
DE202004008828U1 (en) * 2004-06-03 2005-10-13 Structurelab Gmbh Tent-like construction supported at its outer margins by a series of bow-rods linked by base fittings
JP2006143136A (en) * 2004-11-24 2006-06-08 Meipuru:Kk Flexible top frame
CN201963028U (en) * 2011-01-27 2011-09-07 上海洋帆实业有限公司 Tent
CN202866375U (en) * 2012-09-21 2013-04-10 浙江锐天科技有限公司 Dome awning
CN203846849U (en) * 2014-05-09 2014-09-24 厦门友一金属有限公司 Awning

Also Published As

Publication number Publication date
CN103993776A (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN106014182B (en) A kind of triangle agronomy ladder
CN205040307U (en) Gardens are with type flowerpot that loosens soil
CN203846849U (en) Awning
CN103993776B (en) A kind of awn and assembly method thereof
CN202949796U (en) Tree supporting frame
CN203271255U (en) Tent frame bar
CN204060116U (en) Detachable paulin room structure
CN104060882A (en) Folding tent
CN205400255U (en) Combination rail
CN106258798A (en) A kind of tree grafting growth fender bracket
CN209457504U (en) Warning fence is used in a kind of construction of garden landscape
CN206620593U (en) A kind of greenhouse Automaitc shade-rolling machine with windproof structure
CN201929512U (en) Multi-purpose folding screen
CN207436647U (en) A kind of support construction in paulin room
CN209402903U (en) Metal shell construction
CN206534429U (en) A kind of Display Rack for Circular mirror frame
CN205060239U (en) Weave storage basket
CN205213589U (en) Silk screen warmhouse booth
CN205162342U (en) Table tennis table
CN204561621U (en) A kind of straw plaited flower rack
CN204571238U (en) Project building construction frame
CN204802023U (en) Yacht protection shed structure
CN206753131U (en) A kind of garden landscape corridor
CN209990200U (en) Support stable pull net stage
CN203416672U (en) Green plant planting box

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518