- Publication number
- CN103982011A CN103982011A CN201410242765.6A CN201410242765A CN103982011A CN 103982011 A CN103982011 A CN 103982011A CN 201410242765 A CN201410242765 A CN 201410242765A CN 103982011 A CN103982011 A CN 103982011A
- Authority
- CN
- China
- Prior art keywords
- drip
- finished product
- water drip
- water
- inner frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Door And Window Frames Mounted To Openings (AREA)
- Building Environments (AREA)
Abstract
The invention provides a finished product metal water drip in building operations. An inner frame of the water drip is fixedly arranged on a mounting face of a finished product in the building operations through an expansion tube screw, and rubber waterproof strips are compressed by fastening the expansion tube screw. Bayonets with corresponding positions are formed in the outer side of a flange plate of the inner frame of the water drip and the inner side of a flange plate of an outer frame of the water drip, the outer frame of the water drip is clamped on the outer side of the inner frame of the water drip, the rubber waterproof strips are compressed by the flange plate of the outer frame of the water drip, and water can be prevented from flowing into the outer frame of the water drip. A water dripping groove is formed in the center of the outer frame of the water drip, the width of the water dripping groove is about 1 cm, and the water can be effectively prevented from flowing into a building. The finished product metal water drip has the advantages that the finished product metal water drip can be fast mounted and is short in work period; the operation process is simple and convenient; the finished product after mounting is high in quality, low in cost and capable of being maintained or replaced later, finished product precision is high, and mounting straightness accuracy can reach the error of +/-1 mm per meter, and is greatly improved compared with the straightness accuracy with the error of +/-3 mm per meter of a manual plastering water drip.
Description
Technical field
The present invention relates to finished product metal drip line in eaves in building operations, the lintel of window, balcony, awning, the stringcourse of giving prominence to the finished products such as exterior wall, the drip of stair tread feather edge, particularly a kind of building operations.
Background technology
In common buildings construction, stringcourse, the stair tread feather edge of eaves, the lintel of window, balcony, awning, outstanding exterior wall need to arrange drip.Drip is a groove that 1cm left and right is wide, is to prevent that rainwater from entering in balcony or flowing to measure on glass when dirty along metope.The construction of drip is generally mounted to drip (groove) in floated coat in the time plastering.Manual technical requirements is high, consumes a large amount of man-hours, and the straightness accuracy of drip (groove) and planeness control difficulty large, often finished product poor effect, and plaster skin coat easily ftractures.
Summary of the invention
The object of this invention is to provide finished product metal drip line in a kind of building operations, can be fixed on the installed surface at the position such as stringcourse, stair tread feather edge of eaves, the lintel of window, balcony, awning, outstanding exterior wall by expanding tube screw, after plastering construction, this finished product metal drip line can quick, high-quality installation.
For achieving the above object, the technical solution used in the present invention is to provide finished product metal drip line in a kind of building operations, this drip structure includes rubber waterproof bar, drip inner frame, the outer skeleton of drip, expanding tube screw, the end face of described drip inner frame is provided with draw-in groove, draw-in groove is provided with rubber waterproof bar, described drip inner frame is fixed on the installed surface of finished product in building operations by expanding tube screw, and compresses rubber waterproof bar by fastening expanding tube screw.The wing plate outside of described drip inner frame, the wing plate inner side of the outer skeleton of drip are provided with bayonet socket corresponding to position, make the outer skeleton of drip be stuck in the outside of drip inner frame 2, and make the outer skeleton wing plate of drip compress rubber waterproof bar, can prevent that water from flowing to the inner side of drip dermoskeleton.
The center of the outer skeleton of described drip is provided with the groove that drips, and the wide 1cm left and right of the groove that drips, can effectively prevent that water from flowing into building interior.
Effect of the present invention is that this drip has advantage and has following five aspects:
The first, be can be after having plastered, adopt the method for mechanical erection to install, and installation rate is fast, does not take the main duration;
The second, operating procedure is easy, adopts the instruments such as common angle grinding machine, guiding ruler, Electric portable drill, screwdriver, can operate through simple training, far below the plaster technical difficulty requirement of wet trade method of employing;
The 3rd, the end product quality after installation is high, and finished product metal drip line adopts aluminum alloy material, makes in factory process, and finished product accuracy is high, and can reach ± 1mm of installation straightness accuracy error/every meter, than manual drip straightness accuracy ± 3mm error of plastering/every meter of significantly improve;
The 4th, cost is low, adopts the not only technical difficulty requirement of wet trade method of plastering, and needs the workman that technical level is higher, and labour cost is higher, adopts the metal drip line of Mechanized Processing can reduce expense 50%;
The 5th, can later maintenance or replacing.
Brief description of the drawings
Fig. 1 is finished product metal drip line structure schematic diagram of the present invention.
In figure:
1, outer skeleton 4, draw-in groove 5, expanding tube screw 6, bayonet socket 7 of rubber waterproof bar 2, drip inner frame 3, drip, groove drips
Detailed description of the invention
By reference to the accompanying drawings finished product metal drip line structure in building operations of the present invention is illustrated.
As shown in Figure 1, finished product metal drip line in building operations of the present invention, this drip structure includes rubber waterproof bar 1, drip inner frame 2, the outer skeleton 3 of drip, expanding tube screw 5, the end face of described drip inner frame 2 is provided with draw-in groove 4, draw-in groove 4 is provided with rubber waterproof bar 1, described drip inner frame 2 is fixed on the installed surface of finished product in building operations by expanding tube screw 5, and compresses rubber waterproof bar 1 by fastening expanding tube screw 5.
The wing plate outside of described drip inner frame 2, the wing plate inner side of the outer skeleton 3 of drip are provided with bayonet socket corresponding to position 6, make the outer skeleton 3 of drip be stuck in the outside of drip inner frame 2, and make outer skeleton 3 wing plates of drip compress rubber waterproof bar 1, can prevent that water from flowing to the inner side of drip dermoskeleton.
The center of the outer skeleton 3 of described drip is provided with the groove 7 that drips, and the wide 1cm left and right of the groove 7 that drips, can effectively prevent that water from flowing into building interior.
In building operations of the present invention, finished product metal drip line installation process is as follows:
Step 1: base treatment
The discrete particles of installed surface is cleaned out, and grinding machine polishing in angle for uneven place, makes installed surface comparatively smooth.
Step 2: snap the line
Eject installation control line and the center line of metal drip line, determine the position that expanding tube screw 5 is installed.
Step 3: punching
The position of installing at expanding tube screw 5 gets out installing hole.
Step 4: drip inner frame is installed
First rubber waterproof bar 1 is arranged in the draw-in groove 4 of drip inner frame 2, with expanding tube screw, drip inner frame 2 is fixed on again on the installed surface at the position such as stringcourse, stair tread feather edge of eaves, the lintel of window, balcony, awning, outstanding exterior wall, and the control line that aligns, compress expanding tube screw 5, make rubber waterproof bar 1 seal the gap between drip inner frame 2 and installed surface completely.
Step 5: the outer skeleton of drip is installed
Outer drip skeleton 3 is stuck in to drip inner frame 2 outsides, clamps by bayonet socket 6, and make outer skeleton 3 wing plates of drip compress rubber waterproof bar 1, can prevent that water from flowing to the inner side of the outer skeleton 3 of drip.The center of the outer skeleton 3 of drip is provided with the groove 7 that drips.
Claims (2)
1. finished product metal drip line in a building operations, it is characterized in that: this drip structure includes rubber waterproof bar (1), drip inner frame (2), the outer skeleton (3) of drip, expanding tube screw (5), the end face of described drip inner frame (2) is provided with draw-in groove (4), draw-in groove (4) is provided with rubber waterproof bar (1), described drip inner frame (2) is fixed on the installed surface of finished product in building operations by expanding tube screw (5), and compresses rubber waterproof bar (1) by fastening expanding tube screw (5);
The wing plate outside of described drip inner frame (2), the wing plate inner side of the outer skeleton (3) of drip are provided with bayonet socket corresponding to position (6), make the outer skeleton (3) of drip be stuck in the outside of drip inner frame (2), and make outer skeleton (3) wing plate of drip compress rubber waterproof bar (1); The center of the outer skeleton (3) of described drip is provided with the groove that drips (7).
2. finished product metal drip line in building operations according to claim 1, is characterized in that: described in the wide of groove (7) of dripping be 1cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410242765.6A CN103982011B (en) | 2014-06-03 | 2014-06-03 | Finished product metal drip line in construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410242765.6A CN103982011B (en) | 2014-06-03 | 2014-06-03 | Finished product metal drip line in construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103982011A true CN103982011A (en) | 2014-08-13 |
CN103982011B CN103982011B (en) | 2016-05-11 |
Family
ID=51274159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410242765.6A Active CN103982011B (en) | 2014-06-03 | 2014-06-03 | Finished product metal drip line in construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103982011B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10299109A (en) * | 1997-04-24 | 1998-11-10 | Ig Tech Res Inc | Water drip |
JP2006257821A (en) * | 2005-03-18 | 2006-09-28 | Asahi Tostem Gaiso Kk | Water drip structure of overhang part |
CN101033673A (en) * | 2007-03-16 | 2007-09-12 | 于少峰 | Device for water-proof of window |
CN201539198U (en) * | 2009-12-02 | 2010-08-04 | 温州中川节能建材有限公司 | Dripping line connected with corner guard of external wall |
CN202718306U (en) * | 2012-07-09 | 2013-02-06 | 浙江博元建设股份有限公司 | Front check throat and protective corner integrated water drip |
CN203905323U (en) * | 2014-06-03 | 2014-10-29 | 天津住总建筑集团有限公司 | Finished metal water drip in building construction |
-
2014
- 2014-06-03 CN CN201410242765.6A patent/CN103982011B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10299109A (en) * | 1997-04-24 | 1998-11-10 | Ig Tech Res Inc | Water drip |
JP2006257821A (en) * | 2005-03-18 | 2006-09-28 | Asahi Tostem Gaiso Kk | Water drip structure of overhang part |
CN101033673A (en) * | 2007-03-16 | 2007-09-12 | 于少峰 | Device for water-proof of window |
CN201539198U (en) * | 2009-12-02 | 2010-08-04 | 温州中川节能建材有限公司 | Dripping line connected with corner guard of external wall |
CN202718306U (en) * | 2012-07-09 | 2013-02-06 | 浙江博元建设股份有限公司 | Front check throat and protective corner integrated water drip |
CN203905323U (en) * | 2014-06-03 | 2014-10-29 | 天津住总建筑集团有限公司 | Finished metal water drip in building construction |
Also Published As
Publication number | Publication date |
---|---|
CN103982011B (en) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102409926B (en) | Heat preservation doors and windows with conveniently-dismounted attached frames of doors and windows | |
CN104179321A (en) | Wallboard mounting system and mounting method thereof | |
CN206605597U (en) | A kind of construction timber cutter device | |
CN104018650B (en) | Wall plastering plane rushes muscle bar and using method thereof | |
CN211321390U (en) | On-spot monitoring device for construction | |
CN203430029U (en) | Drip groove formwork | |
CN203905323U (en) | Finished metal water drip in building construction | |
CN114263329A (en) | Construction process for water dripping line of staircase | |
CN103982011A (en) | Finished product metal water drip in building operations | |
CN201695651U (en) | Punctuation nail | |
CN204023953U (en) | A kind of wallboard installation system | |
CN214995647U (en) | Building paint wall punching rib supporting device | |
CN104018651B (en) | Wall plastering Yang Jiao rushes muscle bar and using method thereof | |
CN204476179U (en) | Auxiliary frame construction and installation fixture | |
CN108695793B (en) | Multifunctional electrician junction box protection device | |
CN104389414A (en) | Building plasterer | |
CN109339417B (en) | Door and window entrance to a cave is quick easily to plaster binding off device | |
CN109424084B (en) | Wall unit supporting adjustment and adjustment method of wall unit | |
CN204531987U (en) | A kind of window structure carrying cleaning brush | |
CN218205503U (en) | White appurtenance is scraped to wall of a well | |
CN216664872U (en) | Wall punching bar convenient to install | |
CN204401839U (en) | Novel special-shaped curtain wall adaptor | |
CN204060323U (en) | A kind of door and window auxiliary frame | |
CN203594887U (en) | Protection sleeve | |
CN215618893U (en) | Concrete block cutting waste material cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300304 8 Ping Ying Road, Dongli District, Tianjin Co-patentee after: Tianjin Tianyi Construction Group Co., Ltd. Patentee after: Tianjin General Group Co., Ltd. Address before: 300304 8 Ping Ying Road, Dongli District, Tianjin Co-patentee before: Tianjin Tianyi Construction Group Co., Ltd. Patentee before: Total Group Co.,Ltd that builds is lived in Tianjin |