CN103968402A - Flue gas denitrification system of coal-fired unit - Google Patents

Flue gas denitrification system of coal-fired unit Download PDF

Info

Publication number
CN103968402A
CN103968402A CN201410166410.3A CN201410166410A CN103968402A CN 103968402 A CN103968402 A CN 103968402A CN 201410166410 A CN201410166410 A CN 201410166410A CN 103968402 A CN103968402 A CN 103968402A
Authority
CN
China
Prior art keywords
economizer
coal
flue gas
flue
fired unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410166410.3A
Other languages
Chinese (zh)
Inventor
方占岭
赵建军
代东
孟庆文
庄润民
季益冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUNCO BOILER CO Ltd
Original Assignee
JIANGSU SUNCO BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUNCO BOILER CO Ltd filed Critical JIANGSU SUNCO BOILER CO Ltd
Priority to CN201410166410.3A priority Critical patent/CN103968402A/en
Publication of CN103968402A publication Critical patent/CN103968402A/en
Pending legal-status Critical Current

Links

Landscapes

  • Exhaust Gas Treatment By Means Of Catalyst (AREA)

Abstract

The invention discloses a flue gas denitrification system of a coal-fired unit with a complete flue gas denitrification reaction. The flue gas denitrification system comprises a boiler body, a denitrification reactor and coal economizers, the boiler body, and the denitrification reactor are connected together through a flue, denitrification catalysts are contained in the denitrification reactor, the coal economizers comprise the first coal economizer and the second coal economizer, the first coal economizer is arranged in a tail fuel on the boiler body, the second coal economizer is arranged at the position where flue gas passes after the flue gas flows through the denitrification catalysts, the first coal economizer and the second coal economizer are connected in series, the second coal economizer is connected with a water supply pipe, and the first coal economizer is connected with a water outlet pipe.

Description

A kind of flue gas denitrification system of coal-fired unit
Technical field
The present invention relates to a kind of flue gas denitrification system of coal-fired unit.
Background technology
The denitrating flue gas of current coal-fired unit is the necessary project of environmental requirement, is to ensure effect and the quality of denitrating flue gas, must make to enter the flue-gas temperature of Benitration reactor within the specific limits.The flue gas denitrification system of general coal-fired unit, comprise boiler body, economizer and Benitration reactor, economizer is arranged on the back-end ductwork place of boiler body, but because on boiler body, economizer heat exchange area is large, heat exchange is abundant, make under coal-fired unit low load condition, on the low side by the flue-gas temperature out of the economizer on boiler body, can not meet the requirement of denitration, make the denitration reaction system can not bringing normally into operation, therefore denitration reaction be incomplete, still can be to environment.
Summary of the invention
Technical problem to be solved by this invention is: the flue gas denitrification system that the coal-fired unit that a kind of denitrating flue gas reacts completely is provided.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of flue gas denitrification system of coal-fired unit, comprise the boiler body and the Benitration reactor that link together by flue, and economizer, in Benitration reactor, be provided with denitrating catalyst, described economizer comprises the first economizer and the second economizer, the first economizer is arranged in the back-end ductwork on boiler body, the second economizer is arranged on smoke gas flow and crosses the denitrating catalyst position of process afterwards, the first economizer is connected with the second economizer, and the second economizer is connected with feed pipe, the first economizer is connected with outlet pipe.
Described Benitration reactor exit is provided with air preheater by flue.
Described the second economizer is arranged on the below of denitrating catalyst in Benitration reactor.
Described the second economizer is arranged in the flue between Benitration reactor and air preheater.
The invention has the beneficial effects as follows: owing to economizer being divided for the first economizer and the second economizer, the first economizer is arranged in the back-end ductwork on boiler body, the second economizer is arranged on smoke gas flow and crosses the denitrating catalyst position of process afterwards, the first economizer is connected with the second economizer, and the second economizer is connected with feed pipe, the first economizer is connected with outlet pipe, even if make the flue-gas temperature that enters Benitration reactor under coal-fired unit low load condition also can meet denitration reaction requirement, thereby guarantee that denitrating flue gas is complete.And in the time that unit load changes, the cigarette temperature scope that enters Benitration reactor is dwindled, and is conducive to ensure the high efficiency of denitration, thereby has also reduced operating cost, has improved environmental quality.
Because Benitration reactor exit is provided with air preheater by flue, improve the thermal efficiency of whole system.
Because the second economizer is arranged on the below of denitrating catalyst in Benitration reactor, this place's installing space is convenient to greatly the fitting operation of the second economizer, this place's flue gas flow rate distribution is comparatively even in addition, also more uniform to the wearing and tearing of the second economizer, the service life that can improve the second economizer.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
In Fig. 1: 1. flue, 2. boiler body, 3. Benitration reactor, 31. denitrating catalysts, 4. flue, 5. air preheater, 6. the first economizer, 7. the second economizer, 8. feed pipe, 9. outlet pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, describe specific embodiment of the invention scheme in detail.
As shown in Figure 1, a kind of flue gas denitrification system of coal-fired unit, comprise the boiler body 2 and Benitration reactor 3 and the economizer that link together by flue 1, be provided with denitrating catalyst 31 in Benitration reactor 3, Benitration reactor 3 exits are provided with air preheater 5 by flue 4.Described economizer comprises the first economizer 6 and the second economizer 7.The first economizer 6 is arranged in the back-end ductwork on boiler body 2, and the second economizer 7 is arranged on the below of the interior denitrating catalyst 31 of Benitration reactor 3.The first economizer 6 is connected with the second economizer 7, and the second economizer 7 is connected with feed pipe 8, and the first economizer 6 is connected with outlet pipe 9.
The above embodiments are principle and effect thereof of illustrative the invention only, and the embodiment of part utilization, but not for limiting the present invention; It should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise of the invention, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (4)

1. the flue gas denitrification system of a coal-fired unit, comprise the boiler body and Benitration reactor and the economizer that link together by flue, in Benitration reactor, be provided with denitrating catalyst, it is characterized in that: described economizer comprises the first economizer and the second economizer, the first economizer is arranged in the back-end ductwork on boiler body, the second economizer is arranged on smoke gas flow and crosses the denitrating catalyst position of process afterwards, the first economizer is connected with the second economizer, and the second economizer is connected with feed pipe, the first economizer is connected with outlet pipe.
2. the flue gas denitrification system of a kind of coal-fired unit as claimed in claim 1, is characterized in that: described Benitration reactor exit is provided with air preheater by flue.
3. the flue gas denitrification system of a kind of coal-fired unit as claimed in claim 2, is characterized in that: described the second economizer is arranged on the below of denitrating catalyst in Benitration reactor.
4. the flue gas denitrification system of a kind of coal-fired unit as claimed in claim 2, is characterized in that: described the second economizer is arranged in the flue between Benitration reactor and air preheater.
CN201410166410.3A 2014-04-24 2014-04-24 Flue gas denitrification system of coal-fired unit Pending CN103968402A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410166410.3A CN103968402A (en) 2014-04-24 2014-04-24 Flue gas denitrification system of coal-fired unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410166410.3A CN103968402A (en) 2014-04-24 2014-04-24 Flue gas denitrification system of coal-fired unit

Publications (1)

Publication Number Publication Date
CN103968402A true CN103968402A (en) 2014-08-06

Family

ID=51238225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410166410.3A Pending CN103968402A (en) 2014-04-24 2014-04-24 Flue gas denitrification system of coal-fired unit

Country Status (1)

Country Link
CN (1) CN103968402A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104534492A (en) * 2014-12-25 2015-04-22 哈尔滨锅炉厂有限责任公司 Device and method for increasing denitration inlet gas temperature
CN105570956A (en) * 2016-03-12 2016-05-11 河北工业大学 Boiler flue gas waste heat circulating heat-supply system
CN110332514A (en) * 2019-08-22 2019-10-15 哈尔滨锅炉厂有限责任公司 A kind of efficient wide load double reheat tower-type furnace economizer hierarchical arrangement system
CN111603928A (en) * 2020-05-24 2020-09-01 西安交通大学 Efficient, clean and flexible cooperative coal-fired power generation system and operation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5315639A (en) * 1976-07-27 1978-02-13 Hitachi Zosen Corp Boiler has denitration device built-in
US20040045513A1 (en) * 2002-09-06 2004-03-11 Mcnertney Robert M. Passive system for optimal NOx reduction via selective catalytic reduction with variable boiler load
CN102430306A (en) * 2011-09-14 2012-05-02 无锡华光新动力环保科技股份有限公司 Pre-dedusting device used in SCR flue gas denitration for coal-fired boiler
CN202709159U (en) * 2012-07-05 2013-01-30 东方电气集团东方锅炉股份有限公司 Boiler capable of meeting full-load operation low exhaust temperature of selective catalytic reduction (SCR) denitration device
CN102937295A (en) * 2012-11-20 2013-02-20 上海锅炉厂有限公司 Boiler economizer arrangement form suitable for denitration device negative whole process load operation
CN203464231U (en) * 2013-09-16 2014-03-05 山西大唐国际临汾热电有限责任公司 Mounting structure of coal economizer
CN203797683U (en) * 2014-04-24 2014-08-27 江苏申港锅炉有限公司 Flue gas denitration system of coal-fired unit

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5315639A (en) * 1976-07-27 1978-02-13 Hitachi Zosen Corp Boiler has denitration device built-in
US20040045513A1 (en) * 2002-09-06 2004-03-11 Mcnertney Robert M. Passive system for optimal NOx reduction via selective catalytic reduction with variable boiler load
CN102430306A (en) * 2011-09-14 2012-05-02 无锡华光新动力环保科技股份有限公司 Pre-dedusting device used in SCR flue gas denitration for coal-fired boiler
CN202709159U (en) * 2012-07-05 2013-01-30 东方电气集团东方锅炉股份有限公司 Boiler capable of meeting full-load operation low exhaust temperature of selective catalytic reduction (SCR) denitration device
CN102937295A (en) * 2012-11-20 2013-02-20 上海锅炉厂有限公司 Boiler economizer arrangement form suitable for denitration device negative whole process load operation
CN203464231U (en) * 2013-09-16 2014-03-05 山西大唐国际临汾热电有限责任公司 Mounting structure of coal economizer
CN203797683U (en) * 2014-04-24 2014-08-27 江苏申港锅炉有限公司 Flue gas denitration system of coal-fired unit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104534492A (en) * 2014-12-25 2015-04-22 哈尔滨锅炉厂有限责任公司 Device and method for increasing denitration inlet gas temperature
CN105570956A (en) * 2016-03-12 2016-05-11 河北工业大学 Boiler flue gas waste heat circulating heat-supply system
CN105570956B (en) * 2016-03-12 2018-03-16 河北工业大学 A kind of residual heat from boiler fume circulating heat supply system
CN110332514A (en) * 2019-08-22 2019-10-15 哈尔滨锅炉厂有限责任公司 A kind of efficient wide load double reheat tower-type furnace economizer hierarchical arrangement system
CN111603928A (en) * 2020-05-24 2020-09-01 西安交通大学 Efficient, clean and flexible cooperative coal-fired power generation system and operation method
CN111603928B (en) * 2020-05-24 2021-07-06 西安交通大学 Efficient, clean and flexible cooperative coal-fired power generation system and operation method

Similar Documents

Publication Publication Date Title
US9857125B2 (en) Denitration and waste heat recovery integrated furnace
CN102042605B (en) Side-to-side thermal deashing method for rotary air preheater
CN102309918B (en) Dedusting and denitration system for thermal power plant fire coal smoke
CN106949446B (en) It is matched in the high temperature and pressure denitration waste heat boiler of catalytic cracking unit
CN103084064A (en) System and method for improving operation capacity of SCR (Silicon Controlled Rectifier) denitration device in electric power plant
CN103968402A (en) Flue gas denitrification system of coal-fired unit
CN202021013U (en) Dedusting and denitration system of coal-fired flue gas of thermal power plant
CN108786455B (en) Heat utilization system and denitration method of sintering flue gas SCR denitration device
CN103277788A (en) SCR temperature regulating system of boiler and method for regulating smoke temperature of SCR inlet of boiler
CN203170222U (en) System for improving running capability of SCR (selective catalytic reduction) denitrating device in power plant
CN105318313A (en) Smoke waste-heat utilization system based on selective catalytic reduction (SCR) denitration device
CN203517748U (en) Temperature controllable coal economizer
CN205627628U (en) Low temperature coke oven smoke SOx/NOx control integrated device
CN208786167U (en) A kind of system of the wide load denitration of air water cooperative achievement
CN203364109U (en) SCR temperature regulating system of boiler
CN208599489U (en) A kind of cement kiln flue gas SCR denitration system
CN104548900A (en) Process device of coke oven fume denitrification, desulfuration and reheating system
CN203797683U (en) Flue gas denitration system of coal-fired unit
CN202993536U (en) Coal-fired hot blast furnace set with waste heat boiler
CN204665224U (en) A kind of Water pipe heating pipe afterheat boiler system be built on sintering machine flue
CN105889899A (en) Superheated steam temperature adjusting system and method suitable for SCR low-load operation
CN203927970U (en) A kind of boiler exhaust gas denitrification apparatus
CN103727552A (en) Adjustable denitration smoke temperature control system
CN202328127U (en) Smoke waste heat recycling device for coke oven
CN203464231U (en) Mounting structure of coal economizer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140806