CN103967518B - The method of spiral disposal drop shaft leak stopping - Google Patents

The method of spiral disposal drop shaft leak stopping Download PDF

Info

Publication number
CN103967518B
CN103967518B CN201410206635.7A CN201410206635A CN103967518B CN 103967518 B CN103967518 B CN 103967518B CN 201410206635 A CN201410206635 A CN 201410206635A CN 103967518 B CN103967518 B CN 103967518B
Authority
CN
China
Prior art keywords
drop shaft
shaft
spiral
leak stopping
drop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410206635.7A
Other languages
Chinese (zh)
Other versions
CN103967518A (en
Inventor
方仕立
黄孙恺
邬海燕
陈云寿
刘鹏
谢哲
王志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Zhongxin Engineering Consulting Management Co ltd
Original Assignee
Cnbm Design & Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cnbm Design & Research Institute filed Critical Cnbm Design & Research Institute
Priority to CN201410206635.7A priority Critical patent/CN103967518B/en
Publication of CN103967518A publication Critical patent/CN103967518A/en
Application granted granted Critical
Publication of CN103967518B publication Critical patent/CN103967518B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses the method for a kind of spiral disposal drop shaft leak stopping.The method drives up a spiral tunnel (3) from the footrill of drop shaft (2) bottom along the drop shaft storage bin (4) of drop shaft inside is spiral, horizontal eyelet is offered from spiral tunnel, the method inwardly being inserted shaft by eyelet obtains leak stopping position, in this leak stopping of elimination of detonating to eyelet explosive.Present device is simple, operating cost is cheap, simple to operate fast, safety is good.

Description

The method of spiral disposal drop shaft leak stopping
Technical field
The present invention relates to a kind of mining methods, particularly relate to the method for a kind of spiral disposal drop shaft leak stopping, belong to mining technique field.
Background technology
In field of mining, service year limit for length, production scale is large and medium-sized and the mine (as limestone deposit, iron ore etc.) that the mining depth discrepancy in elevation is large for making full use of the gravity haulage of ore self, reduce equipment investment in Ore Transportation process, reduce running cost and energy consumption, adopt footrill-drop shaft expanding design can reduce Ore Transportation merit widely, thus reach effects of energy saving and emission reduction, realize society and Business Economic Benefit bumper harvests.Adopt the mine of footrill-drop shaft expanding design, the transportation route of ore: stope → drop shaft → footrill → processing factory, wherein drop shaft is not only as the link transport of in ore gravity haulage, and be responsible for the storage bin function of part ore storage, the ore be stored in drop shaft plays cushioning effect to the ore poured in stope in drop shaft, and the enormous impact power of avoiding the gravity haulage of ore self to produce damages the facility of drop shaft bottom, equipment and production development accident.The ore stored in drop shaft storage bin is due to factors such as the storage time are long, many containing cementing composition, particle size is uneven, bonding or bulk generation occlusion mutually can be there is between ore, cause drop shaft leak stopping, whole footrill-drop shaft Development system can be caused time serious to scrap, enterprise stops production, and causes huge economic loss.At present, the leak stopping of prevention drop shaft mainly adopts following method: 1) drop shaft mouth arranges crushing system, guarantees that the ore particle size entered in drop shaft is comparatively even, eliminates lump ore and enter drop shaft, 2) strengthen mine overburden operation, reduce cementing composition and be mixed in ore; 3) reasonable arrangement is produced, and avoids ore in methods such as long-time storage, reduces the methods such as the probability of drop shaft leak stopping formation.For the leak stopping formed in drop shaft, the following method of disposal of main employing: 1) mine rocket projectile blasting procedure; 2) bamboo bar blasting procedure; 3) high pressure water flushing striking; 4) douche; 5) bore blowing-up method etc.But the method ubiquity of existing disposal drop shaft leak stopping the problem that equipment is complicated, with high costs, job step is numerous and diverse, security performance is also lower.
Summary of the invention
The object of the invention is to, the method for a kind of spiral disposal drop shaft leak stopping is provided.Present device is simple, operating cost is cheap, simple to operate fast, safety is good.
Technical scheme of the present invention: the method for a kind of spiral disposal drop shaft leak stopping, the method specifically comprises the following steps;
A, bottom drop shaft, there is footrill, bottom drop shaft, a spiral tunnel is tunneled from footrill, this spiral tunnel drives up along the drop shaft storage bin of drop shaft inside is spiral, keep 3-8m distance between the inwall in spiral tunnel and the drop shaft borehole wall, upper end, spiral tunnel is communicated with drop shaft storage bin top;
B, in spiral tunnel, level is offered many groups and is penetrated the drop shaft borehole wall and the horizontal eyelet pointing to drop shaft storage bin axis, vertical direction distance 1-3m between adjacent eyelet;
Shaft is placed in c, eyelet;
When there is drop shaft leak stopping in d, drop shaft storage bin, from bottom to top or from top to bottom shaft in eyelet is inserted through the drop shaft borehole wall by root in drop shaft along drop shaft, if there is shaft can insert in drop shaft storage bin, then between this shaft and the shaft that can not insert drop shaft storage bin above it, there is drop shaft leak stopping;
E, to take out shaft can not be inserted in drop shaft storage bin in eyelet in spiral tunnel, drilling rod is inserted again from eyelet, punching to drop shaft leak stopping position with hammer drill, cutter is near drop shaft storage bin axis place, the boring of energy blasting charge is formed at drop shaft leak stopping position, stop punchinging operation, from eyelet, take out drilling rod;
F, will to load in eyelet with priming device explosive, and with shaft, explosive to be filled in boring, and blastic fuse is led in spiral tunnel;
G, connected with initiator by blastic fuse in spiral tunnel, detonating charge, the force of explosion that explosive blasting produces destroys drop shaft leak stopping, makes drop shaft storage bin slip ore deposit unimpeded.
In the method for above-mentioned spiral disposal drop shaft leak stopping, in step a, described spiral tunnel drives up along drop shaft storage bin is spiral by the gradient of 15-25%.
In the method for aforesaid spiral disposal drop shaft leak stopping, in step a, between the inwall in spiral tunnel and the drop shaft borehole wall, keep 5m distance.
In the method for aforesaid spiral disposal drop shaft leak stopping, in step a, in step b, vertical direction distance 2m between adjacent eyelet.
In the method for aforesaid spiral disposal drop shaft leak stopping, in step a, in step c, described shaft is bamboo pole, reinforcement bar or pvc pipe etc.
Compared with prior art, the present invention has following beneficial effect:
1, the equipment wanted required for the present invention is very common and simple, reduces the cost disposing drop shaft plugging operations widely, has the economic benefit of highly significant;
2, the present invention can determine the concrete position of drop shaft generation leak stopping accurately, fast, and by means of only simply, easily operating procedure just can eliminate drop shaft leak stopping;
3, the explosive amount of process leak stopping consumption of the present invention is few, successful;
4, spiral tunnel of the present invention can act on the duty cycle of whole footrill-drop shaft system; And the leak stopping at any position of drop shaft can be processed;
5, safety is good, and explosive is placed in the leak stopping position at drop shaft axis place by the present invention, and detonates in spiral tunnel, avoids the injury of Harmful effects from blasting to disposal personnel to greatest extent, greatly increases operational security;
6, detonating charge installation position is generally within drop shaft axis place, Harmful effects from blasting to the drop shaft borehole wall without any breakdown operation.
Accompanying drawing explanation
Fig. 1 is top view of the present invention;
Fig. 2 is left view of the present invention;
The operation schematic diagram of Fig. 3 steps d of the present invention;
The operation schematic diagram of Fig. 4 step e of the present invention;
The operation schematic diagram of Fig. 5 step f of the present invention;
Fig. 6 is eyelet in Fig. 3, spiral tunnel and drop shaft relativeness structure chart;
Fig. 7 is eyelet and shaft structure chart in Fig. 6.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail, but not as limitation of the present invention.
Embodiments of the invention: the method for a kind of spiral disposal drop shaft leak stopping, as shown in accompanying drawing 1-7, the method specifically comprises the following steps;
A, bottom drop shaft 2, there is footrill 1, bottom drop shaft, a spiral tunnel 3 is tunneled from footrill 1, drop shaft 2 inside is full of ore 17 and forms drop shaft storage bin 4, this spiral tunnel 3 drives up along the drop shaft storage bin 4 of drop shaft inside is spiral by the gradient of 20%, keep 5m distance between the inwall 5 in spiral tunnel 3 and the drop shaft borehole wall 6, spiral upper end, tunnel 3 and drop shaft storage bin 4 top are got through;
B, in spiral tunnel 3, level is dug many groups and is penetrated the drop shaft borehole wall 6 and the horizontal eyelet 8 pointing to drop shaft storage bin axis 7, vertical direction distance 2m between adjacent eyelet 8;
Place shaft 9 in c, eyelet 8, shaft can be pvc pipe etc.;
When there is drop shaft leak stopping in d, drop shaft storage bin 4, in drop shaft storage bin, a certain region ore is piled up, then cavity can be formed below the region that this ore is piled up, now from top to bottom shaft in eyelet 9 is inserted through the drop shaft borehole wall 6 by root in drop shaft 2 along drop shaft 2, if have one and be that first shaft 92 can insert in drop shaft storage bin 4 (shaft 91 namely above shaft 92 can not insert drop shaft storage bin), show shaft 92 and it forms drop shaft leak stopping between shaft 91;
E, to take out shaft 92 in drop shaft storage bin 4 can not be inserted in eyelet 8 in spiral tunnel 3, drilling rod 11 is inserted again from eyelet 8, drilling rod 11 is driven to punching to drop shaft leak stopping 10 position with hammer drill 12, cutter is near drop shaft storage bin axis 7 place, the boring 14 of energy blasting charge 13 is formed at drop shaft leak stopping 10 position, stop punchinging operation, from eyelet 8, take out drilling rod 11;
F, will load in eyelet 8 with priming device explosive 13, and with shaft 9, explosive 13 be filled in boring 14, and blastic fuse 15 is led in spiral tunnel 3;
G, connected with initiator 16 by blastic fuse 15 in spiral tunnel 3, detonating charge, the force of explosion that explosive 13 explosion produces destroys drop shaft leak stopping 10, makes drop shaft storage bin 4 slip ore deposit unimpeded.

Claims (5)

1. the method for spiral disposal drop shaft leak stopping, is characterized in that: the method specifically comprises the following steps;
A, drop shaft (2) bottom there is footrill (1), bottom drop shaft, a spiral tunnel (3) is tunneled from footrill (1), this spiral tunnel (3) drives up along the drop shaft storage bin (4) of drop shaft inside is spiral, keep 3-8m distance between the inwall (5) in spiral tunnel (3) and the drop shaft borehole wall (6), spiral tunnel (3) upper end is communicated with drop shaft storage bin (4) top;
B, in spiral tunnel (3) level offer many groups penetrate the drop shaft borehole wall (6) and point to drop shaft storage bin axis (7) horizontal eyelet (8), vertical direction distance 1-3m between adjacent eyelet (8);
Shaft (9) is placed in c, eyelet (8);
When there is drop shaft leak stopping in d, drop shaft storage bin (4), from bottom to top or from top to bottom shaft in eyelet (9) is inserted through the drop shaft borehole wall (6) by root in drop shaft (2) along drop shaft (2), if there is shaft (91) can insert in drop shaft storage bin (4), then between this shaft (91) and the shaft (92) that can not insert drop shaft storage bin above it, there is drop shaft leak stopping (10);
E, in spiral tunnel (3) not inserting shaft (92) taking-up in drop shaft storage bin (4) in eyelet (8), drilling rod (11) is inserted again from eyelet (8), punching to drop shaft leak stopping (10) position with hammer drill (12), cutter is near drop shaft storage bin axis (7) place, the boring (14) of energy blasting charge (13) is formed at drop shaft leak stopping (10) position, stop punchinging operation, from eyelet (8), take out drilling rod (11);
F, the explosive (13) with priming device is loaded in eyelet (8), with shaft (9), explosive (13) is filled in boring (14), and blastic fuse (15) is led in spiral tunnel (3);
G, in spiral tunnel (3), blastic fuse (15) to be connected with initiator (16), detonating charge, the force of explosion that explosive (13) explosion produces destroys drop shaft leak stopping (10), makes drop shaft storage bin (4) slip ore deposit unimpeded.
2. the method for spiral disposal drop shaft according to claim 1 leak stopping, is characterized in that: in step a, and described spiral tunnel (3) drives up along drop shaft storage bin (4) is spiral by the gradient of 15-25%.
3. the method for spiral disposal drop shaft according to claim 1 leak stopping, is characterized in that: in step a, keeps 5m distance between the inwall (5) of spiral tunnel (3) and the drop shaft borehole wall (6).
4. the method for spiral disposal drop shaft according to claim 1 leak stopping, is characterized in that: in step b, vertical direction distance 2m between adjacent eyelet (8).
5. the method for spiral disposal drop shaft according to claim 1 leak stopping, is characterized in that: in step c, and described shaft (9) is bamboo pole, reinforcement bar or pvc pipe.
CN201410206635.7A 2014-05-15 2014-05-15 The method of spiral disposal drop shaft leak stopping Active CN103967518B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410206635.7A CN103967518B (en) 2014-05-15 2014-05-15 The method of spiral disposal drop shaft leak stopping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410206635.7A CN103967518B (en) 2014-05-15 2014-05-15 The method of spiral disposal drop shaft leak stopping

Publications (2)

Publication Number Publication Date
CN103967518A CN103967518A (en) 2014-08-06
CN103967518B true CN103967518B (en) 2015-12-09

Family

ID=51237476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410206635.7A Active CN103967518B (en) 2014-05-15 2014-05-15 The method of spiral disposal drop shaft leak stopping

Country Status (1)

Country Link
CN (1) CN103967518B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761822A (en) * 2016-11-28 2017-05-31 北京中煤矿山工程有限公司 Drop shaft technique is repaired in a kind of metal mine backfill prose style free from parallelism slip casting

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3691775A (en) * 1969-08-13 1972-09-19 Bernhard Holtrup Mineral mining installations
SU1682602A1 (en) * 1988-07-18 1991-10-07 Читинский политехнический институт Ore discharge device
CN101832743A (en) * 2010-03-29 2010-09-15 中冶集团华冶资源开发有限责任公司 Winze top-breaking blasting method
CN102162372A (en) * 2011-02-19 2011-08-24 北京科技大学 Method and system for clearing blockage of ore chute
CN202687179U (en) * 2012-04-28 2013-01-23 谈智玲 Retractable foldable intense-stirring loosening and unblocking device
CN102927864A (en) * 2012-11-08 2013-02-13 攀钢集团矿业有限公司 Device and method for performing blasting processing for ore-pass high position blockage by balloon suspended explosive powders
CN103170404A (en) * 2011-12-21 2013-06-26 刘建民 Dense medium spiral roller coal gangue discharge method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3691775A (en) * 1969-08-13 1972-09-19 Bernhard Holtrup Mineral mining installations
SU1682602A1 (en) * 1988-07-18 1991-10-07 Читинский политехнический институт Ore discharge device
CN101832743A (en) * 2010-03-29 2010-09-15 中冶集团华冶资源开发有限责任公司 Winze top-breaking blasting method
CN102162372A (en) * 2011-02-19 2011-08-24 北京科技大学 Method and system for clearing blockage of ore chute
CN103170404A (en) * 2011-12-21 2013-06-26 刘建民 Dense medium spiral roller coal gangue discharge method
CN202687179U (en) * 2012-04-28 2013-01-23 谈智玲 Retractable foldable intense-stirring loosening and unblocking device
CN102927864A (en) * 2012-11-08 2013-02-13 攀钢集团矿业有限公司 Device and method for performing blasting processing for ore-pass high position blockage by balloon suspended explosive powders

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高深溜井井筒堵塞的爆破处理实践;吕向东;《工程爆破》;20100930;第16卷(第3期);第56-58页 *

Also Published As

Publication number Publication date
CN103967518A (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN111022049B (en) Operation-controllable roof-cutting pressure-relief gob-side entry retaining method
CN107060760A (en) A kind of method that colliery withdraws tunnel presplit blasting caving release
CN101644156B (en) Method for weakening coal-rock mass by hydraulic blasting and fracturing
CN103334790B (en) Based on the roof Advance presplitting method of high pressure pneumatic component
CN102628352B (en) Multi-section fixed point hydraulic fracturing method
CN204041074U (en) Exempt from explosion hydraulic splitting equipment
CN104100266B (en) The method of preventing and treating gob side entry bump
CN105298462A (en) High-power electric knocking assisted hydrofracture coal seam permeability increase method for end-located drainage roadway
CN101440704B (en) Ground-dipping ore bed continuous high-energy gas fracturing seepage increasing method and specific high-energy gas generator
CN102322262A (en) Colliery isolated island coal column crossheading bump control method
CN104481539A (en) Extruding blasting caving mining method for self-pulling slot
CN101285384B (en) Large diameter, deep borehole and non undercutting mining method
CN107339920B (en) The method of superdeep holes presplit blasting
CN109869152B (en) Mining method for reserved roadway of coal and gas outburst coal seam
CN102808621B (en) Method for blasting heavy-inclined thick ore bodies
CN102264998A (en) Continuous mining
CN102966333A (en) Anti-blockage method for bottom hole of mine stope and roadway driving working face
CN104033155B (en) A kind of novel tunnel smooth surface digging rock drilling equipment and construction method
CN104453898A (en) Deep hole blasting and static water injecting combining coal seam weakening method
CN108999596A (en) A kind of supercritical CO2The method of point type jet impulse gas explosion fracturing coal and rock
CN103967518B (en) The method of spiral disposal drop shaft leak stopping
CN104727847A (en) Non chain pillar gob-side entry retaining method with filling wall self-erasure
CN106593387A (en) Method for realizing staged multi-cluster fracturing of horizontal well
CN204082151U (en) From intake type hydraulic splitting equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310022 No. 208, Huazhong Road, Gongshu District, Hangzhou City, Zhejiang Province

Patentee after: CNBM DESIGN & RESEARCH INSTITUTE CO.,LTD.

Address before: 310003 No. 450, Zhongshan North Road, Xiacheng District, Hangzhou, Zhejiang

Patentee before: CHINA NEW BUILDING MATERIALS DESIGN & Research Institute

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221025

Address after: 310022 room 601-1, Huafeng building, 208 Huazhong Road, Gongshu District, Hangzhou, Zhejiang

Patentee after: Hangzhou Zhongxin Engineering Consulting Management Co.,Ltd.

Address before: 310022 No. 208, Huazhong Road, Gongshu District, Hangzhou City, Zhejiang Province

Patentee before: CNBM DESIGN & RESEARCH INSTITUTE CO.,LTD.