CN103967052A - 一种防护新旧框构桥基底高差土体的方法 - Google Patents

一种防护新旧框构桥基底高差土体的方法 Download PDF

Info

Publication number
CN103967052A
CN103967052A CN201410224056.5A CN201410224056A CN103967052A CN 103967052 A CN103967052 A CN 103967052A CN 201410224056 A CN201410224056 A CN 201410224056A CN 103967052 A CN103967052 A CN 103967052A
Authority
CN
China
Prior art keywords
frame structure
structure bridge
jet grouting
bridge
pipe roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410224056.5A
Other languages
English (en)
Other versions
CN103967052B (zh
Inventor
韩超
臧立秋
周路舟
汪忠
姜枚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Railway Survey Design Consulting Co Ltd
Original Assignee
Shenyang Railway Survey Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Railway Survey Design Consulting Co Ltd filed Critical Shenyang Railway Survey Design Consulting Co Ltd
Priority to CN201410224056.5A priority Critical patent/CN103967052B/zh
Publication of CN103967052A publication Critical patent/CN103967052A/zh
Application granted granted Critical
Publication of CN103967052B publication Critical patent/CN103967052B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种防护新旧框构桥基底高差土体的方法,属于铁路和公路建设领域。其步骤如下:一,在铁路一侧开挖工作坑,并在工作坑中施作钢筋混凝土滑板及地锚梁、浆砌片石后顶背及分配梁,然后预制框构桥;二,在顶进前端施作管幕的后背支撑墙及管幕与水平旋喷桩的施工平台;三,对既有线采用工字钢纵横梁加固线路:四,采用导向顶管跟进螺旋出土工法施工既有框构桥底板下的钢管幕,自下而上,竖向管幕施工至既有框构桥底板处;五,施工管幕后的水平旋喷桩,采用水平旋喷桩固化土体以减小管幕的侧向土压力;六,拆除管幕的后背支撑墙,顶进新建框构桥。本发明通过在既有框构桥底板下打设管幕及水平旋喷桩的方法来控制既有框构桥的沉降,从而保证既有线运营的安全。

Description

一种防护新旧框构桥基底高差土体的方法
技术领域
本发明属于铁路和公路建设领域,主要涉及一种适用于防护新旧框构桥基底高差土体的施工方法。
背景技术
近年来,随着铁路提速和城乡交通建设的快速发展,铁路平交道口的存在已严重威胁到铁路的行车与安全,采用立交方案是解决这一问题的最佳途径。由于下穿铁路框构桥较上跨桥的造价低、占地少、影响铁路行车时间短等优越性,而多被采纳。当框构桥因使用年限过长或者由于净宽不能满足城市交通的需求时,就需要采用一个大孔径的框构桥代替既有桥或在旁位新顶进一个框构桥,从而从根本上解决交通问题。
本发明需要解决的技术问题是:靠近既有框构桥顶进新建框构桥时,由于新建框构桥的建设标准比旧桥高,必然会导致两桥基底不在同一高程上,从而导致顶进新建框构桥时会引起既有桥基底土体的扰动,严重时可能导致既有框构桥倾覆。
发明内容
为解决上述问题,本发明提出为确保既有框构桥基底土体稳定,在既有框构桥与新建框构桥相邻一侧基底设置管幕加水平管幕的方法防护既有桥基底下土体,从而确保顶进作业时既有桥稳定和铁路行车安全。
本发明采用的技术方案如下:
一种防护新旧框构桥基底高差土体的方法,其特征在于,步骤如下:
1) 步骤一,在铁路一侧开挖工作坑,并在工作坑中施作钢筋混凝土滑板及地锚梁、浆砌片石后顶背及分配梁,然后预制框构桥;
2) 步骤二,在顶进前端施作管幕的后背支撑墙及管幕与水平旋喷桩的施工平台;
3) 步骤三,对既有线采用工字钢纵横梁加固线路:采用3-5-3吊轨梁加Ⅰ56c工字钢纵横抬梁加固方案,横抬梁间距80cm。如果顶进框构桥施工范围内有道岔,线路加固前需将施工范围内道岔移出施工范围,将加固范围内线路全部更换为250×16×20cm新Ⅰ类木枕;
4) 步骤四,采用导向顶管跟进螺旋出土工法施工既有框构桥底板下的钢管幕,自下而上,竖向管幕施工至既有框构桥底板处;
5) 步骤五,施工管幕后的水平旋喷桩,采用水平旋喷桩固化土体以减小管幕的侧向土压力;
6) 步骤六,拆除管幕的后背支撑墙,顶进新建框构桥。
本发明的有益效果:本发明是通过在既有框构桥底板下打设管幕及水平旋喷桩的方法来控制既有框构桥的沉降,从而保证既有线运营的安全,为今后的其他框构桥施工提供参考。该发明具有如下优点:(1)水平旋喷桩加固土体质量优,桩体外型标准,内部质量均匀稳定,相互咬合的水平旋喷桩就像一道连续墙,既能防止土体坍塌又可防渗漏。(2)该体系承载能力好,水平旋喷桩能够较好的使土体与竖向钢管幕形成整体,提高凌空面的土体刚度。(3)施工效率高,水平旋喷桩无需成孔,其钻进、搅拌、注浆同步进行,施工速度快,每小时成桩 15 m 左右,与小导管注浆、大管棚和冷冻法相比其效率要高。(4)操作方便,水平旋喷桩的施工无需大型设备,其工艺简单,容易掌握,操作方便。与能达到相同效果的其他工法相比,水平旋喷桩的成本较低,而其效果要比其他工法好。
附图说明
本发明将通过例子并参照附图的方式说明。
图1为本发明的新旧框构桥平面布置图。
图2本发明的框构桥及管幕与水平旋喷桩的工作坑轴截面图。
图3为本发明的框构桥及管幕与水平旋喷桩的横剖面图。
图中,1:钢筋混凝土滑板及地锚梁;2:浆砌片石后顶背;3:分配梁;4:新建框构桥;5:施作管幕的后背支撑墙;6:管幕与水平旋喷桩的施工平台;7:管幕;8:水平旋喷桩; 9:既有框构桥。
具体实施方式
为了更进一步的说明本发明,通过下述实施例对本发明的各步骤进行详细说明。
如图1~3所示,为本发明的一个2-20.5m框构桥下穿沈阳南站到达场(8股道线路)的施工方法实施例。
本框构桥轴长65米,桥轴线与下行场线路斜交62.66度,顶进处既有8股道铁路线。新建框构桥净宽采用2-20.5m,垂直截面全宽44.7m,桥高12m。既有桥为1-10m框构桥,桥高7m,新旧框构桥基底高差5m,框构之间留20cm的间隙。为解决新旧框构桥基底高差5m土体的难题,本工程采用Φ60cm管幕加水平旋喷桩的方法加固既有框构桥基底土体,从而确保既有框构桥及铁路线运营的安全。
本实施例的具体施工步序为:
1)步骤一,在铁路一侧开挖工作坑,在工作坑中施作钢筋混凝土滑板及地锚梁1、浆砌片石后顶背2、分配梁3,然后预制新建框构桥4,其中后顶背2及分配梁3的尺寸根据受力计算确定。
2)步骤二,在顶进前端施作管幕的后背支撑墙5及管幕与水平旋喷桩的施工平台6。
3)步骤三,对既有线采用工字钢纵横梁加固线路。采用3-5-3吊轨梁加Ⅰ56c工字钢纵横抬梁加固方案,横抬梁间距80cm。顶进框构桥施工范围内有道岔,线路加固前需将施工范围内道岔移出施工范围,将加固范围内线路全部更换为250×16×20cm新Ⅰ类木枕。
4)步骤四,采用导向顶管跟进螺旋出土工法施工既有框构桥底板下的钢管幕7,自下而上,竖向管幕施工至既有框构桥9底板处。管幕施工过程中通过控制螺旋钻的出土速度和钻头伸出的位置决定顶进的速度,采用测量仪器对钢管进行高低左右偏差监测,误差不超过30mm,控制挖土量,保证吃土顶进,不得超挖,保证其偏差符合要求。
5)步骤五,施工管幕后的水平旋喷桩8,采用水平旋喷桩固化土体以减小管幕7的侧向土压力,其中水平旋喷桩具有旋喷桩、搅拌桩的双重优点,对地层适用范围进一步扩大,水泥土拌合更加均匀,强度更高,止水效果更好,施工质量有保证。
6)步骤六,拆除管幕的后背支撑墙5,顶进新建框构桥4。

Claims (1)

1.一种防护新旧框构桥基底高差土体的方法,其特征在于,步骤如下:
1)步骤一,在铁路一侧开挖工作坑,并在工作坑中施作钢筋混凝土滑板及地锚梁、浆砌片石后顶背及分配梁,然后预制框构桥;
2)步骤二,在顶进前端施作管幕的后背支撑墙及管幕与水平旋喷桩的施工平台;
3)步骤三,对既有线采用工字钢纵横梁加固线路:采用3-5-3吊轨梁加Ⅰ56c工字钢纵横抬梁加固方案,横抬梁间距80cm;如果顶进框构桥施工范围内有道岔,线路加固前需将施工范围内道岔移出施工范围,将加固范围内线路全部更换为250×16×20cm新Ⅰ类木枕;
4)步骤四,采用导向顶管跟进螺旋出土工法施工既有框构桥底板下的钢管幕,自下而上,竖向管幕施工至既有框构桥底板处;
5)步骤五,施工管幕后的水平旋喷桩,采用水平旋喷桩固化土体以减小管幕的侧向土压力;
6)步骤六,拆除管幕的后背支撑墙,顶进新建框构桥。
CN201410224056.5A 2014-05-26 2014-05-26 一种防护新旧框构桥基底高差土体的方法 Active CN103967052B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410224056.5A CN103967052B (zh) 2014-05-26 2014-05-26 一种防护新旧框构桥基底高差土体的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410224056.5A CN103967052B (zh) 2014-05-26 2014-05-26 一种防护新旧框构桥基底高差土体的方法

Publications (2)

Publication Number Publication Date
CN103967052A true CN103967052A (zh) 2014-08-06
CN103967052B CN103967052B (zh) 2016-01-06

Family

ID=51237021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410224056.5A Active CN103967052B (zh) 2014-05-26 2014-05-26 一种防护新旧框构桥基底高差土体的方法

Country Status (1)

Country Link
CN (1) CN103967052B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594909A (zh) * 2014-12-19 2015-05-06 中建六局土木工程有限公司 一种超长管幕的后背装置的安装施工方法
CN105714686A (zh) * 2016-03-02 2016-06-29 沈阳铁道勘察设计院有限公司 双l型管幕结构控制框构桥顶进方法
CN108867693A (zh) * 2018-07-18 2018-11-23 中铁十二局集团第二工程有限公司 既有综合管廊加固保护的施工方法
CN113005918A (zh) * 2021-04-15 2021-06-22 铁道第三勘察设计院有限公司 防护铁路车站内多股道高填土施工大跨度框构桥的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008223325A (ja) * 2007-03-13 2008-09-25 Ohbayashi Corp 高架橋の耐震補強構造
FR2915214A1 (fr) * 2007-04-23 2008-10-24 Francois Chalons Bloc de circulation en beton pour pont rail.
CN102808381A (zh) * 2012-08-21 2012-12-05 中铁十局集团有限公司 高水位粉砂土地质下穿多股铁路框架桥顶进对接施工方法
CN102943488A (zh) * 2012-11-28 2013-02-27 上海市城市建设设计研究总院 软土地区大面积绿化下非开挖实施地下空间的施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008223325A (ja) * 2007-03-13 2008-09-25 Ohbayashi Corp 高架橋の耐震補強構造
FR2915214A1 (fr) * 2007-04-23 2008-10-24 Francois Chalons Bloc de circulation en beton pour pont rail.
CN102808381A (zh) * 2012-08-21 2012-12-05 中铁十局集团有限公司 高水位粉砂土地质下穿多股铁路框架桥顶进对接施工方法
CN102943488A (zh) * 2012-11-28 2013-02-27 上海市城市建设设计研究总院 软土地区大面积绿化下非开挖实施地下空间的施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594909A (zh) * 2014-12-19 2015-05-06 中建六局土木工程有限公司 一种超长管幕的后背装置的安装施工方法
CN104594909B (zh) * 2014-12-19 2016-10-19 中建六局土木工程有限公司 一种超长管幕的后背装置的安装施工方法
CN105714686A (zh) * 2016-03-02 2016-06-29 沈阳铁道勘察设计院有限公司 双l型管幕结构控制框构桥顶进方法
CN108867693A (zh) * 2018-07-18 2018-11-23 中铁十二局集团第二工程有限公司 既有综合管廊加固保护的施工方法
CN113005918A (zh) * 2021-04-15 2021-06-22 铁道第三勘察设计院有限公司 防护铁路车站内多股道高填土施工大跨度框构桥的方法

Also Published As

Publication number Publication date
CN103967052B (zh) 2016-01-06

Similar Documents

Publication Publication Date Title
US9322137B2 (en) Method for building structures, particularly passages under operating railways or the like
CN101440708B (zh) Pba浅埋暗挖近距离大断面三洞分离岛式结构施工方法
CN102808381B (zh) 高水位粉砂土地质下穿多股铁路框架桥顶进对接施工方法
CN101761068A (zh) 隧道穿越河流上方桥梁桩基的箱-筏承压式基础托换及施工加固方法
CN103696784B (zh) 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法
CN105672356A (zh) 一种市政管线群跨越隧道的地下结构及其施工方法
CN105064397A (zh) 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法
CN106567718A (zh) 一种复合地层单拱超大跨地铁车站拉槽支撑代换的施工方法
CN105089670B (zh) 一种在并行区间盾构隧道基础上扩挖地铁车站施工方法
CN104120731A (zh) 一种隧道沉降防护装置及其施工方法
CN105201516A (zh) 一种地铁车站主体结构及其四联拱pba暗挖施工方法
CN105089680A (zh) 一种沿空留巷轻质高强混凝土砌块墙体及其施工工艺
CN103967052B (zh) 一种防护新旧框构桥基底高差土体的方法
CN210887325U (zh) 地铁隧道的保护结构
CN102505697A (zh) 一种干线铁路便桥下深基坑开挖方法
JP6170268B1 (ja) バラスト軌道の路盤形成方法
CN108708290B (zh) 小半径铁路曲线单元的箱桥架空结构及现浇施工方法
CN205036380U (zh) 一种四联拱pba暗挖地铁车站主体结构
Konukhov et al. Ensuring the safety of the existing buildings during the construction of the underground in Moscow
CN117027824A (zh) 一种深长冻结斜井掘砌平行作业施工方法
CN113293665B (zh) 一种铁路桥涵接长侧路基加固方法
US11686198B2 (en) Reinforcement system at railway tunnel section passing through karst cave with large dip angle and construction method
CN113236261B (zh) 一种浅埋地下车站大断面洞室开挖方法
CN115681613A (zh) 用于淤泥质粉质黏土层施工中的顶管施工方法
CN111911169A (zh) 一种既有铁路线路下浅埋深隧道施工方法及结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant