Summary of the invention
In order to solve the problem, the object of the invention is to disclose a kind of straw bag braider, it greatly can improve the braiding speed of straw bag, and reduce labour cost, and the uniformity of product is excellent, the present invention is achieved through the following technical solutions.
In first embodiment of the present invention, a kind of straw bag braider, it is characterized in that it is by the first column 101, second column 102, 3rd column 111, 4th column 112, 5th column 121, 6th column 122, 7th column 131, 8th column 132, first support column 141, second support column 142, first spreader 201, second spreader 211, 3rd spreader 221, 4th spreader 231, 5th spreader 241, 6th spreader 251, first movable post 261, 7th spreader 271, first vertical post 301, second vertical post 311, 3rd vertical post 321, 4th vertical post 331, draw post 341, cross rope parts 351, fixed bar 361, support component 4, first holder post 41, second holder post 42, first joint pin 43, second joint pin 44, draw axle 45, rotating shaft 46, depression bar 47, cross shuttle body 5, at the bottom of shuttle 61, shuttle bar 62, shuttle head 71, draw careless hole 72, shuttle driver part composition, one end of the vertical post 301 of first column 101, first spreader 201, first links together, one end of the vertical post 311 of 5th column 121, second spreader 211, second links together, one end of 3rd column 111, the 4th spreader 231, the 3rd vertical post 321 links together, the 7th column 131, the 3rd spreader 221,
4th vertical post 311one end link together, the other end of the first spreader 201, the vertical post 311 of the 3rd column 111, second links together, the other end of the 5th column 121, the 3rd vertical post 321, the 3rd spreader 221 links together, the other end of the first vertical post 301, second spreader 211, the 7th column 131 links together, and the other end of the 4th spreader 231, first column 101, the 4th vertical post 331 links together, the below of the other end connection of the 4th spreader 231, first column 101, the 4th vertical post 331 is connected with one end of the second column 102, the below of the connection, one end of the 3rd column 111, the 4th spreader 231, the 3rd vertical post 321 is connected with one end of the 4th column 112, the below of the other end connection of the 5th column 121, the 3rd vertical post 321, the 3rd spreader 221 is connected with one end of the 6th column 122, the 7th column 131, the 3rd spreader 221,
4th vertical post 311the below of connection, one end be connected with one end of the 8th column 132, the other end of the 4th column 112 is connected to one end of the 6th spreader 251, the other end of the second column 102 is connected to the other end of the 6th spreader 251, the other end of the 6th column 122 is connected to one end of the 7th spreader 271, and the other end of the 8th column 132 is connected to the other end of the 7th spreader 271, fixed bar 361 is connected with between 6th spreader 251 and the 7th spreader 271, first support column 141 is indulged between post 331 at the first vertical post 301 and the 4th, the second support column 142 is indulged between post 321 at the second vertical post 311 and the 3rd, the relevant position of the relative inner of the first support column 141 and the second support column 142 has to be fixed the first movable post 261 and can make the chute that before and after the first movable post, small distance moves, first movable post is provided with multiple being not in contact with each other and the extraction post 341 of parallel placement, the other end of each extraction post 341 had rope parts 351, and the rope through crossing rope parts is through from the top down, 5th spreader 241 is between the first vertical post 301 and the second vertical post 311, the top being positioned at the support component 4 on the right side of the 7th column 131 had shuttle body 5, cross in shuttle body have for shuttle through and be the groove of horizontal positioned, shuttle at the bottom of the shuttle being positioned at below 61, the shuttle bar 62 that is positioned at top at the bottom of shuttle and the shuttle head 71 that is positioned at shuttle bar one end form, shuttle head 71 has and draws careless hole 72, the shuttle bar other end connects shuttle driver part, draw post 341, the excessively height apart from horizontal plane of rope parts 351 and be greater than the height of shuttle head 71 apart from horizontal plane.
In second embodiment of the present invention, a kind of straw bag braider, it is characterized in that it is by the first column 101, second column 102, 3rd column 111, 4th column 112, 5th column 121, 6th column 122, 7th column 131, 8th column 132, first support column 141, second support column 142, first spreader 201, second spreader 211, 3rd spreader 221, 4th spreader 231, 6th spreader 251, first movable post 261, 7th spreader 271, first vertical post 301, second vertical post 311, 3rd vertical post 321, 4th vertical post 331, draw post 341, cross rope parts 351, fixed bar 361, support component 4, first holder post 41, second holder post 42, first joint pin 43, second joint pin 44, draw axle 45, rotating shaft 46, depression bar 47, cross shuttle body 5, at the bottom of shuttle 61, shuttle bar 62, shuttle head 71, draw careless hole 72, shuttle driver part composition, one end of the vertical post 301 of first column 101, first spreader 201, first links together, one end of the vertical post 311 of 5th column 121, second spreader 211, second links together, one end of 3rd column 111, the 4th spreader 231, the 3rd vertical post 321 links together, the 7th column 131, the 3rd spreader 221,
4th vertical post 311one end link together, the other end of the first spreader 201, the vertical post 311 of the 3rd column 111, second links together, the other end of the 5th column 121, the 3rd vertical post 321, the 3rd spreader 221 links together, the other end of the first vertical post 301, second spreader 211, the 7th column 131 links together, and the other end of the 4th spreader 231, first column 101, the 4th vertical post 331 links together, the below of the other end connection of the 4th spreader 231, first column 101, the 4th vertical post 331 is connected with one end of the second column 102, the below of the connection, one end of the 3rd column 111, the 4th spreader 231, the 3rd vertical post 321 is connected with one end of the 4th column 112, the below of the other end connection of the 5th column 121, the 3rd vertical post 321, the 3rd spreader 221 is connected with one end of the 6th column 122, the 7th column 131, the 3rd spreader 221,
4th vertical post 311the below of connection, one end be connected with one end of the 8th column 132, the other end of the 4th column 112 is connected to one end of the 6th spreader 251, the other end of the second column 102 is connected to the other end of the 6th spreader 251, the other end of the 6th column 122 is connected to one end of the 7th spreader 271, and the other end of the 8th column 132 is connected to the other end of the 7th spreader 271, fixed bar 361 is connected with between 6th spreader 251 and the 7th spreader 271, first support column 141 is indulged between post 331 at the first vertical post 301 and the 4th, the second support column 142 is indulged between post 321 at the second vertical post 311 and the 3rd, the relevant position of the relative inner of the first support column 141 and the second support column 142 has to be fixed the first movable post 261 and can make the chute that before and after the first movable post, small distance moves, first movable post is provided with multiple being not in contact with each other and the extraction post 341 of parallel placement, the other end of each extraction post 341 had rope parts 351, and the rope through crossing rope parts is through from the top down, the top being positioned at the support component 4 on the right side of the 7th column 131 had shuttle body 5, cross in shuttle body have for shuttle through and be the groove of horizontal positioned, shuttle at the bottom of the shuttle being positioned at below 61, the shuttle bar 62 that is positioned at top at the bottom of shuttle and the shuttle head 71 that is positioned at shuttle bar one end form, shuttle head 71 has and draws careless hole 72, the shuttle bar other end connects shuttle driver part, draw post 341, the excessively height apart from horizontal plane of rope parts 351 and be greater than the height of shuttle head 71 apart from horizontal plane, second spreader 211 is flexibly connected, its can forwards and rear do motion among a small circle, the front of the 7th column 131 is provided with the first holder post 41, the front of the 5th column 121 be provided with the second holder post 42, first hold in the palm post 41 is provided with the first joint pin 43, second hold in the palm post 42 is provided with to be provided with between the second joint pin 44, first joint pin 43 and the second joint pin 44 rotating shaft 46, second joint pin 44 is provided with draw axle 45, namely the rear of rotating shaft 46 be provided with the many depression bars be arranged in parallel 47, drawing axle is be connected with rotating shaft, draws axle one end and is connected with power source.
Certainly, any one straw bag braider described above, is characterized in that the described rope through crossing rope parts 351 is through from the top down; And rope parts have an opening excessively, this mode makes the mode of passing of rope have more more options, and efficiency is higher, and can hold the uneven situation of rope thickness.
Certainly, any one straw bag braider described above, it is characterized in that described shuttle head 71 can also tilt relative to shuttle bar 62, this mode is more conducive to the placement of straw.
Therefore, this invention has following main beneficial effect: be skillfully constructed, machine construction is simple, be easy to manufacture, machinery equipment is with low cost, and speed of production is exceedingly fast, and the straw bag quality comparatively unification made, appearance looks elegant.
Detailed description of the invention
In order to enable those skilled in the art understand the present invention better, existing by reference to the accompanying drawings to the unified explanation of Reference numeral do, in figure, 101-the first column, 102-the second column, 111-the three column, 112-the four column, 121-the five column, 122-the six column, 131-the seven column, 132-the eight column, 141-the first support column, 142-the second support column, 201-the first spreader, 211-the second spreader, 221-the three spreader, 231-the four spreader, 241-the five spreader, 251-the six spreader, 261-the first movable post, 271-the seven spreader, 301-the first vertical post, 311-the second vertical post, 321-the three vertical post, 331-the four vertical post, 341-draw post, 351-cross rope parts, 361-fixed bar, 4-support component, 41-the first holder post, 42-the second holder post, 43-the first joint pin, 44-the second joint pin, 45-draw axle, 46-rotating shaft, 47-depression bar, 5-cross shuttle body, at the bottom of 61-shuttle, 62-shuttle bar, 71-shuttle head, 72-draw careless hole, 81-the first rope body, 82-the second rope body, 91-straw.
embodiment 1
Ask for an interview Fig. 1 and Fig. 3, a kind of straw bag braider, it is characterized in that it is by the first column 101, second column 102, 3rd column 111, 4th column 112, 5th column 121, 6th column 122, 7th column 131, 8th column 132, first support column 141, second support column 142, first spreader 201, second spreader 211, 3rd spreader 221, 4th spreader 231, 5th spreader 241, 6th spreader 251, first movable post 261, 7th spreader 271, first vertical post 301, second vertical post 311, 3rd vertical post 321, 4th vertical post 331, draw post 341, cross rope parts 351, fixed bar 361, support component 4, first holder post 41, second holder post 42, first joint pin 43, second joint pin 44, draw axle 45, rotating shaft 46, depression bar 47, cross shuttle body 5, at the bottom of shuttle 61, shuttle bar 62, shuttle head 71, draw careless hole 72, shuttle driver part composition, one end of vertical post 301 three of first column 101, first spreader 201, first links together, one end of vertical post 311 three of 5th column 121, second spreader 211, second links together, one end of 3rd column 111, the 4th spreader 231, the 3rd vertical post 321 three links together, the 7th column 131, the 3rd spreader 221,
4th vertical post 311one end of three links together, the other end of the first spreader 201, vertical post 311 three of the 3rd column 111, second links together, the other end of the 5th column 121, the 3rd vertical post 321, the 3rd spreader 221 three links together, the other end of the first vertical post 301, second spreader 211, the 7th column 131 three links together, and the other end of the 4th spreader 231, first column 101, the 4th vertical post 331 three links together, the below of the other end connection of the 4th spreader 231, first column 101, the 4th vertical post 331 three is connected with one end of the second column 102, the below of the connection, one end of the 3rd column 111, the 4th spreader 231, the 3rd vertical post 321 three is connected with one end of the 4th column 112, the below of the other end connection of the 5th column 121, the 3rd vertical post 321, the 3rd spreader 221 three is connected with one end of the 6th column 122, the 7th column 131, the 3rd spreader 221,
4th vertical post 311the below of the connection, one end of three is connected with one end of the 8th column 132, the other end of the 4th column 112 is connected to one end of the 6th spreader 251, the other end of the second column 102 is connected to the other end of the 6th spreader 251, the other end of the 6th column 122 is connected to one end of the 7th spreader 271, and the other end of the 8th column 132 is connected to the other end of the 7th spreader 271, fixed bar 361 is connected with between 6th spreader 251 and the 7th spreader 271, first support column 141 is indulged between post 331 at the first vertical post 301 and the 4th, the second support column 142 is indulged between post 321 at the second vertical post 311 and the 3rd, the relevant position of the relative inner of the first support column 141 and the second support column 142 has to be fixed the first movable post 261 and can make the chute that before and after the first movable post, small distance moves, first movable post is provided with multiple being not in contact with each other and the extraction post 341 of parallel placement, the other end of each extraction post 341 had rope parts 351, and the rope through crossing rope parts is through from the top down, 5th spreader 241 is between the first vertical post 301 and the second vertical post 311, the top being positioned at the support component 4 on the right side of the 7th column 131 had shuttle body 5, cross in shuttle body have for shuttle through and be the groove of horizontal positioned, shuttle at the bottom of the shuttle being positioned at below 61, the shuttle bar 62 that is positioned at top at the bottom of shuttle and the shuttle head 71 that is positioned at shuttle bar one end form, shuttle head 71 has and draws careless hole 72, the shuttle bar other end connects shuttle driver part, draw post 341, the excessively height apart from horizontal plane of rope parts 351 and be greater than the height of shuttle head 71 apart from horizontal plane.
The principle that the present invention makes straw bag is such: penetrate in the gap between the 5th spreader 241 and the second spreader 211 by first rope body 81 one end, and passed the 3rd spreader 221 front, it is walked around backward the 4th spreader 231 and the first spreader 201, body 81 other end of now can being restricted in one end and first of the first rope body 81 is connected again; Also first rope body 81 other end can be used to start to pass from the top of the second spreader 211 as one end of the second rope body 82, and passed the rope through of rope parts 351, and then passed the 3rd spreader 221 front, again it is walked around backward the 4th spreader 231 and the first spreader 201, now, the other end of body 82 of being restricted one end and second of second rope body 82 is tied or one end of body 81 of restricting as next root first mutually, and method of the wearing space of restricting body 81 according to first wears cloth, the like; Until arrive the straw bag amplitude needed; Open shuttle driver part, shuttle is moved back and forth in a groove, and by straw 91 through drawing careless hole 72, entering the first rope body 81 and second restricts in crossing spatial that body 82 formed, after passing many straw, external force is adopted to press down straw, then, make the little segment distance of the first movable post 261 forward slip, now, the second rope body 82 protrudes from the first rope body 81, therefore the second rope body 82 and first is restricted between body 81 and formed reverse crossing spatial, now this reverse crossing spatial is according in the scope of motion of shuttle, therefore straw is still placed in reverse crossing spatial; After placed several straw, make the first movable post 261 slide backward little segment distance and get back to original position, repeatedly continuous like this, until form the straw bag needing length, it should be noted that being hung words at straw restricts after between body 81 at the second rope body 82 and first, applies pressure above straw, straw not only can be made compacted close, and, when strength is suitable, straw bag slightly movement downwards can be made, like this, the braiding of a straw bag can be completed soon; Through test, shuttle driver part adopts spring, the mode tramped with one's feet, and single machine is single 23 times of the most skillfully weaving workman, and adopts this machine greatly to save strength than artificial braiding, and therefore, the straw bag cost of manufacture significantly reduces; Applicant has also done further improvement to this machine, adopts motor as the power of shuttle driver part, even if adopt slowspeed machine like this, also reaches and the most skillfully weaves 94 times that workman weaves speed; On this basis, applicant changes straw supply mode into mechanical feeding by manual supply, and speed reaches and the most skillfully weaves 315 times that workman weaves speed; But, this speed, applicant is satisfied with very much, on this basis, the supply mode for straw has carried out further useful improvement to applicant, changes by original unidirectional confession straw, for shuttle also supplies the mode of straw when backhaul, like this, make manufacturing speed turn improve nearly one times, reach and the most skillfully weave 570 times that workman weaves speed.
Therefore, this invention have employed design mode more cleverly, reaches desirable effect, and structure simple, be easy to manufacture, machinery equipment is with low cost, and speed of production is exceedingly fast, and the straw bag quality comparatively unification made, appearance looks elegant.
embodiment 2
Ask for an interview Fig. 2 and Fig. 3, and with reference to figure 1, a kind of straw bag braider, it is the first generation product that applicant studies, and substantially with embodiment 1, difference is: it does not have the 5th spreader 241, but the second spreader 211 is flexibly connected, its can forwards and rear do motion among a small circle; The front of the 7th column 131 is provided with the first holder post 41, the front of the 5th column 121 be provided with the second holder post 42, first hold in the palm post 41 is provided with the first joint pin 43, second hold in the palm post 42 is provided with to be provided with between the second joint pin 44, first joint pin 43 and the second joint pin 44 rotating shaft 46, second joint pin 44 is provided with draw axle 45, namely the rear of rotating shaft 46 be provided with the many depression bars be arranged in parallel 47; Drawing axle is be connected with rotating shaft, draws axle one end and is connected with power source.
In this embodiment, second spreader 211 forwards and rear do motion among a small circle, with draw post 341, cross parts 351 of restrict and coordinates the space forming forward and oppositely intersect so that shuttle can shuttle back and forth in the space of intersection and bring straw 91 into, and the straw bag body of formation gap intersection; Power source makes extraction axle drive rotating shaft small angle rotation, makes depression bar 47 compress straw and straw bag is constantly moved downward; Certainly, when depression bar 47 compresses straw between adjacent extraction post 341 and with extraction post 341, cross rope parts 351 and do not contact.
Certainly, a kind of straw bag braider described in above-mentioned arbitrary embodiment, is characterized in that the described rope through crossing rope parts 351 is through from the top down; And rope parts have an opening excessively, this mode makes the mode of passing of rope have more more options, and efficiency is higher, and can hold the uneven situation of rope thickness.
Certainly, in above-mentioned arbitrary embodiment, described a kind of straw bag braider, it is characterized in that described shuttle head 71 can also tilt relative to shuttle bar 62, this mode is more conducive to the placement of straw.
It should be noted that, in embodiment 1, the first rope body 81 and second body 82 of restricting is interspersed but is not wound around mutually, and the first rope body 81 always will through in the gap the 5th spreader 241 and the second spreader 211, and do not need through the rope through crossing rope parts 351 but directly walk around the 3rd spreader 221 front, and the second rope body 82 does not need through the gap the 5th spreader 241 and the second spreader 211, but directly walk around the second spreader 211, passed the rope through of rope parts 351 again, then walk around the 3rd spreader 221 front.
And first rope body 81 is walked around the second spreader 211 front, is walked around the 3rd spreader 221 front again in embodiment 2; And the second rope body 82 is directly walked around the second spreader 211, passed the rope through of rope parts 351 again, then walk around the 3rd spreader 221 front.
In the present invention, the first rope body 81, second is restricted cannot be overlapping between body 82; In manufacture, the quantity of the first rope body 81, second rope body 82 controls the fabric width of straw bag; When close to complete time, by first rope body 81, second restrict body 82 transversely cut off, take off straw bag, then again frame first restrict body 81, second rope body 82; Certainly, the first rope body 81 and second body 82 of restricting is connected to, and can add rapid erection speed.
Certainly, in the present invention, the first spreader 201, second spreader 211, the 3rd spreader 221, the 4th spreader 231 can also be set to cylindrical structure and can turn around two ends separately, and the movement of such straw bag is more convenient, more laborsaving.
The present invention is not limited to above-mentioned preferred forms, and should be appreciated that design of the present invention can be implemented to use by other various forms, they drop in protection scope of the present invention equally.