CN103962269A - Apparatus for fixing splinkler head - Google Patents

Apparatus for fixing splinkler head Download PDF

Info

Publication number
CN103962269A
CN103962269A CN201310468306.5A CN201310468306A CN103962269A CN 103962269 A CN103962269 A CN 103962269A CN 201310468306 A CN201310468306 A CN 201310468306A CN 103962269 A CN103962269 A CN 103962269A
Authority
CN
China
Prior art keywords
clamping part
sprinkler tip
fixing
handle
hooking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310468306.5A
Other languages
Chinese (zh)
Other versions
CN103962269B (en
Inventor
林太庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
(strain) Enters Bellows Forever
Original Assignee
(strain) Enters Bellows Forever
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (strain) Enters Bellows Forever filed Critical (strain) Enters Bellows Forever
Publication of CN103962269A publication Critical patent/CN103962269A/en
Application granted granted Critical
Publication of CN103962269B publication Critical patent/CN103962269B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C35/00Permanently-installed equipment
    • A62C35/58Pipe-line systems
    • A62C35/68Details, e.g. of pipes or valve systems
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C31/00Delivery of fire-extinguishing material
    • A62C31/28Accessories for delivery devices, e.g. supports
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C37/00Control of fire-fighting equipment
    • A62C37/08Control of fire-fighting equipment comprising an outlet device containing a sensor, or itself being the sensor, i.e. self-contained sprinklers

Landscapes

  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Clamps And Clips (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The present invention relates to a device for fixing a sprinkler head which is installed on the ceiling, in particular, relates to a device for fixing a sprinkler head which easily fixates a sprinkler head without using a screw and is stably fixated despite water hammering due to spray of the fire extinguishing water by including: a pair of fixing brackets which are engaged to a pair of ceiling panels which are separated apart from a predetermined distance and fix a rectangular bar in the both ends; and a grip unit which is supported by the rectangular bar, is installed in between the pair of fixing brackets and fixes a sprinkler body, wherein the grip unit includes: a grip body which has an opened space into which the rectangular bar is inserted; and a handle of which one side is fixed to the grip body and rotated, and provides a fixing force to pressurize the sprinkler body by being engaged with the grip body.

Description

Sprinkler tip fixture
Technical field
The sprinkler tip fixture that the present invention relates to be arranged on ceiling, more particularly, comprises: be incorporated on a pair of top board skeleton arranging across a certain distance mutually, and support a pair of fixed support of four angle beads at two ends; With supported by four angle beads, and be arranged between a pair of fixed support, for the clamping part of fixing watering jet pipe, wherein clamping part comprises: have open space for inserting the clamping part body of four angle beads; Being fixed on clamping part body with a side does and rotates, and be combined with clamping part body, the handle that provides bed knife to exert pressure to watering jet pipe, the present invention relates to not need can fix easily sprinkler tip in conjunction with screw, and sprinkler tip fixture that can be stably fixing under the impact of water sprinkler injection fire water.
Background technology
Conventionally the fixture of sprinkler tip is arranged on above the top board that forms ceiling, and its formation is the watering jet pipe 200 for being fixedly connected on fire water supply pipe 100 and is connected in described watering jet pipe 200 and sprays the sprinkler tip 300 of fire water.
As shown in Figure 1 to Figure 2, utilization is arranged on the T-shaped top board skeleton 400 above top board and arranges existing sprinkler tip fixture 1.Existing sprinkler tip fixture 1 comprises: is fixed on the top board skeleton 400 of setting separated by a certain interval, and for inserting a pair of side supports 11 of four angle beads 500; With the centre that sandwiches described four angle beads 500, and for inserting the intermediate support 12 of fixing described watering jet pipe 200.
Described side supports 11 comprises: have and make patchhole 111a that described four angle beads 500 pass through and a pair of relative vertical plate 111 of the 1st screw hole (111b) in conjunction with screw; Connect the upper end of described vertical plate 111, and there is the upper water plain film 112 in conjunction with the 2nd screw hole 112a of screw; At the lower end of the described vertical plate 111 lower horizontal sheet 113 that tortuous 90 degree form to the inside; And described lower horizontal sheet 113 more tortuous 90 degree form, and be close to described top board skeleton 400 be close to sheet 114.
In addition, described intermediate support 12 comprises: have the upper and lower fixing plate 121 of patchhole 111a, wherein said patchhole 111a is used for inserting described watering jet pipe 200; With the vertical connecting plate 22 that is connected described upper and lower fixing plate 121, wherein said vertical connecting plate 122 comprises the 3rd screw hole that inserts screw.
Therefore, watch the fixed form of existing sprinkler tip fixture 1, described side supports 11 sandwiches after described top board skeleton 400, limit maintains certain position with hand, limit is inserted screw at described the 1st screw hole and is exerted pressure, and is close to sheet 114 described in to be exerted pressure and be fixed with described top board skeleton 400 by the combination of screw.In addition, described four angle beads 500 are inserted in the patchhole 111a of a pair of side supports 11 being oppositely arranged, then by exerting pressure and be fixed in described side supports 11 at the screw of described the 2nd screw hole combination.Then, described intermediate support 12 sandwiches the central part of described four angle beads 500, inserts after described watering jet pipe 200, by exerting pressure described watering jet pipe 200 and intermediate support 12 are close to fixing at the screw of the 3rd screw hole combination at described perforation 121a.
As mentioned above, existing sprinkler tip fixture 1 is that staff considers the position of setting described side supports 11 after position, left and right and height with hand, and fixes described side supports 11 in conjunction with screw with hand holding position time.In addition, described intermediate support 12 is also with fixing with screw combination behind the position of the fixing described watering jet pipe 200 of hand by staff.Therefore, when existing sprinkler tip fixture 1 is set, to climbing to the staff of execution work above of ceiling, operating efficiency and construction effect can reduce, there is on the whole the problem that operating expenses rises, and fail to mix up equilbrium position, there is easy distortion or damaged problem.
In the patent documentation showing below, although Kei shows the sprinkler tip fixture of improving structure, also directly using under the state of hand fixed position and will, in conjunction with screw, adjust height, and under the impact of supplying with fire water, thering is disequilibrium or damaged problem.
(patent documentation)
Open utility model communique No. 20-2008-0003695 (2008.9.2 is open) " supportive device of installing component and the water sprinkler reduced pipe that comprises it "
In addition, because described intermediate support 12 is to rely on the fixing described watering jet pipe 200 of exerting pressure of screw, under the impact of supplying with fire water, screw can unclamp, the bonding state of described watering jet pipe 200 and intermediate support 12 can become flexible, and result is that described watering jet pipe 200 can be mobile or rock and produce the problem of inclination.In addition, described side supports 11 is not only and is produced the unclamping of screw, and produces distortion or interval and become flexible with the sheet 114 of being close to that described top board skeleton 400 is close to, and produces thus that whole sprinkler tip fixture 1 tilts or the problem of breakage.
Summary of the invention
(1) technical problem that will solve
The present invention proposes in order to solve problem as above.
The object of this invention is to provide to comprise by four angle beads and support, be arranged between a pair of fixed support, for the clamping part of fixing watering jet pipe, and clamping part comprises: have open space for inserting the clamping part body of four angle beads; Be fixed on clamping part body with a side and do and rotate, be combined with clamping part body, the handle that provides bed knife to exert pressure to watering jet pipe, does not need can fix easily in conjunction with screw the sprinkler tip fixture of sprinkler tip.
The object of this invention is to provide and comprise a side and be fixed on clamping part body and do and rotate, lateral surface contacts and is provided bed knife with handle, medial surface is exerted pressure and is passed on the press body of bed knife watering jet pipe, more can effectively catch watering jet pipe, under the impact of water sprinkler injection fire water, can stably keep thus the sprinkler tip fixture of stationary state.
The object of this invention is to provide to comprise and there is the steady pin that is fixed on clamping part body, with be connected to press body and steady pin and press body provided to the press body of the elastic mean of recuperability, in the time untiing fixing handle, also rotate and untie by the recuperability press body of elastic mean with together with the rotation of handle, thus in maintenance, the mobile or sprinkler tip fixture that can easily untie while disassembling water sprinkler.
The object of this invention is to provide and on the face contacting with press body at handle, comprise press section press body is exerted pressure, in correct position, press body is exerted pressure and can stably be fixed the sprinkler tip fixture of watering jet pipe thus.
The object of this invention is to provide and be included in the press section that handle hinge forms in conjunction with the roller of rotation, also contact with the lateral surface of press body with the rotation of handle together roller, not only can exert pressure to press body in best position, but also can prevent from pressing at handle the sprinkler tip fixture of contingent friction and damage that collision causes in the process of press body.
The object of this invention is to provide the clamping part body that comprises the portion of hooking with fixed handle, and have to the handle of the outstanding means of hooking of being combined with the portion of hooking of direction of clamping part body, can conveniently arrange and keep the sprinkler tip fixture of bed knife.
The object of this invention is to provide the portion of hooking and be included in the perforation relatively forming on a pair of level board, switch means with the insertion perforation stay hook section of stopping, keep the bed knife that watering jet pipe is exerted pressure and can carry out easily combination and the sprinkler tip fixture of disassembling.
The object of this invention is to provide along the lateral surface at the outstanding position of the means of hooking and form and a plurality ofly hook projection so that according to the fixing position of thickness adjustment of watering jet pipe, can be applicable to thus the sprinkler tip fixture of sizes watering jet pipe.
The object of this invention is to provide comprise have in bottom with " " fixed support of the outstanding zigzag part that sandwiches top board skeleton of shape, can make fixed support once sandwich top board skeleton, and not need to adjust the sprinkler tip fixture of height.
The object of this invention is to provide and be included in bottom and form to the inside and can be close to fixing fixed support with described top board skeleton, make fixed support be close to top board skeleton, sprinkler tip fixture that more can be stably fixing.
The protuberance that the object of this invention is to provide the both sides formation that is included in zigzag part, the upper end that protuberance is placed in described top board skeleton makes fixed support maintenance level, can improve thus the sprinkler tip fixture of worker's operating efficiency.
The object of this invention is to provide comprise with " " the tortuous protuberance forming of shape, to add in the both sides of zigzag part the protuberance forming with zigzag part identical function, more can improve thus the sprinkler tip fixture of described support bracket fastened bed knife.
(2) technical scheme
In order to complete object of the present invention as above, sprinkler tip fixture comprises following formation.
Sprinkler tip fixture according to an embodiment of the invention, is characterized in that comprising: be incorporated on a pair of top board skeleton arranging across a certain distance mutually, and support a pair of fixed support of four angle beads at two ends; With supported by described four angle beads, and be arranged between described a pair of fixed support, for the clamping part of fixing watering jet pipe, wherein said clamping part comprises: have open space for inserting the clamping part body of described four angle beads; Be fixed on described clamping part body with a side and do and rotate, and be combined with described clamping part body, the handle that provides bed knife to exert pressure to described watering jet pipe.
According to another embodiment of the present invention, according to sprinkler tip fixture of the present invention, it is characterized in that described clamping part comprises a side and is fixed on described clamping part body and does and rotate, lateral surface contacts and is provided bed knife with described handle, and medial surface is exerted pressure and passed on the press body of bed knife described watering jet pipe.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described press body comprises the steady pin that is fixed on clamping part body, and be connected to described press body and steady pin and described press body provided to the elastic mean of recuperability.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described handle comprises press section to described press body is exerted pressure on the face contacting with described press body.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described press section is the roller in conjunction with rotation at described handle hinge.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that the portion of hooking that described clamping part body comprises fixing described handle; Described handle comprise to the direction of described clamping part body outstanding with described in the portion's of hooking means of hooking of being combined.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described clamping part body comprises formation separated by a certain interval, and there is open space for inserting a pair of level board of described watering jet pipe; Be connected described level board, along the vertical sidewall of being close to described four angle beads that forms of a lateral edges of described level board, described in the portion of hooking be included in the perforation relatively forming on described a pair of level board; Described in making with the described perforation of insertion, hook the fixing switch means of means.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, described in it is characterized in that, the means of hooking are to hook projection along the lateral surface formation at outstanding position to engage fixing with described switch means.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, described in it is characterized in that, hook projection form a plurality of, according to the fixing position of the thickness adjustment of described watering jet pipe.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, described in it is characterized in that, the means of hooking are formed on the relative edge of pivot one side of described handle, described in the portion of hooking be formed on and described position corresponding to means and intermeshing of hooking.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, described in it is characterized in that, the means of hooking are formed on pivot one side of described handle, described in the portion of hooking be formed on and described position corresponding to means and intermeshing of hooking.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described fixed support comprises described four angle beads are inserted to fixing support sector, and in bottom with " " the outstanding zigzag part that sandwiches described top board skeleton of shape.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described fixed support can be close to fixing with described top board skeleton by bottom tortuous formation to the inside.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described fixed support is included in the protuberance of the both sides formation of described zigzag part, the upper end that described protuberance is placed in described top board skeleton makes described fixed support maintenance level.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described protuberance be with " " shape complications, to more stably fix described fixed support.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described zigzag part comprises the 1st combined hole in conjunction with screw, to stably fix described fixed support.
According to still another embodiment of the invention, according to sprinkler tip fixture of the present invention, it is characterized in that described support sector is formed on described support bracket fastened upper end, comprise a pair of relative peristome passing through for described four angle beads, with the upper plate and the lower plate that are connected described pair of openings portion, described lower plate comprises in conjunction with the 2nd combined hole of screw to exert pressure fixing to described four angle beads.
(3) beneficial effect
The present invention's combination embodiment and formation described later before this, can obtain following effect according to use relation.
The present invention comprises by four angle beads and supports, is arranged between a pair of fixed support, and for the clamping part of fixing watering jet pipe, and clamping part comprises: have open space for inserting the clamping part body of four angle beads; Be fixed on clamping part body with a side and do and rotate, be combined with clamping part body, the handle that provides bed knife to exert pressure to watering jet pipe, has the effect that does not need can fix easily in conjunction with screw sprinkler tip thus.
The present invention comprises a side and is fixed on clamping part body and does and rotate, lateral surface contacts and is provided bed knife with handle, medial surface is exerted pressure and is passed on the press body of bed knife watering jet pipe, more can effectively catch watering jet pipe, there is thus the effect that can stably keep stationary state under the impact of water sprinkler injection fire water.
The present invention comprises and has the steady pin that is fixed on clamping part body, with be connected to press body and steady pin and press body provided to the press body of the elastic mean of recuperability, in the time untiing fixing handle, also rotate and untie by the recuperability press body of elastic mean with together with the rotation of handle, having thus in maintenance, the mobile or effect that can easily untie while disassembling water sprinkler.
On the face that the present invention contacts with press body at handle, comprise press section press body is exerted pressure, have thus in correct position press body is exerted pressure and can stably be fixed the effect of watering jet pipe.
The present invention is included in the press section that handle hinge forms in conjunction with the roller of rotation, also contact with the lateral surface of press body with the rotation of handle together roller, not only can exert pressure to press body in best position, but also can prevent from pressing at handle the effect of contingent friction and damage that collision causes in the process of press body.
The clamping part body that the present invention comprises the portion of hooking with fixed handle, and have to the handle of the outstanding means of hooking of being combined with the portion of hooking of direction of clamping part body, the effect that can conveniently arrange and keep bed knife there is thus.
The present invention is that the portion of hooking is included in the perforation relatively forming on a pair of level board, and the switch means of the insertion perforation stay hook section of stopping, and has thus and keeps the bed knife that watering jet pipe is exerted pressure and can carry out easily combination and the effect of disassembling.
The present invention forms and a plurality ofly hooks projection so that according to the fixing position of thickness adjustment of watering jet pipe along the lateral surface at the outstanding position of the means of hooking, and has thus the effect that can be applicable to sizes watering jet pipe.
The present invention comprise have in bottom with " " fixed support of the outstanding zigzag part that sandwiches top board skeleton of shape, have thus and can make fixed support once sandwich top board skeleton, and do not need to adjust the effect of height.
The present invention is included in bottom tortuous formation to the inside can be close to fixing fixed support with described top board skeleton, has thus the fixed support of making and is close to top board skeleton, effect that more can be stably fixing.
The present invention is included in the protuberance of the both sides formation of zigzag part, and the upper end that protuberance is placed in described top board skeleton makes fixed support maintenance level, has thus the effect of the operating efficiency that can improve worker.
The present invention comprise with " " the tortuous protuberance forming of shape, to add in the both sides of zigzag part the protuberance forming with zigzag part identical function, there is thus the effect that more can improve described support bracket fastened bed knife.
Brief description of the drawings
Fig. 1 is the oblique view of existing sprinkler tip fixture.
Fig. 2 is the exploded perspective view of Fig. 1.
Fig. 3 is the oblique view of sprinkler tip fixture according to an embodiment of the invention.
Fig. 4 is the exploded perspective view of Fig. 3.
Fig. 5 is the sectional view of clamping part in Fig. 3.
Fig. 6 is the reference diagram of clamping part cohesive process in key diagram 3.
Fig. 7 is the reference diagram of clamping part solution open procedure in key diagram 3.
Fig. 8 is the exploded perspective view of the clamping part of sprinkler tip fixture according to another embodiment of the present invention.
Fig. 9 is the sectional view of clamping part in Fig. 8.
Figure 10 is the reference diagram of clamping part cohesive process in key diagram 8.
Figure 11 is the reference diagram of clamping part solution open procedure in key diagram 8.
Figure 12 is the sectional view cutting off along the A-A line of Fig. 3.
Figure 13 is according to the support bracket fastened oblique view of the sprinkler tip fixture of further embodiment of this invention.
Figure 14 is according to the support bracket fastened oblique view of the sprinkler tip fixture of further embodiment of this invention.
Figure 15 is according to the support bracket fastened oblique view of the sprinkler tip fixture of further embodiment of this invention.
Figure 16 is the sectional view cutting off along the B-B line of Figure 15.
Detailed description of the invention
Below in conjunction with accompanying drawing, the sprinkler tip fixture according to preferred embodiment of the present invention is described in detail.In explanation of the present invention, think that illustrating of relevant known function or formation will its detailed explanation of omission when main points of the present invention are caused to unnecessary mixed meat and fish dishes below.In whole description, say that some parts " comprise " some constituent elements, and while thering is no different record, this does not refer to gets rid of other constituent element, and refer to and also may comprise other constituent element.
As mentioned above, water sprinkler is arranged on the ceiling of building, it comprises the fire water supply pipe 100 of supplying with fire water, be connected in the watering jet pipe 200 of described fire water supply pipe 100, and be connected with described watering jet pipe 200, when fire, spray the sprinkler tip 300 of the fire water of being supplied with by described fire water supply pipe 100.
Described sprinkler tip fixture is to arrange in ceiling for fixing sprinkler device, and utilization is erected at the T-shaped top board skeleton 400 above the top board that forms ceiling and arranges.Conventionally the top board skeleton 400 setting up be wider bottom surface screw etc. be fixed on top board above, the upper end of described top board skeleton 400 is to have the ledge in " " type cross section to form on length direction, so that the sprinkler tip fixture that prevents from being arranged on described top board skeleton 400 departs from.
With reference to Fig. 3 to Fig. 7, sprinkler tip fixture is according to an embodiment of the invention described as follows, described sprinkler tip fixture comprises: be incorporated on a pair of top board skeleton 400 arranging across a certain distance mutually, and support a pair of fixed support 3 of four angle beads 500 at two ends; With supported by described four angle beads 500, and be arranged between described a pair of fixed support 3, for the clamping part 2 of fixing watering jet pipe 200, wherein said clamping part 2 comprises: have open space for inserting the clamping part body 21 of described four angle beads 500; Be fixed on described clamping part body 21 with a side and do and rotate, and with described clamping part body 21 combinations, the handle 23 that provides bed knife to exert pressure to described watering jet pipe 200.Detailed description about described fixed support 3 will be stated in the back, first centered by described clamping part 2, describes.
Described clamping part 2 comprises: have open space for inserting the clamping part body 21 of fixing described four angle beads 500; Be fixed on described clamping part body 21 with a side and do and rotate, the handle 23 that provides bed knife to exert pressure to described watering jet pipe 200, and can comprise press body 22 for fixing described watering jet pipe 200 more tightly.The formation of described clamping part 2 is that the combination that does not need screw only can be fixed described watering jet pipe 200 by simple binding operation, and supplies with at water sprinkler under the impact of fire water and can keep bed knife, being described in detail as follows of its formation.
Described clamping part body 21 comprises formation separated by a certain interval, and has open space for inserting a pair of level board 211 of described watering jet pipe 200; Be connected described level board 211, along the vertical sidewall 212 of being close to described four angle beads 500 that forms of a lateral edges of described level board 21.In addition, described clamping part body 21 comprises the portion of hooking (213) and described handle 23 combinations.
Described a pair of level board 211 is to isolate up and down certain intervals to form, and described press body 22 and the rotatable space of handle 23 are provided, and makes a side of described press body 22 and handle 23 be fixed to do and rotates.Described level board 211 is that the described sidewall 212 by forming at a lateral edges of each level board 211 connects, and similarly forms the space that can insert described watering jet pipe 200 at opposite side at each level board 211.The space of now, inserting described watering jet pipe 200 can manufacture various ways according to the outer peripheral face shape of described watering jet pipe 200.
Described sidewall 212 is to connect described a pair of level board 211 and vertically formation.Described sidewall 212 is close to a side of described four angle beads 500, described handle is exerted pressure when fixing to described watering jet pipe 200, the outer peripheral face of the another side of described four angle beads 500 and described watering jet pipe 200 is close to fixing, and described clamping part 2 is fixed on described four angle beads 500 motionless thus.
The described portion 213 of hooking comprises the perforation 213a relatively forming on described a pair of level board 211, and inserts the switch means 213b of described perforation 213a.The described portion 213 of hooking makes described handle 23 provide bed knife with described clamping part body 21 combinations, to exert pressure fixing described watering jet pipe 200.Fixing formation engages with the means of hooking 232 that form on described handle 23 in the described portion 213 of hooking, can be suitable for the device that hooks of various ways according to described form of hooking means 232, in addition, described in the same basis, hook the position that means 232 form as described later, on the position corresponding with it, form.About described in hook means 232 explanation will state in the back.
Described perforation 213a lower horizontal board 211 on described relatively runs through, and hooks that means 232 are fixed and forms on the position that can exert pressure to described watering jet pipe 200, and insert fixing described switch means 213b described.In addition, as described later the same according to described in hook the 213a that bores a hole described in the position of means 232 position also can change.
Described switch means 213b can be suitable for the various ways that hooks means 232 described in fixing, but forms to have flexible pin at the present embodiment, inserts described perforation 213a fixing better.Described to have flexible pin be to insert described perforation 213a with bending form, and its one end complications are close to described clamping part body 21, and the other end forms certain shape and can be by the formation of finger presses.Therefore, press...with one's finger and press described switch means 213b to dissolve in described in untiing to hook means 232, described in can being made by the elasticity of described pin, hook means 232 and be easy to be fixed when fixing.Utilize the detailed operating process of the described clamping part 2 of described switch means 213b will aftermentioned.
Described press body 22 is to make the combination of described handle 23 and described clamping part body 21 and the bed knife that produces is more effectively communicated to the formation of described watering jet pipe 200.The corresponding formation of outer peripheral face of the medial surface of described press body 22 and described watering jet pipe 200, is exerted pressure when fixing by described handle 23, can catch tightly described watering jet pipe 200.In addition, contact with described handle 23, in the time that described handle 23 rotates towards described clamping part body 21, to rotate together, described watering jet pipe 200 is exerted pressure.Now, described press body 22 is the same as described later contacts with the press section 231 of described handle 23.To be described press bodies 22 form the pivot of described press body 22 on the fixing position of described clamping part body 21, be positioned at the direction identical with the pivot of described handle 23, described press body 22 is combined and can be done the formation of rotating with described clamping part body 21 hinges.The detailed description of fixed operation about the watering jet pipe 200 that utilizes described press body 22 will aftermentioned.In addition, described press body 22 can comprise the steady pin 221 that is fixed on described clamping part body 21, and is connected in described press body 22 and described steady pin 221 and described press body 22 is provided to the elastic mean 222 of recuperability.
Described steady pin 221 is that lower horizontal board 211 is fixed its two ends on described, is connected with one end of described elastic mean 222.Described steady pin 221 supports described elastic mean 222 that described press body 22 is strained by the recuperability of described elastic mean 222.Describing in detail about the operation of described press body 22 will aftermentioned.
Described elastic mean 222 can be suitable for the multiple means such as the spring of elastic recovering force can be provided, but be that one end connects described steady pin in the applicable formation of the present embodiment, be centered around the rotating shaft that pivot that described press body 22 rotates forms, it is better that its other end extends to the inside of described press body 22 curved spring forming.Therefore,, in the time that described handle 23 is exerted pressure to described press body 22 to the direction rotation of described clamping part body 21, described elastic mean 222 is opened distortion by described press body 22.And the combination of described handle 23 and described clamping part body 21 is untied, described handle 23 is during to direction rotation away from described clamping part body 21, and described elastic mean 222 produces restorable recuperability can retract described press body 22.So by the recuperability of described elastic mean 222, described press body 22 and handle 23 from described clamping part body 21 to away from direction easily rotate, untiing of described clamping part 2 operated and becomes easy.Described elastic mean 222 can be suitable for the common spring that produces recuperability according to the elongation of length, can more effectively pass on recuperability but be suitable for curved spring at narrow space as mentioned above.
Described handle 23 is that a side is fixed on described clamping part body 21 and does and rotate, and with described clamping part body 21 combinations, the bed knife that can exert pressure to described watering jet pipe 200 is provided.Described handle 23 is to have can catch with hand rectangular, and the formation that smoothing processing can be pressed with hand is done in upper end.The pivot of described handle 23 is formed at fixing position on described clamping part body 21, is positioned at the direction identical with the pivot of described press body 22.In addition, described handle 23 can be exerted pressure to described press body 22 containing press section 231 at the bread contacting with described press body 22, and can comprise direction to described clamping part body 21 outstanding with described in hook the means of hooking 232 of portion's 213 combinations.
Described press section 231 is bed knifes that described handle 23 is provided, be the direction rotation of described handle 23 to described clamping part body 21, with the pressure producing in the process of described clamping part body 21 combinations correct be communicated to described press body 22, the formation of more effectively fixing described watering jet pipe 200.The form of described press section 231 is also unrestricted, but is better in conjunction with revolvable roller at described handle 23 hinges at the present embodiment.Described roller contacts and rotates with described press body 22.Therefore, will fix described watering jet pipe 200 in the process of the direction rotation of described clamping part body 21 at described handle 23, described roller contacts and rotates with described press body 22, so that described handle 23 is pressed described press body 22 naturally.Thus can be laborsaving in cohesive process, can also prevent the problem due to the damaged described press body 22 of excessive pressure or handle 23.Moreover,, when described handle 23 is fixed with described clamping part body 21 combinations, make described handle 23 fix the state that described press body 22 is pressed in best position.Therefore, more can fix tightly described watering jet pipe 200 by described roller.
The described means 232 of hooking are the formations of hooking portion 213 described in correspondence, the outstanding formation of direction at described handle 23 to described clamping part body 21.The described means 232 of hooking are to form better the relative edge of pivot one side of described handle 23, but equally can be formed on as described later pivot one side of described handle 23.If hooking portion 213 so also moves to the position of hooking means 232 described in correspondence with respect to described clamping part body 21 and forms.Described hook described in hooking means 232 and forming at described clamping part body 21 portion 213 in conjunction with and fix.The described means 232 of hooking can be suitable for the multiple seating meanses such as annular state, elastomer, according to described in described form of hooking means 232, hook portion 213 also can be suitable for can with the variform of its combination., be to be formed by the projection of hooking forming along the lateral surface of ledge hooking means 232 described in the present embodiment.The described projection of hooking refers to the groove forming with certain depth along the lateral surface of ledge.The described projection of hooking is to engage and fix with the described switch means 213b that hooks portion 213.In other words, form described switch means 213b and have that flexible pin hooks the groove of projection described in inserting and fixing.Described hook projection can form a plurality of, and according to the thickness of described watering jet pipe 200 can change described switch means 213b pin insert described in hook protrusion groove position.Therefore, sprinkler tip fixture according to the present invention goes for having the water sprinkler of multiple watering jet pipe 200.
Sprinkler tip fixture according to an embodiment of the invention, with reference to Fig. 6 to Fig. 7, describes the operating process of described clamping part 2.Fig. 6 is the figure that shows the cohesive process of described clamping part 2, and Fig. 7 is the figure that shows the solution open procedure of described clamping part 2.
First the cohesive process of described clamping part 2 is described, as shown in Fig. 6 (1), described press body 22 and handle 23, under the state opening, insert described watering jet pipe 200 in the inner space of described clamping part body 21.While inserting described watering jet pipe 200, as shown in Fig. 6 (2), described handle 23 is to the direction rotation of described clamping part body 21, and described press section 231 contacts rotation together with described press body 22 thus.In addition, described elastic mean 222 opens distortion gradually according to the rotation of described press body 22.(3) of Fig. 6 are to show the figure that is completed stationary state by the described watering jet pipe 200 of effect of described clamping part 2, according to the thickness of described watering jet pipe 200, the pin of described switch means 213b inserts suitable position and fixes in the described groove that hooks projection.Now, because described switch means 213b has flexible pin to form, described in only can inserting by slight strength, hook the groove of projection.Complete under the state of combination, as shown in Fig. 6 (3), the outer peripheral face of described watering jet pipe 200 by the medial surface of described press body 22 and described clamping part body 21 be close to around, can stably fix thus.
The solution open procedure of described clamping part 2 is described with reference to Fig. 7, (1) of Fig. 7 is to be presented at the state diagram that the jet pipe 200 of sprinkling water described in described clamping part 2 is fixed, described switch means 213b described above is the groove that hooks projection described in insertion is fixed on, and described elastic mean 222 keeps opening the state of distortion.To untie described watering jet pipe 200 from described clamping part 2, as shown in Fig. 7 (2), described switch means 213b, i.e. one end of pin, the forming section of pressing with hand by pressure energy as illustrated before, described switch means 213b departs from from the described groove that hooks projection thus, and the bed knife being provided by described handle 23 is untied.(3) of Fig. 7 show the fixing state diagram of being untied completely of described watering jet pipe 200, by described handle 23 in the process of the direction rotation away from described clamping part body 21, be pulled by press body 22 described in the recuperability of described elastic mean 222, according to handle 23 described in this recuperability also rotation naturally.Therefore the simple operations that, described clamping part 2 is just pressed described switch means 213b by the effect of described elastic mean 222 can easily be untied.
With reference to Fig. 8 to Figure 11, sprinkler tip fixture is according to another embodiment of the present invention described, described sprinkler tip fixture comprise clamping part 2 and fixed support 3 the same as one embodiment of the invention, described fixed support 3 has the formation identical with a described embodiment, therefore omit the explanation about described fixed support 3 at the present embodiment, as mentioned above equally below will aftermentioned about the explanation of described fixed support 3.To according to the clamping part 2 of the sprinkler tip fixture of the present embodiment, described in hook pivot one side that means 232 are formed on described handle 23, described in hook portion 213 and be formed on the position of hooking means 232 described in correspondence, and intermeshing.
The formation of the described clamping part body 21 except described position of hooking portion 213 of described clamping part 2, the formation of described press body 22, to hook the formation of described handle 23 position that means 232 form the same with the statement of one embodiment of the invention except described, so the description thereof will be omitted below.
Described pivot one side of means 232 at described handle 23 of hooking, extends and forms at the end of described handle 23 fixed positions.Form with hooking according to an embodiment of the invention on the position of position opposite of means 232.Therefore,, hook portion 213 move to described hook means 232 can in conjunction with correspondence position and form.In addition, described in watching, hook the part that projection forms, as shown in Figure 9, hook different that the shape of the means of hooking 232 of projection forms from one embodiment of the invention described in forming at the present embodiment., described in hook means 232 and form described handle 23 is outstanding, form with the projection of hooking of the groove that contains certain depth, hook projection to insert the principle that described switch means 213b is fixing identical with one embodiment of the invention described.
Figure 10 to Figure 11 shows the figure of the cohesive process reconciliation open procedure of clamping part 2 according to another embodiment of the present invention, and Figure 10 shows the cohesive process of described clamping part 2, and Figure 11 shows the solution open procedure of described clamping part 2.The operating principle of described clamping part 2 is the same as mentioned above, so in this simple declaration.First watch cohesive process, as shown in Figure 10 (1), described press body 22 and handle 23 are under the state opening, insert described watering jet pipe 200 in the inner space of described clamping part body 21, then as shown in Figure 10 (2), described handle 23 is exerted pressure to described press body 22 to the direction rotation of described clamping part body 21, final as Figure 10 (3) as shown in, described in hook means 232 with described in hook portion 213 in conjunction with and fix described watering jet pipe 200.Now, described in hook means 232 hook the outside of projection towards described clamping part body 21, by described in hook portion 213 switch means 213b hook and fix.
In addition, separate open procedure as shown in Figure 11 (1), described handle 23 and clamping part body 21, at the state of combination, as shown in Figure 11 (2), are pinned described switch means 213b and are departed from and untie fixing from the described groove that hooks projection.Then,, as shown in Figure 11 (3), by the effect easy rotation of described handle 23 of described elastic mean 222, described watering jet pipe 200 is untied since fixing.
Sprinkler tip fixture according to an embodiment of the invention, described fixed support is described with reference to Fig. 3 to Fig. 4 and Figure 12 to Figure 14, described a pair of fixed support 3 is incorporated into a pair of top board skeleton 400 of setting separated by a certain interval, and supports described four angle beads 500 at two ends.
Described a pair of fixed support 3 is on a pair of top board skeleton 400 setting up separated by a certain interval, to be oppositely arranged separately on ceiling, and the fixing two ends of supporting described four angle beads 500.Described fixed support 3 is stably to support described four angle beads 500, and can not formed by the material with certain rigidity of breakage under the impact of water sprinkler supply fire water, and the template shape with certain width is better.Described fixed support 3 be included in bottom with " " shape is outstanding sandwiches the zigzag part 31 of described top board skeleton 400 and insert fixing support sector 32 at four angle beads 500 described in upper end.In addition, described fixed support 3 also comprises protuberance 33 and more can stably be fixed on described top board skeleton 400.
The bottom that described zigzag part 31 is included in described fixed support 3 extends the part that forms again the downward 90 direction complications of spending with the outstanding part of the direction of 90 degree with at its end.Therefore, described zigzag part 31 is close to described fixed support 3 is sandwiched on described top board skeleton 400 with the upper end with " " shape of described top board skeleton 400.Said zigzag part 31 makes described fixed support 3 be placed in the upper end of described top board skeleton 400, and around the upper end that sandwiches described top board skeleton 400, without adjusting height up and down, described fixed support 3 is arranged on to correct position, only once to sandwich the position adjustment that has operated described fixed support 3.Now, make described fixed support 3 more stably be fixed on described top board skeleton 400, its bottom can be tortuous to the inside.As shown in figure 12, the lowest end of described fixed support 3 to the inside complications is close to described top board skeleton 400, thus described top board skeleton 400 completely by the tortuous lowest end of described zigzag part 31 and described fixed support 3 around, described fixed support 3 can not be rocked and is stably fixed on described top board skeleton 400.
As shown in figure 12, described support sector 32 is formed on the upper end of described fixed support 3, comprise and insert fixing for described four angle beads 500, and a pair of relative peristome 321 that described four angle beads 500 pass through, with the upper plate 322 and the lower plate 323 that are connected described pair of openings portion 321, described lower plate 323 comprises in conjunction with the 2nd combined hole 323a of screw to exert pressure fixing to described four angle beads 500.
Described pair of openings portion 321 is spaces that described four angle beads 500 pass through, and one in the upper end of described fixed support 3, and another is connected with lower plate 323 with described upper plate 322 mutually and relatively forms.Therefore, described four angle beads 500 are suspended in described pair of openings portion 321, are pressed fixing by the 2nd combined hole 323a forming in described lower plate 323 in conjunction with screw.
Described upper plate 322 is connected described pair of openings portion 321 and supports described four angle beads 500 with lower plate 323, form the 2nd combined hole 323a so that in conjunction with screw as mentioned above in described lower plate 323.Screw by described the 2nd combined hole 323a combination is exerted pressure to described four angle beads 500, and described four angle beads 500 are fixed by the low side support of described peristome 321.
As mentioned above, described the 2nd combined hole 323a is inserted into screw described four angle beads 500 is exerted pressure, now described the 2nd combined hole 323a is not at described upper plate 322 but forms in lower plate 323, to staff's execution work smoothly of sprinkler tip fixture is set under ceiling.
As shown in figure 13, described protuberance 33 is outstanding with identical direction at the height identical with described zigzag part 31, forms respectively one in the both sides of described zigzag part 31.The upper end that described protuberance 33 is placed in described top board skeleton 400 makes described fixed support 3 maintenance levels.In addition, as shown in figure 14, described protuberance 33 makes its formation have the function identical with described zigzag part 31 to tortuous 90 degree below at its end again.Therefore, described fixed support 3, more can be stably fixed on described top board skeleton 400 more tightly around described top board skeleton 400 by the effect of described zigzag part 31 and protuberance 33.
With reference to Figure 15 to Figure 16, the sprinkler tip fixture according to further embodiment of this invention is described clamping part 2 and fixed support 3 as described in described sprinkler tip fixture comprises as one embodiment of the invention.Described clamping part 2 has formation as above, so the description thereof will be omitted below.
Described fixed support 3 comprises described zigzag part 31, support sector 32 and protuberance 33, and detailed explanation is the same as mentioned above.Just, can also comprise the 1st combined hole 311 in conjunction with screw at zigzag part described in the present embodiment 31.Described fixed support 3 described above can easily be adjusted position and be sandwiched by the effect of described zigzag part 31 and be fixed on top board skeleton 400, but for making described fixed support 3 more stably be fixed on described top board skeleton 400, can be in conjunction with screw at described zigzag part 31.
Described the 1st combined hole 311 described zigzag part 31 with " " the outstanding part of shape on, form in the part parallel with described top board skeleton 400.Described the 1st combined hole 311 be by described the 1st combined hole 311 in conjunction with screw, in conjunction with screw described top board skeleton 400 is exerted pressure, make described fixed support 3 and described top board skeleton 400 more fixing.But, screw by described the 1st combined hole 311 in conjunction be operated in described clamping part 2 and fixed support 3 all that rear execution is set is better, because pass through described the 1st combined hole 311 in conjunction with before screw, described fixed support 3 can stably be fixed on described top board skeleton 400, even if increase the effect that still can keep improving work convenience in conjunction with the process of screw than existing sprinkler tip fixture 1.
Above, applicant is illustrated various embodiments of the present invention, but so embodiment just realizes an embodiment of the technology of the present invention thought, every arbitrary modification or fixed case that realizes the technology of the present invention thought should be interpreted as belonging to scope of the present invention.
The explanation > of the main pictorial symbolization of <
100: fire water supply pipe 200: watering jet pipe
300: sprinkler tip 400: top board skeleton
500: four angle beads 1: existing sprinkler tip fixture
11: side supports 111: vertical plate
111a: patchhole 111b: the 1st screw hole
112: upper water plain film 112a: the 2nd screw hole
113: lower horizontal sheet 114: be close to sheet
12: intermediate support 121: fixed head
121a: perforation 122: vertical connecting plate
122a: the 3rd screw hole 2: clamping part
21: clamping part body 211: level board
212: sidewall 213: hook portion
213a: perforation 213b: switch means
22: press body 221: steady pin
222: elastic mean 23: handle
231: press section 232: hook means
3: fixed support 31: zigzag part
311: the 1 combined holes 32: support sector
321: peristome 322: upper plate
The 323: lower plate 323a: the 2nd combined hole
33: protuberance

Claims (17)

1. a sprinkler tip fixture, is characterized in that comprising:
Be incorporated on a pair of top board skeleton arranging across a certain distance mutually, and support a pair of fixed support of four angle beads at two ends; With
Supported by described four angle beads, and be arranged between described a pair of fixed support, for the clamping part of fixing watering jet pipe,
Wherein, described clamping part comprises: have open space for inserting the clamping part body of described four angle beads; Be fixed on described clamping part body with a side and do and rotate, and be combined with described clamping part body, the handle that provides bed knife to exert pressure to described watering jet pipe.
2. sprinkler tip fixture according to claim 1, is characterized in that described clamping part comprises
One side is fixed on described clamping part body and does and rotate, and lateral surface contacts and is provided bed knife with described handle, and medial surface is exerted pressure and passed on the press body of bed knife described watering jet pipe.
3. sprinkler tip fixture according to claim 2, is characterized in that described press body comprises the steady pin that is fixed on described clamping part body, and is connected to described press body and described steady pin and described press body is provided to the elastic mean of recuperability.
4. sprinkler tip fixture according to claim 3, is characterized in that described handle comprises press section to described press body is exerted pressure on the face contacting with described press body.
5. sprinkler tip fixture according to claim 4, is characterized in that described press section is the roller in conjunction with rotation at described handle hinge.
6. according to the sprinkler tip fixture described in any one in claim 1 to 5, it is characterized in that the portion of hooking that described clamping part body comprises fixing described handle,
Described handle comprise to the direction of described clamping part body outstanding with described in the portion's of hooking means of hooking of being combined.
7. sprinkler tip fixture according to claim 6, is characterized in that described clamping part body comprises:
Formation separated by a certain interval, and there is open space for inserting a pair of level board of described watering jet pipe; Be connected described level board, along the vertical sidewall of being close to described four angle beads that forms of a lateral edges of described level board,
The described portion of hooking is included in the perforation relatively forming on described a pair of level board; Described in making with the described perforation of insertion, hook the fixing switch means of means.
8. sprinkler tip fixture according to claim 7, described in it is characterized in that, the means of hooking are to hook projection along the lateral surface formation at outstanding position to engage fixing with described switch means.
9. sprinkler tip fixture according to claim 8, described in it is characterized in that, hook projection form a plurality of, according to the fixing position of the thickness adjustment of described watering jet pipe.
10. sprinkler tip fixture according to claim 6, described in it is characterized in that, the means of hooking are formed on the relative edge of pivot one side of described handle,
11. sprinkler tip fixtures according to claim 6, described in it is characterized in that, the means of hooking are formed on pivot one side of described handle,
The described portion of hooking is formed on and described position corresponding to means and intermeshing of hooking.
12. sprinkler tip fixtures according to claim 1, is characterized in that described fixed support comprises described four angle beads are inserted to fixing support sector, and in bottom with " " the outstanding zigzag part that sandwiches described top board skeleton of shape.
13. sprinkler tip fixtures according to claim 12, is characterized in that described fixed support can be close to fixing with described top board skeleton by bottom tortuous formation to the inside.
14. sprinkler tip fixtures according to claim 13, is characterized in that described fixed support is included in the protuberance of the both sides formation of described zigzag part,
The upper end that described protuberance is placed in described top board skeleton makes described fixed support maintenance level.
15. sprinkler tip fixtures according to claim 14, it is characterized in that described protuberance be with " " shape complications, to more stably fix described fixed support.
16. sprinkler tip fixtures according to claim 15, is characterized in that described zigzag part comprises the 1st combined hole in conjunction with screw, to stably fix described fixed support.
17. sprinkler tip fixtures according to claim 12, is characterized in that described support sector is formed on described support bracket fastened upper end, comprise a pair of relative peristome passing through for described four angle beads, with the upper plate and the lower plate that are connected described pair of openings portion,
Described lower plate comprises in conjunction with the 2nd combined hole of screw to exert pressure fixing to described four angle beads.
CN201310468306.5A 2013-08-09 2013-10-09 Sprinkler tip fixture Active CN103962269B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020130094711A KR101335984B1 (en) 2013-08-09 2013-08-09 Apparatus for fixing splinkler head
KR10-2013-0094711 2013-08-09

Publications (2)

Publication Number Publication Date
CN103962269A true CN103962269A (en) 2014-08-06
CN103962269B CN103962269B (en) 2015-12-02

Family

ID=49987048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310468306.5A Active CN103962269B (en) 2013-08-09 2013-10-09 Sprinkler tip fixture

Country Status (2)

Country Link
KR (1) KR101335984B1 (en)
CN (1) CN103962269B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107362486A (en) * 2016-05-13 2017-11-21 (株)永进波纹管 The bellows fixing device of sprinkling equipment
CN108291671A (en) * 2015-11-30 2018-07-17 维克托里克公司 Sprinkler adapter and pipe plug

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101456011B1 (en) * 2013-06-05 2014-11-03 김형수 Fixing Bracket For Installing The Reducer
KR101603863B1 (en) * 2015-01-12 2016-03-17 정운택 Fixing Bracket of Sprinkler
WO2020236108A1 (en) * 2019-05-21 2020-11-26 Haci Ayvaz Endüstri̇yel Mamüller Sanayi̇ Ve Ti̇caret Anoni̇m Şi̇rketi̇ Upper clamp lock of sprinkler bracket
KR200493270Y1 (en) * 2019-09-18 2021-03-04 백창선 One touch fixing apparatus for reducer of sprinkler
KR200493271Y1 (en) * 2019-09-18 2021-03-03 백창선 One touch fixing apparatus for reducer of sprinkler
WO2021100963A1 (en) * 2019-11-22 2021-05-27 임영순 Fire-extinguishing sprinkler end bracket having lock function
KR102340752B1 (en) * 2020-01-14 2021-12-16 김주완 Fixing apparatus for reduer of sprinkler
KR102195038B1 (en) * 2020-05-04 2020-12-24 차종현 Fixing Device For Fire-Fighting Pipe
KR102541725B1 (en) 2023-01-27 2023-06-13 임영순 Bracket for sprinkler head

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2629893A1 (en) * 1988-04-11 1989-10-13 Sofanou Sa Connection and fixing component for ringed tubes
US6213140B1 (en) * 2000-01-05 2001-04-10 The Lisle Corporation Hose clamp tool and method for clamping hoses of multiple size
CN2695753Y (en) * 2004-04-29 2005-04-27 杭州稳可精密电子有限公司 Easy operated clasp
CN201505386U (en) * 2009-09-25 2010-06-16 昆山展宇波纹管有限公司 Locating device of fire-fighting flexible pipe
CN101748774A (en) * 2010-01-12 2010-06-23 厦门松霖科技有限公司 Toggle slide
KR20110018085A (en) * 2009-08-17 2011-02-23 장규철 Clamp for fixing of hose and steel bar
KR20120032337A (en) * 2010-09-28 2012-04-05 (주)파라다이스산업 Apparatus for mounting sprinkler and sprinkler having the same
KR101289274B1 (en) * 2013-01-21 2013-07-24 주식회사 영진플렉스 Fixing bracket of sprinkler

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2629893A1 (en) * 1988-04-11 1989-10-13 Sofanou Sa Connection and fixing component for ringed tubes
US6213140B1 (en) * 2000-01-05 2001-04-10 The Lisle Corporation Hose clamp tool and method for clamping hoses of multiple size
CN2695753Y (en) * 2004-04-29 2005-04-27 杭州稳可精密电子有限公司 Easy operated clasp
KR20110018085A (en) * 2009-08-17 2011-02-23 장규철 Clamp for fixing of hose and steel bar
CN201505386U (en) * 2009-09-25 2010-06-16 昆山展宇波纹管有限公司 Locating device of fire-fighting flexible pipe
CN101748774A (en) * 2010-01-12 2010-06-23 厦门松霖科技有限公司 Toggle slide
KR20120032337A (en) * 2010-09-28 2012-04-05 (주)파라다이스산업 Apparatus for mounting sprinkler and sprinkler having the same
KR101289274B1 (en) * 2013-01-21 2013-07-24 주식회사 영진플렉스 Fixing bracket of sprinkler

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108291671A (en) * 2015-11-30 2018-07-17 维克托里克公司 Sprinkler adapter and pipe plug
CN111520548A (en) * 2015-11-30 2020-08-11 维克托里克公司 Sprinkler adapter and pipe plug
US10927993B2 (en) 2015-11-30 2021-02-23 Victaulic Company Pipe plug and method of use
CN111520548B (en) * 2015-11-30 2022-02-22 维克托里克公司 Sprinkler adapter and pipe plug
CN107362486A (en) * 2016-05-13 2017-11-21 (株)永进波纹管 The bellows fixing device of sprinkling equipment

Also Published As

Publication number Publication date
KR101335984B1 (en) 2013-12-04
CN103962269B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103962269A (en) Apparatus for fixing splinkler head
US20120138766A1 (en) Supporting frame for flat electronic device,
TWM498228U (en) Improved structure for tile flattener
CA2458511A1 (en) Support structure of a portable keyboard
WO2008150717A3 (en) Work space arrangements including counter assembly
US20170332786A1 (en) Easel
DE602006014580D1 (en) STRAP DEVICE
CN203099235U (en) Support frame for fixing panel-shaped electronic product
KR101356687B1 (en) A bracket for fixing expansion joint of splinkler
CN107362486A (en) The bellows fixing device of sprinkling equipment
CN104307938B (en) Sheet metal bar folder for construction site
CN206246984U (en) It is easy to the panel computer equipment of basic computer teaching
EP2040142A3 (en) Display
CN108018682B (en) Screw cover and washing machine adopting same
JP5408561B1 (en) Tablet holder
KR100944632B1 (en) Computer monitor holding bracket located on a partition board
CA127314S (en) Adhesive thoraco lumbar support brace
CN203856152U (en) Spliced decorating plate
USD553875S1 (en) Loop-frame lectern with removable front panel
CN205030766U (en) Angle adjusting device
WO2017199136A1 (en) Toy construction kit
CN209473794U (en) A kind of wearable device and watchband connection component
CN209908368U (en) Assembled and disassembled screen structure for door and window
CN208540849U (en) A kind of adjustable storage box
CN207285699U (en) Computer chair improved structure with decompression

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant