Waterway switching device and gondola water faucet
Technical field
The present invention relates to a kind of waterway switching device and gondola water faucet.
Background technology
It is entitled that Chinese patent database discloses utility model on 31st in August in 2011《A kind of three function pushing-toggling switch switchings
Gondola water faucet》Utility model, its notification number be CN201949936U, it includes body, water outlet cavity, pushing button, seal shaft and bullet
Property sealing gasket, first group of outlet of two kinds of functional effects and second group of outlet are formed on water outlet cavity;In body interior
First water route, the second water route, switching chamber and total water route be set, the water outlet port in the first water route and the second water route respectively with first group
Outlet and second group of outlet communicate, and the water inlet port in the first water route and the second water route is communicated with total water route by switching chamber,
The corresponding switching chamber of body surface also opens up switching port;Seal shaft is slidably arranged in switching chamber, and elastic sealing gasket is arranged on sealing
On axle;Pushing button is slidably arranged on switching port, and pushing button is connected with seal shaft, drives elastic sealing gasket to block the first water route
Water inlet port or the water inlet port in the second water route or the water inlet port of simultaneously opening the first water route and the second water route.This technical side
Case there are following deficiency:This water outlet port direction is vertical with seal shaft glide direction, then whole switching device height is higher, close
Envelope axle sliding stroke is longer, takes up room larger.
Content of the invention
The invention provides waterway switching device and gondola water faucet, which overcome existing for waterway switching device in background technology
Not enough.
The present invention solves one of technical scheme being adopted of its technical problem:
Waterway switching device, is connected to the switching seat of standing part and and lives including a standing part, an energy slide anteroposterior
It is automatically connected in standing part and the operating parts of the switching seat that is in transmission connection;This fixed part sets up separately into water route and at least two points water routes,
This point of water route all has the entrance that can turn on into water route, and the entrance in this at least two points of water route is all arranged forward backward;This switching seat
If at least one seal receptacle, this seal receptacle can be adapted to the entrance in sealing point water route, drives switching seat relatively solid by operating parts operation
Determine part slide anteroposterior, drive seal receptacle fore-aft travel to realize a point water route switching by switching seat slide anteroposterior.
Among one preferred embodiment:This point of water route number is two, the entrance in this two points of water routes towards arrangement, this sealing
Seat number is one, and this seal receptacle is located between the entrance in two points of water routes.
Among one preferred embodiment:This point of water route number is two and respectively first point water route and second point of water route, should
Seal receptacle number is two and the respectively first seal receptacle and the second seal receptacle, and this first seal receptacle and first point of waterway inlet are fitted
Join, this second seal receptacle and second point of waterway inlet are adapted to;This switching seat relatively fixed part is in primary importance and the second position
Between slide, positioned at primary importance when the first seal receptacle seal first point of waterway inlet, the second seal receptacle and second point of waterway inlet
Away from, positioned at the second position when the second seal receptacle seal second point of waterway inlet, the first seal receptacle and first point of waterway inlet
Away from.
Among one preferred embodiment:This first point of waterway inlet and second point of waterway inlet between left and right every and towards towards,
This first seal receptacle and the second seal receptacle are located between first point of waterway inlet and second point of waterway inlet and are respectively and fixedly connected to switch
The left and right sides of seat.
Among one preferred embodiment:This operating parts is rocker type switch, is articulated in standing part, this operation in the middle part of this operating parts
The rear portion of part and switching seat are in transmission connection.
Among one preferred embodiment:Switching shaft is set between this operating parts and switching seat, the affixed switching in this switching shaft one end seat, separately
One end sets two annular flange flange of time interval;This operating parts rear portion sets between left and right every two pulling parts, and this switching shaft other end is folded in
Between two pulling parts, this two pulling part is between two annular flange flange.
Among one preferred embodiment:This fixed part sets up all separately and changes chamber, and this two points of waterway inlets are located at switching intracavity, and this is cut
Change the part that intracavity is formed as into water route or enters water route, this switching seat one end is stretched out outside switching chamber and the operating parts that is in transmission connection.
What the present invention solved the technical scheme being adopted of its technical problem two is:
Gondola water faucet, including gondola water faucet main body, this gondola water faucet main body has one handle section and head sections, sets and correspond to not in this head sections
At least two water chambers of congenerous spray, this waterway switching device is installed in gondola water faucet main body, this at least two water chamber and at least two
Divide water route to correspond to connect.
Among one preferred embodiment:This operating parts is installed in the position near head sections of the handle section of gondola water faucet main body.
Among one preferred embodiment:Switching chamber is set, this two points of waterway inlets are located at switching intracavity, this switching in this head sections
The part that intracavity is formed as into water route or enters water route, this switching seat one end is stretched out outside switching chamber and the operating parts that is in transmission connection.
Compared with background technology, it has the advantage that the technical program:
1st, the entrance at least two points of water routes is all arranged forward backward, switching seat relatively fixed part slide anteroposterior, then overcome
Deficiency existing for background technology and produce following technique effect:A, switching device height relatively low, switching seat slip row
Journey is shorter, takes up room little;B, switching are firmly little, and feel is brisk, and handover operation is convenient;C, can hydraulic pressure effect under keep switching
State afterwards, good seal performance, reduces elastomer, structure is simple, low cost.
2nd, towards arrangement, seal receptacle is located between the entrance in two points of water routes the entrance in two points of water routes, and structure is simple, takies
Space is little.
3rd, slide between primary importance and the second position in switching seat relatively fixed part, positioned at primary importance when first seal
Seat first point of waterway inlet of sealing, the second seal receptacle and second point of waterway inlet away from, positioned at the second position when second seal
Seat second point of waterway inlet of sealing, the first seal receptacle and first point of waterway inlet are away from firmly little, the handover operation side of switching
Just, take up room little.
4th, first point of waterway inlet and second point of waterway inlet between left and right every and towards close towards, the first seal receptacle and second
Envelope seat is located between first point of waterway inlet and second point of waterway inlet and is respectively and fixedly connected to switch the left and right sides of seat, and layout is ingenious,
Take up room little, handover operation is convenient.
5th, operating parts is rocker type switch, is articulated in standing part, the rear portion of operating parts and switching seat transmission in the middle part of operating parts
Connect, this structure is substantially indicative strong, and user easily looks for, lever construction exerts oneself to save, and one-handed performance is convenient.
6th, the switching shaft other end sets two annular flange flange of time interval, and operating parts rear portion sets between left and right every two pulling parts, switches
Axle one end is folded between two pulling parts, and two pulling parts, between two annular flange flange, drive switching shaft and switching by pressing rocker type switch
Seat slide anteroposterior together, handover operation is convenient, firmly saves, compact conformation, takes up room little.
7th, fixed part sets up switching chamber separately, and two points of waterway inlets are located at switching intracavity, and switching intracavity is formed as into water route or enters
The part in water route, switching seat one end is stretched out outside switching chamber and the operating parts that is in transmission connection, compact conformation.
8th, waterway switching device is installed in gondola water faucet main body, whole gondola water faucet thickness of thin, compact conformation, small volume, and outward appearance is very thin
Succinctly attractive in appearance.
9th, operating parts is installed in the position near head sections of the handle section of gondola water faucet main body, is easy to user's one-handed performance.
Brief description
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 depicts the schematic perspective view of gondola water faucet.
Fig. 2 depicts the perspective exploded view of gondola water faucet.
Fig. 3 depicts the A-A generalized section of Fig. 4, and now gondola water faucet goes out the first spray.
Fig. 4 depicts the B-B generalized section of Fig. 3, and now gondola water faucet goes out the first spray.
Fig. 5 depicts the C-C generalized section of Fig. 6, and now gondola water faucet goes out the second spray.
Fig. 6 depicts the D-D generalized section of Fig. 5, and now gondola water faucet goes out the second spray.
Label declaration:Body 10, cover 12, point water body 14, bonnet 16, switching seat 18, operating parts 20, annular wall 22, close
Shrouding 24,26, second point of 42, first point of water route of through hole water route 28, enter the entrance 30, second in 60, the first point of water route 26 in water route
32, first point of water box 34 of entrance in point water route 28, second point of water box 36, the first seal receptacle 38, the second seal receptacle 40, sealing gasket
58th, switching shaft 44, annular flange flange 46, pulling part 48, stopper 50, mandrel 52, front pipeline section 54, rear pipeline section 56.
Specific embodiment
Refer to Fig. 1 to Fig. 6, gondola water faucet, including gondola water faucet main body, this gondola water faucet main body includes a body 10,12, one point of a cover
Water body 14 and a bonnet 16.This body 10 has handle section and head portion, this bonnet 16 closure be connected on head portion and its
Interior formation accommodation space, this cover 12 and a point water body 14 are all installed in accommodation space and constitute head sections, this cover 12 and point
Water body 14 is affixed and sets first water chamber corresponding to the first function spray and the second water chamber of a corresponding second function spray.
This gondola water faucet main body sets waterway switching device.This waterway switching device includes a standing part, an energy slide anteroposterior even
The switching seat 18 and one being connected on standing part is movably connected in standing part and the operating parts 20 of the switching seat 18 that is in transmission connection.This reality
Apply among example, this standing part applies gondola water faucet main body.
Fixed annular wall 22 on this point of water body 14, separately sets the sealing plate 24 that closure connects annular wall 22, to be formed as cutting
Change chamber, separately set in annular wall 22 and water source can be introduced the through hole 42 running through inside and outside switching intracavity.This fixed part sets up first separately
Point 26, second point of water route water route 28 and enter water route 60, among the present embodiment, this enters water route is switching chamber, and this point of water route all has
Can turn on the entrance into water route, this two points of waterway inlets are located at switching intracavity.And, entrance 30 court in this first point of water route 26
Before, the entrance 32 in second point of water route 28 backwards, before and after the entrance 30 in this first point of water route 26 and the entrance 32 in second point of water route 28
Arrangement and between left and right every.Among the present embodiment, this first point of water route 26 include a relatively fixed part fixed there is an opening
First point of water box 34 connect with one first point of water box 34 first connection water route, this opening be above-mentioned entrance 30;The present embodiment
Among, first point of water box 34 and the first water chamber are connected in this first connection water route;This second point of water route includes one and is relatively fixed portion
Fixed second point of water box 36 with an opening are divided to connect the second connection water route of second point of water box 36 with one, this opening is upper
State entrance 32;Among the present embodiment, second point of water box 34 and the second water chamber are connected in this second connection water route;The present embodiment it
In, this first, second point of water box 34,36 is installed on point water body, and a point water body is run through, to connect in this first, second connection water route
Divide water box and water chamber.
This switching seat 18 sets the first seal receptacle 38, the second seal receptacle 40, this first seal receptacle 38 and first point of waterway inlet
30 adaptations, this second seal receptacle 40 and second point of waterway inlet 32 are adapted to;This first seal receptacle 38 and the second seal receptacle 40 are located at
Between first point of waterway inlet 30 and second point of waterway inlet 32, time interval and be respectively and fixedly connected to switch seat 18 left and right sides.This
Among embodiment, at best first seal receptacle 38, set up sealing gasket 58 to increase sealing property.This switching seat 18 is relatively fixed portion
Slide point between primary importance and the second position, positioned at primary importance when the first seal receptacle 38 seal first point of waterway inlet 30,
Second seal receptacle 40 and second point of waterway inlet 32 away from, positioned at the second position when the second seal receptacle 40 seal second point of water route
Entrance 32, the first seal receptacle 38 and first point of waterway inlet 30 are away to drive seal receptacle by switching seat 18 slide anteroposterior
38th, 40 fore-aft travel are to realize point water route 26,28 switching.
Among the present embodiment, the rear end of this switching seat 18 can slide pass switching chamber annular wall 22 outside to be in transmission connection
Operating parts 20.
This operating parts 20 is installed in the position near head sections of the handle section of gondola water faucet main body, and this operating parts 20 is opened for ship shape
Close, in the middle part of this operating parts 20, be articulated in standing part, the rear portion of this operating parts and switching seat are in transmission connection.Among the present embodiment,
Operating parts 20 and switching seat 18 between set switching shaft 44, this switching shaft 44 one end affixed switching seat 18 rear end, the other end set before and after between
Every two annular flange flange 46;This operating parts 20 rear portion sets between left and right every two pulling parts 48, and this switching shaft other end is folded in two pulling parts
Between, this two pulling part is between two annular flange flange, so that can drive switching shaft slide anteroposterior when operating parts swings, drives switching seat
Relatively fixed part slide anteroposterior.
Among the present embodiment, this handle section passes through stopper 50 can be installed in watering, can turn on water source.
Among the present embodiment, also include a mandrel 52, this mandrel 52 has the front pipeline section 54 of two bifurcateds and by managing before two
Section 54 rear portions accumulate one after pipeline section 56;This switching chamber sets two through holes 42, this before two pipeline section 54 connect this two through hole 42, should
Before water source is passed through two by pipeline section 56 afterwards, pipeline section 54 introduces switching intracavity, and this switching shaft 44 is located between the front pipeline section 54 of two bifurcateds.
Among the present embodiment, this handle section sets breach, and this operating parts is connected to this breach, and this mandrel is installed in handle section, and makes
The bifurcated of this pipeline section before two partly correspond to breach, so that operating parts connects switching shaft.
Among the present embodiment, but it is not limited thereto taking two seal receptacles as a example, as needed, such as two entrances front
Right, then a seal receptacle being located between the entrance in two points of water routes also can achieve switching.
Among the present embodiment, with two points of water routes with example, but it is not limited thereto, as needed, also can in three points of water routes
The applicable present invention.
The above, only present pre-ferred embodiments, therefore can not limit according to this present invention enforcement scope, that is, according to
Equivalence changes and modification that the scope of the claims of the present invention and description are made, all should still belong in the range of the present invention covers.