CN103959864B - Signaling method and relevant device - Google Patents
Signaling method and relevant device Download PDFInfo
- Publication number
- CN103959864B CN103959864B CN201380002697.XA CN201380002697A CN103959864B CN 103959864 B CN103959864 B CN 103959864B CN 201380002697 A CN201380002697 A CN 201380002697A CN 103959864 B CN103959864 B CN 103959864B
- Authority
- CN
- China
- Prior art keywords
- subscriber equipment
- intervalometer
- base station
- power overhead
- preference
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0212—Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0212—Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
- H04W52/0216—Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave using a pre-established activity schedule, e.g. traffic indication frame
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0251—Power saving arrangements in terminal devices using monitoring of local events, e.g. events related to user activity
- H04W52/0254—Power saving arrangements in terminal devices using monitoring of local events, e.g. events related to user activity detecting a user operation or a tactile contact or a motion of the device
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention relates to the communications field, particularly to a kind of signaling method and relevant device, the method comprise the steps that when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, judge that the first timer for limiting the transmission that the preference reducing power overhead indicates is the most overtime, if it is judged that be yes, then send the preference instruction reducing power overhead to base station;When the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, send to described base station and increase the preference instruction of power overhead or judge that the second timer being used for limiting the transmission of the preference instruction increasing power overhead is the most overtime, if it is judged that be yes, then send the preference instruction increasing power overhead to described base station.The present invention can promote the experience of user.
Description
This application claims and submit Patent Office of the People's Republic of China, Application No. on August 6th, 2012
PCT/CN2012/079743, the PCT Patent Shen of invention entitled " signaling method and relevant apparatus "
Priority please, entire contents is hereby incorporated by the application.
Technical field
The present invention relates to the communications field, particularly to a kind of signaling method and relevant device.
Background technology
In 3GPP(3rd Generation Partnership Project, third generation partner program) EDDA
(Enhancement on Diverse Data Applications, diversity data application strengthens) WI(Work
Item, job) standard discussion in, have agreed to: UE(User Equipment, subscriber equipment)
Can be to eNB(evolved Node B, enode b) send one about UE power overhead preference
Instruction (power preference indication).Such as, when the screen of UE is closed, UE wishes permissible
It is operated in the state of more power saving, therefore can obtain the configuration of more power saving to eNB request;And when UE wishes
Hope and recover default conditions, i.e. can ensure that its QoS(Quality of Service, service quality) shape that requires
During state, UE can return its default conditions to eNB request, it is thus achieved that the configuration parameter that guaranteed qos requires.
Additionally, the instruction of this power overhead preference can also be defined as asking the instruction of power overhead " high/low ".
Such as, when UE is to current DRX(Discontinuous Reception, discontinuous reception) configure and be discontented with
During meaning, UE can ask to reduce the configuration of power overhead, i.e. to the instruction that eNB sending value is " low ";Phase
Anti-, if UE wishes to obtain more preferable user impression and do not mind power overhead, UE can be to eNB
Sending value is the instruction of " high ".Described " high " or " low " is a relative concept, i.e. UE can
" high " is asked with continuous print, or continuous print request " low ".
In order to limit the frequent transmission of the instruction of this power overhead preference, cause unnecessary signaling consumption and increasing
Adding the power overhead of UE, prior art proposes some restriction schemes, and one of which is limit based on intervalometer
Making mechanism, this mechanism includes: after UE have sent a power overhead preference instruction, (request power overhead is " high
/ low " instruction), start a default intervalometer, only when, after this timer expiry, could again send out
Send the instruction of power overhead preference.
Due to the instruction of UE power overhead preference, can be that the request of power optimization (i.e. extends DRX cycle
Length, reduce power overhead), it is also possible to for performance boost request (i.e. shorten DRX cycle length, sacrificial
Domestic animal power overhead exchanges the lifting of performance for, improves power overhead).From both requests it can be seen that UE
The urgency of request performance boost is higher than request power optimization, and the request of performance boost can not be quick else if
It is met, is then likely to result in the decline of user's impression.
Summary of the invention
In consideration of it, the present invention provides a kind of signaling method and relevant device, to reducing the inclined of power overhead
The preference instruction of good instruction and increase power overhead is handled differently, and promotes the experience of user.
First aspect present invention provides a kind of method for obtaining network information, it may include:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that be used for limiting fall
The first timer of the transmission of the preference instruction of low-power expense is the most overtime, if it is judged that be yes, then
The preference instruction reducing power overhead is sent to base station;
When the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, send to described base station
Increase the preference instruction of power overhead, or judge the transmission for limiting the preference instruction increasing power overhead
Second timer the most overtime, if it is judged that be yes, then to described base station send increase power overhead
Preference instruction.
In conjunction with first aspect, in the implementation that the first is possible, described subscriber equipment includes default conditions
With reduce power overhead state two states, then need to reduce when the preference of power overhead is changed into by subscriber equipment
During power overhead, perform to judge the first judgement whether subscriber equipment is in default conditions, if first judges
Judged result be yes, then perform judge for limit reduce power overhead preference instruction transmission first
The second judgement that intervalometer is the most overtime, if the second judged result judged is yes, then sends fall to base station
The preference instruction of low-power expense;
And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that Yong Hushe
Standby whether being in reduces power overhead state, if it is judged that be yes, then send to described base station and increases merit
The preference instruction of rate expense;
And, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, perform user
Whether equipment is in the 3rd judgement reducing power overhead state, if the 3rd judged result judged is yes,
The 4th that the second timer of the transmission performing the preference instruction for limiting increase power overhead is the most overtime sentences
Disconnected, if the 4th judged result judged is yes, then the preference sending increase power overhead to described base station refers to
Show.
In conjunction with the first possible implementation of first aspect, in the implementation that the second is possible, institute
State subscriber equipment and judge that the determination methods of oneself state in which includes:
Described subscriber equipment judges oneself state in which according to the parameter length specified, when described parameter length
When meeting the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described
Parameter length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in fall
Low-power expense state;
Or, described subscriber equipment judges that the determination methods of oneself state in which includes:
Described subscriber equipment receives DRX parameter according to the noncontinuity that described base station is described user device configuration
Judge oneself state in which, receive when described subscriber equipment is currently in use noncontinuity corresponding to default conditions
During DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment is currently in use fall
When noncontinuity corresponding to low-power expense state receives DRX parameter, then judge that described subscriber equipment is in fall
Low-power expense state.
In conjunction with first aspect, the implementation that the first of first aspect is possible, the second of first aspect can
The implementation of energy, in the implementation that the third is possible, when judging that described first timer is the most overtime,
The protocol layer notice indicated for sending the preference reducing power overhead in described subscriber equipment knows subscriber equipment
Power overhead preference occur change protocol layer reduce power overhead preference instruction transmission limited;
Or,
When judging that described first timer is the most overtime, described subscriber equipment does not perform any operation.
In conjunction with first aspect, the implementation that the first of first aspect is possible, the second of first aspect can
The implementation of energy, in the 4th kind of possible implementation, when judging that described second timer is the most overtime,
The protocol layer notice indicated for sending the preference increasing power overhead in described subscriber equipment knows subscriber equipment
Power overhead preference occur change protocol layer increase power overhead preference instruction transmission limited;
Or,
When judging that described second timer is the most overtime, subscriber equipment does not perform any operation.
In conjunction with first aspect, or the first possible implementation of first aspect, or the second of first aspect
Plant possible implementation, or the third possible implementation of first aspect, or the 4th of first aspect the
Plant possible implementation, in the 5th kind of possible implementation,
Described transmission to base station reduces the preference instruction of power overhead or described to described base station transmission increase power
After the preference instruction of expense, also include:
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
And/or described second timer.
In conjunction with the 5th kind of possible implementation of first aspect, in the 6th kind of possible implementation,
When the first timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead,
Described subscriber equipment can not send the preference instruction reducing power overhead to described base station, until described first is fixed
Time device time-out;
And, when the second timer in described subscriber equipment has not timed out, receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into increasing power by subscriber equipment
During expense, described subscriber equipment can not send the preference instruction increasing power overhead to described base station, until institute
State second timer time-out.
In conjunction with the 5th kind of possible implementation of first aspect, in the 7th kind of possible implementation, when
Described first timer in described subscriber equipment has timed out, but does not receives the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead,
Described subscriber equipment can not send the preference instruction reducing power overhead to described base station, until receiving described
The radio resource parameter configuration result that base station sends;
And, when the described second timer in described subscriber equipment has timed out, but do not receive described base station
The radio resource parameter configuration result sent, and the preference of power overhead is again transformed into needing increasing by subscriber equipment
When adding power overhead, described subscriber equipment can not send the preference instruction increasing power overhead to described base station,
Until receiving the radio resource parameter configuration result that described base station sends.
In conjunction with the 4th kind of possible implementation of first aspect to first aspect, the 8th kind of possible realization
In mode,
Described transmission to base station reduces the preference instruction of power overhead or described to described base station transmission increase power
After the preference instruction of expense, also include:
Described subscriber equipment receive described base station according to the instruction of the preference of the described reduction power overhead received or
The preference of described increase power overhead is designated as the radio resource parameter of described user device configuration.
In conjunction with the 8th kind of possible implementation of first aspect, in the 9th kind of possible implementation, institute
After stating as described user device configuration radio resource parameter, also include:
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
And/or described second timer.
In conjunction with the 4th kind of possible implementation of first aspect to first aspect, the tenth kind of possible realization
In mode,
When base station judges currently can not to update radio resource parameter configuration as subscriber equipment, described subscriber equipment
Do not receive described base station the preference of described reduction power overhead is indicated or the preference of described increase power overhead
The response message of instruction.
In conjunction with the 8th kind of possible implementation of first aspect, or the 9th kind of possible realization of first aspect
Mode, in the 11st kind of possible implementation,
Described subscriber equipment receive described base station according to the instruction of the preference of the described reduction power overhead received or
The preference of described increase power overhead is designated as the radio resource parameter of described user device configuration, including:
It is described user device configuration by RRM process that described subscriber equipment receives described base station
Discontinuous reception DRX parameter and physical layer parameter.
In conjunction with the 11st kind of possible implementation of first aspect, the 12nd kind of possible implementation
In, when described subscriber equipment includes default conditions and reduces power overhead state two states, described user
Equipment receives described base station by discontinuous reception that RRM process is described user device configuration
DRX parameter and physical layer parameter include:
The described base station of described subscriber equipment reception is when RRM RRC connects and reconfigures, for described use
Family equipment configuration two set noncontinuity receives DRX parameter, and indicates described subscriber equipment carrying out Radio Resource
The instruction information reducing DRX parameter corresponding to power overhead is used when management connects;And receive described base station
Receive DRX parameter according to two set noncontinuities, overlap physical layer parameters for the two of described user device configuration, and
Instruction subscriber equipment carry out RRM connect reconfigure after, use reduce power overhead corresponding
The instruction information of the physical layer parameter that DRX parameter is corresponding.
In conjunction with the 11st kind of possible implementation of first aspect, in the 13rd kind of possible implementation,
When described subscriber equipment includes default conditions and reduces power overhead state two states, described subscriber equipment
Receive described base station to be joined by the discontinuous reception DRX that RRM process is described user device configuration
Number and physical layer parameter include:
The described base station of described subscriber equipment reception is when RRM RRC connects and reconfigures, for described use
Family equipment configuration two set noncontinuity receives DRX parameter, and indicates described subscriber equipment carrying out Radio Resource
Use when management connects and increase the instruction information of DRX parameter corresponding to power overhead;And receive described base station
Receive DRX parameter according to two set noncontinuities, overlap physical layer parameters for the two of described user device configuration, and
Instruction subscriber equipment carry out RRM connect reconfigure after, use increase power overhead corresponding
The instruction information of the physical layer parameter that DRX parameter is corresponding.
In conjunction with the 13rd kind of possible implementation of first aspect to first aspect, possible at the 14th kind
In implementation, the length of described first timer is more than or equal to the length of described second timer.
In conjunction with the 5th kind of possible implementation of first aspect, or the tenth kind of possible realization of first aspect
Mode, in the 15th kind of possible implementation, the length of described first timer, described second timing
The length of device and the length of described 3rd intervalometer are set in advance in described subscriber equipment;
Or, the length of described first timer, the length of described second timer and described 3rd timing
The length of device is reconfigured in RRM connection establishment process or RRM connection by described base station
During be assigned to described subscriber equipment.
In conjunction with in the 15th kind of possible implementation of first aspect to first aspect any one, the 16th
In kind possible implementation, before the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment,
Also include:
Subscriber equipment obtains the 4th intervalometer;
Then estimate at described subscriber equipment when the 4th timer expiry or the described subscriber equipment of described subscriber equipment
In the time of idle condition more than or equal to the length of the 4th intervalometer of described subscriber equipment time, determine described use
The preference of power overhead is changed into by family equipment need to reduce power overhead;
Before the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, also include:
Subscriber equipment obtains the 5th intervalometer;
Then estimate at described subscriber equipment when the 5th timer expiry or the described subscriber equipment of described subscriber equipment
In the time of idle condition less than or equal to the length of the 5th intervalometer of described subscriber equipment time, determine described use
The preference of power overhead is changed into by family equipment need to increase power overhead.
In conjunction with the 16th kind of possible implementation of first aspect, in the 17th kind of possible implementation,
Described subscriber equipment obtains the 4th intervalometer and includes:
Described subscriber equipment sets described 4th intervalometer according to the 6th intervalometer;Or, obtain from described base station
Described 4th intervalometer, described 6th intervalometer is the intervalometer arranged in described base station;
Described subscriber equipment obtains the 5th intervalometer and includes:
Described subscriber equipment sets described 5th intervalometer according to the 7th intervalometer;Or, obtain from described base station
Described 5th intervalometer, described 7th intervalometer is the intervalometer arranged in described base station.
In conjunction with in the 17th kind of possible implementation of first aspect any one, the 18th kind of possible reality
In existing mode, the length of described 4th intervalometer is less than or equal to the length of described 6th intervalometer, described
Before subscriber equipment sets described 4th intervalometer according to the 6th intervalometer, also include:
Described 6th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described user sets
Before setting described 5th intervalometer according to the 7th intervalometer, also include:
Described 7th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 7th intervalometer arranged in described base station.
In conjunction with in the 18th kind of possible implementation of first aspect any one, the 19th kind of possible reality
In existing mode, when obtaining described four intervalometer from described base station, described 4th intervalometer carries described
The radio resource control message of base station transmission, physical layer message, data-link layer message, community switching
In message in any one;
When obtaining described five intervalometer from described base station, described 5th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described six intervalometer from described base station, described 6th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described seven intervalometer from described base station, described 7th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one.
Second aspect present invention provides a kind of method determining power overhead preference, and it comprises the steps that
Subscriber equipment obtains at least one in the 4th intervalometer and the 5th intervalometer;
When the 4th timer expiry or the described subscriber equipment of described subscriber equipment predict at described subscriber equipment
In the time of idle condition more than or equal to the length of the 4th intervalometer of described subscriber equipment time, determine described use
The preference of power overhead is changed into by family equipment need to reduce power overhead;
When the 5th timer expiry or the described subscriber equipment of described subscriber equipment estimate that described subscriber equipment is in
When the time of idle condition is less than or equal to the length of the 5th intervalometer of described subscriber equipment, determine described user
The preference of power overhead is changed into by equipment need to increase power overhead.
In conjunction with second aspect, in the implementation that the first is possible, described subscriber equipment obtains the 4th timing
Device includes:
Described subscriber equipment sets described 4th intervalometer according to the 6th intervalometer;Or, obtain from described base station
Described 4th intervalometer, described 6th intervalometer is the intervalometer arranged in described base station;
Described subscriber equipment obtains the 5th intervalometer and includes:
Described subscriber equipment sets described 5th intervalometer according to the 7th intervalometer;Or, obtain from described base station
Described 5th intervalometer, described 7th intervalometer is the intervalometer arranged in described base station.
In conjunction with the first possible implementation of second aspect, in the implementation that the second is possible, institute
State the length of the 4th intervalometer length less than or equal to described 6th intervalometer, described subscriber equipment according to
Before 6th intervalometer sets described 4th intervalometer, also include:
Described 6th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described user sets
Before setting described 5th intervalometer according to the 7th intervalometer, also include:
Described 7th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 7th intervalometer arranged in described base station.
In conjunction with the implementation that the second of second aspect is possible, in the implementation that the third is possible, when
When obtaining described four intervalometer from described base station, described 4th intervalometer carries the nothing sent in described base station
In line Resource Control protocols message, physical layer message, data-link layer message, cell switching information any one
In;
When obtaining described five intervalometer from described base station, described 5th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described six intervalometer from described base station, described 6th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described seven intervalometer from described base station, described 7th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one.
Third aspect present invention provides a kind of subscriber equipment, described subscriber equipment include indicating sending module and
On the basis of first control module, also include at least one in the second control module and the 3rd control module:
Described instruction sending module, for indicating to base-station transmitting-power expense preference, described power overhead refers to
Show and include the preference instruction reducing power overhead or the preference instruction increasing power overhead;
Described first control module, for reducing power when the preference of power overhead is changed into by subscriber equipment
During expense, it is judged that the most overtime for limiting the first timer of the transmission of the preference instruction reducing power overhead,
If it is judged that be yes, notify that the preference that described instruction sending module reduces power overhead to base station transmission refers to
Show;
Described second control module, for increasing power when the preference of power overhead is changed into by subscriber equipment
During expense, notify that described instruction sending module sends the preference instruction increasing power overhead to described base station;Or,
Described 3rd control module, for increasing power when the preference of power overhead is changed into by subscriber equipment
During expense, it is judged that the most overtime for limiting the second timer of the transmission of the preference instruction increasing power overhead,
If it is judged that be yes, notifying that described instruction sending module sends to described base station increases the inclined of power overhead
Good instruction.
In conjunction with the third aspect, in the implementation that the first is possible, described acquisition module is specifically for passing through
The data-interface set up with second network equipment sends external network information inquiring request to second network equipment,
And receive the Query Result information that described second network equipment returns according to described inquiry request.Described user sets
For including default conditions and reducing power overhead state two states;Described subscriber equipment also includes for judging
The condition judgment module of described subscriber equipment state in which;
Then, described first control module is specifically for needing fall when the preference of power overhead is changed into by subscriber equipment
Low-power expense, and when described condition judgment module indicates described subscriber equipment to be in default conditions, it is judged that use
The most overtime in the first timer of the transmission limiting the preference instruction reducing power overhead, if it is judged that
It is yes, notifies that described instruction sending module sends the preference instruction reducing power overhead to base station;
And, described second control module is specifically for needing when the preference of power overhead is changed into by subscriber equipment
When increasing power overhead, and when described condition judgment module indicates described subscriber equipment to reduce power overhead state,
Notify that described instruction sending module sends the preference instruction increasing power overhead to described base station;
And, described 3rd control module is specifically for needing when the preference of power overhead is changed into by subscriber equipment
When increasing power overhead, and when described condition judgment module indicates described subscriber equipment to reduce power overhead state,
Judge that the second timer for limiting the transmission that the preference increasing power overhead indicates is the most overtime, if sentenced
Disconnected result is yes, notifies that described instruction sending module sends the preference instruction increasing power overhead to described base station.
In conjunction with the first possible implementation of the third aspect, in the implementation that the second is possible, institute
State condition judgment module and judge that described subscriber equipment state in which includes:
Described condition judgment module according to specify parameter length judge described subscriber equipment state in which,
During the length met needed for described parameter length meets default conditions, then judge that described subscriber equipment is in silent
Recognize state;Reduce, when described parameter length meets, the length met needed for power overhead state, then judge described
Subscriber equipment is in reduction power overhead state;
Or, described condition judgment module judges that described subscriber equipment state in which includes:
Described condition judgment module receives DRX according to the noncontinuity that described base station is described user device configuration
Parameter judges oneself state in which, when described subscriber equipment is currently in use the noncontinuity that default conditions are corresponding
When receiving DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment makes
When receiving DRX parameter by the noncontinuity that reduction power overhead state is corresponding, then judge at described subscriber equipment
In reducing power overhead state.
In conjunction with the implementation that the second of the third aspect to the third aspect is possible, in the realization that the third is possible
In mode, described first control module is additionally operable to when judging that described first timer is the most overtime, and instruction is in
The instruction sending module of the protocol layer sending the preference instruction reducing power overhead in described subscriber equipment notifies institute
Stating the interior preference for knowing the power overhead of subscriber equipment of subscriber equipment occurs the protocol layer changed to reduce power
The transmission of the preference instruction of expense is limited;Or, when judging that described first timer is the most overtime, indicate institute
State subscriber equipment and do not perform any operation.
In conjunction with the implementation that the second of the third aspect to the third aspect is possible, the 4th kind of possible realization
In mode, described 3rd control module is additionally operable to when judging that described second timer is the most overtime, and instruction is in
The protocol layer notice sending the preference instruction increasing power overhead in described subscriber equipment knows the merit of subscriber equipment
The transmission that the preference that the preference of rate expense occurs the protocol layer changed to increase power overhead indicates is limited;Or,
When judging that described second timer is the most overtime, described subscriber equipment is indicated not perform any operation.
In conjunction with the 4th kind of possible implementation of the third aspect to the third aspect, the 5th kind of possible realization
In mode, first timer management module is for including first timer when described subscriber equipment and described
Instruction sending module, after base station have sent the instruction of power overhead preference, starts described first timer;With
And when described subscriber equipment includes first timer and second timer, and described instruction sending module is to base station
After have sent the instruction of power overhead preference, start described first timer and/or described second timer.
In conjunction with the 5th kind of possible implementation of the third aspect, in the 6th kind of possible implementation, join
Put receiver module, for receiving the radio resource parameter configuration result that base station is described user device configuration;
Configure on the basis of receiver module including, described subscriber equipment also include the 6th control module, the 7th
In control module at least one, wherein;
Described 6th control module, is used for when the first timer in described subscriber equipment has not timed out, but institute
State configuration receiver module and receive radio resource parameter configuration result, and the preference that subscriber equipment is to power overhead
When being again transformed into need to reducing power overhead, notify that described instruction sending module is in described first timer time-out
Before can not to described base station send reduce power overhead preference instruction;
Described 7th control module, is used for when the second timer in described subscriber equipment has not timed out, but institute
State configuration receiver module and receive the radio resource parameter configuration result that described base station sends, and subscriber equipment pair
When the preference of power overhead is again transformed into need to increasing power overhead, notify that described instruction sending module is described
Can not send to described base station before second timer time-out and increase the preference instruction of power overhead.
In conjunction with the 5th kind of possible implementation of the third aspect, in the 7th kind of possible implementation, join
Put receiver module, for receiving the radio resource parameter configuration result that base station is described user device configuration;
Configure on the basis of receiver module including, described subscriber equipment also include the 8th control module, the 9th
In control module at least one, wherein;
Described 8th control module, for having timed out when the described first timer in described subscriber equipment, but
Described configuration receiver module does not receives the radio resource parameter configuration result that described base station sends, and user sets
When the standby preference to power overhead is again transformed into need to reducing power overhead, notify that described instruction sending module exists
Can not send to described base station before receiving the radio resource parameter configuration result that described base station sends and reduce merit
The preference instruction of rate expense;
Described 9th control module, for having timed out when the described second timer in described subscriber equipment, but
Described configuration receiver module does not receives the radio resource parameter configuration result that described base station sends, and user sets
When the standby preference to power overhead is again transformed into need to increasing power overhead, notify that described instruction sending module exists
Can not send to described base station before receiving the radio resource parameter configuration result that described base station sends and increase merit
The preference instruction of rate expense.
In conjunction with the 5th kind of possible implementation of the third aspect, in the tenth kind of possible implementation, should
Subscriber equipment also includes: arrange module, arranges described first timer in described subscriber equipment in advance
Length, the length of described second timer.
In conjunction with the 5th kind of possible implementation of the third aspect, in the 11st kind of possible implementation,
This subscriber equipment also includes: length receiver module, is assigned to described subscriber equipment for receiving described base station
The length of described first timer, the length of described second timer and the length of described 3rd intervalometer.
In conjunction with in the 11st kind of possible implementation of the third aspect to the third aspect any one, the 12nd
In middle possible implementation, described subscriber equipment also includes:
Intervalometer acquisition module, for obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module, for the 4th timer expiry or described obtained when described intervalometer acquisition module
Subscriber equipment estimates that described subscriber equipment is in the time of idle condition more than or equal to described intervalometer acquisition module
During the length of the 4th intervalometer obtained, determining that the preference of power overhead is changed into by described subscriber equipment needs fall
Low-power expense;And/or,
When institute estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
State the 5th timing that subscriber equipment is in the time of idle condition and obtains less than or equal to described intervalometer acquisition module
During the length of device, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In conjunction with the 12nd kind of possible implementation of the third aspect, in implementation possible in the 13rd,
Described intervalometer acquisition module includes that the first acquisition submodule and second obtains at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In conjunction with the 13rd kind of possible implementation of the third aspect, in implementation possible in the 14th,
The length of described 4th intervalometer is less than or equal to the length of described 6th intervalometer, and described first obtains son
Module is additionally operable to obtain described 6th intervalometer from described base station, or, according to disappearing of obtaining from described base station
Breath estimates the length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
In conjunction with the 14th kind of possible implementation of the third aspect, in implementation possible in the 15th,
The length of described 4th intervalometer is less than or equal to described 6th intervalometer, and described second arranges module is setting
Before fixed described 4th intervalometer, described intervalometer receiver module obtains described 6th intervalometer from described base station,
Or described second arranged module before setting described 4th intervalometer by the message obtained from described base station
Estimate the length of described 6th intervalometer;
The length of described 5th intervalometer is less than or equal to described 7th intervalometer, and described second arranges module
Before setting described 5th intervalometer, it is fixed that described intervalometer receiver module obtains the described 7th from described base station
Time device, or described second arrange module and setting before described 5th intervalometer by obtaining from described base station
Message estimate described 7th intervalometer length.
In conjunction with the 15th kind of possible implementation of the third aspect, in implementation possible in the 16th,
When described first acquisition submodule obtains described four intervalometer from described base station, send from described base station
In radio resource control message, physical layer message, data-link layer message, cell switching information arbitrary
Kind obtains described 4th intervalometer;
When described second acquisition submodule obtains described five intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 5th intervalometer;
When described first acquisition submodule obtains described six intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 6th intervalometer;
When described second acquisition submodule obtains described seven intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 7th intervalometer.
Fourth aspect present invention provides a kind of subscriber equipment, and it comprises the steps that
Intervalometer acquisition module, for obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module, for the 4th timer expiry or described obtained when described intervalometer acquisition module
Subscriber equipment estimates that described subscriber equipment is in the time of idle condition more than or equal to described intervalometer acquisition module
During the length of the 4th intervalometer obtained, determining that the preference of power overhead is changed into by described subscriber equipment needs fall
Low-power expense;And/or,
When institute estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
State the 5th timing that subscriber equipment is in the time of idle condition and obtains less than or equal to described intervalometer acquisition module
During the length of device, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In conjunction with fourth aspect, in the implementation that the first is possible, described intervalometer acquisition module includes
One obtains submodule and second obtains at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In conjunction with the first possible implementation of fourth aspect, in the implementation that the second is possible, institute
Stating the length length less than or equal to described 6th intervalometer of the 4th intervalometer, described first obtains submodule
Block is additionally operable to obtain described 6th intervalometer from described base station, or, according to the message obtained from described base station
Estimate the length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
In conjunction with the implementation that the second of fourth aspect is possible, in the implementation that the third is possible, institute
The length stating the 4th intervalometer is less than or equal to described 6th intervalometer, and described second arranges module is setting
Before described 4th intervalometer, described intervalometer receiver module obtains described 6th intervalometer from described base station,
Or described second arranged module before setting described 4th intervalometer by the message obtained from described base station
Estimate the length of described 6th intervalometer;
The length of described 5th intervalometer is less than or equal to described 7th intervalometer, and described second arranges module
Before setting described 5th intervalometer, it is fixed that described intervalometer receiver module obtains the described 7th from described base station
Time device, or described second arrange module and setting before described 5th intervalometer by obtaining from described base station
Message estimate described 7th intervalometer length.
In conjunction with the third possible implementation of fourth aspect, in the 4th kind of possible implementation, when
When described first acquisition submodule obtains described four intervalometer from described base station, the nothing sent from described base station
In line Resource Control protocols message, physical layer message, data-link layer message, cell switching information any one
Described 4th intervalometer of middle acquisition;
When described second acquisition submodule obtains described five intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 5th intervalometer;
When described first acquisition submodule obtains described six intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 6th intervalometer;
When described second acquisition submodule obtains described seven intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 7th intervalometer.
Fifth aspect present invention provides a kind of signaling sending control system, it may include the above-mentioned user of the present invention sets
Any one in Bei and base station, the power overhead preference that described base station sends for receiving described subscriber equipment refers to
Show, and be that described subscriber equipment carries out radio resource parameter configuration, described merit by RRM process
The instruction of rate expense preference includes the preference instruction reducing power overhead or increases the preference instruction of power overhead.
In conjunction with the 5th aspect, in the implementation that the first is possible, described base station is additionally operable to described user
Equipment sends at least one in the 4th intervalometer, the 5th intervalometer, the 6th intervalometer, the 7th intervalometer.
In conjunction with the first possible implementation of the 5th aspect to the 5th aspect, in the realization that the second is possible
In mode, when described subscriber equipment includes default conditions and reduces power overhead state two states,
Described base station is that described subscriber equipment carries out radio resource parameter configuration by RRM process,
Comprising: when RRM connection establishment, described base station is that described user device configuration two overlaps non-company
Continuous property receives DRX parameter, and indicates described subscriber equipment to use when carrying out RRM and connecting
DRX parameter, wherein set of parameter is used for indicating described subscriber equipment to be in default conditions, and another set of parameter is used
It is in reduction power overhead state in indicating described subscriber equipment;Described base station connects according to different noncontinuities
Receive DRX parameter, for the two set physical layers that described user device configuration is corresponding;
Or,
Described base station is that described subscriber equipment carries out radio resource parameter configuration by RRM process,
Comprising: when RRM reconfiguration course is carried out, described base station is described user device configuration two
Set noncontinuity receives DRX parameter, and indicates described subscriber equipment to reconfigure carrying out RRM
The DRX parameter used after one-tenth, wherein set of parameter is used for indicating described subscriber equipment to be in default conditions, separately
Set of parameter is used for indicating described subscriber equipment to be in reduction power overhead state;Described base station is according to different
Noncontinuity receives DRX parameter, for the two set physical layers that described user device configuration is corresponding.
Sixth aspect present invention provides a kind of computer-readable storage medium, and this computer-readable storage medium can store journey
Sequence, can include the part or all of step of the signaling method that the present invention provides to program when performing.
Seventh aspect present invention provides a kind of computer-readable storage medium, and this computer-readable storage medium can store journey
Sequence, can include the part or all of step of the determination power overhead preference that the present invention provides to program when performing
Eighth aspect present invention provides a kind of subscriber equipment, including: input equipment, output device and processor,
Wherein, described processor execution following steps:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that be used for limiting fall
The first timer of the transmission of the preference instruction of low-power expense is the most overtime, if it is judged that be yes, then
Described output device is indicated to send the preference instruction reducing power overhead to base station;
When the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, indicate described output dress
Put and send the preference instruction increasing power overhead to described base station, or, it is judged that it is used for limiting increase power and opens
The second timer of the transmission of the preference instruction of pin is the most overtime, if it is judged that be yes, indicates described defeated
Go out device and send the preference instruction increasing power overhead to described base station.
In conjunction with eighth aspect, in the implementation that the first is possible, described subscriber equipment includes default conditions
With reduction power overhead state two states, the most described processor also executes the following steps:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, perform to judge that user sets
Standby the first judgement whether being in default conditions, if the first judged result judged is yes, then performs judgement
For limiting the second judgement that the first timer of the transmission of the preference instruction reducing power overhead is the most overtime,
If the second judged result judged is yes, indicates described output device to send to base station and reduce power overhead
Preference indicates;
And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that Yong Hushe
Standby whether being in reduces power overhead state, if it is judged that be yes, indicates described output device to described
Base station sends the preference instruction increasing power overhead;
Or, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, perform user
Whether equipment is in the 3rd judgement reducing power overhead state, if the 3rd judged result judged is yes,
The 4th that the second timer of the transmission performing the preference instruction for limiting increase power overhead is the most overtime sentences
Disconnected, if the 4th judged result judged is yes, indicating described output device to send to described base station increases merit
The preference instruction of rate expense.
In conjunction with the first possible implementation of eighth aspect, in the implementation that the second is possible, institute
State processor and judge that the determination methods of described subscriber equipment state in which includes:
Described processor judges oneself state in which according to the parameter length specified, when described parameter length accords with
When closing the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described ginseng
Number length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in reduction
Power overhead state;
Or, described processor judges that the determination methods of described subscriber equipment state in which includes:
Described processor receives DRX parameter according to the noncontinuity that described base station is described user device configuration and sentences
Disconnected described subscriber equipment state in which, when described subscriber equipment is currently in use corresponding discontinuous of default conditions
Property receive DRX parameter time, then judge that described subscriber equipment is in default conditions;When described subscriber equipment
When the noncontinuity using reduction power overhead state corresponding receives DRX parameter, then judge described subscriber equipment
It is in reduction power overhead state.
In conjunction with the implementation that the second of eighth aspect to eighth aspect is possible, in the realization that the third is possible
In mode, described processor also executes the following steps:
When judging that described first timer is the most overtime, notify that described subscriber equipment is interior for sending reduction power
The protocol layer notice of the preference instruction of expense knows that the preference of the power overhead of subscriber equipment occurs the agreement changed
The transmission of the preference instruction that layer reduces power overhead is limited;
Or, when judging that described first timer is the most overtime, notify that described subscriber equipment does not perform any behaviour
Make.
In conjunction with the implementation that the second of eighth aspect to eighth aspect is possible, the 4th kind of possible realization
In mode, described processor also executes the following steps:
When judging that described second timer is the most overtime, notify that described subscriber equipment is interior for sending increase power
The protocol layer notice of the preference instruction of expense knows that the preference of the power overhead of subscriber equipment occurs the agreement changed
The transmission of the preference instruction that layer increases power overhead is limited;
Or,
When judging that described second timer is the most overtime, notifying user equipment does not perform any operation.
In conjunction with the 4th kind of possible implementation of eighth aspect to eighth aspect, the 5th kind of possible realization
In mode, described transmission to base station reduces the preference instruction of power overhead or described to the transmission increase of described base station
After the preference instruction of power overhead, described processor also executes the following steps:
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
With described second timer.
In conjunction with the 5th kind of possible implementation of eighth aspect, in the 6th kind of possible implementation, institute
State processor to also execute the following steps:
When the first timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead,
Indicate described output device can not send the preference instruction reducing power overhead to described base station, until described the
One timer expiry;
When the second timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to increasing power overhead to the preference of power overhead,
Instruction indicates described output device can not send the preference instruction increasing power overhead to described base station, until institute
State second timer time-out.
In conjunction with the 5th kind of possible implementation of eighth aspect, in the 7th kind of possible implementation, institute
State processor to also execute the following steps: when the described first timer in described subscriber equipment has timed out, but not
Receive the radio resource parameter configuration result that described base station sends, and the preference that subscriber equipment is to power overhead
When being again transformed into need to reducing power overhead, indicate described output device can not send to described base station and reduce merit
In conjunction with the 7th kind of possible implementation of eighth aspect, in the 8th kind of possible implementation, institute
The preference instruction of rate expense, until receiving the radio resource parameter configuration result that described base station sends;
When the described second timer in described subscriber equipment has timed out, but do not receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into increasing power by subscriber equipment
During expense, instruction indicates described output device can not send the preference instruction increasing power overhead to described base station,
Until receiving the radio resource parameter configuration result that described base station sends.
State processor to also execute the following steps:
Receive the radio resource parameter configuration result that described base station sends;
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
With described second timer.
In conjunction with the 8th kind of possible implementation of eighth aspect to eighth aspect, the 9th kind of possible realization
In mode, the length of described first timer is more than or equal to the length of described second timer.
In conjunction with the 5th kind of possible implementation of eighth aspect, in the tenth kind of possible implementation, institute
State processor to also execute the following steps:
The length of described first timer, the length of described second timer are set in advance in described subscriber equipment
Degree;
Or, receive and connected in RRM connection establishment process or RRM by described base station
Reconfiguration course is assigned to the length of the described first timer of described subscriber equipment, described second timer
Length.
In conjunction with in the tenth kind of possible implementation of eighth aspect to eighth aspect, possible at the 11st kind
In implementation, described processor also executes the following steps: acquisition the 4th intervalometer;
Then estimate that described subscriber equipment is in sky when the 4th timer expiry or the described subscriber equipment of described acquisition
When the time of not busy state is more than or equal to the length of the 4th intervalometer of described acquisition, described processor determines described
The preference of power overhead is changed into by subscriber equipment need to reduce power overhead;
Obtain the 5th intervalometer;
Then estimate at described subscriber equipment when the 5th timer expiry or the described subscriber equipment of described subscriber equipment
In the time of idle condition less than or equal to the length of the 5th intervalometer of described subscriber equipment time, described processor
Determine that the preference of power overhead is changed into by described subscriber equipment and need to increase power overhead.
In conjunction with in the 11st kind of possible implementation of eighth aspect, the 12nd kind of possible implementation
In, described processor obtains the 4th intervalometer acquisition the 4th intervalometer and specifically includes:
Described processor sets described 4th intervalometer according to the 6th intervalometer;Or, described processor is from described
Base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described processor obtains the 5th intervalometer and specifically includes:
Described processor sets described 5th intervalometer according to the 7th intervalometer;Or, described processor is from described
Base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In conjunction with in the 12nd kind of possible implementation of eighth aspect, the 13rd kind of possible implementation
In, the length of described 4th intervalometer is less than or equal to the length of described 6th intervalometer, described processor
Before setting described 4th intervalometer according to the 6th intervalometer, also execute the following steps:
Described 6th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, described processor
Before setting described 5th intervalometer according to the 7th intervalometer, also execute the following steps:
Described 7th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 7th intervalometer arranged in described base station.
In conjunction with in the 12nd kind of possible implementation of eighth aspect, the 13rd kind of possible implementation
In, when described processor obtains described four intervalometer from described base station, described 4th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one;
When described processor obtains described five intervalometer from described base station, described 5th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one;
When described processor obtains described six intervalometer from described base station, described 6th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one;
When described processor obtains described seven intervalometer from described base station, described 7th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one.
Therefore, in some feasible embodiments of the present invention, limit subscriber equipment respectively to reduction
The transmission of the preference instruction of power overhead and the transmission to the preference instruction increasing power overhead, with prior art
Limited by same intervalometer and compare, more flexibly, improve the experience of user.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the first embodiment of the signaling method of the present invention;
Fig. 2 is the schematic flow sheet of the second embodiment of the signaling method of the present invention;
Fig. 3 is the schematic flow sheet of the 3rd embodiment of the signaling method of the present invention;
Fig. 4 is the schematic flow sheet of the 4th embodiment of the signaling method of the present invention;
Fig. 5 is the structure composition schematic diagram of the first embodiment of the subscriber equipment of the present invention;
Fig. 6 is the structure composition schematic diagram of the second embodiment of the subscriber equipment of the present invention;
Fig. 7 is the structure composition schematic diagram of the 3rd embodiment of the subscriber equipment of the present invention;
Fig. 8 is the structure composition schematic diagram of the 4th embodiment of the subscriber equipment of the present invention;
Fig. 9 is an example structure composition schematic diagram of the signaling transmission system of the present invention;
Figure 10 is the structure composition schematic diagram of the 7th embodiment of the subscriber equipment of the present invention.
Specific embodiment
In some feasible embodiments of the present invention, when the preference of power overhead is changed into by subscriber equipment
When need to reduce power overhead, it is judged that for limiting the first timing of the transmission of the preference instruction reducing power overhead
Device is the most overtime, if it is judged that be yes, then sends the preference instruction reducing power overhead to base station;When
The preference of power overhead is changed into when need to increase power overhead by subscriber equipment, then sending to described base station increases
The preference instruction of power overhead;Or, power need to be increased when the preference of power overhead is changed into by subscriber equipment
During expense, it is judged that the most overtime for limiting the second timer of the transmission of the preference instruction increasing power overhead,
If it is judged that be yes, then send the preference instruction increasing power overhead to described base station.Distinguish with this
Limit subscriber equipment to the transmission of the preference instruction of reduction power overhead with to the preference instruction increasing power overhead
Transmission, limited by same intervalometer with prior art compared with, more flexibly, improve the body of user
Test.
Below in conjunction with accompanying drawing, the embodiment of the present invention is described in further detail.
Fig. 1 is the schematic flow sheet of the first embodiment of the signaling method of the present invention.As it is shown in figure 1,
It comprises the steps that
Step S10, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that use
The most overtime in the first timer of the transmission limiting the preference instruction reducing power overhead, if it is judged that
It is yes, performs step S11.
Step S11, described subscriber equipment sends the preference instruction reducing power overhead to base station.
Step S12, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, then to institute
State base station and send the preference instruction increasing power overhead.
In the embodiment that some are feasible, step S10 and step S12 can be without sequencing, i.e. user
Equipment the preference of power overhead is first changed into need increase power overhead, after be changed into need reduce power open
Pin.
In the embodiment that some are feasible, before step S10, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to reduce power overhead, and it comprises the steps that
Subscriber equipment obtains the 4th intervalometer;Then when the 4th timer expiry or the described use of described subscriber equipment
It is fixed more than or equal to the 4th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead;
In the embodiment that some are feasible, before step S12, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to increase power overhead, and it comprises the steps that
Subscriber equipment obtains the 5th intervalometer, then when the 5th timer expiry or the described use of described subscriber equipment
It is fixed less than or equal to the 5th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain described 4th intervalometer from described base station,
Subscriber equipment can obtain described 5th intervalometer from described base station, and described 4th intervalometer and/or the described 5th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, the length of described 4th intervalometer is little
In the length equal to the 6th intervalometer in described base station, the length of described 5th intervalometer is less than or equal to described
The length of the 7th intervalometer in base station.Described 6th intervalometer is to safeguard for described base station in described base station
Side trigger reduce power overhead trigger, described 7th intervalometer be in described base station safeguard for described
Base station side triggers the trigger increasing power overhead.So when the 4th timer expiry obtained in subscriber equipment
Time, determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when subscriber equipment obtains
During five timer expiry obtained, determining that the preference of power overhead is changed into by described subscriber equipment need to increase merit
Rate expense.
In the embodiment that some are feasible, subscriber equipment can obtain described 6th intervalometer from described base station,
Subscriber equipment can obtain described 7th intervalometer from described base station, and described 6th intervalometer and/or the described 7th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, when subscriber equipment obtains from base station
During the length of six timer length and the 7th intervalometer, can be set in a user device according to the 6th intervalometer
Four intervalometers, and set the 5th intervalometer, and the length of the 4th set intervalometer according to the 7th intervalometer
Degree is smaller than the length equal to described 6th intervalometer, and the length of the 5th set intervalometer is smaller than being equal to
The length of described 7th intervalometer.So, when four timer expiry set in subscriber equipment, determine
The preference of power overhead is changed into by described equipment need to reduce power overhead, when the 5th of subscriber equipment setting
During timer expiry, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be estimated according to the message obtained from base station with oneself
Described 6th intervalometer and or the length of described 7th intervalometer.Such as, UE has performed a data transmit-receive behaviour
After work start a timer, this timer in UE executions once data transmit-receive operate after be restarted,
Assume that base station issues reconfiguration message/RRC connection release message to subscriber equipment, then subscriber equipment can basis
The content of reconfiguration message/RRC connection release message decides whether to record a length of 6th of above-mentioned timer the
Intervalometer and the length of the 7th intervalometer.Such as, if this reconfiguration message/RRC connection release message is to cut
Change order, or set up new radio bearer, or discharge original radio bearer, etc., subscriber equipment is not
A length of 6th intervalometer and the length of the 7th intervalometer of above-mentioned timer can be recorded;Disappear if this reconfigures
Breath/RRC connection release message is configuration DRX or the DRX configuring more power saving, then subscriber equipment can record
State a length of 6th intervalometer and the length of the 7th intervalometer of timer.
In implementing, when the length of subscriber equipment record the 6th timer length and the 7th intervalometer, can
Set the 4th intervalometer in a user device according to the 6th intervalometer, and set the 5th according to the 7th intervalometer
Intervalometer, and the length of the 4th set intervalometer is smaller than the length equal to described 6th intervalometer, institute
The length of the 5th intervalometer set is smaller than the length equal to described 7th intervalometer.So, set as user
During four timer expiry of standby middle setting, determining that the preference of power overhead is changed into by described equipment needs fall
Low-power expense, when five timer expiry that subscriber equipment sets, determines that described subscriber equipment is to power
The preference of expense is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the embodiment of the present invention is aforesaid determines that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead, and/or determine that the described subscriber equipment Preference Conversion to power overhead is for needing to increase
The flow process of power overhead can exist independent of the flow process shown in Fig. 1.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Being to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes default conditions
(" default " state) and reduction power overhead state (" lower power consumption " state) two
Kind of state, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, in step
S10, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, first subscriber equipment is sentenced
Break and oneself whether be in default conditions, if it is judged that be yes, then determine whether for limiting reduction merit
The first timer (recordable is " T_Default ") of the transmission of the preference instruction of rate expense is the most overtime (i.e.
Intervalometer does not runs), if it is judged that be yes, perform step S11.And in step S12, when with
The preference of power overhead is changed into when need to increase power overhead by family equipment, it is judged that whether oneself is in reduction merit
Rate expense state, if it is judged that be yes, then sends the preference instruction increasing power overhead to described base station.
In the embodiment that some are feasible, subscriber equipment judges that the determination methods of oneself state in which can be wrapped
Include:
Described subscriber equipment judges oneself state in which according to the parameter length specified, when described parameter length
When meeting the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described
Parameter length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in fall
Low-power expense state.Such as, the cycle (DRX cycle) can be received with the noncontinuity in subscriber equipment
Length judge oneself state in which, when the length of the presently configured DRX cycle of subscriber equipment is less than
During idle (IDLE) state during the length of DRX cycle, then judge to lay oneself open to " default " state,
The DRX cycle length presently configured when subscriber equipment equals to or more than IDLE state DRX cycle length
Degree, then it is assumed that UE is in " lower power consumption " state.Above-mentioned with DRX during idle condition
The length of cycle distinguishes " default " and " lower power consumption " state as threshold value, only
It is only one example, in implementing, the length of other parameters can be used to be used as threshold decision.So,
In step S10, when subscriber equipment is currently in use the length of DRX cycle corresponding to " default " state,
When i.e. subscriber equipment is in " default " state, if the power preference of subscriber equipment changes, it would be desirable to fall
Low-power expense, on the premise of meeting first timer time-out, then subscriber equipment sends " power to base station
Preference indication ", request uses the DRX that " lower power consumption " state is corresponding
Parameter configuration.And in step S12, when subscriber equipment is currently in use " lower power consumption " shape
The length of the DRX cycle that state is corresponding, i.e. subscriber equipment are in " lower power consumption " state
Time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases power overhead, then uses
Family equipment sends " power preference indication " to base station, and request uses " default " state corresponding
DRX parameter configuration.
In the embodiment that some are feasible, described subscriber equipment judges the determination methods of oneself state in which
Comprise the steps that
Described subscriber equipment receives DRX parameter according to the noncontinuity that described base station is described user device configuration
Judge oneself state in which, receive when described subscriber equipment is currently in use noncontinuity corresponding to default conditions
During DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment is currently in use fall
When noncontinuity corresponding to low-power expense state receives DRX parameter, then judge that described subscriber equipment is in fall
Low-power expense state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, in step S10, when subscriber equipment is currently in use " default " state pair
During the DRX parameter answered, when i.e. subscriber equipment is in " default " state, if the power preference of subscriber equipment
Change, it would be desirable to reducing power overhead, on the premise of meeting first timer time-out, then user sets
Standby to base station transmission " power preference indication ", request uses " lower power consumption "
The DRX parameter configuration that state is corresponding.And in step S12, when subscriber equipment is currently in use " lower power
Consumption " DRX parameter corresponding to state time, i.e. subscriber equipment is in " lower power
Consumption " state time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases
Add power overhead, then subscriber equipment sends " power preference indication " to base station, and request uses
The DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can not be limited by subscriber equipment state in which, i.e. when subscriber equipment, the preference of power overhead be changed
Time, all the preference of transmit power expense can be indicated to base station.Now, in step S10, when subscriber equipment is to merit
The preference of rate expense is changed into when need to reduce power overhead, directly judges to reduce the inclined of power overhead for limiting
The first timer of the transmission of good instruction is the most overtime, if it is judged that be yes, then send to base station and reduces
The preference instruction of power overhead.And in step S12, need when the preference of power overhead is changed into by subscriber equipment
When increasing power overhead, then directly send to described base station and increase the preference instruction of power overhead.
In the embodiment that some are feasible, optionally, when whether step S10 judges described first timer
When the judged result of time-out is no, i.e. first timer is the most operationally, if subscriber equipment is inclined for power
The good judgement changed and subscriber equipment perform " power preference indication " and send and timer management
Operation not at same protocol layer, (for convenience, can claim described subscriber equipment perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then user sets
Standby AS layer can notify upper layer, and " power preference indication " sends limited.And work as phase
After the first timer time-out answered, the AS layer of subscriber equipment can also notify upper layer, sends the most not
Limited.And after the upper layer of AS receives this unrestricted instruction, it is judged that subscriber equipment remains a need for sending fall
The preference instruction of low-power expense, then may be notified that Access Layer AS layer;Otherwise, if subscriber equipment already without
Send the preference instruction reducing power overhead, the most do not carry out any operation.If subscriber equipment is for power
The judgement of preference and subscriber equipment perform " power preference indication " and send and timer management
Operation is at same protocol layer, and (be the most no longer specifically defined this protocol layer at this, executive agent is referred to as user and sets
Standby), then subscriber equipment can not perform any operation.
In the embodiment that some are feasible, the length of described first timer is set in advance in described user and sets
In Bei.
In the embodiment that some are feasible, the length of described first timer by described base station at Radio Resource
Management connection establishment process or RRM connection reconfiguration course are assigned to described subscriber equipment.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, and the transmission to the preference instruction increasing power overhead
Do not limit, limit the transmission and right of the subscriber equipment preference instruction to reducing power overhead with this respectively
Increase the transmission of the preference instruction of power overhead, limited by same intervalometer with prior art compared with, more
Add flexibly, improve the experience of user.Further, the embodiment of the present invention is by the 6th intervalometer by network side
Whether the 4th intervalometer controlled enters reduction power overhead to subscriber equipment, by the 7th timing of network side
Device the 5th intervalometer increases the preference of power overhead and is controlled, and has more effectively coordinated network side and user sets
The standby demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
The timer duration contradiction of network side intervalometer and user equipment side can be efficiently solved and cause power preference to be adjusted
Whole defect not in time.Further, the embodiment of the present invention is in the free time by the subscriber equipment that subscriber equipment is anticipated
The time of state combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters reduction power
The preference of expense or increase power overhead is controlled, and has more effectively coordinated subscriber equipment to power preference
Demand, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
Fig. 2 is the schematic flow sheet of the second embodiment of the signaling method of the present invention.It is the first enforcement
The extension of example, as in figure 2 it is shown, it comprises the steps that
Step S20, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that use
The most overtime in the first timer of the transmission limiting the preference instruction reducing power overhead, if it is judged that
It is yes, performs step S21.
Step S21, described subscriber equipment sends the preference instruction reducing power overhead to base station.
Step S22, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that use
The most overtime in the second timer of the transmission limiting the preference instruction increasing power overhead, if it is judged that
It is yes, performs step S23.
Step S23, described subscriber equipment sends the preference instruction increasing power overhead to described base station.
In the embodiment that some are feasible, step S20 and step S22 can be without sequencing, i.e. user
Equipment the preference of power overhead is first changed into need increase power overhead, after be changed into need reduce power open
Pin.
In the embodiment that some are feasible, before step S20, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to reduce power overhead, and it comprises the steps that
Subscriber equipment obtains the 4th intervalometer;Then when the 4th timer expiry or the described use of described subscriber equipment
It is fixed more than or equal to the 4th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead;
In the embodiment that some are feasible, before step S22, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to increase power overhead, and it comprises the steps that
Subscriber equipment obtains the 5th intervalometer, then when the 5th timer expiry or the described use of described subscriber equipment
It is fixed less than or equal to the 5th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain described 4th intervalometer from described base station,
Subscriber equipment can obtain described 5th intervalometer from described base station, and described 4th intervalometer and/or the described 5th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, the length of described 4th intervalometer is little
In the length equal to the 6th intervalometer in described base station, the length of described 5th intervalometer is less than or equal to described
The length of the 7th intervalometer in base station.Described 6th intervalometer is to safeguard for described base station in described base station
Side trigger reduce power overhead trigger, described 7th intervalometer be in described base station safeguard for described
Base station side triggers the trigger increasing power overhead.So when the 4th timer expiry obtained in subscriber equipment
Time, determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when subscriber equipment obtains
During five timer expiry obtained, determining that the preference of power overhead is changed into by described subscriber equipment need to increase merit
Rate expense.
In the embodiment that some are feasible, subscriber equipment can obtain described 6th intervalometer from described base station,
Subscriber equipment can obtain described 7th intervalometer from described base station, and described 6th intervalometer and/or the described 7th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, when subscriber equipment obtains from base station
During the length of six timer length and the 7th intervalometer, can be set in a user device according to the 6th intervalometer
Four intervalometers, and set the 5th intervalometer, and the length of the 4th set intervalometer according to the 7th intervalometer
Degree is smaller than the length equal to described 6th intervalometer, and the length of the 5th set intervalometer is smaller than being equal to
The length of described 7th intervalometer.So, when four timer expiry set in subscriber equipment, determine
The preference of power overhead is changed into by described equipment need to reduce power overhead, when the 5th of subscriber equipment setting
During timer expiry, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be estimated according to the message obtained from base station with oneself
Described 6th intervalometer and or the length of described 7th intervalometer.Such as, UE has performed a data transmit-receive behaviour
After work start a timer, this timer in UE executions once data transmit-receive operate after be restarted,
Assume that base station issues reconfiguration message/RRC connection release message to subscriber equipment, then subscriber equipment can basis
The content of reconfiguration message/RRC connection release message decides whether to record a length of 6th of above-mentioned timer the
Intervalometer and the length of the 7th intervalometer.Such as, if this reconfiguration message/RRC connection release message is to cut
Change order, or set up new radio bearer, or discharge original radio bearer, etc., subscriber equipment is not
A length of 6th intervalometer and the length of the 7th intervalometer of above-mentioned timer can be recorded;Disappear if this reconfigures
Breath/RRC connection release message is configuration DRX or the DRX configuring more power saving, then subscriber equipment can record
State a length of 6th intervalometer and the length of the 7th intervalometer of timer.
In implementing, when the length of subscriber equipment record the 6th timer length and the 7th intervalometer, can
Set the 4th intervalometer in a user device according to the 6th intervalometer, and set the 5th according to the 7th intervalometer
Intervalometer, and the length of the 4th set intervalometer is smaller than the length equal to described 6th intervalometer, institute
The length of the 5th intervalometer set is smaller than the length equal to described 7th intervalometer.So, set as user
During four timer expiry of standby middle setting, determining that the preference of power overhead is changed into by described equipment needs fall
Low-power expense, when five timer expiry that subscriber equipment sets, determines that described subscriber equipment is to power
The preference of expense is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the embodiment of the present invention is aforesaid determines that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead, and/or determine that the described subscriber equipment Preference Conversion to power overhead is for needing to increase
The flow process of power overhead can exist independent of the flow process shown in Fig. 2.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Being to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes default conditions
(" default " state) and reduction power overhead state (" lower power consumption " state) two
Kind of state, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, in step
S20, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, first subscriber equipment is sentenced
Break and oneself whether be in default conditions, if it is judged that be yes, then determine whether for limiting reduction merit
The first timer (recordable is " T_Default ") of the transmission of the preference instruction of rate expense is the most overtime (i.e.
Intervalometer does not runs), if it is judged that be yes, perform step S21.And in step S22, when with
The preference of power overhead is changed into when need to increase power overhead by family equipment, it is judged that whether oneself is in reduction merit
Rate expense state, if it is judged that be yes, then determines whether for limiting the preference increasing power overhead
The second timer (recordable is " T_LowerPower ") of instruction is the most overtime, if the judgment is Yes, then
The preference instruction increasing power overhead is sent to described base station.
In the embodiment that some are feasible, subscriber equipment judges that the determination methods of oneself state in which can be wrapped
Include:
Described subscriber equipment judges oneself state in which according to the parameter length specified, when described parameter length
When meeting the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described
Parameter length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in fall
Low-power expense state.Such as, the cycle (DRX cycle) can be received with the noncontinuity in subscriber equipment
Length judge oneself state in which, when the length of the presently configured DRX cycle of subscriber equipment is less than
During idle (IDLE) state during the length of DRX cycle, then judge to lay oneself open to " default " state,
The DRX cycle length presently configured when subscriber equipment equals to or more than IDLE state DRX cycle length
Degree, then it is assumed that UE is in " lower power consumption " state.Above-mentioned with DRX during idle condition
The length of cycle distinguishes " default " and " lower power consumption " state as threshold value, only
It is only one example, in implementing, the length of other parameters can be used to be used as threshold decision.So,
In step S20, when subscriber equipment is currently in use the length of DRX cycle corresponding to " default " state,
When i.e. subscriber equipment is in " default " state, if the power preference of subscriber equipment changes, it would be desirable to fall
Low-power expense, on the premise of meeting first timer time-out, then subscriber equipment sends " power to base station
Preference indication ", request uses the DRX that " lower power consumption " state is corresponding
Parameter configuration.And in step S22, when subscriber equipment is currently in use " lower power consumption " shape
The length of the DRX cycle that state is corresponding, i.e. subscriber equipment are in " lower power consumption " state
Time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases power overhead, then uses
Family equipment sends " power preference indication " to base station, and request uses " default " state corresponding
DRX parameter configuration.
In the embodiment that some are feasible, described subscriber equipment judges the determination methods of oneself state in which
Comprise the steps that
Described subscriber equipment receives DRX parameter according to the noncontinuity that described base station is described user device configuration
Judge oneself state in which, receive when described subscriber equipment is currently in use noncontinuity corresponding to default conditions
During DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment is currently in use fall
When noncontinuity corresponding to low-power expense state receives DRX parameter, then judge that described subscriber equipment is in fall
Low-power expense state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, in step S20, when subscriber equipment is currently in use " default " state pair
During the DRX parameter answered, when i.e. subscriber equipment is in " default " state, if the power preference of subscriber equipment
Change, it would be desirable to reducing power overhead, on the premise of meeting first timer time-out, then user sets
Standby to base station transmission " power preference indication ", request uses " lower power consumption "
The DRX parameter configuration that state is corresponding.And in step S22, when subscriber equipment is currently in use " lower power
Consumption " DRX parameter corresponding to state time, i.e. subscriber equipment is in " lower power
Consumption " state time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases
Add power overhead, then, on the premise of meeting second timer time-out, subscriber equipment sends " power to base station
Preference indication ", request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can not be limited by subscriber equipment state in which, i.e. when subscriber equipment, the preference of power overhead be changed
Time, all the preference of transmit power expense can be indicated to base station.Now, in step S20, when subscriber equipment is to merit
The preference of rate expense is changed into when need to reduce power overhead, directly judges to reduce the inclined of power overhead for limiting
The first timer of the transmission of good instruction is the most overtime, if it is judged that be yes, then send to base station and reduces
The preference instruction of power overhead.And in step S22, need when the preference of power overhead is changed into by subscriber equipment
When increasing power overhead, directly judge that be used for limiting the transmission of the preference instruction increasing power overhead second is fixed
Time device the most overtime, if it is judged that be yes, then to described base station send increase power overhead preference refer to
Show.
In the embodiment that some are feasible, optionally, when whether step S20 judges described first timer
When the judged result of time-out is no, i.e. first timer is the most operationally, if subscriber equipment is inclined for power
The good judgement changed and subscriber equipment perform " power preference indication " and send and timer management
Operation not at same protocol layer, (for convenience, can claim described subscriber equipment perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then user sets
Standby AS layer can notify upper layer, and " power preference indication " sends limited.And work as phase
After the first timer time-out answered, the AS layer of subscriber equipment can also notify upper layer, sends the most not
Limited.And after the upper layer of AS receives this unrestricted instruction, it is judged that subscriber equipment remains a need for sending fall
The preference instruction of low-power expense, then may be notified that Access Layer AS layer;Otherwise, if subscriber equipment already without
Send the preference instruction reducing power overhead, the most do not carry out any operation.If subscriber equipment is for power
The judgement of preference and subscriber equipment perform " power preference indication " and send and timer management
Operation is at same protocol layer, and (be the most no longer specifically defined this protocol layer at this, executive agent is referred to as user and sets
Standby), then subscriber equipment can not perform any operation.
In the embodiment that some are feasible, optionally, judge whether described second timer surpasses when step S22
Time judged result when being no, i.e. second timer is the most operationally, if subscriber equipment is for power preference
Judgement and the subscriber equipment changed performs " power preference indication " and sends and timer management
Operation, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then user sets
Standby AS layer can notify upper layer, and " power preference indication " sends limited.And when the
After two timer expiries, the AS layer of subscriber equipment can also notify upper layer, sends the most unrestricted.
And after the upper layer of AS receives this unrestricted instruction, it is judged that subscriber equipment remains a need for sending increases power
The preference instruction of expense, then may be notified that Access Layer AS layer;Otherwise, if subscriber equipment is already without to send
Increase the preference instruction of power overhead, the most do not carry out any operation.If subscriber equipment is for power preference
Judge that the operation performing " power preference indication " transmission and timer management with subscriber equipment exists
Same protocol layer, (being the most no longer specifically defined this protocol layer at this, executive agent is referred to as subscriber equipment), then
Subscriber equipment can not perform any operation.
In the embodiment that some are feasible, the length of described first timer and described second timer can be pre-
First it is arranged in described subscriber equipment.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Degree can be connected reconfiguration course by described base station in RRM connection establishment process or RRM
In be assigned to described subscriber equipment.
In the embodiment that some are feasible, the length of described first timer is longer than or fixed equal to described second
Time device length.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, limits user to increasing power by second timer
The transmission of the preference instruction of expense, limits the subscriber equipment preference instruction to reducing power overhead respectively with this
Transmission and to increase power overhead preference instruction transmission, limited by same intervalometer with prior art
Surely compare, more flexibly, improve the experience of user.Further, the embodiment of the present invention is by by network side
Whether the 6th timer-operated 4th intervalometer enters reduction power overhead, by network side to subscriber equipment
The 7th intervalometer the 5th intervalometer increase power overhead preference be controlled, more effectively coordinated network
Side and the subscriber equipment demand to power preference, it is ensured that subscriber equipment within the shortest time to power preference
It is adjusted.Network side intervalometer can be efficiently solved cause with the timer duration contradiction of user equipment side
Power preference adjusts defect not in time.Further, the embodiment of the present invention is set by the user that subscriber equipment is anticipated
The standby time being in idle condition combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters
Reduce power overhead or increase the preference of power overhead and be controlled, more effectively having coordinated subscriber equipment
Demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
Fig. 3 is the schematic flow sheet of the 3rd embodiment of the signaling method of the present invention, this embodiment be
The extension carried out on the basis of second embodiment.As it is shown on figure 3, it comprises the steps that
Step S30, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that use
The most overtime in the first timer of the transmission limiting the preference instruction reducing power overhead, if it is judged that
It is yes, performs step S31.
Step S31, described subscriber equipment sends the preference instruction reducing power overhead to base station.
Step S32, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that use
The most overtime in the second timer of the transmission limiting the preference instruction increasing power overhead, if it is judged that
It is yes, performs step S33.
Step S33, described subscriber equipment sends the preference instruction increasing power overhead to described base station.
Step S34, described subscriber equipment starts described first timer and/or described second timer.
In the embodiment that some are feasible, step S30 and step S32 can be without sequencing, i.e. user
Equipment the preference of power overhead is first changed into need increase power overhead, after be changed into need reduce power open
Pin.Wherein step 34 and step 30, step 31, the order of step 32 and step 33 is: step 30,
Step 31, step 34;Or step 32, step 33, step 34.The most each subscriber equipment is to described base
After the instruction of transmit power of standing expense preference, being required for performing step 34, the power overhead regardless of this transmission is inclined
It is designated as reducing well and is also to increase.
In the embodiment that some are feasible, before step S30, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to reduce power overhead, and it comprises the steps that
Subscriber equipment obtains the 4th intervalometer;Then when the 4th timer expiry or the described use of described subscriber equipment
It is fixed more than or equal to the 4th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead;
In the embodiment that some are feasible, before step S32, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to increase power overhead, and it comprises the steps that
Subscriber equipment obtains the 5th intervalometer, then when the 5th timer expiry or the described use of described subscriber equipment
It is fixed less than or equal to the 5th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain described 4th intervalometer from described base station,
Subscriber equipment can obtain described 5th intervalometer from described base station, and described 4th intervalometer and/or the described 5th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, the length of described 4th intervalometer is little
In the length equal to the 6th intervalometer in described base station, the length of described 5th intervalometer is less than or equal to described
The length of the 7th intervalometer in base station.Described 6th intervalometer is to safeguard for described base station in described base station
Side trigger reduce power overhead trigger, described 7th intervalometer be in described base station safeguard for described
Base station side triggers the trigger increasing power overhead.So when the 4th timer expiry obtained in subscriber equipment
Time, determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when subscriber equipment obtains
During five timer expiry obtained, determining that the preference of power overhead is changed into by described subscriber equipment need to increase merit
Rate expense.
In the embodiment that some are feasible, subscriber equipment can obtain described 6th intervalometer from described base station,
Subscriber equipment can obtain described 7th intervalometer from described base station, and described 6th intervalometer and/or the described 7th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, when subscriber equipment obtains from base station
During the length of six timer length and the 7th intervalometer, can be set in a user device according to the 6th intervalometer
Four intervalometers, and set the 5th intervalometer, and the length of the 4th set intervalometer according to the 7th intervalometer
Degree is smaller than the length equal to described 6th intervalometer, and the length of the 5th set intervalometer is smaller than being equal to
The length of described 7th intervalometer.So, when four timer expiry set in subscriber equipment, determine
The preference of power overhead is changed into by described equipment need to reduce power overhead, when the 5th of subscriber equipment setting
During timer expiry, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be estimated according to the message obtained from base station with oneself
Described 6th intervalometer and or the length of described 7th intervalometer.Such as, UE has performed a data transmit-receive behaviour
After work start a timer, this timer in UE executions once data transmit-receive operate after be restarted,
Assume that base station issues reconfiguration message/RRC connection release message to subscriber equipment, then subscriber equipment can basis
The content of reconfiguration message/RRC connection release message decides whether to record a length of 6th of above-mentioned timer the
Intervalometer and the length of the 7th intervalometer.Such as, if this reconfiguration message/RRC connection release message is to cut
Change order, or set up new radio bearer, or discharge original radio bearer, etc., subscriber equipment is not
A length of 6th intervalometer and the length of the 7th intervalometer of above-mentioned timer can be recorded;Disappear if this reconfigures
Breath/RRC connection release message is configuration DRX or the DRX configuring more power saving, then subscriber equipment can record
State a length of 6th intervalometer and the length of the 7th intervalometer of timer.
In implementing, when the length of subscriber equipment record the 6th timer length and the 7th intervalometer, can
Set the 4th intervalometer in a user device according to the 6th intervalometer, and set the 5th according to the 7th intervalometer
Intervalometer, and the length of the 4th set intervalometer is smaller than the length equal to described 6th intervalometer, institute
The length of the 5th intervalometer set is smaller than the length equal to described 7th intervalometer.So, set as user
During four timer expiry of standby middle setting, determining that the preference of power overhead is changed into by described equipment needs fall
Low-power expense, when five timer expiry that subscriber equipment sets, determines that described subscriber equipment is to power
The preference of expense is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the embodiment of the present invention is aforesaid determines that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead, and/or determine that the described subscriber equipment Preference Conversion to power overhead is for needing to increase
The flow process of power overhead can exist independent of the flow process shown in Fig. 3.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Being to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes default conditions
(" default " state) and reduction power overhead state (" lower power consumption " state) two
Kind of state, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, in step
S30, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, first subscriber equipment is sentenced
Break and oneself whether be in default conditions, if it is judged that be yes, then determine whether for limiting reduction merit
The first timer (recordable is " T_Default ") of the transmission of the preference instruction of rate expense is the most overtime (i.e.
Intervalometer does not runs), if it is judged that be yes, perform step S31.And in step S32, when with
The preference of power overhead is changed into when need to increase power overhead by family equipment, it is judged that whether oneself is in reduction merit
Rate expense state, if it is judged that be yes, then determines whether for limiting the preference increasing power overhead
The second timer (recordable is " T_LowerPower ") of instruction is the most overtime, if the judgment is Yes, then
The preference instruction increasing power overhead is sent to described base station.
In the embodiment that some are feasible, subscriber equipment judges that the determination methods of oneself state in which can be wrapped
Include:
Described subscriber equipment judges oneself state in which according to the parameter length specified, when described parameter length
When meeting the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described
Parameter length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in fall
Low-power expense state.Such as, the cycle (DRX cycle) can be received with the noncontinuity in subscriber equipment
Length judge oneself state in which, when the length of the presently configured DRX cycle of subscriber equipment is less than
During idle (IDLE) state during the length of DRX cycle, then judge to lay oneself open to " default " state,
The DRX cycle length presently configured when subscriber equipment equals to or more than IDLE state DRX cycle length
Degree, then it is assumed that UE is in " lower power consumption " state.Above-mentioned with DRX during idle condition
The length of cycle distinguishes " default " and " lower power consumption " state as threshold value, only
It is only one example, in implementing, the length of other parameters can be used to be used as threshold decision.So,
In step S30, when subscriber equipment is currently in use the length of DRX cycle corresponding to " default " state,
When i.e. subscriber equipment is in " default " state, if the power preference of subscriber equipment changes, it would be desirable to fall
Low-power expense, on the premise of meeting first timer time-out, then subscriber equipment sends " power to base station
Preference indication ", request uses the DRX that " lower power consumption " state is corresponding
Parameter configuration.And in step S32, when subscriber equipment is currently in use " lower power consumption " shape
The length of the DRX cycle that state is corresponding, i.e. subscriber equipment are in " lower power consumption " state
Time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases power overhead, then uses
Family equipment sends " power preference indication " to base station, and request uses " default " state corresponding
DRX parameter configuration.
In the embodiment that some are feasible, described subscriber equipment judges the determination methods of oneself state in which
Comprise the steps that
Described subscriber equipment receives DRX parameter according to the noncontinuity that described base station is described user device configuration
Judge oneself state in which, receive when described subscriber equipment is currently in use noncontinuity corresponding to default conditions
During DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment is currently in use fall
When noncontinuity corresponding to low-power expense state receives DRX parameter, then judge that described subscriber equipment is in fall
Low-power expense state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, in step S310, when subscriber equipment is currently in use " default " state
During corresponding DRX parameter, when i.e. subscriber equipment is in " default " state, if the power of subscriber equipment is inclined
Change well, it would be desirable to reduce power overhead, on the premise of meeting first timer time-out, then user
Equipment sends " power preference indication " to base station, and request uses " lower power
Consumption " DRX parameter configuration corresponding to state.And in step S32, when subscriber equipment is currently in use
During DRX parameter corresponding to " lower power consumption " state, i.e. subscriber equipment is in " lower
Power consumption " state time, the power preference of subscriber equipment changes, it would be desirable to improving performance,
I.e. increase power overhead, then, on the premise of meeting second timer time-out, subscriber equipment sends to base station
" power preference indication ", request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can not be limited by subscriber equipment state in which, i.e. when subscriber equipment, the preference of power overhead be changed
Time, all the preference of transmit power expense can be indicated to base station.Now, in step S30, when subscriber equipment is to merit
The preference of rate expense is changed into when need to reduce power overhead, directly judges to reduce the inclined of power overhead for limiting
The first timer of the transmission of good instruction is the most overtime, if it is judged that be yes, then send to base station and reduces
The preference instruction of power overhead.And in step S32, need when the preference of power overhead is changed into by subscriber equipment
When increasing power overhead, directly judge that be used for limiting the transmission of the preference instruction increasing power overhead second is fixed
Time device the most overtime, if it is judged that be yes, then to described base station send increase power overhead preference refer to
Show.
In the embodiment that some are feasible, optionally, when whether step S30 judges described first timer
When the judged result of time-out is no, i.e. first timer is the most operationally, if subscriber equipment is inclined for power
The good judgement changed and subscriber equipment perform " power preference indication " and send and timer management
Operation not at same protocol layer, (for convenience, can claim described subscriber equipment perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then user sets
Standby AS layer can notify upper layer, and " power preference indication " sends limited.And work as phase
After the first timer time-out answered, the AS layer of subscriber equipment can also notify upper layer, sends the most not
Limited.And after the upper layer of AS receives this unrestricted instruction, it is judged that subscriber equipment remains a need for sending fall
The preference instruction of low-power expense, then may be notified that Access Layer AS layer;Otherwise, if subscriber equipment already without
Send the preference instruction reducing power overhead, the most do not carry out any operation.If subscriber equipment is for power
The judgement of preference and subscriber equipment perform " power preference indication " and send and timer management
Operation is at same protocol layer, and (be the most no longer specifically defined this protocol layer at this, executive agent is referred to as user and sets
Standby), then subscriber equipment can not perform any operation.
In the embodiment that some are feasible, optionally, judge whether described second timer surpasses when step S32
Time judged result when being no, i.e. second timer is the most operationally, if subscriber equipment is for power preference
Judgement and the subscriber equipment changed performs " power preference indication " and sends and timer management
Operation, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then user sets
Standby AS layer can notify upper layer, and " power preference indication " sends limited.And when the
After two timer expiries, the AS layer of subscriber equipment can also notify upper layer, sends the most unrestricted.
And after the upper layer of AS receives this unrestricted instruction, it is judged that subscriber equipment remains a need for sending increases power
The preference instruction of expense, then may be notified that Access Layer AS layer;Otherwise, if subscriber equipment is already without to send
Increase the preference instruction of power overhead, the most do not carry out any operation.If subscriber equipment is for power preference
Judge that the operation performing " power preference indication " transmission and timer management with subscriber equipment exists
Same protocol layer, (being the most no longer specifically defined this protocol layer at this, executive agent is referred to as subscriber equipment), then
Subscriber equipment can not perform any operation.
In the embodiment that some are feasible, the length of described first timer and described second timer can be pre-
First it is arranged in described subscriber equipment.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Degree can be connected reconfiguration course by described base station in RRM connection establishment process or RRM
In be assigned to described subscriber equipment.
In the embodiment that some are feasible, the length of described first timer is longer than or fixed equal to described second
Time device length.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
In the embodiment that some are feasible, available " need when the preference of power overhead is changed into by subscriber equipment
Increase power overhead time, to described base station send increase power overhead preference instruction " step replacement step
S32 and step S33.Now, step S34 can be replaced: described subscriber equipment starts described first timer.
In the embodiment that some are feasible, when subscriber equipment includes two kinds of clear states, in step S34, when
Subscriber equipment is in default conditions, can only start first timer;When subscriber equipment is in reduction power overhead
State, can only start second timer.If described subscriber equipment only includes first timer, when in step S34
Judge when user is in reduction power overhead state, it is not necessary to start intervalometer.If subscriber equipment is not limited by state
Time processed, first timer and second timer can be started in step S34 simultaneously;If described subscriber equipment only wraps
Include first timer, only start first timer in step S34.When subscriber equipment starts two timings simultaneously
During device, if after user equipment requests sends new power overhead preference and the transmission of satisfied transmission condition, if two
Intervalometer there is an intervalometer still running, after needing to stop this intervalometer, then start the first timing simultaneously
Device and second timer.In the present embodiment and follow-up each embodiment, " startup " of indication of the present invention includes
Primary startup and follow-up intervalometer is zeroed out after restart.
In the embodiment that some are feasible, optionally, when, after performing step S34, described user sets
Described first timer in Bei has timed out, but does not receives the radio resource parameter configuration that described base station sends
As a result, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead, described user
Equipment can not send the preference instruction reducing power overhead to described base station, sends until receiving described base station
Radio resource parameter configuration result.
In the embodiment that some are feasible, optionally, when, after performing step S34, described user sets
Described second timer in Bei has timed out, but does not receives the radio resource parameter configuration that described base station sends
As a result, and when subscriber equipment is again transformed into need to increasing power overhead to the preference of power overhead, described user
Equipment can not send the preference instruction increasing power overhead to described base station, sends until receiving described base station
Radio resource parameter configuration result.
In the embodiment that some are feasible, optionally, when, after performing step S34, described user sets
When described first timer in Bei has not timed out, receive the radio resource parameter configuration knot that described base station sends
Really, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead, described user sets
The standby preference instruction that can not send reduction power overhead to described base station, until described first timer time-out.
In the embodiment that some are feasible, optionally, when, after performing step S34, described user sets
When described second timer in Bei has not timed out, receive the radio resource parameter configuration knot that described base station sends
Really, and when subscriber equipment is again transformed into need to increasing power overhead to the preference of power overhead, described user sets
The standby preference instruction that can not send increase power overhead to described base station, until described second timer time-out.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, limits user to increasing power by second timer
The transmission of the preference instruction of expense, limits the subscriber equipment preference instruction to reducing power overhead respectively with this
Transmission and to increase power overhead preference instruction transmission, limited by same intervalometer with prior art
Surely compare, more flexibly, improve the experience of user.Further, the embodiment of the present invention is by by network side
Whether the 6th timer-operated 4th intervalometer enters reduction power overhead, by network side to subscriber equipment
The 7th intervalometer the 5th intervalometer increase power overhead preference be controlled, more effectively coordinated network
Side and the subscriber equipment demand to power preference, it is ensured that subscriber equipment within the shortest time to power preference
It is adjusted.Network side intervalometer can be efficiently solved cause with the timer duration contradiction of user equipment side
Power preference adjusts defect not in time.Further, the embodiment of the present invention is set by the user that subscriber equipment is anticipated
The standby time being in idle condition combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters
Reduce power overhead or increase the preference of power overhead and be controlled, more effectively having coordinated subscriber equipment
Demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
Fig. 4 is the schematic flow sheet of the 4th embodiment of the signaling method of the present invention, this embodiment be
The extension carried out on the basis of second embodiment.As shown in Figure 4, it comprises the steps that
Step S40, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that use
The most overtime in the first timer of the transmission limiting the preference instruction reducing power overhead, if it is judged that
It is yes, performs step S41.
Step S41, described subscriber equipment sends the preference instruction reducing power overhead to base station.
Step S42, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that use
The most overtime in the second timer of the transmission limiting the preference instruction increasing power overhead, if it is judged that
It is yes, performs step S43.
Step S43, described subscriber equipment sends the preference instruction increasing power overhead to described base station.
Step S44, described base station indicates or described increase according to the preference of the described reduction power overhead received
The preference instruction of power overhead, for described user device configuration radio resource parameter.
Step S45, described subscriber equipment receives the radio resource parameter configuration result that described base station sends.
Step S46, described subscriber equipment starts described first timer and/or described second timer.
In the embodiment that some are feasible, step S40 and step S42 can be without sequencing, i.e. user
Equipment the preference of power overhead is first changed into need increase power overhead, after be changed into need reduce power open
Pin.Wherein step 44~step 46 and step 40, step 41, the order of step 42 and step 43 is: step
Rapid 40, step 41, step 44~step 46;Or step 42, step 43, step 44~step 46.
After the most each subscriber equipment receives the radio resource parameter configuration result that described base station sends, it is required for performing step
Rapid 44~step 46, it is designated as reducing also being to increase regardless of the power overhead preference of this transmission.
In the embodiment that some are feasible, before step S40, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to reduce power overhead, and it comprises the steps that
Subscriber equipment obtains the 4th intervalometer;Then when the 4th timer expiry or the described use of described subscriber equipment
It is fixed more than or equal to the 4th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead;
In the embodiment that some are feasible, before step S42, may also include determining that subscriber equipment is to merit
Whether the preference of rate expense is changed into the flow process that need to increase power overhead, and it comprises the steps that
Subscriber equipment obtains the 5th intervalometer, then when the 5th timer expiry or the described use of described subscriber equipment
It is fixed less than or equal to the 5th of described subscriber equipment that family equipment estimates that described subscriber equipment is in time of idle condition
Time device length time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain described 4th intervalometer from described base station,
Subscriber equipment can obtain described 5th intervalometer from described base station, and described 4th intervalometer and/or the described 5th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, the length of described 4th intervalometer is little
In the length equal to the 6th intervalometer in described base station, the length of described 5th intervalometer is less than or equal to described
The length of the 7th intervalometer in base station.Described 6th intervalometer is to safeguard for described base station in described base station
Side trigger reduce power overhead trigger, described 7th intervalometer be in described base station safeguard for described
Base station side triggers the trigger increasing power overhead.So when the 4th timer expiry obtained in subscriber equipment
Time, determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when subscriber equipment obtains
During five timer expiry obtained, determining that the preference of power overhead is changed into by described subscriber equipment need to increase merit
Rate expense.
In the embodiment that some are feasible, subscriber equipment can obtain described 6th intervalometer from described base station,
Subscriber equipment can obtain described 7th intervalometer from described base station, and described 6th intervalometer and/or the described 7th is determined
Time device can disappear from the radio resource control message that described base station sends, physical layer message, data link layer
Breath, cell switching information obtain at least one.In implementing, when subscriber equipment obtains from base station
During the length of six timer length and the 7th intervalometer, can be set in a user device according to the 6th intervalometer
Four intervalometers, and set the 5th intervalometer, and the length of the 4th set intervalometer according to the 7th intervalometer
Degree is smaller than the length equal to described 6th intervalometer, and the length of the 5th set intervalometer is smaller than being equal to
The length of described 7th intervalometer.So, when four timer expiry set in subscriber equipment, determine
The preference of power overhead is changed into by described equipment need to reduce power overhead, when the 5th of subscriber equipment setting
During timer expiry, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be estimated according to the message obtained from base station with oneself
Described 6th intervalometer and or the length of described 7th intervalometer.Such as, UE has performed a data transmit-receive behaviour
After work start a timer, this timer in UE executions once data transmit-receive operate after be restarted,
Assume that base station issues reconfiguration message/RRC connection release message to subscriber equipment, then subscriber equipment can basis
The content of reconfiguration message/RRC connection release message decides whether to record a length of 6th of above-mentioned timer the
Intervalometer and the length of the 7th intervalometer.Such as, if this reconfiguration message/RRC connection release message is to cut
Change order, or set up new radio bearer, or discharge original radio bearer, etc., subscriber equipment is not
A length of 6th intervalometer and the length of the 7th intervalometer of above-mentioned timer can be recorded;Disappear if this reconfigures
Breath/RRC connection release message is configuration DRX or the DRX configuring more power saving, then subscriber equipment can record
State a length of 6th intervalometer and the length of the 7th intervalometer of timer.
In implementing, when the length of subscriber equipment record the 6th timer length and the 7th intervalometer, can
Set the 4th intervalometer in a user device according to the 6th intervalometer, and set the 5th according to the 7th intervalometer
Intervalometer, and the length of the 4th set intervalometer is smaller than the length equal to described 6th intervalometer, institute
The length of the 5th intervalometer set is smaller than the length equal to described 7th intervalometer.So, set as user
During four timer expiry of standby middle setting, determining that the preference of power overhead is changed into by described equipment needs fall
Low-power expense, when five timer expiry that subscriber equipment sets, determines that described subscriber equipment is to power
The preference of expense is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the embodiment of the present invention is aforesaid determines that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead, and/or determine that the described subscriber equipment Preference Conversion to power overhead is for needing to increase
The flow process of power overhead can exist independent of the flow process shown in Fig. 4.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Being to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes default conditions
(" default " state) and reduction power overhead state (" lower power consumption " state) two
Kind of state, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, in step
S40, when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, first subscriber equipment is sentenced
Break and oneself whether be in default conditions, if it is judged that be yes, then determine whether for limiting reduction merit
The first timer (recordable is " T_Default ") of the transmission of the preference instruction of rate expense is the most overtime (i.e.
Intervalometer does not runs), if it is judged that be yes, perform step S41.And in step S42, when with
The preference of power overhead is changed into when need to increase power overhead by family equipment, it is judged that whether oneself is in reduction merit
Rate expense state, if it is judged that be yes, then determines whether for limiting the preference increasing power overhead
The second timer (recordable is " T_LowerPower ") of instruction is the most overtime, if the judgment is Yes, then
The preference instruction increasing power overhead is sent to described base station.
In the embodiment that some are feasible, subscriber equipment judges that the determination methods of oneself state in which can be wrapped
Include:
Described subscriber equipment judges oneself state in which according to the parameter length specified, when described parameter length
When meeting the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described
Parameter length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in fall
Low-power expense state.Such as, the cycle (DRX cycle) can be received with the noncontinuity in subscriber equipment
Length judge oneself state in which, when the length of the presently configured DRX cycle of subscriber equipment is less than
During idle (IDLE) state during the length of DRX cycle, then judge to lay oneself open to " default " state,
The DRX cycle length presently configured when subscriber equipment equals to or more than IDLE state DRX cycle length
Degree, then it is assumed that UE is in " lower power consumption " state.Above-mentioned with DRX during idle condition
The length of cycle distinguishes " default " and " lower power consumption " state as threshold value, only
It is only one example, in implementing, the length of other parameters can be used to be used as threshold decision.So,
In step S40, when subscriber equipment is currently in use the length of DRX cycle corresponding to " default " state,
When i.e. subscriber equipment is in " default " state, if the power preference of subscriber equipment changes, it would be desirable to fall
Low-power expense, on the premise of meeting first timer time-out, then subscriber equipment sends " power to base station
Preference indication ", request uses the DRX that " lower power consumption " state is corresponding
Parameter configuration.And in step S42, when subscriber equipment is currently in use " lower power consumption " shape
The length of the DRX cycle that state is corresponding, i.e. subscriber equipment are in " lower power consumption " state
Time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases power overhead, then uses
Family equipment sends " power preference indication " to base station, and request uses " default " state corresponding
DRX parameter configuration.
In the embodiment that some are feasible, described subscriber equipment judges the determination methods of oneself state in which
Comprise the steps that
Described subscriber equipment receives DRX parameter according to the noncontinuity that described base station is described user device configuration
Judge oneself state in which, receive when described subscriber equipment is currently in use noncontinuity corresponding to default conditions
During DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment is currently in use fall
When noncontinuity corresponding to low-power expense state receives DRX parameter, then judge that described subscriber equipment is in fall
Low-power expense state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, in step S40, when subscriber equipment is currently in use " default " state pair
During the DRX parameter answered, when i.e. subscriber equipment is in " default " state, if the power preference of subscriber equipment
Change, it would be desirable to reducing power overhead, on the premise of meeting first timer time-out, then user sets
Standby to base station transmission " power preference indication ", request uses " lower power consumption "
The DRX parameter configuration that state is corresponding.And in step S42, when subscriber equipment is currently in use " lower power
Consumption " DRX parameter corresponding to state time, i.e. subscriber equipment is in " lower power
Consumption " state time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases
Add power overhead, then, on the premise of meeting second timer time-out, subscriber equipment sends " power to base station
Preference indication ", request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication "), including reduce power overhead preference instruction and increase power overhead preference instruction) send out
Send and can not be limited by subscriber equipment state in which, i.e. occur to turn to the preference of power overhead when subscriber equipment
During change, all the preference of transmit power expense can be indicated to base station.Now, in step S40, when subscriber equipment pair
The preference of power overhead is changed into when need to reduce power overhead, directly judges to reduce power overhead for limiting
The first timer of the transmission of preference instruction is the most overtime, if it is judged that be yes, then sends fall to base station
The preference instruction of low-power expense.And in step S42, when the preference of power overhead is changed into by subscriber equipment
When need to increase power overhead, directly judge the second of the transmission indicated for the preference limiting increase power overhead
Intervalometer is the most overtime, if it is judged that be yes, then send to described base station and increases the preference of power overhead
Instruction.
In the embodiment that some are feasible, optionally, when whether step S40 judges described first timer
When the judged result of time-out is no, i.e. first timer is the most operationally, if subscriber equipment is inclined for power
The good judgement changed and subscriber equipment perform " power preference indication " and send and timer management
Operation not at same protocol layer, (for convenience, can claim described subscriber equipment perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then user sets
Standby AS layer can notify upper layer, and " power preference indication " sends limited.And work as phase
After the first timer time-out answered, the AS layer of subscriber equipment can also notify upper layer, sends the most not
Limited.And after the upper layer of AS receives this unrestricted instruction, it is judged that subscriber equipment remains a need for sending fall
The preference instruction of low-power expense, then may be notified that Access Layer AS layer;Otherwise, if subscriber equipment already without
Send the preference instruction reducing power overhead, the most do not carry out any operation.If subscriber equipment is for power
The judgement of preference and subscriber equipment perform " power preference indication " and send and timer management
Operation is at same protocol layer, and (be the most no longer specifically defined this protocol layer at this, executive agent is referred to as user and sets
Standby), then subscriber equipment can not perform any operation.
In the embodiment that some are feasible, optionally, judge whether described second timer surpasses when step S42
Time judged result when being no, i.e. second timer is the most operationally, if subscriber equipment is for power preference
Judgement and the subscriber equipment changed performs " power preference indication " and sends and timer management
Operation, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then user sets
Standby AS layer can notify upper layer, and " power preference indication " sends limited.And when the
After two timer expiries, the AS layer of subscriber equipment can also notify upper layer, sends the most unrestricted.
And after the upper layer of AS receives this unrestricted instruction, it is judged that subscriber equipment remains a need for sending increases power
The preference instruction of expense, then may be notified that Access Layer AS layer;Otherwise, if subscriber equipment is already without to send
Increase the preference instruction of power overhead, the most do not carry out any operation.If subscriber equipment is for power preference
Judge that the operation performing " power preference indication " transmission and timer management with subscriber equipment exists
Same protocol layer, (being the most no longer specifically defined this protocol layer at this, executive agent is referred to as subscriber equipment), then
Subscriber equipment can not perform any operation.
In the embodiment that some are feasible, in step S44, when base station receives the preference of reduction power overhead
After instruction, the DRX parameter that power overhead (" lower power consumption ") state is corresponding will be reduced
Giving subscriber equipment with physical layer parameter configuration (such as CQI, Sounding), its way can be as follows:
When RRC connects and reconfigures, described base station is that described user device configuration two overlaps noncontinuity reception
DRX parameter, and indicate described subscriber equipment to use " lower power when carrying out RRM and connecting
Consumption " corresponding DRX parameter;And described base station receives DRX ginseng according to two set noncontinuities
Number, overlaps physical layer parameter for described user device configuration two, and indicates subscriber equipment carrying out Radio Resource pipe
The physical layer parameter that the DRX parameter of " lower power consumption " correspondence is corresponding is used when reason connects.
In the embodiment that some are feasible, in step S44, increase the preference of power overhead when base station receives
After instruction, DRX parameter corresponding to power overhead (" default ") state and physical layer parameter configuration will be increased
(such as CQI, Sounding) gives subscriber equipment, and its way can be as follows:
When RRC connects and reconfigures, described base station is that described user device configuration two overlaps noncontinuity reception
DRX parameter, and indicate described subscriber equipment to use " default " right when carrying out RRM and connecting
The DRX parameter answered;And described base station receives DRX parameters, for described user according to two set noncontinuities
Equipment configuration two set physical layer parameter, and indicate subscriber equipment to use when carrying out RRM and connecting
The physical layer parameter that DRX parameter that " default " is corresponding is corresponding.
In the embodiment that some are feasible, base station includes the length of DRX cycle to the setting of DRX parameter
Setting, when receive reduce power overhead preference instruction after, the length of DRX cycle can be set to
Less than in the length of IDLE state DRX cycle.After receiving the preference instruction increasing power overhead, can
The length of DRX cycle is set greater than or is equal to the length of IDLE state DRX cycle.
In the embodiment that some are feasible, subscriber equipment can also carry out implicit expression by the state that judgement is presently in
The DRX parameter that used of determination: current user equipment is in " default " state, if base station does not has
Be explicitly indicated subscriber equipment transition state, then subscriber equipment uses the DRX of new correspondence " default " state
Parameter;Otherwise, current user equipment is in " lower power consumption " state, if base station does not has
Clearly dictate otherwise subscriber equipment transition state, then subscriber equipment uses new correspondence " lower power
Consumption " the DRX parameter of state.
In the embodiment that some are feasible, the length of described first timer and described second timer can be pre-
First it is arranged in described subscriber equipment.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Degree can be connected reconfiguration course by described base station in RRM connection establishment process or RRM
In be assigned to described subscriber equipment.
In the embodiment that some are feasible, the length of described first timer is longer than or fixed equal to described second
Time device length.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
In the embodiment that some are feasible, available " need when the preference of power overhead is changed into by subscriber equipment
Increase power overhead time, to described base station send increase power overhead preference instruction " step replacement step
S42 and step S43.Now, step S46 can be replaced: described subscriber equipment starts described first timer.
In the embodiment that some are feasible, when subscriber equipment includes two kinds of clear states, in step S46, when
Subscriber equipment is in default conditions, can only start first timer;When subscriber equipment is in reduction power overhead
State, can only start second timer.If described subscriber equipment only includes first timer, when in step S46
Judge when user is in reduction power overhead state, it is not necessary to start intervalometer.If subscriber equipment is not limited by state
Time processed, first timer and second timer can be started in step S46 simultaneously;If described subscriber equipment only wraps
Include first timer, only start first timer in step S46.When subscriber equipment starts two timings simultaneously
During device, if after user equipment requests sends new power overhead preference and the transmission of satisfied transmission condition, if two
Intervalometer there is an intervalometer still running, after needing to stop this intervalometer, then start the first timing simultaneously
Device and second timer.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, limits user to increasing power by second timer
The transmission of the preference instruction of expense, limits the subscriber equipment preference instruction to reducing power overhead respectively with this
Transmission and to increase power overhead preference instruction transmission, limited by same intervalometer with prior art
Surely compare, more flexibly, improve the experience of user.Further, the embodiment of the present invention is by by network side
Whether the 6th timer-operated 4th intervalometer enters reduction power overhead, by network side to subscriber equipment
The 7th intervalometer the 5th intervalometer increase power overhead preference be controlled, more effectively coordinated network
Side and the subscriber equipment demand to power preference, it is ensured that subscriber equipment within the shortest time to power preference
It is adjusted.Network side intervalometer can be efficiently solved cause with the timer duration contradiction of user equipment side
Power preference adjusts defect not in time.Further, the embodiment of the present invention is set by the user that subscriber equipment is anticipated
The standby time being in idle condition combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters
Reduce power overhead or increase the preference of power overhead and be controlled, more effectively having coordinated subscriber equipment
Demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
For more preferably implementing each scheme of the embodiment of the method for the present invention, the embodiment of the present invention additionally provides relevant dress
Put.
Fig. 5 is the first embodiment that can be used for implementing the subscriber equipment of the embodiment of the method for the present invention of the present invention
Structure composition schematic diagram, as it is shown in figure 5, the subscriber equipment of the present invention can include indicate sending module 700,
First control module the 701, second control module 702, wherein:
Instruction sending module 700, for indicating to base-station transmitting-power expense preference, described power overhead indicates
Including reducing the preference instruction of power overhead or increasing the preference instruction of power overhead.
First control module 701, for reducing power open when the preference of power overhead be changed into by subscriber equipment
During pin, it is judged that the most overtime for limiting the first timer of the transmission of the preference instruction reducing power overhead,
If it is judged that be yes, notify that described instruction sending module 700 sends to base station and reduce the inclined of power overhead
Good instruction.
Described second control module 702, for increasing merit when the preference of power overhead is changed into by subscriber equipment
During rate expense, notify that described instruction sending module sends the preference instruction increasing power overhead to described base station.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can be to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes giving tacit consent to shape
State (" default " state) and reduction power overhead state (" lower power consumption " state)
Two states, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, the most originally
The subscriber equipment of invention also includes condition judgment module 704, is used for judging described subscriber equipment state in which.
First control module 701 when the preference of power overhead being changed into need to reduce power overhead when subscriber equipment,
And described condition judgment module 704 is when indicating described subscriber equipment to be in default conditions, it is judged that be used for limiting fall
The first timer (recordable is " T_Default ") of the transmission of the preference instruction of low-power expense is the most overtime
(i.e. intervalometer does not runs), if it is judged that be yes, then notifies that described instruction sending module 700 is to base
Stand and send the preference instruction reducing power overhead.And second control module 702 when subscriber equipment is to power
The preference of expense is changed into when need to increase power overhead, and described condition judgment module 704 indicates described user
When equipment reduces power overhead state, notifying that described instruction sending module 700 sends to described base station increases merit
The preference instruction of rate expense.
In the embodiment that some are feasible, condition judgment module 704 judges subscriber equipment state in which
Determination methods comprises the steps that
Described condition judgment module 704 judges subscriber equipment state in which according to the parameter length specified, when
When described parameter length meets the length met needed for default conditions, then judge that described subscriber equipment is in acquiescence
State;Reduce, when described parameter length meets, the length met needed for power overhead state, then judge described use
Family equipment is in reduction power overhead state.Such as, condition judgment module 704 can be with in subscriber equipment
Noncontinuity receives the length in cycle (DRX cycle) and judges described subscriber equipment state in which, works as user
The length of the DRX cycle that equipment is presently configured is less than the length of DRX cycle during idle (IDLE) state
When spending, then judge to lay oneself open to " default " state, when the DRX cycle length that subscriber equipment is presently configured
Degree is equal to or more than IDLE state DRX cycle length, then it is assumed that UE is in " lower power
Consumption " state.Above-mentioned distinguish using the length of DRX cycle during idle condition as threshold value
" default " and " lower power consumption " state, is only only one example, in implementing,
The length that can use other parameters is used as threshold decision.So, judge to use when condition judgment module 704
When family equipment is currently in use the length of DRX cycle corresponding to " default " state, i.e. judge subscriber equipment
When being in " default " state, if the power preference of subscriber equipment changes, it would be desirable to reduce power overhead,
On the premise of meeting first timer time-out, it indicates that sending module 700 can send " power to base station
Preference indication ", request uses the DRX that " lower power consumption " state is corresponding
Parameter configuration.Judge subscriber equipment when condition judgment module 704 and be currently in use " lower power
Consumption " length of DRX cycle corresponding to state, i.e. subscriber equipment is in " lower power
Consumption " state time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases
When adding power overhead, instruction sending module 700 can send " power preference indication " to base station,
Request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, described condition judgment module 704 judges the shape residing for subscriber equipment
The determination methods of state comprises the steps that
Described condition judgment module 704 receives according to the noncontinuity that described base station is described user device configuration
DRX parameter judges subscriber equipment state in which, and when described subscriber equipment, to be currently in use default conditions corresponding
When noncontinuity receives DRX parameter, then judge that described subscriber equipment is in default conditions;When described user sets
Standby being currently in use reduces noncontinuity corresponding to power overhead state when receiving DRX parameter, then judge described use
Family equipment is in reduction power overhead state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, condition judgment module 704 judges that subscriber equipment is currently in use " default "
During DRX parameter corresponding to state, when i.e. subscriber equipment is in " default " state, if the merit of subscriber equipment
Rate preference changes, it would be desirable to reduce power overhead, on the premise of meeting first timer time-out, then
Subscriber equipment can send to base station " power preference indication ", and request uses " lower power
Consumption " DRX parameter configuration corresponding to state.Condition judgment module 704 judges that subscriber equipment is just
When the DRX parameter that " the lower power consumption " state of use is corresponding, i.e. subscriber equipment is in
During " lower power consumption " state, the power preference of subscriber equipment changes, it would be desirable to carry
Rise performance, i.e. increase power overhead, then subscriber equipment can send " power preference to base station
Indication ", request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can not be limited by subscriber equipment state in which, i.e. when subscriber equipment, the preference of power overhead be changed
Time, all the preference of transmit power expense can be indicated to base station.Now, subscriber equipment may not include condition adjudgement
Module 704.When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, first controls mould
Block 701 directly judges whether the first timer of the transmission for limiting the preference instruction reducing power overhead surpasses
Time, if it is judged that be yes, then notice instruction sending module 700 sends to base station and reduces power overhead
Preference indicates.And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, second
Control module 702 the most directly notifies that indicating sending module 700 to send to described base station increases the inclined of power overhead
Good instruction.
In the embodiment that some are feasible, optionally, the first control module 701 judges described first timing
When the judged result of device whether time-out is no, i.e. first timer is the most operationally, if subscriber equipment for
The judgement that power preference changes and subscriber equipment perform " power preference indication " and send and timing
The operation of device management, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then the first control
Molding block 701 is additionally operable to indicate AS layer notice upper layer, and " power preference indication " sends out
Send limited.And when, after corresponding first timer time-out, the first control module 701 is additionally operable to indicate AS layer also
Upper layer can be notified, send the most unrestricted.And when the upper layer of AS receives this unrestricted finger
After showing, it is judged that subscriber equipment remains a need for sending the preference instruction reducing power overhead, then may be notified that Access Layer AS
Layer;Otherwise, if subscriber equipment is already without to send the preference instruction reducing power overhead, do not carry out
Any operation.If subscriber equipment performs " power preference for the judgement of power preference with subscriber equipment
Indication " send and the operation of timer management is at same protocol layer, (the most no longer it is specifically defined this association at this
View layer, executive agent is referred to as subscriber equipment), then subscriber equipment can not perform any operation.
In the embodiment that some are feasible, the length of described first timer is set in advance in described user and sets
In Bei, now, optionally, subscriber equipment may also include and arranges module (not shown), in advance with
Family equipment arranges the length of described first timer.
In the embodiment that some are feasible, the length of described first timer by described base station at Radio Resource
Management connection establishment process or RRM connection reconfiguration course are assigned to described subscriber equipment.This
Time, optionally, subscriber equipment may also include length receiver module (not shown), is used for receiving described base station
It is assigned to the length of the described first timer of described subscriber equipment.
In the embodiment that some are feasible, subscriber equipment may also include intervalometer acquisition module (not shown),
For obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module (not shown), surpasses for the 4th intervalometer obtained when described intervalometer acquisition module
Time or described subscriber equipment estimate that described subscriber equipment is in time of idle condition more than or equal to described intervalometer
During the length of the 4th intervalometer that acquisition module obtains, determine that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead;And/or,
When institute estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
State the 5th timing that subscriber equipment is in the time of idle condition and obtains less than or equal to described intervalometer acquisition module
During the length of device, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, described intervalometer acquisition module includes the first acquisition submodule and
Two obtain at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In the embodiment that some are feasible, the length of described 4th intervalometer is less than or equal to the described 6th
The length of intervalometer, described first obtains submodule is additionally operable to obtain described 6th intervalometer from described base station,
Or, the length of described 6th intervalometer arranged in described base station is estimated according to the message obtained from described base station
Degree;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 4th from described base station
Time device, described second obtain submodule can obtain described 5th intervalometer from described base station, concrete, described
Radio resource control message that 4th intervalometer and/or described 5th intervalometer can send from described base station,
Physical layer message, data-link layer message, cell switching information obtain at least one.In implementing,
The length of described 4th intervalometer is less than or equal to the length of the 6th intervalometer in described base station, and the described 5th is fixed
Time device length less than or equal to the length of the 7th intervalometer in described base station.Described 6th intervalometer is described
Safeguarding in base station and trigger the trigger reducing power overhead for described base station side, described 7th intervalometer is institute
State the trigger triggering increase power overhead for described base station side safeguarded in base station.So determine when instruction
When module knows four timer expiry that the first acquisition submodule obtains, it may be determined that described equipment is to power
The preference of expense is changed into need to reduce power overhead, when instruction determines that module knows that the second acquisition submodule obtains
Five timer expiries time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power
Expense.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 6th from described base station
Time device, described second obtains submodule can obtain described 7th intervalometer from described base station, described 6th timing
Device and/or described 7th intervalometer can disappear from the radio resource control message that described base station sends, physical layer
Breath, data-link layer message, cell switching information obtain at least one.In implementing, when first
Obtain submodule when obtaining six intervalometers from base station, the can be set in a user device according to the 6th intervalometer
Four intervalometers, and when the second acquisition submodule obtains seven intervalometers from base station, can be according to the 7th timing
Device sets the 5th intervalometer, and the length of the 4th set intervalometer is smaller than equal to described 6th intervalometer
Length, the length of the 5th set intervalometer is smaller than the length equal to described 7th intervalometer.So,
When instruction determines that module knows four timer expiry that the first acquisition submodule sets, determine described with setting
The standby preference to power overhead is changed into need to reduce power overhead, when instruction determines that module knows the second acquisition
During five timer expiry of module settings, determining that the preference of power overhead is changed into by described subscriber equipment needs
Increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain submodule from base station with oneself according to first
The message obtained is estimated described 6th intervalometer and or obtains the message that obtains from base station of submodule according to second and estimate
Count the length of described 7th intervalometer.Such as, UE starts a timing after having performed a data transmit-receive operation
Device, this timer in UE execution once data transmit-receive operation after be restarted, it is assumed that base station sets to user
Standby reconfiguration message/the RRC connection release message that issues, then the first acquisition submodule can be according to reconfiguration message
The content of/RRC connection release message decides whether to record the length of a length of 6th intervalometer of above-mentioned timer
Degree;Second obtains submodule can decide whether according to the content of reconfiguration message/RRC connection release message
Record the length of a length of 7th intervalometer of above-mentioned timer.Such as, if this reconfiguration message/RRC connects
Connecing release message is switching command, or sets up new radio bearer, or discharges original radio bearer etc.,
First acquisition submodule or the second acquisition submodule will not record a length of 6th intervalometer of above-mentioned timer
Length;If this reconfiguration message/RRC connection release message is configuration DRX or the DRX configuring more power saving,
Then first obtain the length that submodule can record a length of 6th intervalometer of above-mentioned timer.
In implementing, when recording the length of the 6th timer length and the 7th intervalometer, first obtains son
Module can set the 4th intervalometer in a user device according to the 6th intervalometer, and the second acquisition submodule can
Set the 5th intervalometer according to the 7th intervalometer, and the length of the 4th set intervalometer is smaller than equal to institute
Stating the length of the 6th intervalometer, the length of the 5th set intervalometer is smaller than equal to described 7th intervalometer
Length.So, when instruction determines that module knows four timer expiry that the first acquisition submodule sets,
Determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when instruction determines that module obtains
When knowing five timer expiry that the second acquisition submodule sets, determine that described subscriber equipment is to power overhead
Preference is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the subscriber equipment of the embodiment of the present invention can only include intervalometer acquisition module and instruction really
Cover half block, such subscriber equipment can be exclusively used in the power overhead preference determining subscriber equipment.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, and the transmission to the preference instruction increasing power overhead
Do not limit, limit the transmission and right of the subscriber equipment preference instruction to reducing power overhead with this respectively
Increase the transmission of the preference instruction of power overhead, limited by same intervalometer with prior art compared with, more
Add flexibly, improve the experience of user.Further, the embodiment of the present invention is by the 6th intervalometer by network side
Whether the 4th intervalometer controlled enters reduction power overhead to subscriber equipment, by the 7th timing of network side
Device the 5th intervalometer increases the preference of power overhead and is controlled, and has more effectively coordinated network side and user sets
The standby demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
The timer duration contradiction of network side intervalometer and user equipment side can be efficiently solved and cause power preference to be adjusted
Whole defect not in time.Further, the embodiment of the present invention is in the free time by the subscriber equipment that subscriber equipment is anticipated
The time of state combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters reduction power
The preference of expense or increase power overhead is controlled, and has more effectively coordinated subscriber equipment to power preference
Demand, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
Fig. 6 is the structure composition schematic diagram of the second embodiment of the subscriber equipment of the present invention.As shown in Figure 6,
The subscriber equipment of the present invention can include indicating sending module the 800, first control module 801 and the 3rd control module
803: wherein:
Instruction sending module 800, for indicating to base-station transmitting-power expense preference, described power overhead indicates
Including reducing the preference instruction of power overhead or increasing the preference instruction of power overhead.
First control module 801, for reducing power open when the preference of power overhead be changed into by subscriber equipment
During pin, it is judged that the most overtime for limiting the first timer of the transmission of the preference instruction reducing power overhead,
If it is judged that be yes, notify that described instruction sending module 800 sends to base station and reduce the inclined of power overhead
Good instruction.
3rd control module 803, for increasing power open when the preference of power overhead be changed into by subscriber equipment
During pin, it is judged that the most overtime for limiting the second timer of the transmission of the preference instruction increasing power overhead,
If it is judged that be yes, notifying that described instruction sending module 800 sends to described base station increases power overhead
Preference instruction.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Being to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes default conditions
(" default " state) and reduction power overhead state (" lower power consumption " state) two
Kind of state, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, optionally,
Subscriber equipment also includes condition judgment module 804, needs to reduce when the preference of power overhead is changed into by subscriber equipment
During power overhead, and when described condition judgment module 804 indicates described subscriber equipment to be in default conditions, the
One control module 801 judges that the first timer of the transmission for limiting the preference instruction reducing power overhead (can
It is recorded as " T_Default ") the most overtime (i.e. intervalometer does not runs), if it is judged that be yes, logical
Know that described instruction sending module 800 sends the preference instruction reducing power overhead to base station.And when user sets
The standby preference to power overhead is changed into when need to increase power overhead, and described condition judgment module 804 indicates
When described subscriber equipment is in reduction power overhead state, the 3rd control module 803 judges to be used for limiting increase
The second timer (recordable is " T_LowerPower ") of the preference instruction of power overhead is the most overtime, as
Really judged result is yes, and notifying that described instruction sending module 800 sends to described base station increases power overhead
Preference indicates.
In the embodiment that some are feasible, condition judgment module 804 judges subscriber equipment state in which
Determination methods comprises the steps that
Described condition judgment module 804 judges subscriber equipment state in which according to the parameter length specified, when
When described parameter length meets the length met needed for default conditions, then judge that described subscriber equipment is in acquiescence
State;Reduce, when described parameter length meets, the length met needed for power overhead state, then judge described use
Family equipment is in reduction power overhead state.Such as, the cycle can be received with the noncontinuity in subscriber equipment
The length of (DRX cycle) judges subscriber equipment state in which, as the DRX that subscriber equipment is presently configured
The length of cycle less than during idle (IDLE) state during the length of DRX cycle, then condition judgment module 84
Judge that subscriber equipment is in " default " state, when the DRX cycle length etc. that subscriber equipment is presently configured
In or more than IDLE state DRX cycle length, then it is assumed that UE is in " lower power consumption "
State.Above-mentioned distinguish " default " and " lower using the length of DRX cycle during idle condition as threshold value
Power consumption " state, it is only only one example, in implementing, the length of other parameters can be used
Degree is used as threshold decision.So, judge that subscriber equipment is currently in use when condition judgment module 804
During the length of the DRX cycle that " default " state is corresponding, when i.e. subscriber equipment is in " default " state,
If the power preference of subscriber equipment changes, it would be desirable to reduce power overhead, surpass meeting first timer
Time on the premise of, then sending " power preference indication " to base station, request uses " lower power
Consumption " DRX parameter configuration corresponding to state.When condition judgment module 804 judges subscriber equipment
Be currently in use the length of DRX cycle corresponding to " lower power consumption " state, i.e. user sets
For when being in " lower power consumption " state, the power preference of subscriber equipment changes, uncommon
Hope energy improving performance, i.e. increase power overhead, then send " power preference indication " to base station,
Request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, described condition judgment module 804 judges the shape residing for subscriber equipment
The determination methods of state comprises the steps that
Described condition judgment module 804 receives DRX according to the noncontinuity that base station is described user device configuration
Parameter judges oneself state in which, when described subscriber equipment is currently in use the noncontinuity that default conditions are corresponding
When receiving DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment makes
When receiving DRX parameter by the noncontinuity that reduction power overhead state is corresponding, then judge at described subscriber equipment
In reducing power overhead state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, judge that subscriber equipment is currently in use when condition judgment module 804
During DRX parameter corresponding to " default " state, when i.e. subscriber equipment is in " default " state, if using
The power preference of family equipment changes, it would be desirable to reduce power overhead, is meeting first timer time-out
Under premise, then subscriber equipment sends " power preference indication " to base station, and request uses " lower
Power consumption " DRX parameter configuration corresponding to state.When condition judgment module 804 is judged to use
When family equipment is currently in use DRX parameter corresponding to " lower power consumption " state, i.e. user
When equipment is in " lower power consumption " state, the power preference of subscriber equipment changes,
Wish to improving performance, i.e. increase power overhead, then on the premise of meeting second timer time-out, user
Equipment sends " power preference indication " to base station, and request uses " default " state corresponding
DRX parameter configuration.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can not be limited by subscriber equipment state in which, i.e. when subscriber equipment, the preference of power overhead be changed
Time, all the preference of transmit power expense can be indicated to base station.Now, subscriber equipment may not include condition adjudgement
Module 804.When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, first controls mould
Block 801 directly judges whether the first timer of the transmission for limiting the preference instruction reducing power overhead surpasses
Time, if it is judged that be yes, notify that described instruction sending module 800 sends to base station and reduce power overhead
Preference instruction.And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment,
Three control modules 803 directly judge the second timing of the transmission for limiting the preference instruction increasing power overhead
Device is the most overtime, if it is judged that be yes, notifies that described instruction sending module 800 sends to described base station
Increase the preference instruction of power overhead.
In the embodiment that some are feasible, optionally, judge that described first is fixed when the first control module 801
Time device whether time-out judged result when being no, i.e. first timer is the most operationally, if subscriber equipment pair
The judgement changed in power preference sends and fixed with subscriber equipment execution " power preference indication "
Time device management operation not at same protocol layer, (for convenience, described subscriber equipment can be claimed to perform
The protocol layer of the operation of " power preference indication " transmission and timer management is AS(Access
Stratum, Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)),
Then the first controller 801 may further indicate that AS layer notice the upper layer, " power preference of subscriber equipment
Indication " send limited.And when, after corresponding first timer time-out, the first controller 801 also can refer to
Show that AS layer notifies upper layer, send the most unrestricted.And be not subject to when the upper layer of AS receives this
After limit instruction, it is judged that subscriber equipment remains a need for sending the preference instruction reducing power overhead, then may be notified that access
Layer AS layer;Otherwise, if subscriber equipment is already without to send the preference instruction reducing power overhead, the most not
Carry out any operation.If subscriber equipment performs " power for the judgement of power preference with subscriber equipment
Preference indication " send and the operation of timer management is at same protocol layer, (the most no longer have at this
Body defines this protocol layer, and executive agent is referred to as subscriber equipment), then the first control module 801 indicates user to set
For not performing any operation.
In the embodiment that some are feasible, optionally, described second timing is judged when the 3rd control module 803
When the judged result of device whether time-out is no, i.e. second timer is the most operationally, if subscriber equipment for
The judgement that power preference changes and subscriber equipment perform " power preference indication " and send and timing
The operation of device management, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then the 3rd control
Molding block 803 may indicate that AS layer notice the upper layer, " power preference of subscriber equipment
Indication " send limited.And when, after second timer time-out, the 3rd control module 803 may indicate that user
The AS layer notice upper layer of equipment, sends the most unrestricted.And when the upper layer of AS receives this
After unrestricted instruction, it is judged that subscriber equipment remains a need for sending the preference instruction increasing power overhead, then may be notified that
Access Layer AS layer;Otherwise, if subscriber equipment is already without to send the preference instruction increasing power overhead,
The most do not carry out any operation.If subscriber equipment performs " power for the judgement of power preference with subscriber equipment
Preference indication " send and the operation of timer management is at same protocol layer, (the most no longer have at this
Body defines this protocol layer, and executive agent is referred to as subscriber equipment), then the 3rd control module 803 indicates user to set
For not performing any operation.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Degree can be set in advance in described subscriber equipment, and now, optionally, subscriber equipment may also include and arranges module
(not shown), fixed for the length and described second arranging described first timer the most in a user device
Time device length.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Spend and connected in reconfiguration course in RRM connection establishment process or RRM by described base station
It is assigned to described subscriber equipment.Now, optionally, subscriber equipment may also include length receiver module and (do not schemes
Show), it is assigned to the length of described first timer of described subscriber equipment and described for receiving described base station
The length of second timer.
In the embodiment that some are feasible, the length of described first timer is longer than or fixed equal to described second
Time device length.
In the embodiment that some are feasible, subscriber equipment may also include intervalometer acquisition module (not shown),
For obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module (not shown), surpasses for the 4th intervalometer obtained when described intervalometer acquisition module
Time or described subscriber equipment estimate that described subscriber equipment is in time of idle condition more than or equal to described intervalometer
During the length of the 4th intervalometer that acquisition module obtains, determine that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead;And/or,
When institute estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
State the 5th timing that subscriber equipment is in the time of idle condition and obtains less than or equal to described intervalometer acquisition module
During the length of device, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, described intervalometer acquisition module includes the first acquisition submodule and
Two obtain at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In the embodiment that some are feasible, the length of described 4th intervalometer is less than or equal to the described 6th
The length of intervalometer, described first obtains submodule is additionally operable to obtain described 6th intervalometer from described base station,
Or, the length of described 6th intervalometer arranged in described base station is estimated according to the message obtained from described base station
Degree;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 4th from described base station
Time device, described second obtain submodule can obtain described 5th intervalometer from described base station, concrete, described
Radio resource control message that 4th intervalometer and/or described 5th intervalometer can send from described base station,
Physical layer message, data-link layer message, cell switching information obtain at least one.In implementing,
The length of described 4th intervalometer is less than or equal to the length of the 6th intervalometer in described base station, and the described 5th is fixed
Time device length less than or equal to the length of the 7th intervalometer in described base station.Described 6th intervalometer is described
Safeguarding in base station and trigger the trigger reducing power overhead for described base station side, described 7th intervalometer is institute
State the trigger triggering increase power overhead for described base station side safeguarded in base station.So determine when instruction
When module knows four timer expiry that the first acquisition submodule obtains, it may be determined that described equipment is to power
The preference of expense is changed into need to reduce power overhead, when instruction determines that module knows that the second acquisition submodule obtains
Five timer expiries time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power
Expense.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 6th from described base station
Time device, described second obtains submodule can obtain described 7th intervalometer from described base station, described 6th timing
Device and/or described 7th intervalometer can disappear from the radio resource control message that described base station sends, physical layer
Breath, data-link layer message, cell switching information obtain at least one.In implementing, when first
Obtain submodule when obtaining six intervalometers from base station, the can be set in a user device according to the 6th intervalometer
Four intervalometers, and when the second acquisition submodule obtains seven intervalometers from base station, can be according to the 7th timing
Device sets the 5th intervalometer, and the length of the 4th set intervalometer is smaller than equal to described 6th intervalometer
Length, the length of the 5th set intervalometer is smaller than the length equal to described 7th intervalometer.So,
When instruction determines that module knows four timer expiry that the first acquisition submodule sets, determine described with setting
The standby preference to power overhead is changed into need to reduce power overhead, when instruction determines that module knows the second acquisition
During five timer expiry of module settings, determining that the preference of power overhead is changed into by described subscriber equipment needs
Increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain submodule from base station with oneself according to first
The message obtained is estimated described 6th intervalometer and or obtains the message that obtains from base station of submodule according to second and estimate
Count the length of described 7th intervalometer.Such as, UE starts a timing after having performed a data transmit-receive operation
Device, this timer in UE execution once data transmit-receive operation after be restarted, it is assumed that base station sets to user
Standby reconfiguration message/the RRC connection release message that issues, then the first acquisition submodule can be according to reconfiguration message
The content of/RRC connection release message decides whether to record the length of a length of 6th intervalometer of above-mentioned timer
Degree;Second obtains submodule can decide whether according to the content of reconfiguration message/RRC connection release message
Record the length of a length of 7th intervalometer of above-mentioned timer.Such as, if this reconfiguration message/RRC connects
Connecing release message is switching command, or sets up new radio bearer, or discharges original radio bearer etc.,
First acquisition submodule or the second acquisition submodule will not record a length of 6th intervalometer of above-mentioned timer
Length;If this reconfiguration message/RRC connection release message is configuration DRX or the DRX configuring more power saving,
Then first obtain the length that submodule can record a length of 6th intervalometer of above-mentioned timer.
In implementing, when recording the length of the 6th timer length and the 7th intervalometer, first obtains son
Module can set the 4th intervalometer in a user device according to the 6th intervalometer, and the second acquisition submodule can
Set the 5th intervalometer according to the 7th intervalometer, and the length of the 4th set intervalometer is smaller than equal to institute
Stating the length of the 6th intervalometer, the length of the 5th set intervalometer is smaller than equal to described 7th intervalometer
Length.So, when instruction determines that module knows four timer expiry that the first acquisition submodule sets,
Determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when instruction determines that module obtains
When knowing five timer expiry that the second acquisition submodule sets, determine that described subscriber equipment is to power overhead
Preference is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the subscriber equipment of the embodiment of the present invention can only include intervalometer acquisition module and instruction really
Cover half block, such subscriber equipment can be exclusively used in the power overhead preference determining subscriber equipment.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, limits user to increasing power by second timer
The transmission of the preference instruction of expense, limits the subscriber equipment preference instruction to reducing power overhead respectively with this
Transmission and to increase power overhead preference instruction transmission, limited by same intervalometer with prior art
Surely compare, more flexibly, improve the experience of user.Further, the embodiment of the present invention is by by network side
Whether the 6th timer-operated 4th intervalometer enters reduction power overhead, by network side to subscriber equipment
The 7th intervalometer the 5th intervalometer increase power overhead preference be controlled, more effectively coordinated network
Side and the subscriber equipment demand to power preference, it is ensured that subscriber equipment within the shortest time to power preference
It is adjusted.Network side intervalometer can be efficiently solved cause with the timer duration contradiction of user equipment side
Power preference adjusts defect not in time.Further, the embodiment of the present invention is set by the user that subscriber equipment is anticipated
The standby time being in idle condition combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters
Reduce power overhead or increase the preference of power overhead and be controlled, more effectively having coordinated subscriber equipment
Demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
Fig. 7 be the 3rd embodiment of the subscriber equipment of the present invention structure composition schematic diagram, this embodiment be
The extension carried out on the basis of second embodiment.As it is shown in fig. 7, this subscriber equipment can include that instruction sends mould
The 903, first timing of block the 900, first control module the 901, second control module the 902, the 3rd control module
Device management module 904, wherein at least existence of the second control module 902 and the 3rd control module 903 is originally
In the subscriber equipment of invention:
Described instruction sending module 900, for indicating to base-station transmitting-power expense preference, described power overhead
Instruction includes the preference instruction reducing power overhead or increases the preference instruction of power overhead;
Described first control module 901, for reducing merit when the preference of power overhead is changed into by subscriber equipment
During rate expense, it is judged that for limiting whether the first timer of the transmission of the preference instruction reducing power overhead surpasses
Time, if it is judged that be yes, notify that described instruction sending module 900 sends to base station and reduce power overhead
Preference instruction.
Described second control module 902, for increasing merit when the preference of power overhead is changed into by subscriber equipment
During rate expense, notify that the preference that described instruction sending module 900 increases power overhead to the transmission of described base station refers to
Show.
Described 3rd control module 903, for increasing merit when the preference of power overhead is changed into by subscriber equipment
During rate expense, it is judged that for limiting whether the second timer of the transmission of the preference instruction increasing power overhead surpasses
Time, if it is judged that be yes, notifying that described instruction sending module 900 sends to described base station increases power
The preference instruction of expense.
First timer management module 904, for including first timer, and described finger when described subscriber equipment
Show that sending module 900, after base station have sent the instruction of power overhead preference, starts described first timer;
And when described subscriber equipment includes first timer and second timer, and described instruction sending module 900
After base station have sent the instruction of power overhead preference, start described first timer and/or described second timing
Device.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Being to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes default conditions
(" default " state) and reduction power overhead state (" lower power consumption " state) two
Kind of state, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, the most originally
The subscriber equipment of invention also includes condition judgment module 905, is used for judging described subscriber equipment state in which.
First control module 901 when the preference of power overhead being changed into need to reduce power overhead when subscriber equipment,
And described condition judgment module 905 is when indicating described subscriber equipment to be in default conditions, it is judged that be used for limiting fall
The first timer (recordable is " T_Default ") of the transmission of the preference instruction of low-power expense is the most overtime
(i.e. intervalometer does not runs), if it is judged that be yes, then notifies that described instruction sending module 900 is to base
Stand and send the preference instruction reducing power overhead.And second control module 902 when subscriber equipment is to power
The preference of expense is changed into when need to increase power overhead, and described condition judgment module 905 indicates described user
When equipment reduces power overhead state, notifying that described instruction sending module 900 sends to described base station increases merit
The preference instruction of rate expense.And power overhead need to be increased when the preference of power overhead is changed into by subscriber equipment
Time, and when described condition judgment module 905 indicates described subscriber equipment to be in reduction power overhead state, the
Three control modules 903 judge that the second timer for limiting the preference instruction increasing power overhead is (recordable
For " T_LowerPower ") the most overtime, if it is judged that be yes, notify described instruction sending module
90 increase the preference instruction of power overhead to the transmission of described base station.
In the embodiment that some are feasible, condition judgment module 905 judges subscriber equipment state in which
Determination methods comprises the steps that
Described condition judgment module 905 judges subscriber equipment state in which according to the parameter length specified, when
When described parameter length meets the length met needed for default conditions, then judge that described subscriber equipment is in acquiescence
State;Reduce, when described parameter length meets, the length met needed for power overhead state, then judge described use
Family equipment is in reduction power overhead state.Such as, the cycle can be received with the noncontinuity in subscriber equipment
The length of (DRX cycle) judges subscriber equipment state in which, as the DRX that subscriber equipment is presently configured
The length of cycle less than during idle (IDLE) state during the length of DRX cycle, then condition judgment module 905
Judge that subscriber equipment is in " default " state, when the DRX cycle length etc. that subscriber equipment is presently configured
In or more than IDLE state DRX cycle length, then it is assumed that UE is in " lower power consumption "
State.Above-mentioned distinguish " default " and " lower using the length of DRX cycle during idle condition as threshold value
Power consumption " state, it is only only one example, in implementing, the length of other parameters can be used
Degree is used as threshold decision.So, judge that subscriber equipment is currently in use when condition judgment module 905
During the length of the DRX cycle that " default " state is corresponding, when i.e. subscriber equipment is in " default " state,
If the power preference of subscriber equipment changes, it would be desirable to reduce power overhead, surpass meeting first timer
Time on the premise of, then sending " power preference indication " to base station, request uses " lower power
Consumption " DRX parameter configuration corresponding to state.When condition judgment module 905 judges subscriber equipment
Be currently in use the length of DRX cycle corresponding to " lower power consumption " state, i.e. user sets
For when being in " lower power consumption " state, the power preference of subscriber equipment changes, uncommon
Hope energy improving performance, i.e. increase power overhead, then send " power preference indication " to base station,
Request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, described condition judgment module 905 judges the shape residing for subscriber equipment
The determination methods of state comprises the steps that
Described condition judgment module 905 can receive according to the noncontinuity that base station is described user device configuration
DRX parameter judges oneself state in which, when described subscriber equipment is currently in use the non-company that default conditions are corresponding
When continuous property receives DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment just
When the noncontinuity using reduction power overhead state corresponding receives DRX parameter, then judge that described user sets
Standby being in reduces power overhead state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, judge that subscriber equipment is currently in use when condition judgment module 905
During DRX parameter corresponding to " default " state, when i.e. subscriber equipment is in " default " state, if using
The power preference of family equipment changes, it would be desirable to reduce power overhead, is meeting first timer time-out
Under premise, it indicates that sending module 900 can send to base station " power preference indication ", request
The DRX parameter configuration that " the lower power consumption " state of use is corresponding.And when condition adjudgement mould
Block 905 judges that subscriber equipment is currently in use the DRX that " lower power consumption " state is corresponding
During parameter, when i.e. subscriber equipment is in " lower power consumption " state, the power of subscriber equipment
Preference changes, it would be desirable to improving performance, i.e. increases power overhead, is then meeting second timer time-out
On the premise of (on the premise of subscriber equipment includes the 3rd control module 903), instruction sending module 900 can be to
Base station sends " power preference indication ", and request uses the DRX that " default " state is corresponding
Parameter configuration.And when condition judgment module 904 judges that subscriber equipment is currently in use " lower power
Consumption " DRX parameter corresponding to state time, i.e. subscriber equipment is in " lower power
Consumption " state time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases
Adding power overhead, instruction sending module 900 can send " power preference indication " and (use to base station
On the premise of family equipment includes the second control module 902), request uses the DRX that " default " state is corresponding
Parameter configuration.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can not be limited by subscriber equipment state in which, i.e. when subscriber equipment, the preference of power overhead be changed
Time, all the preference of transmit power expense can be indicated to base station.Now, subscriber equipment may not include condition adjudgement
Module 905 is when the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, and first controls mould
Block 901 directly judges whether the first timer of the transmission for limiting the preference instruction reducing power overhead surpasses
Time, if it is judged that be yes, then notify that described instruction sending module 900 sends reduction power and opens to base station
The preference instruction of pin.And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment,
Second control module 902 directly notifies that indicating sending module 900 to send to described base station increases power overhead
Preference indicates.And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, the 3rd
Control module 903 directly judges the second timer of the transmission for limiting the preference instruction increasing power overhead
The most overtime, if it is judged that be yes, notify that described instruction sending module 900 sends to described base station and increase
Add the preference instruction of power overhead.
In the embodiment that some are feasible, optionally, described first is judged when the first control module 901
When the judged result of intervalometer whether time-out is no, i.e. first timer is the most operationally, if subscriber equipment
Judgement and the subscriber equipment that power preference is changed perform " power preference indication " send and
The operation of timer management, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform
The protocol layer of the operation of " power preference indication " transmission and timer management is AS(Access
Stratum, Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)),
Then the first control module 901 may indicate that AS layer notice the upper layer, " power preference of subscriber equipment
Indication " send limited.And when, after corresponding first timer time-out, the AS layer of instruction subscriber equipment leads to
Know upper layer, send the most unrestricted.And after the upper layer of AS receives this unrestricted instruction,
Judge that subscriber equipment remains a need for sending the preference instruction reducing power overhead, then may be notified that Access Layer AS layer;No
Then, if subscriber equipment is already without to send the preference instruction reducing power overhead, any behaviour is not the most carried out
Make.If subscriber equipment performs " power preference for the judgement of power preference with subscriber equipment
Indication " send and the operation of timer management is at same protocol layer, (the most no longer it is specifically defined this association at this
View layer, executive agent is referred to as subscriber equipment), then the first control module 901 can notify the user that equipment does not performs
Any operation.
In the embodiment that some are feasible, optionally, described second timing is judged when the 3rd control module 903
When the judged result of device whether time-out is no, i.e. second timer is the most operationally, if subscriber equipment for
The judgement that power preference changes and subscriber equipment perform " power preference indication " and send and timing
The operation of device management, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then the 3rd control
Molding block 903 may indicate that AS layer notice the upper layer, " power preference of subscriber equipment
Indication " send limited.And when, after second timer time-out, the 3rd control module 903 may indicate that user
The AS layer notice upper layer of equipment, sends the most unrestricted.And when the upper layer of AS receives this
After unrestricted instruction, it is judged that subscriber equipment remains a need for sending the preference instruction increasing power overhead, then may be notified that
Access Layer AS layer;Otherwise, if subscriber equipment is already without to send the preference instruction increasing power overhead,
The most do not carry out any operation.If subscriber equipment performs " power for the judgement of power preference with subscriber equipment
Preference indication " send and the operation of timer management is at same protocol layer, (the most no longer have at this
Body defines this protocol layer, and executive agent is referred to as subscriber equipment), then the 3rd control module 903 indicates user to set
For not performing any operation.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Degree can be set in advance in described subscriber equipment, and now, optionally, subscriber equipment may also include and arranges module
(not shown), fixed for the length and described second arranging described first timer the most in a user device
Time device length.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Spend and connected in reconfiguration course in RRM connection establishment process or RRM by described base station
It is assigned to described subscriber equipment.Now, optionally, subscriber equipment may also include length receiver module and (do not schemes
Show), it is assigned to the length of described first timer of described subscriber equipment and described for receiving described base station
The length of second timer.
In the embodiment that some are feasible, the length of described first timer is longer than or fixed equal to described second
Time device length.
In the embodiment that some are feasible, subscriber equipment may also include intervalometer acquisition module (not shown),
For obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module (not shown), surpasses for the 4th intervalometer obtained when described intervalometer acquisition module
Time or described subscriber equipment estimate that described subscriber equipment is in time of idle condition more than or equal to described intervalometer
During the length of the 4th intervalometer that acquisition module obtains, determine that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead;And/or,
When institute estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
State the 5th timing that subscriber equipment is in the time of idle condition and obtains less than or equal to described intervalometer acquisition module
During the length of device, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, described intervalometer acquisition module includes the first acquisition submodule and
Two obtain at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In the embodiment that some are feasible, the length of described 4th intervalometer is less than or equal to the described 6th
The length of intervalometer, described first obtains submodule is additionally operable to obtain described 6th intervalometer from described base station,
Or, the length of described 6th intervalometer arranged in described base station is estimated according to the message obtained from described base station
Degree;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 4th from described base station
Time device, described second obtain submodule can obtain described 5th intervalometer from described base station, concrete, described
Radio resource control message that 4th intervalometer and/or described 5th intervalometer can send from described base station,
Physical layer message, data-link layer message, cell switching information obtain at least one.In implementing,
The length of described 4th intervalometer is less than or equal to the length of the 6th intervalometer in described base station, and the described 5th is fixed
Time device length less than or equal to the length of the 7th intervalometer in described base station.Described 6th intervalometer is described
Safeguarding in base station and trigger the trigger reducing power overhead for described base station side, described 7th intervalometer is institute
State the trigger triggering increase power overhead for described base station side safeguarded in base station.So determine when instruction
When module knows four timer expiry that the first acquisition submodule obtains, it may be determined that described equipment is to power
The preference of expense is changed into need to reduce power overhead, when instruction determines that module knows that the second acquisition submodule obtains
Five timer expiries time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power
Expense.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 6th from described base station
Time device, described second obtains submodule can obtain described 7th intervalometer from described base station, described 6th timing
Device and/or described 7th intervalometer can disappear from the radio resource control message that described base station sends, physical layer
Breath, data-link layer message, cell switching information obtain at least one.In implementing, when first
Obtain submodule when obtaining six intervalometers from base station, the can be set in a user device according to the 6th intervalometer
Four intervalometers, and when the second acquisition submodule obtains seven intervalometers from base station, can be according to the 7th timing
Device sets the 5th intervalometer, and the length of the 4th set intervalometer is smaller than equal to described 6th intervalometer
Length, the length of the 5th set intervalometer is smaller than the length equal to described 7th intervalometer.So,
When instruction determines that module knows four timer expiry that the first acquisition submodule sets, determine described with setting
The standby preference to power overhead is changed into need to reduce power overhead, when instruction determines that module knows the second acquisition
During five timer expiry of module settings, determining that the preference of power overhead is changed into by described subscriber equipment needs
Increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain submodule from base station with oneself according to first
The message obtained is estimated described 6th intervalometer and or obtains the message that obtains from base station of submodule according to second and estimate
Count the length of described 7th intervalometer.Such as, UE starts a timing after having performed a data transmit-receive operation
Device, this timer in UE execution once data transmit-receive operation after be restarted, it is assumed that base station sets to user
Standby reconfiguration message/the RRC connection release message that issues, then the first acquisition submodule can be according to reconfiguration message
The content of/RRC connection release message decides whether to record the length of a length of 6th intervalometer of above-mentioned timer
Degree;Second obtains submodule can decide whether according to the content of reconfiguration message/RRC connection release message
Record the length of a length of 7th intervalometer of above-mentioned timer.Such as, if this reconfiguration message/RRC connects
Connecing release message is switching command, or sets up new radio bearer, or discharges original radio bearer etc.,
First acquisition submodule or the second acquisition submodule will not record a length of 6th intervalometer of above-mentioned timer
Length;If this reconfiguration message/RRC connection release message is configuration DRX or the DRX configuring more power saving,
Then first obtain the length that submodule can record a length of 6th intervalometer of above-mentioned timer.
In implementing, when recording the length of the 6th timer length and the 7th intervalometer, first obtains son
Module can set the 4th intervalometer in a user device according to the 6th intervalometer, and the second acquisition submodule can
Set the 5th intervalometer according to the 7th intervalometer, and the length of the 4th set intervalometer is smaller than equal to institute
Stating the length of the 6th intervalometer, the length of the 5th set intervalometer is smaller than equal to described 7th intervalometer
Length.So, when instruction determines that module knows four timer expiry that the first acquisition submodule sets,
Determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when instruction determines that module obtains
When knowing five timer expiry that the second acquisition submodule sets, determine that described subscriber equipment is to power overhead
Preference is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the subscriber equipment of the embodiment of the present invention can only include intervalometer acquisition module and instruction really
Cover half block, such subscriber equipment can be exclusively used in the power overhead preference determining subscriber equipment.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
In the embodiment that some are feasible, when subscriber equipment includes two kinds of clear states, at subscriber equipment
In default conditions, first timer management module 904 can only start first timer;When subscriber equipment is in
Reducing power overhead state, first timer management module 904 can only start second timer.If described use
Family equipment only includes first timer, and when user is in reduction power overhead state, first timer manages
Module 904 is without starting intervalometer.If subscriber equipment is not by state limit, first timer management module
904 can start first timer and second timer simultaneously;If described subscriber equipment only includes first timer,
First timer management module 904 only starts first timer.
In the embodiment that some are feasible, optionally, subscriber equipment may also include configuration receiver module 908,
On the basis of including configuring receiver module 908, may also include the 6th control module 909 and the 7th and control mould
In block 910 at least one.(now, subscriber equipment may not include the 8th control module the 911, the 9th control mould
Block 912), wherein:
Configuration receiver module 908, for receiving the radio resource parameter configuration that base station is described user device configuration
Result.
6th control module 909, is used for when the first timer in described subscriber equipment has not timed out, but described
Configuration receiver module 908 receives radio resource parameter configuration result, and inclined to power overhead of subscriber equipment
When being again transformed into well need to reducing power overhead, notify that described instruction sending module 900 is in described first timing
The preference instruction reducing power overhead can not be sent to described base station before device time-out.
7th control module 910, is used for when the second timer in described subscriber equipment has not timed out, but described
Configuration receiver module 908 receives the radio resource parameter configuration result that described base station sends, and subscriber equipment
When the preference of power overhead is again transformed into need to increasing power overhead, notify described instruction sending module 900
Can not send to described base station before described second timer time-out and increase the preference instruction of power overhead.
In the embodiment that some are feasible, optionally, subscriber equipment may also include configuration receiver module 908,
On the basis of including configuring receiver module 908, may also include the 8th control module 911 and the 9th and control mould
Block 912 at least one (now, subscriber equipment may not include the 6th control module the 909, the 7th control module
910), wherein:
Configuration receiver module 908, for receiving the radio resource parameter configuration that base station is described user device configuration
Result.
8th control module 911, for having timed out when the described first timer in described subscriber equipment, but institute
State configuration receiver module 908 and do not receive the radio resource parameter configuration result that described base station sends, and user
When equipment is again transformed into need to reducing power overhead to the preference of power overhead, notify described instruction sending module
900 can not before configuration receiver module 908 receives the radio resource parameter configuration result that described base station sends
The preference instruction reducing power overhead is sent to described base station.
9th control module 912, for having timed out when the described second timer in described subscriber equipment, but institute
State configuration receiver module 908 and do not receive the radio resource parameter configuration result that described base station sends, and user
When equipment is again transformed into need to increasing power overhead to the preference of power overhead, notify described instruction sending module
900 can not before configuration receiver module 908 receives the radio resource parameter configuration result that described base station sends
The preference instruction increasing power overhead is sent to described base station.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, limits user to increasing power by second timer
The transmission of the preference instruction of expense, limits the subscriber equipment preference instruction to reducing power overhead respectively with this
Transmission and to increase power overhead preference instruction transmission, limited by same intervalometer with prior art
Surely compare, more flexibly, improve the experience of user.Further, the embodiment of the present invention is by by network side
Whether the 6th timer-operated 4th intervalometer enters reduction power overhead, by network side to subscriber equipment
The 7th intervalometer the 5th intervalometer increase power overhead preference be controlled, more effectively coordinated network
Side and the subscriber equipment demand to power preference, it is ensured that subscriber equipment within the shortest time to power preference
It is adjusted.Network side intervalometer can be efficiently solved cause with the timer duration contradiction of user equipment side
Power preference adjusts defect not in time.Further, the embodiment of the present invention is set by the user that subscriber equipment is anticipated
The standby time being in idle condition combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters
Reduce power overhead or increase the preference of power overhead and be controlled, more effectively having coordinated subscriber equipment
Demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
Fig. 8 is the structure composition schematic diagram of the 4th embodiment of the subscriber equipment of the present invention.As shown in Figure 8,
The subscriber equipment of the present embodiment can include indicating sending module the 1000, first control module 1001, second to control
Module the 1002, the 3rd control module 1003, configuration receiver module 1004 and the 3rd management module of timer
1005, wherein the second control module 1002 and the 3rd control module 1003 at least one have the present invention's
In subscriber equipment:
Described instruction sending module 1000, for indicating to base-station transmitting-power expense preference, described power is opened
Pin instruction includes the preference instruction reducing power overhead or increases the preference instruction of power overhead.
Described first control module 1001, for needing to reduce when the preference of power overhead is changed into by subscriber equipment
During power overhead, it is judged that for whether limiting the first timer of the transmission of the preference instruction reducing power overhead
Time-out, if it is judged that be yes, notifies that described instruction sending module 1000 sends reduction power and opens to base station
The preference instruction of pin.
Described second control module 1002, for needing to increase when the preference of power overhead is changed into by subscriber equipment
During power overhead, notifying that described instruction sending module 1000 sends to described base station increases the preference of power overhead
Instruction.
Described 3rd control module 1003, for needing to increase when the preference of power overhead is changed into by subscriber equipment
During power overhead, it is judged that for whether limiting the second timer of the transmission of the preference instruction increasing power overhead
Time-out, if it is judged that be yes, notifying that described instruction sending module 1000 sends to described base station increases merit
The preference instruction of rate expense.
Configuration receiver module 1004, joins for receiving the radio resource parameter that base station is described user device configuration
Put result.
3rd management module of timer 1005, for receiving described wireless when described configuration receiver module 1004
After resource parameters configuration result, when described subscriber equipment includes first timer, start described first fixed
Time device;When described subscriber equipment includes first timer and second timer, start described first timing
Device and/or described second timer.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Being to carry out based on two kinds of clear states residing for subscriber equipment, now, subscriber equipment includes default conditions
(" default " state) and reduction power overhead state (" lower power consumption " state) two
Kind of state, when subscriber equipment judges to lay oneself open to " default(acquiescence) " state, (can only compare to base station
Such as, evolution base station eNB) send the preference of " lower power consumption(reduces power overhead) "
Instruction;If on the contrary, user judges to lay oneself open to " lower power consumption " state, be only capable of
The preference instruction of " default " state of return (increase power overhead) is sent to base station.Now, the most originally
The subscriber equipment of invention also includes condition judgment module 1006, is used for judging described subscriber equipment state in which.
First control module 1001 when the preference of power overhead being changed into need to reduce power overhead when subscriber equipment,
And described condition judgment module 1006 is when indicating described subscriber equipment to be in default conditions, it is judged that be used for limiting fall
The first timer (recordable is " T_Default ") of the transmission of the preference instruction of low-power expense is the most overtime
(i.e. intervalometer does not runs), if it is judged that be yes, then notify described instruction sending module 1000 to
Base station sends the preference instruction reducing power overhead.And second control module 1002 when subscriber equipment is to merit
The preference of rate expense is changed into when need to increase power overhead, and described condition judgment module 1006 indicates described use
When family equipment reduces power overhead state, notifying that described instruction sending module 1000 sends to described base station increases
The preference instruction of power overhead.And power need to be increased open when the preference of power overhead is changed into by subscriber equipment
During pin, and when described condition judgment module 1006 indicates described subscriber equipment to be in reduction power overhead state,
3rd control module 1003 judges (can remember for the second timer limiting the preference instruction increasing power overhead
Record is " T_LowerPower ") the most overtime, if it is judged that be yes, notify described instruction sending module
90 increase the preference instruction of power overhead to the transmission of described base station.
In the embodiment that some are feasible, condition judgment module 1006 judges subscriber equipment state in which
Determination methods comprises the steps that
Described condition judgment module 1006 judges subscriber equipment state in which according to the parameter length specified, when
When described parameter length meets the length met needed for default conditions, then judge that described subscriber equipment is in acquiescence
State;Reduce, when described parameter length meets, the length met needed for power overhead state, then judge described use
Family equipment is in reduction power overhead state.Such as, the cycle can be received with the noncontinuity in subscriber equipment
The length of (DRX cycle) judges subscriber equipment state in which, as the DRX that subscriber equipment is presently configured
The length of cycle less than during idle (IDLE) state during the length of DRX cycle, then condition judgment module 84
Judge that subscriber equipment is in " default " state, when the DRX cycle length etc. that subscriber equipment is presently configured
In or more than IDLE state DRX cycle length, then it is assumed that UE is in " lower power consumption "
State.Above-mentioned distinguish " default " and " lower using the length of DRX cycle during idle condition as threshold value
Power consumption " state, it is only only one example, in implementing, the length of other parameters can be used
Degree is used as threshold decision.So, judge that subscriber equipment is currently in use when condition judgment module 1006
During the length of the DRX cycle that " default " state is corresponding, when i.e. subscriber equipment is in " default " state,
If the power preference of subscriber equipment changes, it would be desirable to reduce power overhead, surpass meeting first timer
Time on the premise of, then sending " power preference indication " to base station, request uses " lower power
Consumption " DRX parameter configuration corresponding to state.When condition judgment module 1006 judges that user sets
The standby length being currently in use DRX cycle corresponding to " lower power consumption " state, i.e. user
When equipment is in " lower power consumption " state, the power preference of subscriber equipment changes,
Wish to improving performance, i.e. increase power overhead, then send " power preference indication " to base station,
Request uses the DRX parameter configuration that " default " state is corresponding.
In the embodiment that some are feasible, described condition judgment module 1006 judges the shape residing for subscriber equipment
The determination methods of state comprises the steps that
Described condition judgment module 1006 can receive according to the noncontinuity that base station is described user device configuration
DRX parameter judges oneself state in which, when described subscriber equipment is currently in use the non-company that default conditions are corresponding
When continuous property receives DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment just
When the noncontinuity using reduction power overhead state corresponding receives DRX parameter, then judge that described user sets
Standby being in reduces power overhead state.
In the embodiment that some are feasible, noncontinuity corresponding for default conditions can be received by base station simultaneously
DRX parameter with reduce noncontinuity corresponding to power overhead state and receive DRX parameter and be allocated to user simultaneously
Equipment, and by the way of explicitly or implicitly, it is prompted to the state that parameter described in user is corresponding.Or, base station
Also can the most only configure a set of DRX parameter to subscriber equipment, and by the way of explicit, indicate described DRX
The state that parameter is corresponding.Such as, base station can with RRM RRC connection establishment time, set for user
The DRX parameter that standby configuration two set is different.And base station can indicate UE entering RRC by the way of explicit
Any set DRX parameter is used (to use the DRX parameter that " default " is corresponding, or use " lower during connection status
Power consumption " corresponding DRX parameter), i.e. it is in which state;Regulation can also be given tacit consent to,
Subscriber equipment, when entering RRC connection status, is directly entered " default " state, uses " default "
The DRX parameter that state is corresponding.Or, regulation can be given tacit consent to, subscriber equipment is entering RRC connection status
Time, it is directly entered " lower power consumption " state, uses " lower power consumption "
The DRX parameter that state is corresponding.For another example, base station can be carried out, i.e. at RRC at RRC connection reconfiguration course
Connecting reconfiguration course, base station is that user device configuration two overlaps different DRX parameters.So base station can lead to
Crossing the instruction of display, which set DRX parameter instruction subscriber equipment, after RRC reconfiguration course, uses, i.e.
It is in which state.For another example, base station indicates subscriber equipment state in which by the way of implicit expression, its way
For, subscriber equipment is by judging that presently used DRX parameter judges oneself state in which: if used
Family equipment finds the two set DRX parameters that base station is newly configured, and the most a set of DRX parameter is current with subscriber equipment
The DRX parameter used is identical, then UE passes through the state that this set DRX parameter is corresponding, determines that oneself is at weight
State in which after configuration.So, judge that subscriber equipment is currently in use when condition judgment module 1006
During DRX parameter corresponding to " default " state, when i.e. subscriber equipment is in " default " state, if using
The power preference of family equipment changes, it would be desirable to reduce power overhead, is meeting first timer time-out
Under premise, it indicates that sending module 1000 can send " power preference indication " to base station, please
Seek the DRX parameter configuration that use " lower power consumption " state is corresponding.And work as condition adjudgement
Module 1006 judges that subscriber equipment is currently in use the DRX that " lower power consumption " state is corresponding
During parameter, when i.e. subscriber equipment is in " lower power consumption " state, the power of subscriber equipment
Preference changes, it would be desirable to improving performance, i.e. increases power overhead, is then meeting second timer time-out
On the premise of (on the premise of subscriber equipment includes the 3rd control module 1003), instruction sending module 1000 can
Sending " power preference indication " to base station, request uses the DRX that " default " state is corresponding
Parameter configuration.And when condition judgment module 1006 judges that subscriber equipment is currently in use " lower power
Consumption " DRX parameter corresponding to state time, i.e. subscriber equipment is in " lower power
Consumption " state time, the power preference of subscriber equipment changes, it would be desirable to improving performance, i.e. increases
Adding power overhead, instruction sending module 1000 can send " power preference indication " and (use to base station
On the premise of family equipment includes the second control module 1002), request uses the DRX that " default " state is corresponding
Parameter configuration.
In the embodiment that some are feasible, preference instruction (" the power preference of power overhead
Indication ", including reduce power overhead preference instruction and increase power overhead preference instruction) transmission
Can not be limited by subscriber equipment state in which, i.e. when subscriber equipment, the preference of power overhead be changed
Time, all the preference of transmit power expense can be indicated to base station.Now, subscriber equipment may not include condition adjudgement
Module 1006.When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, first controls
Whether module 1001 directly judges the first timer for limiting the transmission that the preference reducing power overhead indicates
Time-out, if it is judged that be yes, then notify that described instruction sending module 1000 sends to base station and reduces power
The preference instruction of expense.And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment,
Second control module 1002 directly notifies that indicating sending module 1000 to send to described base station increases power overhead
Preference instruction.And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment,
Three control modules 1003 directly judge the second timing of the transmission for limiting the preference instruction increasing power overhead
Device is the most overtime, if it is judged that be yes, notifies that described instruction sending module 1000 sends to described base station
Increase the preference instruction of power overhead.
In the embodiment that some are feasible, optionally, described first is judged when the first control module 1001
When the judged result of intervalometer whether time-out is no, i.e. first timer is the most operationally, if subscriber equipment
Judgement and the subscriber equipment that power preference is changed perform " power preference indication " send and
The operation of timer management, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform
The protocol layer of the operation of " power preference indication " transmission and timer management is AS(Access
Stratum, Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)),
Then the first control module 1001 may indicate that AS layer notice the upper layer, " power of subscriber equipment
Preference indication " send limited.And when, after corresponding first timer time-out, indicating subscriber equipment
AS layer notice upper layer, send the most unrestricted.And be not subject to when the upper layer of AS receives this
After limit instruction, it is judged that subscriber equipment remains a need for sending the preference instruction reducing power overhead, then may be notified that access
Layer AS layer;Otherwise, if subscriber equipment is already without to send the preference instruction reducing power overhead, the most not
Carry out any operation.If subscriber equipment performs " power for the judgement of power preference with subscriber equipment
Preference indication " send and the operation of timer management is at same protocol layer, (the most no longer have at this
Body defines this protocol layer, and executive agent is referred to as subscriber equipment), then the first control module 1001 can notify to use
Family equipment does not perform any operation.
In the embodiment that some are feasible, optionally, described second timing is judged when the 3rd control module 1003
When the judged result of device whether time-out is no, i.e. second timer is the most operationally, if subscriber equipment for
The judgement that power preference changes and subscriber equipment perform " power preference indication " and send and timing
The operation of device management, not at same protocol layer, (for convenience, can claim described subscriber equipment to perform " power
Preference indication " send and the protocol layer of operation of timer management is AS(Access Stratum,
Access Layer), and judge that the protocol layer of power preference is called the upper layer(upper strata of AS)), then the 3rd control
Molding block 1003 may indicate that AS layer notice the upper layer, " power preference of subscriber equipment
Indication " send limited.And when, after second timer time-out, the 3rd control module 1003 may indicate that user
The AS layer notice upper layer of equipment, sends the most unrestricted.And when the upper layer of AS receives this
After unrestricted instruction, it is judged that subscriber equipment remains a need for sending the preference instruction increasing power overhead, then may be notified that
Access Layer AS layer;Otherwise, if subscriber equipment is already without to send the preference instruction increasing power overhead,
The most do not carry out any operation.If subscriber equipment performs " power for the judgement of power preference with subscriber equipment
Preference indication " send and the operation of timer management is at same protocol layer, (the most no longer have at this
Body defines this protocol layer, and executive agent is referred to as subscriber equipment), then the 3rd control module 1003 indicates user
Equipment can not perform any operation.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Degree can be set in advance in described subscriber equipment, and now, optionally, subscriber equipment may also include and arranges module
(not shown), fixed for the length and described second arranging described first timer the most in a user device
Time device length.
In the embodiment that some are feasible, the length of described first timer and the length of described second timer
Spend and connected in reconfiguration course in RRM connection establishment process or RRM by described base station
It is assigned to described subscriber equipment.Now, optionally, subscriber equipment may also include length receiver module and (do not schemes
Show), it is assigned to the length of described first timer of described subscriber equipment and described for receiving described base station
The length of second timer.
In the embodiment that some are feasible, the length of described first timer is longer than or fixed equal to described second
Time device length.
In the embodiment that some are feasible, subscriber equipment may also include intervalometer acquisition module (not shown),
For obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module (not shown), surpasses for the 4th intervalometer obtained when described intervalometer acquisition module
Time or described subscriber equipment estimate that described subscriber equipment is in time of idle condition more than or equal to described intervalometer
During the length of the 4th intervalometer that acquisition module obtains, determine that the preference of power overhead is turned by described subscriber equipment
Become reducing power overhead;And/or,
When institute estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
State the 5th timing that subscriber equipment is in the time of idle condition and obtains less than or equal to described intervalometer acquisition module
During the length of device, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
In the embodiment that some are feasible, described intervalometer acquisition module includes the first acquisition submodule and
Two obtain at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In the embodiment that some are feasible, the length of described 4th intervalometer is less than or equal to the described 6th
The length of intervalometer, described first obtains submodule is additionally operable to obtain described 6th intervalometer from described base station,
Or, the length of described 6th intervalometer arranged in described base station is estimated according to the message obtained from described base station
Degree;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 4th from described base station
Time device, described second obtain submodule can obtain described 5th intervalometer from described base station, concrete, described
Radio resource control message that 4th intervalometer and/or described 5th intervalometer can send from described base station,
Physical layer message, data-link layer message, cell switching information obtain at least one.In implementing,
The length of described 4th intervalometer is less than or equal to the length of the 6th intervalometer in described base station, and the described 5th is fixed
Time device length less than or equal to the length of the 7th intervalometer in described base station.Described 6th intervalometer is described
Safeguarding in base station and trigger the trigger reducing power overhead for described base station side, described 7th intervalometer is institute
State the trigger triggering increase power overhead for described base station side safeguarded in base station.So determine when instruction
When module knows four timer expiry that the first acquisition submodule obtains, it may be determined that described equipment is to power
The preference of expense is changed into need to reduce power overhead, when instruction determines that module knows that the second acquisition submodule obtains
Five timer expiries time, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power
Expense.
In the embodiment that some are feasible, it is fixed that the first acquisition submodule can obtain the described 6th from described base station
Time device, described second obtains submodule can obtain described 7th intervalometer from described base station, described 6th timing
Device and/or described 7th intervalometer can disappear from the radio resource control message that described base station sends, physical layer
Breath, data-link layer message, cell switching information obtain at least one.In implementing, when first
Obtain submodule when obtaining six intervalometers from base station, the can be set in a user device according to the 6th intervalometer
Four intervalometers, and when the second acquisition submodule obtains seven intervalometers from base station, can be according to the 7th timing
Device sets the 5th intervalometer, and the length of the 4th set intervalometer is smaller than equal to described 6th intervalometer
Length, the length of the 5th set intervalometer is smaller than the length equal to described 7th intervalometer.So,
When instruction determines that module knows four timer expiry that the first acquisition submodule sets, determine described with setting
The standby preference to power overhead is changed into need to reduce power overhead, when instruction determines that module knows the second acquisition
During five timer expiry of module settings, determining that the preference of power overhead is changed into by described subscriber equipment needs
Increase power overhead.
In the embodiment that some are feasible, subscriber equipment can obtain submodule from base station with oneself according to first
The message obtained is estimated described 6th intervalometer and or obtains the message that obtains from base station of submodule according to second and estimate
Count the length of described 7th intervalometer.Such as, UE starts a timing after having performed a data transmit-receive operation
Device, this timer in UE execution once data transmit-receive operation after be restarted, it is assumed that base station sets to user
Standby reconfiguration message/the RRC connection release message that issues, then the first acquisition submodule can be according to reconfiguration message
The content of/RRC connection release message decides whether to record the length of a length of 6th intervalometer of above-mentioned timer
Degree;Second obtains submodule can decide whether according to the content of reconfiguration message/RRC connection release message
Record the length of a length of 7th intervalometer of above-mentioned timer.Such as, if this reconfiguration message/RRC connects
Connecing release message is switching command, or sets up new radio bearer, or discharges original radio bearer etc.,
First acquisition submodule or the second acquisition submodule will not record a length of 6th intervalometer of above-mentioned timer
Length;If this reconfiguration message/RRC connection release message is configuration DRX or the DRX configuring more power saving,
Then first obtain the length that submodule can record a length of 6th intervalometer of above-mentioned timer.
In implementing, when recording the length of the 6th timer length and the 7th intervalometer, first obtains son
Module can set the 4th intervalometer in a user device according to the 6th intervalometer, and the second acquisition submodule can
Set the 5th intervalometer according to the 7th intervalometer, and the length of the 4th set intervalometer is smaller than equal to institute
Stating the length of the 6th intervalometer, the length of the 5th set intervalometer is smaller than equal to described 7th intervalometer
Length.So, when instruction determines that module knows four timer expiry that the first acquisition submodule sets,
Determine that the preference of power overhead is changed into by described equipment and need to reduce power overhead, when instruction determines that module obtains
When knowing five timer expiry that the second acquisition submodule sets, determine that described subscriber equipment is to power overhead
Preference is changed into need to increase power overhead.
In the embodiment that some are feasible, subscriber equipment can be by repeatedly estimating that obtaining the described 6th determines
Time device and or the length of described 7th intervalometer, such as estimated result repeatedly is averaged, or takes
Little value, or take the value etc. of maximum, wherein estimation procedure is identical with above-mentioned method of estimation, at this not every time
Repeat, to have increased access to described 6th intervalometer and or the accuracy of length of described 7th intervalometer.
In the embodiment that some are feasible, it is operated into the free time when subscriber equipment has performed a data transmit-receive
During state, described subscriber equipment is it is contemplated that described subscriber equipment is by (concrete for the time being continuously in idle condition
In realization, the type of service of the data that subscriber equipment can received and dispatched according to subscriber equipment, the shape of current network
The factors such as condition estimate that described subscriber equipment will be continuously in the time of idle condition), it is such as 10s, same with this
Time, described subscriber equipment can set the 4th intervalometer according to the 6th intervalometer received from base station, it is assumed that the
Six intervalometers are 8s, then subscriber equipment can set the 4th intervalometer as 5s, or directly receive the 4th from base station
Intervalometer (such as, for 11s), so, when described subscriber equipment estimates that described subscriber equipment is in idle shape
The time (than 10s described above) of state is more than or equal to the length (ratio of the 4th intervalometer of described subscriber equipment
5s described above), determine that the preference of power overhead is changed into by described subscriber equipment and need to reduce power overhead, if
When described subscriber equipment estimates that described subscriber equipment is in time (than 10s described above) of idle condition and is less than
The length (than 11s described above) of the 4th intervalometer of described subscriber equipment, then can not show that preference is changed into
Reduce the conclusion of power overhead.5th intervalometer is similar to, is not repeated herein.
In implementing, the subscriber equipment of the embodiment of the present invention can only include intervalometer acquisition module and instruction really
Cover half block, such subscriber equipment can be exclusively used in the power overhead preference determining subscriber equipment.
In the embodiment that some are feasible, after base station receives the preference instruction of reduction power overhead, will
Reduce DRX parameter corresponding to power overhead (" lower power consumption ") state and physical layer ginseng
Number configuration (such as CQI, Sounding) gives subscriber equipment, and its way can be as follows:
When RRC connects and reconfigures, described base station is that described user device configuration two overlaps noncontinuity reception
DRX parameter, and indicate described subscriber equipment to use " lower power when carrying out RRM and connecting
Consumption " corresponding DRX parameter;And described base station receives DRX ginseng according to two set noncontinuities
Number, overlaps physical layer parameter for described user device configuration two, and indicates subscriber equipment carrying out Radio Resource pipe
The physical layer parameter that the DRX parameter of " lower power consumption " correspondence is corresponding is used when reason connects.
In the embodiment that some are feasible, after base station receives the preference instruction of increase power overhead, will
Increase DRX parameter corresponding to power overhead (" default ") state and physical layer parameter configuration (such as CQI,
Sounding) giving subscriber equipment, its way can be as follows:
When RRC connects and reconfigures, described base station is that described user device configuration two overlaps noncontinuity reception
DRX parameter, and indicate described subscriber equipment to use " default " right when carrying out RRM and connecting
The DRX parameter answered;And described base station receives DRX parameters, for described user according to two set noncontinuities
Equipment configuration two set physical layer parameter, and indicate subscriber equipment to use when carrying out RRM and connecting
The physical layer parameter that DRX parameter that " default " is corresponding is corresponding.
In the embodiment that some are feasible, base station includes the length of DRX cycle to the setting of DRX parameter
Setting, when receive reduce power overhead preference instruction after, the length of DRX cycle can be set to
Less than in the length of IDLE state DRX cycle.After receiving the preference instruction increasing power overhead, can
The length of DRX cycle is set greater than or is equal to the length of IDLE state DRX cycle.
In the embodiment that some are feasible, subscriber equipment can also carry out implicit expression by the state that judgement is presently in
The DRX parameter that used of determination: current user equipment is in " default " state, if base station does not has
Be explicitly indicated subscriber equipment transition state, then subscriber equipment uses the DRX of new correspondence " default " state
Parameter;Otherwise, current user equipment is in " lower power consumption " state, if base station does not has
Clearly dictate otherwise subscriber equipment transition state, then subscriber equipment uses new correspondence " lower power
Consumption " the DRX parameter of state.
In the embodiment that some are feasible, optionally, when subscriber equipment, to base station, transmission reduces power overhead
Preference instruction or described to described base station send increase power overhead preference instruction after, described base station can
Judge the most whether can update radio resource parameter configuration as described subscriber equipment, if it is judged that be no,
The most described base station be not responding to described reduction power overhead preference instruction or described base station be not responding to described increase merit
The preference instruction of rate expense.
In the embodiment that some are feasible, optionally, when described subscriber equipment, to base station, transmission reduces power
After the preference instruction of expense, described base station judges the most whether can update Radio Resource as described subscriber equipment
Parameter configuration, if it is judged that be no, the most described base station is not responding to the preference of described reduction power overhead and refers to
Show.
In the embodiment that some are feasible, when subscriber equipment includes two kinds of clear states, at subscriber equipment
In default conditions, the 3rd management module of timer 1005 can only start first timer;When subscriber equipment is in
Reducing power overhead state, the 3rd management module of timer 1005 can only start second timer.If described use
Family equipment only includes first timer, when user is in reduction power overhead state, and the 3rd timer management
Module 1005 is without starting intervalometer.If subscriber equipment is not by state limit, the 3rd management module of timer
1005 can start first timer and second timer simultaneously;If described subscriber equipment only includes first timer,
3rd management module of timer 1005 only starts first timer.
Therefore, in some feasible embodiments of the present invention, limit user by first timer
The transmission of the equipment preference instruction to reducing power overhead, limits user to increasing power by second timer
The transmission of the preference instruction of expense, limits the subscriber equipment preference instruction to reducing power overhead respectively with this
Transmission and to increase power overhead preference instruction transmission, limited by same intervalometer with prior art
Surely compare, more flexibly, improve the experience of user.Further, the embodiment of the present invention is by by network side
Whether the 6th timer-operated 4th intervalometer enters reduction power overhead, by network side to subscriber equipment
The 7th intervalometer the 5th intervalometer increase power overhead preference be controlled, more effectively coordinated network
Side and the subscriber equipment demand to power preference, it is ensured that subscriber equipment within the shortest time to power preference
It is adjusted.Network side intervalometer can be efficiently solved cause with the timer duration contradiction of user equipment side
Power preference adjusts defect not in time.Further, the embodiment of the present invention is set by the user that subscriber equipment is anticipated
The standby time being in idle condition combines the 4th intervalometer and the 5th intervalometer is combined whether subscriber equipment enters
Reduce power overhead or increase the preference of power overhead and be controlled, more effectively having coordinated subscriber equipment
Demand to power preference, it is ensured that power preference was adjusted within the shortest time by subscriber equipment.
Accordingly, the embodiment of the present invention also provides for signaling transmission system of knowing clearly, and it can include subscriber equipment 131
With base station 132, any one during wherein subscriber equipment 131 is the present invention aforesaid subscriber equipment embodiment, institute
State the power overhead preference instruction that base station 132 sends for receiving described subscriber equipment, and pass through Radio Resource
Management process is that described subscriber equipment carries out radio resource parameter configuration, and the instruction of described power overhead preference includes
Reduce the preference instruction of power overhead or increase the preference instruction of power overhead.Described base station is additionally operable to described
Subscriber equipment sends at least one in the 4th intervalometer, the 5th intervalometer, the 6th intervalometer, the 7th intervalometer.
When described subscriber equipment includes default conditions and reduces power overhead state two states,
Described base station is that described subscriber equipment carries out radio resource parameter configuration by RRM process,
Comprising: when RRM connection establishment, described base station is that described user device configuration two overlaps non-company
Continuous property receives DRX parameter, and indicates described subscriber equipment to use when carrying out RRM and connecting
DRX parameter, wherein set of parameter is used for indicating described subscriber equipment to be in default conditions, and another set of parameter is used
It is in reduction power overhead state in indicating described subscriber equipment;Described base station connects according to different noncontinuities
Receive DRX parameter, for the two set physical layers that described user device configuration is corresponding;
Or,
Described base station is that described subscriber equipment carries out radio resource parameter configuration by RRM process,
Comprising: when RRM reconfiguration course is carried out, described base station is described user device configuration two
Set noncontinuity receives DRX parameter, and indicates described subscriber equipment to reconfigure carrying out RRM
The DRX parameter used after one-tenth, wherein set of parameter is used for indicating described subscriber equipment to be in default conditions, separately
Set of parameter is used for indicating described subscriber equipment to be in reduction power overhead state;Described base station is according to different
Noncontinuity receives DRX parameter, for the two set physical layers that described user device configuration is corresponding.
In implementing, the present invention also provides for a kind of computer-readable storage medium, and wherein, this Computer Storage is situated between
Matter can have program stored therein, and can include signaling method that the present invention provides or determine power when performing to program
Part or all of step in each embodiment of the method for expense preference.Described storage medium can be magnetic disc,
CD, read-only store-memory body (Read-Only Memory, ROM) or random store-memory body (Random
Access Memory, RAM) etc..
In implementing, as shown in Figure 10, the present invention also provides for a kind of subscriber equipment 14, it may include: input
During device 141, output device 142 and processor 144(implement, the processor 144 of the network equipment 14
Can be multiple, Figure 10 only illustrates as a example by one) wherein, described processor 144 performs to walk as follows
Rapid:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that be used for limiting fall
The first timer of the transmission of the preference instruction of low-power expense is the most overtime, if it is judged that be yes, refers to
Show that described output device 142 sends the preference instruction reducing power overhead to base station;
When the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, indicate described output dress
Put 142 and send the preference instruction increasing power overhead to described base station, or, it is judged that it is used for limiting increase merit
The second timer of the transmission of the preference instruction of rate expense is the most overtime, if it is judged that be yes, indicates institute
State output device 142 and then send the preference instruction increasing power overhead to described base station.
In the embodiment that some are feasible, described subscriber equipment includes default conditions and reduces power overhead shape
State two states, the most described processor 144 also executes the following steps:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, perform to judge that user sets
Standby the first judgement whether being in default conditions, if the first judged result judged is yes, then performs judgement
For limiting the second judgement that the first timer of the transmission of the preference instruction reducing power overhead is the most overtime,
If the second judged result judged is yes, indicates described output device 142 to send reduction power to base station and open
The preference instruction of pin;
And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that Yong Hushe
Standby whether be in reduction power overhead state, if it is judged that be yes, indicate described output device 142 to
Described base station sends the preference instruction increasing power overhead;
And, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, perform user
Whether equipment is in the 3rd judgement reducing power overhead state, if the 3rd judged result judged is yes,
The 4th that the second timer of the transmission performing the preference instruction for limiting increase power overhead is the most overtime sentences
Disconnected, if the 4th judged result judged is yes, indicates described output device 142 to send to described base station and increase
Add the preference instruction of power overhead.
In the embodiment that some are feasible, described processor 144 judges described subscriber equipment state in which
Determination methods include:
Described processor 144 judges oneself state in which according to the parameter length specified, when described parameter is long
When degree meets the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;Work as institute
State parameter length and meet length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in
Reduce power overhead state;
Or, described processor 144 judges that the determination methods of described subscriber equipment state in which includes:
Described processor 144 receives DRX ginseng according to the noncontinuity that described base station is described user device configuration
Number judges described subscriber equipment state in which, when described subscriber equipment is currently in use corresponding non-of default conditions
When seriality receives DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment
It is currently in use and reduces noncontinuity corresponding to power overhead state when receiving DRX parameter, then judge described user
Equipment is in reduction power overhead state.
In the embodiment that some are feasible, described processor 144 also executes the following steps:
When the judged result judging described first timer whether time-out is no, in notifying described subscriber equipment
The protocol layer notice indicated for sending the preference reducing power overhead knows the inclined of the power overhead of subscriber equipment
The transmission of the preference instruction that the good protocol layer occurring to change reduces power overhead is limited;
Or,
When the judged result judging described first timer whether time-out is no, notify described subscriber equipment not
Perform any operation.
In the embodiment that some are feasible, described processor 144 also executes the following steps:
When the judged result judging described second timer whether time-out is no, in notifying described subscriber equipment
The protocol layer notice indicated for sending the preference increasing power overhead knows the inclined of the power overhead of subscriber equipment
The transmission of the preference instruction that the good protocol layer occurring to change increases power overhead is limited;
Or,
When the judged result judging described second timer whether time-out is no, notifying user equipment does not performs
Any operation.
In the embodiment that some are feasible, described processor 144 sends to base station and reduces the inclined of power overhead
After good instruction or the described preference instruction sending increase power overhead to described base station, described processor 144
Also execute the following steps:
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
And/or described second timer.
In the embodiment that some are feasible, described processor 144 also executes the following steps:
When the first timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead,
Indicate described output device 142 can not send the preference instruction reducing power overhead to described base station, until institute
State first timer time-out;
When the second timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to increasing power overhead to the preference of power overhead,
Indicate described output device 142 can not send the preference instruction increasing power overhead to described base station, until institute
State second timer time-out.
In the embodiment that some are feasible, described processor 144 also executes the following steps:
When the described first timer in described subscriber equipment has timed out, but do not receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into reducing power by subscriber equipment
During expense, indicate described output device 142 can not send the preference instruction reducing power overhead to described base station,
Until receiving the radio resource parameter configuration result that described base station sends;
When the described second timer in described subscriber equipment has timed out, but do not receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into increasing power by subscriber equipment
During expense, indicate described output device 142 can not send the preference instruction increasing power overhead to described base station,
Until receiving the radio resource parameter configuration result that described base station sends.
At some it is possible that in embodiment, described processor 144 also executes the following steps:
Receive the radio resource parameter configuration result that described base station sends;
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
And/or described second timer.
In the embodiment that some are feasible, described processor 144 also executes the following steps:
When described input equipment 141 receives the radio resource parameter configuration result that described base station sends, stop
Only described 3rd intervalometer.
In the embodiment that some are feasible, the length of described first timer is more than or equal to described second timing
The length of device.
In the embodiment that some are feasible, described processor 144 also executes the following steps:
The length of described first timer, the length of described second timer are set in advance in described subscriber equipment
Degree;
Or, receive and connected in RRM connection establishment process or RRM by described base station
Reconfiguration course is assigned to the length of the described first timer of described subscriber equipment, described second timer
Length.
In the embodiment that some are feasible, optionally, described processor 144 also executes the following steps: and obtains
Take the 4th intervalometer;
Then estimate that described subscriber equipment is in sky when the 4th timer expiry or the described subscriber equipment of described acquisition
When the time of not busy state is more than or equal to the length of the 4th intervalometer of described acquisition, described processor determines described
The preference of power overhead is changed into by subscriber equipment need to reduce power overhead;
Obtain the 5th intervalometer;
Then estimate at described subscriber equipment when the 5th timer expiry or the described subscriber equipment of described subscriber equipment
In the time of idle condition less than or equal to the length of the 5th intervalometer of described subscriber equipment time, described processor
Determine that the preference of power overhead is changed into by described subscriber equipment and need to increase power overhead.
In the embodiment that some are feasible, described processor 144 obtains the 4th intervalometer and obtains the 4th timing
Implement body includes:
Described processor sets described 4th intervalometer according to the 6th intervalometer;Or, described processor is from described
Base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described processor obtains the 5th intervalometer and specifically includes:
Described processor sets described 5th intervalometer according to the 7th intervalometer;Or, described processor is from described
Base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
In the embodiment that some are feasible, the length of described 4th intervalometer is less than or equal to the described 6th
The length of intervalometer, before described processor 144 sets described 4th intervalometer according to the 6th intervalometer, also
Execution following steps:
Described 6th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, described processor
Before setting described 5th intervalometer according to the 7th intervalometer, also execute the following steps:
Described 7th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 7th intervalometer arranged in described base station.
In the embodiment that some are feasible,
When described processor 144 obtains described four intervalometer from described base station, described 4th intervalometer is taken
Radio resource control message that band sends in described base station, physical layer message, data-link layer message,
In cell switching information in any one;
When described processor 144 obtains described five intervalometer from described base station, described 5th intervalometer is taken
Radio resource control message that band sends in described base station, physical layer message, data-link layer message,
In cell switching information in any one;
When described processor 144 obtains described six intervalometer from described base station, described 6th intervalometer is taken
Radio resource control message that band sends in described base station, physical layer message, data-link layer message,
In cell switching information in any one;
When described processor 144 obtains described seven intervalometer from described base station, described 7th intervalometer is taken
Radio resource control message that band sends in described base station, physical layer message, data-link layer message,
In cell switching information in any one.
Obviously, those skilled in the art can carry out various change and modification without deviating from this to the present invention
Bright spirit and scope.So, if the present invention these amendment and modification belong to the claims in the present invention and
Within the scope of its equivalent technologies, then the present invention is also intended to comprise these change and modification.
Claims (63)
1. a signaling method, it is characterised in that including:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that be used for limiting fall
The first timer of the transmission of the preference instruction of low-power expense is the most overtime, if it is judged that be yes, then
The preference instruction reducing power overhead is sent to base station;
When the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, send to described base station
Increase the preference instruction of power overhead, or judge the transmission for limiting the preference instruction increasing power overhead
Second timer the most overtime, if it is judged that be yes, then to described base station send increase power overhead
Preference instruction.
2. signaling method as claimed in claim 1, it is characterised in that described subscriber equipment includes writing from memory
Recognize state and reduce power overhead state two states, then when subscriber equipment, the preference of power overhead being changed into
When need to reduce power overhead, perform to judge the first judgement whether subscriber equipment is in default conditions, if the
One judged result judged is yes, then perform the transmission judged for limiting the preference instruction reducing power overhead
The second judgement of first timer whether time-out, if the second judged result judged is yes, then to base station
Send the preference instruction reducing power overhead;
And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that Yong Hushe
Standby whether being in reduces power overhead state, if it is judged that be yes, then send to described base station and increases merit
The preference instruction of rate expense;
And, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, perform user
Whether equipment is in the 3rd judgement reducing power overhead state, if the 3rd judged result judged is yes,
The 4th that the second timer of the transmission performing the preference instruction for limiting increase power overhead is the most overtime sentences
Disconnected, if the 4th judged result judged is yes, then the preference sending increase power overhead to described base station refers to
Show.
3. signaling method as claimed in claim 2, it is characterised in that
Described subscriber equipment judges that the determination methods of oneself state in which includes:
Described subscriber equipment judges oneself state in which according to the parameter length specified, when described parameter length
When meeting the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described
Parameter length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in fall
Low-power expense state;
Or, described subscriber equipment judges that the determination methods of oneself state in which includes:
Described subscriber equipment receives DRX parameter according to the noncontinuity that described base station is described user device configuration
Judge oneself state in which, receive when described subscriber equipment is currently in use noncontinuity corresponding to default conditions
During DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment is currently in use fall
When noncontinuity corresponding to low-power expense state receives DRX parameter, then judge that described subscriber equipment is in fall
Low-power expense state.
4. the signaling method as according to any one of claim 1-3, it is characterised in that also include:
When judging that described first timer is the most overtime, it is used in described subscriber equipment sending reduction power overhead
Preference instruction protocol layer notice know subscriber equipment power overhead preference occur change protocol layer fall
The transmission of the preference instruction of low-power expense is limited;
Or,
When judging that described first timer is the most overtime, described subscriber equipment does not perform any operation.
5. the signaling method as according to any one of claim 1-3, it is characterised in that also include:
When judging that described second timer is the most overtime, it is used in described subscriber equipment sending increase power overhead
Preference instruction protocol layer notice know subscriber equipment power overhead preference occur change protocol layer increase
The transmission of the preference instruction adding power overhead is limited;
Or,
When judging that described second timer is the most overtime, subscriber equipment does not perform any operation.
6. signaling method as claimed in claim 1, it is characterised in that described transmission to base station is reduced
After the preference instruction of power overhead or the described preference instruction sending increase power overhead to described base station, also
Including:
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
And/or described second timer.
7. signaling method as claimed in claim 6, it is characterised in that also include:
When the first timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead,
Described subscriber equipment can not send the preference instruction reducing power overhead to described base station, until described first is fixed
Time device time-out;
And, when the second timer in described subscriber equipment has not timed out, receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into increasing power by subscriber equipment
During expense, described subscriber equipment can not send the preference instruction increasing power overhead to described base station, until institute
State second timer time-out.
8. signaling method as claimed in claim 6, it is characterised in that also include:
When the described first timer in described subscriber equipment has timed out, but do not receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into reducing power by subscriber equipment
During expense, described subscriber equipment can not send the preference instruction reducing power overhead to described base station, until connecing
Receive the radio resource parameter configuration result that described base station sends;
And, when the described second timer in described subscriber equipment has timed out, but do not receive described base station
The radio resource parameter configuration result sent, and the preference of power overhead is again transformed into needing increasing by subscriber equipment
When adding power overhead, described subscriber equipment can not send the preference instruction increasing power overhead to described base station,
Until receiving the radio resource parameter configuration result that described base station sends.
9. signaling method as claimed in claim 1 or 2, it is characterised in that described to base station transmission
The preference instruction or the described preference sending increase power overhead to described base station that reduce power overhead indicate it
After, also include:
Described subscriber equipment receive described base station according to the instruction of the preference of the described reduction power overhead received or
The preference of described increase power overhead is designated as the radio resource parameter of described user device configuration.
10. signaling method as claimed in claim 9, it is characterised in that described set for described user
After standby allocation radio resource parameter, also include:
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
And/or described second timer.
11. signaling methods as claimed in claim 1 or 2, it is characterised in that described send out to base station
Send the preference reducing power overhead to indicate or the described preference sending increase power overhead to described base station indicates it
After, also include:
When base station judges currently can not to update radio resource parameter configuration as subscriber equipment, described subscriber equipment
Do not receive described base station the preference of described reduction power overhead is indicated or the preference of described increase power overhead
The response message of instruction.
12. signaling methods as claimed in claim 10, it is characterised in that described subscriber equipment receives
Described base station indicates according to the preference of the described reduction power overhead received or described increase power overhead inclined
It is designated as well the radio resource parameter of described user device configuration, including:
It is described user device configuration by RRM process that described subscriber equipment receives described base station
Discontinuous reception DRX parameter and physical layer parameter.
13. signaling methods as claimed in claim 12, it is characterised in that when described subscriber equipment bag
When including default conditions and reduce power overhead state two states, described subscriber equipment receives described base station to be passed through
RRM process is discontinuous reception DRX parameter and the physical layer parameter bag of described user device configuration
Include:
The described base station of described subscriber equipment reception is when RRM RRC connects and reconfigures, for described use
Family equipment configuration two set noncontinuity receives DRX parameter, and indicates described subscriber equipment carrying out Radio Resource
The instruction information reducing DRX parameter corresponding to power overhead is used when management connects;And receive described base station
Receive DRX parameter according to two set noncontinuities, overlap physical layer parameters for the two of described user device configuration, and
Instruction subscriber equipment carry out RRM connect reconfigure after, use reduce power overhead corresponding
The instruction information of the physical layer parameter that DRX parameter is corresponding.
14. signaling methods as claimed in claim 12, it is characterised in that when described subscriber equipment bag
When including default conditions and reduce power overhead state two states, described subscriber equipment receives described base station to be passed through
RRM process is discontinuous reception DRX parameter and the physical layer parameter bag of described user device configuration
Include:
The described base station of described subscriber equipment reception is when RRM RRC connects and reconfigures, for described use
Family equipment configuration two set noncontinuity receives DRX parameter, and indicates described subscriber equipment carrying out Radio Resource
Use when management connects and increase the instruction information of DRX parameter corresponding to power overhead;And receive described base station
Receive DRX parameter according to two set noncontinuities, overlap physical layer parameters for the two of described user device configuration, and
Instruction subscriber equipment carry out RRM connect reconfigure after, use increase power overhead corresponding
The instruction information of the physical layer parameter that DRX parameter is corresponding.
15. signaling methods as claimed in claim 1, it is characterised in that described first timer
Length is more than or equal to the length of described second timer.
16. signaling methods as claimed in claim 6, it is characterised in that
The length of described first timer, the length of described second timer are set in advance in described subscriber equipment
In;
Or, the length of described first timer, described second timer length by described base station wireless
Resource management's connection establishment process or RRM connection reconfiguration course are assigned to described user set
Standby.
17. signaling methods as claimed in claim 1, it is characterised in that power is opened by subscriber equipment
Before the preference of pin is changed into and need to reduce power overhead, also include:
Subscriber equipment obtains the 4th intervalometer;
Then estimate at described subscriber equipment when the 4th timer expiry or the described subscriber equipment of described subscriber equipment
In the time of idle condition more than or equal to the length of the 4th intervalometer of described subscriber equipment time, determine described use
The preference of power overhead is changed into by family equipment need to reduce power overhead;
Before the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, also include:
Subscriber equipment obtains the 5th intervalometer;
Then estimate at described subscriber equipment when the 5th timer expiry or the described subscriber equipment of described subscriber equipment
In the time of idle condition less than or equal to the length of the 5th intervalometer of described subscriber equipment time, determine described use
The preference of power overhead is changed into by family equipment need to increase power overhead.
18. signaling methods as claimed in claim 17, it is characterised in that described subscriber equipment obtains
4th intervalometer includes:
Described subscriber equipment sets described 4th intervalometer according to the 6th intervalometer;Or, obtain from described base station
Described 4th intervalometer, described 6th intervalometer is the intervalometer arranged in described base station;
Described subscriber equipment obtains the 5th intervalometer and includes:
Described subscriber equipment sets described 5th intervalometer according to the 7th intervalometer;Or, obtain from described base station
Described 5th intervalometer, described 7th intervalometer is the intervalometer arranged in described base station.
19. signaling methods as claimed in claim 18, it is characterised in that described 4th intervalometer
Length is less than or equal to the length of described 6th intervalometer, and described subscriber equipment sets according to the 6th intervalometer
Before described 4th intervalometer, also include:
Described 6th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described user sets
Before setting described 5th intervalometer according to the 7th intervalometer, also include:
Described 7th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 7th intervalometer arranged in described base station.
20. methods determining power overhead preference as claimed in claim 19, it is characterised in that
When obtaining described four intervalometer from described base station, described 4th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described five intervalometer from described base station, described 5th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described six intervalometer from described base station, described 6th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described seven intervalometer from described base station, described 7th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one.
21. 1 kinds of methods determining power overhead preference, it is characterised in that including:
Subscriber equipment obtains at least one in the 4th intervalometer and the 5th intervalometer;
When the 4th timer expiry or the described subscriber equipment of described subscriber equipment predict at described subscriber equipment
In the time of idle condition more than or equal to the length of the 4th intervalometer of described subscriber equipment time, determine described use
The preference of power overhead is changed into by family equipment need to reduce power overhead;
When the 5th timer expiry or the described subscriber equipment of described subscriber equipment estimate that described subscriber equipment is in
When the time of idle condition is less than or equal to the length of the 5th intervalometer of described subscriber equipment, determine described user
The preference of power overhead is changed into by equipment need to increase power overhead.
22. methods determining power overhead preference as claimed in claim 21, it is characterised in that described use
Family equipment obtains the 4th intervalometer and includes:
Described subscriber equipment sets described 4th intervalometer according to the 6th intervalometer;Or, obtain from described base station
Described 4th intervalometer, described 6th intervalometer is the intervalometer arranged in described base station;
Described subscriber equipment obtains the 5th intervalometer and includes:
Described subscriber equipment sets described 5th intervalometer according to the 7th intervalometer;Or, obtain from described base station
Described 5th intervalometer, described 7th intervalometer is the intervalometer arranged in described base station.
23. methods determining power overhead preference as claimed in claim 22, it is characterised in that described
The length of four intervalometers is less than or equal to the length of described 6th intervalometer, and described subscriber equipment is according to the 6th
Before intervalometer sets described 4th intervalometer, also include:
Described 6th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described user sets
Before setting described 5th intervalometer according to the 7th intervalometer, also include:
Described 7th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 7th intervalometer arranged in described base station.
24. methods determining power overhead preference as claimed in claim 23, it is characterised in that
When obtaining described four intervalometer from described base station, described 4th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described five intervalometer from described base station, described 5th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described six intervalometer from described base station, described 6th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one;
When obtaining described seven intervalometer from described base station, described 7th intervalometer carries to be sent out in described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
In any one.
25. 1 kinds of subscriber equipmenies, it is characterised in that described subscriber equipment indicates sending module and the including
On the basis of one control module, also include at least one in the second control module and the 3rd control module:
Described instruction sending module, for indicating to base-station transmitting-power expense preference, described power overhead is inclined
Good instruction includes the preference instruction reducing power overhead or increases the preference instruction of power overhead;
Described first control module, for reducing power when the preference of power overhead is changed into by subscriber equipment
During expense, it is judged that the most overtime for limiting the first timer of the transmission of the preference instruction reducing power overhead,
If it is judged that be yes, notify that the preference that described instruction sending module reduces power overhead to base station transmission refers to
Show;
Described second control module, for increasing power when the preference of power overhead is changed into by subscriber equipment
During expense, notify that described instruction sending module sends the preference instruction increasing power overhead to described base station;Or,
Described 3rd control module, for increasing power when the preference of power overhead is changed into by subscriber equipment
During expense, it is judged that the most overtime for limiting the second timer of the transmission of the preference instruction increasing power overhead,
If it is judged that be yes, notifying that described instruction sending module sends to described base station increases the inclined of power overhead
Good instruction.
26. subscriber equipmenies as claimed in claim 25, it is characterised in that described subscriber equipment includes acquiescence
State and reduction power overhead state two states;Described subscriber equipment also includes for judging that described user sets
The condition judgment module of standby state in which;
Then, described first control module is specifically for needing fall when the preference of power overhead is changed into by subscriber equipment
Low-power expense, and when described condition judgment module indicates described subscriber equipment to be in default conditions, it is judged that use
The most overtime in the first timer of the transmission limiting the preference instruction reducing power overhead, if it is judged that
It is yes, notifies that described instruction sending module sends the preference instruction reducing power overhead to base station;
And, described second control module is specifically for needing when the preference of power overhead is changed into by subscriber equipment
When increasing power overhead, and when described condition judgment module indicates described subscriber equipment to reduce power overhead state,
Notify that described instruction sending module sends the preference instruction increasing power overhead to described base station;
And, described 3rd control module is specifically for needing when the preference of power overhead is changed into by subscriber equipment
When increasing power overhead, and when described condition judgment module indicates described subscriber equipment to reduce power overhead state,
Judge that the second timer for limiting the transmission that the preference increasing power overhead indicates is the most overtime, if sentenced
Disconnected result is yes, notifies that described instruction sending module sends the preference instruction increasing power overhead to described base station.
27. subscriber equipmenies as claimed in claim 26, it is characterised in that described condition judgment module judges
Described subscriber equipment state in which includes:
Described condition judgment module judges described subscriber equipment state in which according to the parameter length specified, when
When described parameter length meets the length met needed for default conditions, then judge that described subscriber equipment is in acquiescence
State;Reduce, when described parameter length meets, the length met needed for power overhead state, then judge described use
Family equipment is in reduction power overhead state;
Or, described condition judgment module judges that described subscriber equipment state in which includes:
Described condition judgment module receives DRX according to the noncontinuity that described base station is described user device configuration
Parameter judges oneself state in which, when described subscriber equipment is currently in use the noncontinuity that default conditions are corresponding
When receiving DRX parameter, then judge that described subscriber equipment is in default conditions;When described subscriber equipment makes
When receiving DRX parameter by the noncontinuity that reduction power overhead state is corresponding, then judge at described subscriber equipment
In reducing power overhead state.
28. subscriber equipmenies as according to any one of claim 25-27, it is characterised in that described first control
Molding block is additionally operable to when judging that described first timer is the most overtime, and instruction sends in being in described subscriber equipment
The instruction sending module of the protocol layer reducing the preference instruction of power overhead is used for obtaining in notifying described subscriber equipment
Know that the protocol layer that the preference of the power overhead of subscriber equipment occurs to change reduces sending out of the preference instruction of power overhead
Send limited;Or, when judging that described first timer is the most overtime, indicate described subscriber equipment not perform to appoint
What operation.
29. subscriber equipmenies as according to any one of claim 25-27, it is characterised in that described 3rd control
Molding block is additionally operable to when judging that described second timer is the most overtime, and instruction sends in being in described subscriber equipment
The protocol layer notice of the preference instruction increasing power overhead knows that the preference of the power overhead of subscriber equipment occurs to turn
The transmission of the preference instruction that the protocol layer become increases power overhead is limited;Or, when judging described second timing
When device is the most overtime, described subscriber equipment is indicated not perform any operation.
30. subscriber equipmenies as claimed in claim 25, it is characterised in that also include:
First timer management module, for including first timer, and described instruction when described subscriber equipment
Sending module, after base station have sent the instruction of power overhead preference, starts described first timer;And work as
Described subscriber equipment includes first timer and second timer, and described instruction sending module sends to base station
After the instruction of power overhead preference, start described first timer and/or described second timer.
31. subscriber equipmenies as claimed in claim 30, it is characterised in that also include:
Configuration receiver module, for receiving the radio resource parameter configuration knot that base station is described user device configuration
Really;
Configure on the basis of receiver module including, described subscriber equipment also include the 6th control module, the 7th
In control module at least one, wherein;
Described 6th control module, is used for when the first timer in described subscriber equipment has not timed out, but institute
State configuration receiver module and receive radio resource parameter configuration result, and the preference that subscriber equipment is to power overhead
When being again transformed into need to reducing power overhead, notify that described instruction sending module is in described first timer time-out
Before can not to described base station send reduce power overhead preference instruction;
Described 7th control module, is used for when the second timer in described subscriber equipment has not timed out, but institute
State configuration receiver module and receive the radio resource parameter configuration result that described base station sends, and subscriber equipment pair
When the preference of power overhead is again transformed into need to increasing power overhead, notify that described instruction sending module is described
Can not send to described base station before second timer time-out and increase the preference instruction of power overhead.
32. subscriber equipmenies as claimed in claim 30, it is characterised in that also include:
Configuration receiver module, for receiving the radio resource parameter configuration knot that base station is described user device configuration
Really;
Configure on the basis of receiver module including, described subscriber equipment also include the 8th control module, the 9th
In control module at least one, wherein;
Described 8th control module, for having timed out when the described first timer in described subscriber equipment, but
Described configuration receiver module does not receives the radio resource parameter configuration result that described base station sends, and user sets
When the standby preference to power overhead is again transformed into need to reducing power overhead, notify that described instruction sending module exists
Can not send to described base station before receiving the radio resource parameter configuration result that described base station sends and reduce merit
The preference instruction of rate expense;
Described 9th control module, for having timed out when the described second timer in described subscriber equipment, but
Described configuration receiver module does not receives the radio resource parameter configuration result that described base station sends, and user sets
When the standby preference to power overhead is again transformed into need to increasing power overhead, notify that described instruction sending module exists
Can not send to described base station before receiving the radio resource parameter configuration result that described base station sends and increase merit
The preference instruction of rate expense.
33. subscriber equipmenies as claimed in claim 25, it is characterised in that also include:
Configuration receiver module, for receiving the radio resource parameter configuration knot that base station is described user device configuration
Really;
3rd management module of timer, for receiving described radio resource parameter when described configuration receiver module
After configuration result, when described subscriber equipment includes first timer, start described first timer;When
When described subscriber equipment includes first timer and second timer, start described first timer and/or institute
State second timer.
34. subscriber equipmenies as claimed in claim 30, it is characterised in that also include:
Module is set, for arranging the length of described first timer, described in advance in described subscriber equipment
The length of second timer.
35. subscriber equipmenies as claimed in claim 30, it is characterised in that also include:
Length receiver module, is assigned to the described first timer of described subscriber equipment for receiving described base station
Length, the length of described second timer.
36. subscriber equipmenies as claimed in claim 25, it is characterised in that also include:
Intervalometer acquisition module, for obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module, for the 4th timer expiry or described obtained when described intervalometer acquisition module
Subscriber equipment estimates that described subscriber equipment is in the time of idle condition more than or equal to described intervalometer acquisition module
During the length of the 4th intervalometer obtained, determining that the preference of power overhead is changed into by described subscriber equipment needs fall
Low-power expense;And/or,
When described use estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
Family equipment is in the 5th intervalometer that time of idle condition obtains less than or equal to described intervalometer acquisition module
During length, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
37. subscriber equipmenies as claimed in claim 36, it is characterised in that described intervalometer acquisition module bag
Include the first acquisition submodule and second and obtain at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
38. subscriber equipmenies as claimed in claim 37, it is characterised in that the length of described 4th intervalometer
Less than or equal to the length of described 6th intervalometer, described first obtains submodule is additionally operable to from described base station
Obtain described 6th intervalometer, or, estimate in described base station according to the message obtained from described base station and arrange
The length of described 6th intervalometer;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
39. subscriber equipmenies as claimed in claim 38, it is characterised in that the length of described 4th intervalometer
Less than or equal to described 6th intervalometer, described first obtain submodule set described 4th intervalometer it
Before, described intervalometer receiver module obtains described 6th intervalometer from described base station, or described second is arranged
Module estimated described 6th timing by the message obtained from described base station before setting described 4th intervalometer
The length of device;
The length of described 5th intervalometer is less than or equal to described 7th intervalometer, and described second arranges module
Before setting described 5th intervalometer, it is fixed that described intervalometer receiver module obtains the described 7th from described base station
Time device, or described second arrange module and setting before described 5th intervalometer by obtaining from described base station
Message estimate described 7th intervalometer length.
40. subscriber equipmenies as claimed in claim 39, it is characterised in that when described first obtain submodule from
When described base station obtains described four intervalometer, the radio resource control message that sends from described base station,
Physical layer message, data-link layer message, cell switching information obtain described 4th intervalometer in any one;
When described second acquisition submodule obtains described five intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 5th intervalometer;
When described first acquisition submodule obtains described six intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 6th intervalometer;
When described second acquisition submodule obtains described seven intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 7th intervalometer.
41. 1 kinds of subscriber equipmenies, it is characterised in that including:
Intervalometer acquisition module, for obtaining at least one in the 4th intervalometer and the 5th intervalometer;
Instruction determines module, for the 4th timer expiry or described obtained when described intervalometer acquisition module
Subscriber equipment estimates that described subscriber equipment is in the time of idle condition more than or equal to described intervalometer acquisition module
During the length of the 4th intervalometer obtained, determining that the preference of power overhead is changed into by described subscriber equipment needs fall
Low-power expense;And/or,
When described use estimated by the 5th timer expiry or the described subscriber equipment of the acquisition of described intervalometer acquisition module
Family equipment is in the 5th intervalometer that time of idle condition obtains less than or equal to described intervalometer acquisition module
During length, determining that the preference of power overhead is changed into by described subscriber equipment need to increase power overhead.
42. subscriber equipmenies as claimed in claim 41, it is characterised in that described intervalometer acquisition module bag
Include the first acquisition submodule and second and obtain at least one in submodule, wherein:
Described first obtains submodule, for setting described 4th intervalometer according to the 6th intervalometer;Or, from
Described base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described second obtains submodule, for setting described 5th intervalometer according to the 7th intervalometer;Or, from
Described base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
43. subscriber equipmenies as claimed in claim 42, it is characterised in that the length of described 4th intervalometer
Less than or equal to the length of described 6th intervalometer, described first obtains submodule is additionally operable to from described base station
Obtain described 6th intervalometer, or, estimate in described base station according to the message obtained from described base station and arrange
The length of described 6th intervalometer;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, and described second obtains
Take submodule and be additionally operable to obtain from described base station described 7th intervalometer, or, obtain according to from described base station
Message estimate the length of described 7th intervalometer arranged in described base station.
44. subscriber equipmenies as claimed in claim 43, it is characterised in that the length of described 4th intervalometer
Less than or equal to described 6th intervalometer, described second arranges module is setting before described 4th intervalometer,
Described intervalometer receiver module obtains described 6th intervalometer from described base station, or described second arranges module
Before setting described 4th intervalometer, the message by obtaining from described base station estimates described 6th intervalometer
Length;
The length of described 5th intervalometer is less than or equal to described 7th intervalometer, and described second arranges module
Before setting described 5th intervalometer, it is fixed that described intervalometer receiver module obtains the described 7th from described base station
Time device, or described second arrange module and setting before described 5th intervalometer by obtaining from described base station
Message estimate described 7th intervalometer length.
45. as described in claim 44 subscriber equipment, it is characterised in that when described first obtain submodule from
When described base station obtains described four intervalometer, the radio resource control message that sends from described base station,
Physical layer message, data-link layer message, cell switching information obtain described 4th intervalometer in any one;
When described second acquisition submodule obtains described five intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 5th intervalometer;
When described first acquisition submodule obtains described six intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 6th intervalometer;
When described second acquisition submodule obtains described seven intervalometer from described base station, send out from described base station
In the radio resource control message sent, physical layer message, data-link layer message, cell switching information
Any one obtains described 7th intervalometer.
46. 1 kinds of signaling sending control systems, it is characterised in that include user as claimed in claim 25
Equipment and base station, the power overhead preference instruction that described base station sends for receiving described subscriber equipment, and lead to
Crossing RRM process is that described subscriber equipment carries out radio resource parameter configuration, and described power overhead is inclined
Good instruction includes the preference instruction reducing power overhead or increases the preference instruction of power overhead.
47. signaling sending control systems as claimed in claim 46, it is characterised in that described base station is also used
In sending in the 4th intervalometer, the 5th intervalometer, the 6th intervalometer, the 7th intervalometer to described subscriber equipment
At least one.
48. signaling sending control systems as claimed in claim 46, it is characterised in that
When described subscriber equipment includes default conditions and reduces power overhead state two states,
Described base station is that described subscriber equipment carries out radio resource parameter configuration by RRM process,
Comprising: when RRM connection establishment, described base station is that described user device configuration two overlaps non-company
Continuous property receives DRX parameter, and indicates described subscriber equipment to use when carrying out RRM and connecting
DRX parameter, wherein set of parameter is used for indicating described subscriber equipment to be in default conditions, and another set of parameter is used
It is in reduction power overhead state in indicating described subscriber equipment;Described base station connects according to different noncontinuities
Receive DRX parameter, for the two set physical layers that described user device configuration is corresponding;
Or,
Described base station is that described subscriber equipment carries out radio resource parameter configuration by RRM process,
Comprising: when RRM reconfiguration course is carried out, described base station is described user device configuration two
Set noncontinuity receives DRX parameter, and indicates described subscriber equipment to reconfigure carrying out RRM
The DRX parameter used after one-tenth, wherein set of parameter is used for indicating described subscriber equipment to be in default conditions, separately
Set of parameter is used for indicating described subscriber equipment to be in reduction power overhead state;Described base station is according to different
Noncontinuity receives DRX parameter, for the two set physical layers that described user device configuration is corresponding.
49. 1 kinds of subscriber equipmenies, it is characterised in that including: input equipment, output device and processor,
Wherein, described processor execution following steps:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, it is judged that be used for limiting fall
The first timer of the transmission of the preference instruction of low-power expense is the most overtime, if it is judged that be yes, then
Described output device is indicated to send the preference instruction reducing power overhead to base station;
When the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, indicate described output dress
Put and send the preference instruction increasing power overhead to described base station, or, it is judged that it is used for limiting increase power and opens
The second timer of the transmission of the preference instruction of pin is the most overtime, if it is judged that be yes, indicates described defeated
Go out device and send the preference instruction increasing power overhead to described base station.
50. subscriber equipmenies as claimed in claim 49, it is characterised in that described subscriber equipment includes acquiescence
State and reduction power overhead state two states, the most described processor also executes the following steps:
When the preference of power overhead is changed into and need to reduce power overhead by subscriber equipment, perform to judge that user sets
Standby the first judgement whether being in default conditions, if the first judged result judged is yes, then performs judgement
For limiting the second judgement that the first timer of the transmission of the preference instruction reducing power overhead is the most overtime,
If the second judged result judged is yes, indicates described output device to send to base station and reduce power overhead
Preference indicates;
And when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, it is judged that Yong Hushe
Standby whether being in reduces power overhead state, if it is judged that be yes, indicates described output device to described
Base station sends the preference instruction increasing power overhead;
Or, when the preference of power overhead is changed into and need to increase power overhead by subscriber equipment, perform user
Whether equipment is in the 3rd judgement reducing power overhead state, if the 3rd judged result judged is yes,
The 4th that the second timer of the transmission performing the preference instruction for limiting increase power overhead is the most overtime sentences
Disconnected, if the 4th judged result judged is yes, indicating described output device to send to described base station increases merit
The preference instruction of rate expense.
51. subscriber equipmenies as claimed in claim 49, it is characterised in that
Described processor judges that the determination methods of described subscriber equipment state in which includes:
Described processor judges oneself state in which according to the parameter length specified, when described parameter length accords with
When closing the length met needed for default conditions, then judge that described subscriber equipment is in default conditions;When described ginseng
Number length meets length satisfied needed for reducing power overhead state, then judge that described subscriber equipment is in reduction
Power overhead state;
Or, described processor judges that the determination methods of described subscriber equipment state in which includes:
Described processor receives DRX parameter according to the noncontinuity that described base station is described user device configuration and sentences
Disconnected described subscriber equipment state in which, when described subscriber equipment is currently in use corresponding discontinuous of default conditions
Property receive DRX parameter time, then judge that described subscriber equipment is in default conditions;When described subscriber equipment
When the noncontinuity using reduction power overhead state corresponding receives DRX parameter, then judge described subscriber equipment
It is in reduction power overhead state.
52. subscriber equipmenies as according to any one of claim 49-51, it is characterised in that described processor
Also execute the following steps:
When judging that described first timer is the most overtime, notify that described subscriber equipment is interior for sending reduction power
The protocol layer notice of the preference instruction of expense knows that the preference of the power overhead of subscriber equipment occurs the agreement changed
The transmission of the preference instruction that layer reduces power overhead is limited;
Or,
When judging that described first timer is the most overtime, notify that described subscriber equipment does not perform any operation.
53. subscriber equipmenies as according to any one of claim 49-51, it is characterised in that described processor
Also execute the following steps:
When judging that described second timer is the most overtime, notify that described subscriber equipment is interior for sending increase power
The protocol layer notice of the preference instruction of expense knows that the preference of the power overhead of subscriber equipment occurs the agreement changed
The transmission of the preference instruction that layer increases power overhead is limited;
Or,
When judging that described second timer is the most overtime, notifying user equipment does not perform any operation.
54. subscriber equipmenies as according to any one of claim 49-51, it is characterised in that described to base station
Send and reduce the preference instruction of power overhead or the described preference instruction sending increase power overhead to described base station
Afterwards, described processor also executes the following steps:
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
With described second timer.
55. subscriber equipmenies as claimed in claim 54, it is characterised in that described processor also performs as follows
Step:
When the first timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to reducing power overhead to the preference of power overhead,
Indicate described output device can not send the preference instruction reducing power overhead to described base station, until described the
One timer expiry;
When the second timer in described subscriber equipment has not timed out, receive the wireless money that described base station sends
Source dates configuration result, and when subscriber equipment is again transformed into need to increasing power overhead to the preference of power overhead,
Indicate described output device can not send the preference instruction increasing power overhead to described base station, until described the
Two timer expiries.
56. subscriber equipmenies as claimed in claim 54, it is characterised in that described processor also performs as follows
Step:
When the described first timer in described subscriber equipment has timed out, but do not receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into reducing power by subscriber equipment
During expense, indicate described output device can not send the preference instruction reducing power overhead to described base station, directly
To receiving the radio resource parameter configuration result that described base station sends;
When the described second timer in described subscriber equipment has timed out, but do not receive what described base station sent
Radio resource parameter configuration result, and the preference of power overhead is again transformed into increasing power by subscriber equipment
During expense, indicate described output device can not send the preference instruction increasing power overhead to described base station, directly
To receiving the radio resource parameter configuration result that described base station sends.
57. subscriber equipmenies as according to any one of claim 49-51, it is characterised in that described processor
Also execute the following steps:
Receive the radio resource parameter configuration result that described base station sends;
When described subscriber equipment includes first timer, start described first timer;
When described subscriber equipment includes first timer and second timer, start described first timer
With described second timer.
58. subscriber equipmenies as claimed in claim 49, it is characterised in that the length of described first timer
Length more than or equal to described second timer.
59. subscriber equipmenies as claimed in claim 54, it is characterised in that described processor also performs as follows
Step:
The length of described first timer, the length of described second timer are set in advance in described subscriber equipment
Degree;
Or, receive and connected in RRM connection establishment process or RRM by described base station
Reconfiguration course is assigned to the length of the described first timer of described subscriber equipment, described second timer
Length.
60. subscriber equipmenies as claimed in claim 49, it is characterised in that described processor also performs as follows
Step: obtain the 4th intervalometer;
Then estimate that described subscriber equipment is in sky when the 4th timer expiry or the described subscriber equipment of described acquisition
When the time of not busy state is more than or equal to the length of the 4th intervalometer of described acquisition, described processor determines described
The preference of power overhead is changed into by subscriber equipment need to reduce power overhead;
Obtain the 5th intervalometer;
Then estimate at described subscriber equipment when the 5th timer expiry or the described subscriber equipment of described subscriber equipment
In the time of idle condition less than or equal to the length of the 5th intervalometer of described subscriber equipment time, described processor
Determine that the preference of power overhead is changed into by described subscriber equipment and need to increase power overhead.
61. subscriber equipmenies as claimed in claim 60, it is characterised in that it is fixed that described processor obtains the 4th
Time device obtain the 4th intervalometer specifically include:
Described processor sets described 4th intervalometer according to the 6th intervalometer;Or, described processor is from described
Base station obtains described 4th intervalometer, and described 6th intervalometer is the intervalometer arranged in described base station;
Described processor obtains the 5th intervalometer and specifically includes:
Described processor sets described 5th intervalometer according to the 7th intervalometer;Or, described processor is from described
Base station obtains described 5th intervalometer, and described 7th intervalometer is the intervalometer arranged in described base station.
62. subscriber equipmenies as claimed in claim 61, it is characterised in that the length of described 4th intervalometer
Less than or equal to the length of described 6th intervalometer, described processor sets described the according to the 6th intervalometer
Before four intervalometers, also execute the following steps:
Described 6th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 6th intervalometer arranged in described base station;
The length of described 5th intervalometer is less than or equal to the length of described 7th intervalometer, described processor
Before setting described 5th intervalometer according to the 7th intervalometer, also execute the following steps:
Described 7th intervalometer is obtained from described base station, or, according to the message estimation obtained from described base station
The length of described 7th intervalometer arranged in described base station.
63. subscriber equipmenies as claimed in claim 62, it is characterised in that
When described processor obtains described four intervalometer from described base station, described 4th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one;
When described processor obtains described five intervalometer from described base station, described 5th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one;
When described processor obtains described six intervalometer from described base station, described 6th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one;
When described processor obtains described seven intervalometer from described base station, described 7th intervalometer carries
The radio resource control message of described base station transmission, physical layer message, data-link layer message, community
In switching message in any one.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610677176.XA CN106413054A (en) | 2012-08-06 | 2013-04-03 | Signal sending method and related device |
CN201380002697.XA CN103959864B (en) | 2012-08-06 | 2013-04-03 | Signaling method and relevant device |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNPCT/CN2012/079743 | 2012-08-06 | ||
PCT/CN2012/079743 WO2014022962A1 (en) | 2012-08-06 | 2012-08-06 | Signalling sending method and related device |
CN201380002697.XA CN103959864B (en) | 2012-08-06 | 2013-04-03 | Signaling method and relevant device |
PCT/CN2013/073760 WO2014023106A1 (en) | 2012-08-06 | 2013-04-03 | Signaling transmission method, and related device |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610677176.XA Division CN106413054A (en) | 2012-08-06 | 2013-04-03 | Signal sending method and related device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103959864A CN103959864A (en) | 2014-07-30 |
CN103959864B true CN103959864B (en) | 2016-09-21 |
Family
ID=51334893
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201380002697.XA Active CN103959864B (en) | 2012-08-06 | 2013-04-03 | Signaling method and relevant device |
CN201610677176.XA Withdrawn CN106413054A (en) | 2012-08-06 | 2013-04-03 | Signal sending method and related device |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610677176.XA Withdrawn CN106413054A (en) | 2012-08-06 | 2013-04-03 | Signal sending method and related device |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN103959864B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108781415A (en) * | 2018-05-31 | 2018-11-09 | 北京小米移动软件有限公司 | Adjust the method and device of DRX relevant parameters |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110891302B (en) * | 2018-09-11 | 2021-10-01 | 华为技术有限公司 | Energy-saving method and device for terminal |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1642033A (en) * | 2004-01-01 | 2005-07-20 | 华为技术有限公司 | Forward power control method for CDMA system |
CN102448158A (en) * | 2010-10-11 | 2012-05-09 | 工业和信息化部电信传输研究所 | Mobile terminal random access method of TD-SCDMA system |
CN102547947A (en) * | 2012-02-29 | 2012-07-04 | 电子科技大学 | Self-adaptive home base station power control method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8818321B2 (en) * | 2006-06-20 | 2014-08-26 | Nokia Corporation | Method and system for providing reply-controlled discontinuous reception |
-
2013
- 2013-04-03 CN CN201380002697.XA patent/CN103959864B/en active Active
- 2013-04-03 CN CN201610677176.XA patent/CN106413054A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1642033A (en) * | 2004-01-01 | 2005-07-20 | 华为技术有限公司 | Forward power control method for CDMA system |
CN102448158A (en) * | 2010-10-11 | 2012-05-09 | 工业和信息化部电信传输研究所 | Mobile terminal random access method of TD-SCDMA system |
CN102547947A (en) * | 2012-02-29 | 2012-07-04 | 电子科技大学 | Self-adaptive home base station power control method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108781415A (en) * | 2018-05-31 | 2018-11-09 | 北京小米移动软件有限公司 | Adjust the method and device of DRX relevant parameters |
WO2019227390A1 (en) * | 2018-05-31 | 2019-12-05 | 北京小米移动软件有限公司 | Method and device for adjusting drx-related parameters |
Also Published As
Publication number | Publication date |
---|---|
CN103959864A (en) | 2014-07-30 |
CN106413054A (en) | 2017-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3454623B1 (en) | Rrc state control method and device | |
CN104796957B (en) | Multi-card multi-standby mobile terminal and its Subscriber Identity Module switching method and apparatus | |
CN113766559A (en) | Network mode control method, terminal and storage medium | |
RU2638729C2 (en) | Power supply mode switching initiated by terminal | |
CN110300461A (en) | A kind of method for connecting network, device and terminal | |
CN105516455A (en) | User equipment, wireless communication method, network node, and access terminal | |
US10117177B2 (en) | Method and related equipment for sending signaling | |
CN110213812A (en) | Energy-saving control method, device, the network equipment and storage medium | |
CN105306681A (en) | Management method and device supporting multiple SIM cards to share RF processor | |
CN103428773A (en) | Method for setting discontinuous reception mode parameter | |
CN103391600A (en) | Method, user equipment and device for configuring parameters with discontinuous reception function | |
CN103581884A (en) | Method, UE and network side equipment for configuring auxiliary information | |
WO2020098730A1 (en) | User equipment migration method, centralized unit, distribution unit and system | |
CN103959864B (en) | Signaling method and relevant device | |
CN112702768A (en) | Dual-connection switching method, device, base station and terminal | |
CN102149155A (en) | Method and device for dual-mode dual-standby terminal to implement communications | |
CN104704904B (en) | A kind of method and user equipment of selection access network | |
EP2934035A1 (en) | Anr task execution method, system and anr user equipment management method, apparatus | |
CN111294899B (en) | Inactivity timer control method and device for DRX (discontinuous reception), storage medium, terminal and base station | |
CN110022587A (en) | A kind of load bearing management method and bearer management device | |
CN110650538B (en) | Resource, time slot format configuration and data transmission methods, devices, equipment and media | |
CN108810943B (en) | Configuration method, user equipment and network side equipment | |
CN108668319A (en) | Data transmission method, device and terminal | |
CN100450203C (en) | Method for preventing IU interface signalling connection hanging | |
CN114375045A (en) | Resource pool switching method and device, terminal and network side equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |