CN103956677B - 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof - Google Patents

10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof Download PDF

Info

Publication number
CN103956677B
CN103956677B CN201410143707.8A CN201410143707A CN103956677B CN 103956677 B CN103956677 B CN 103956677B CN 201410143707 A CN201410143707 A CN 201410143707A CN 103956677 B CN103956677 B CN 103956677B
Authority
CN
China
Prior art keywords
electric pole
power failure
insulator
wire
adapter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410143707.8A
Other languages
Chinese (zh)
Other versions
CN103956677A (en
Inventor
周涛
杨冰
宗克俭
邱远民
王先明
张洪民
孙伟杰
焦裕岩
魏雪敏
黄婷
薛连亮
见青
董辰铮
许艺飞
刘程
朱晓霞
孟硕
张英
鹿纪奎
潘富杰
谢志平
孙宇斌
孙丰进
隋中东
王勇
孙凯
张阳
刘立阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410143707.8A priority Critical patent/CN103956677B/en
Publication of CN103956677A publication Critical patent/CN103956677A/en
Application granted granted Critical
Publication of CN103956677B publication Critical patent/CN103956677B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof, step is as follows: have a power failure the working range needing interruption maintenance to transform;Disconnect chopped-off head the first bow line of power failure range;It is connected with the first bow line of disconnection with the cable got ready in advance, recovers power transmission to the client in power failure range;Set up base shaft on the strain insulator electric pole side disconnected, and fix with strain insulator electric pole electric pole channel-section steel, channel-section steel is installed supports insulative;Carry out normal track remodelling maintenance, and the lead-in wire of base shaft is reserved sufficiently long length;Have a power failure after having worked, disconnect the connection of cable and old circuit, lead-in wire and the former connection of new transformation circuit, and fixed by supports insulative;Power transmission.Power off time of the present invention is short, improves power supply reliability, and line maintenance retrofit work is carried out in the case of not affecting customer electricity, is not limited by the time, can carry out for continuous many days.

Description

10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof
Technical field
The maintenance of power generation of the present invention-operation of power networks maintenance-distribution network, is specifically related to a kind of 10KV circuit and has a power failure in short-term drainage thread Working system and special gate electric pole thereof.
Background technology
In the past, the disconnecting link maintenance work of equipment was carried out regularly cycled recondition by China's power system always, expired required.Week The maintenance of phase property ensure that the healthy operation of equipment and system, produces electric power safety and serves huge effect.But for many years in reality In the running of border, disconnecting link maintenance in a year is once.Cycled recondition creates many problems frequently, and its negative effect brought is remote Category far beyond power system self.
The repair method power off time of 10kV circuit is long at present, and power supply reliability is low.The impact of power failure method time, it is impossible to enter Row work in continuous many days.Existing livewire work method headgroup bar charged one side on one side is not charged, and staff steps on bar operation and there is peace Full hidden danger.
Summary of the invention
It is an object of the invention to provide a kind of 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof, equipment is tied Structure is simple, and power off time is short, improves power supply reliability, eliminates safe hidden trouble, and improves comprehensive benefit, line maintenance retrofit work Carry out in the case of not affecting customer electricity, do not limited by the time, it is possible within continuous many days, carry out.
10KV circuit of the present invention power failure drainage thread working system in short-term, specifically comprises the following steps that
(1) working range needing interruption maintenance to transform is had a power failure;
(2) chopped-off head the first bow line of power failure range is disconnected;
(3) it is connected with the first bow line of disconnection with the cable got ready in advance, recovers power transmission to the client in power failure range;
(4) set up base shaft on the strain insulator electric pole side disconnected, and fix, at channel-section steel with strain insulator electric pole electric pole channel-section steel Upper installation supports insulative;
(5) carry out normal track remodelling maintenance, and the lead-in wire of base shaft is reserved sufficiently long length;
(6) have a power failure after having worked, disconnect the connection of cable and old circuit, lead-in wire and the former connection of new transformation circuit, And fixed by supports insulative;
(7) power transmission.
10KV circuit of the present invention power failure drainage thread working system special gate electric pole in short-term, including strain insulator electric pole electric pole, Electric pole top arranges the first anchor ear, and the first anchor ear arranges hook, and the first anchor ear side arranges the first adapter, the first adapter Connecting the first insulator, the first insulator is connected with the first wire and the first bow line respectively;Strain insulator electric pole side arranges base shaft, Arranging the second anchor ear side in base shaft and arrange the second adapter, the second adapter connects the second insulator, the second insulator respectively with Second wire and the second bow line connect;Strain insulator electric pole electric pole is connected by channel-section steel is fixing with base shaft, channel-section steel arranges support absolutely Edge;All bracing wire is set by hook on first anchor ear and the second anchor ear.
First insulator is connected with the first wire and the first bow line respectively by the 3rd adapter.
Second insulator is connected with the second wire and the second bow line respectively by the 4th adapter.
Compared with prior art, the method have the advantages that
10KV circuit of the present invention power failure drainage thread working system in short-term and strain insulator electric pole thereof, power off time is short, it is only necessary to twice short Time has a power failure, and improves power supply reliability, solves staff and steps on the problem of band pole operation, eliminates safe hidden trouble, and improves comprehensive Benefit.Line maintenance retrofit work can be carried out in the case of not affecting customer electricity, is not limited by the time, can be continuous Within many days, carry out.
Accompanying drawing explanation
The structural representation of Fig. 1,10KV circuit power failure drainage thread working system special gate electric pole in short-term;
In figure, the 1, first wire, the 2, the 3rd adapter, the 3, first insulator, the 4, first adapter, 5, stationary fixture, 6, hook, the 7, second adapter, the 8, second insulator, the 9, the 4th adapter, the 10, second wire, the 11, second bow Line, 12, channel-section steel, 13, electric pole, 14, bracing wire, the 15, the 5th adapter, the 16, first bow line, 17, supports insulative, 18, the second anchor ear, 19, base shaft.
Detailed description of the invention
Below in conjunction with embodiment, the present invention will be further described.
Embodiment
The present embodiment one 10KV circuit power failure drainage thread working system in short-term, specifically comprises the following steps that
(8) working range needing interruption maintenance to transform is had a power failure;
(9) chopped-off head the first bow line 16 of power failure range is disconnected;
(10) it is connected with the first bow line 16 of disconnection with the cable got ready in advance, recovers power transmission to the client in power failure range;
(11) set up base shaft 19 on the strain insulator electric pole side disconnected, and fix with strain insulator electric pole electric pole 13 channel-section steel 12, Channel-section steel 12 is installed supports insulative 17;
(12) normal track remodelling maintenance is carried out;
(13) have a power failure after having worked, disconnect the connection of cable and old circuit, lead-in wire and the former connection of new transformation circuit, And fixed by supports insulative 17;
(14) power transmission.
10KV circuit power failure drainage thread working system special gate electric pole in short-term, including strain insulator electric pole electric pole 13, electric pole 13 pushes up End arranges the first anchor ear 5, and the first anchor ear 5 arranges hook 6, and the first anchor ear 5 side arranges the first adapter 4, and first connects Device 4 connects the first insulator 3, and the first insulator 3 is connected with the first wire 1 and the first bow line 16 respectively;Strain insulator electric pole Side arranges base shaft 19, base shaft 19 arranges the second anchor ear 18 side and arranges the second adapter 7, and the second adapter 7 connects Two insulators 8, the second insulator 8 is connected with the second wire 10 and the second bow line 11 respectively;Strain insulator electric pole electric pole 13 with Base shaft 19 connects by channel-section steel 12 is fixing, and channel-section steel 12 arranges supports insulative 17;On first anchor ear 5 and the second anchor ear 18 All bracing wire 14 is set by hook.
First insulator 3 is connected with the first wire 1 and the first bow line 16 respectively by the 3rd adapter 2.
Second insulator 8 is connected with the second wire 10 and the second bow line 11 respectively by the 4th adapter 9.

Claims (2)

1. a 10KV circuit power failure drainage thread working system in short-term, it is characterised in that specifically comprise the following steps that
(1) working range needing interruption maintenance to transform is had a power failure;
(2) chopped-off head the first bow line (16) of power failure range is disconnected;
(3) it is connected with the first bow line (16) of disconnection with the cable got ready in advance, recovers power transmission to the client in power failure range;
(4) set up base shaft (19) on the strain insulator electric pole side disconnected, and fix with strain insulator electric pole electric pole (13) channel-section steel (12), at channel-section steel (12) upper installation supports insulative (17);
(5) normal track remodelling maintenance is carried out;
(6) have a power failure after having worked, disconnect the connection of cable and old circuit, lead-in wire and the former connection of new transformation circuit, and fixed by supports insulative (17);
(7) power transmission.
2. the power failure drainage thread working system special gate electric pole in short-term of the 10KV circuit described in a claim 1, including strain insulator electric pole electric pole (13), it is characterized in that, electric pole (13) top arranges the first anchor ear (5), hook (6) is set on the first anchor ear (5), first anchor ear (5) side arranges the first adapter (4), and the first adapter (4) connects the first insulator (3), and the first insulator (3) is connected with the first wire (1) and the first bow line (16) respectively;Strain insulator electric pole side arranges base shaft (19), second anchor ear (18) side is set in base shaft (19) the second adapter (7) is set, second adapter (7) connects the second insulator (8), and the second insulator (8) is connected with the second wire (10) and the second bow line (11) respectively;Strain insulator electric pole electric pole (13) is connected by channel-section steel (12) is fixing with base shaft (19), and channel-section steel (12) arranges supports insulative (17);All bracing wire (14) is set by hook on first anchor ear (5) and the second anchor ear (18);
First insulator (3) is connected with the first wire (1) and the first bow line (16) respectively by the 3rd adapter (2);
Second insulator (8) is connected with the second wire (10) and the second bow line (11) respectively by the 4th adapter (9).
CN201410143707.8A 2014-04-10 2014-04-10 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof Active CN103956677B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410143707.8A CN103956677B (en) 2014-04-10 2014-04-10 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410143707.8A CN103956677B (en) 2014-04-10 2014-04-10 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof

Publications (2)

Publication Number Publication Date
CN103956677A CN103956677A (en) 2014-07-30
CN103956677B true CN103956677B (en) 2016-09-28

Family

ID=51333925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410143707.8A Active CN103956677B (en) 2014-04-10 2014-04-10 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof

Country Status (1)

Country Link
CN (1) CN103956677B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000333331A (en) * 1999-05-24 2000-11-30 Burest Kogyo Kenkyusho Co Ltd Support for cable-lead wire
CN201408942Y (en) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 Flow inducing connecting device for 10 kV lines
CN101888073A (en) * 2009-05-15 2010-11-17 上海市南电力工程有限公司 On-load opened and segmented operating method of 10kV line
CN203891535U (en) * 2014-04-10 2014-10-22 国家电网公司 Special-purpose door type electric pole for jumper operation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000333331A (en) * 1999-05-24 2000-11-30 Burest Kogyo Kenkyusho Co Ltd Support for cable-lead wire
CN201408942Y (en) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 Flow inducing connecting device for 10 kV lines
CN101888073A (en) * 2009-05-15 2010-11-17 上海市南电力工程有限公司 On-load opened and segmented operating method of 10kV line
CN203891535U (en) * 2014-04-10 2014-10-22 国家电网公司 Special-purpose door type electric pole for jumper operation

Also Published As

Publication number Publication date
CN103956677A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN203481774U (en) Cable joint
CN103618245A (en) Electrified strain opening operation method on distribution network
CN203277304U (en) Built-in high-voltage fuse sleeve installation apparatus
CN103956677B (en) 10KV circuit power failure drainage thread working system in short-term and special gate electric pole thereof
CN210222122U (en) Ground wire device for circuit insulation test
CN202256512U (en) Multifunctional phase check instrument
CN203300819U (en) Insulating busbar bridge protecting grounding device
CN105186367A (en) Automatic device for overhead power distribution line live cutting and splicing
CN203891535U (en) Special-purpose door type electric pole for jumper operation
CN202772544U (en) T-type three-phase high-tension no-partial-discharge cable joint
CN203289003U (en) Multifunctional insulating operating lever of transformer station
CN203166397U (en) Circuit structure for eliminating induction voltage
CN208637929U (en) A kind of generator car Quick access device for distribution network overhead line
CN208862536U (en) Fault isolation device under drawing for 10kV cable
CN104269231A (en) Insulator with current monitoring function
CN204289965U (en) The multiplex earth terminal of earth connection
CN204835434U (en) Distribution network overhead line interval for use
CN202651391U (en) Grounding wire connection device
CN203275740U (en) Electric power single rod optical cable reservation frame
CN202758768U (en) Vaseline adding device for contact of isolation switch
CN103818833B (en) A kind of for the movable power transmitting device of high-potting bus
CN202189976U (en) Novel wire inlet device of reactor
CN202977750U (en) Lead-wire earth electrode for power transformation device
CN201946936U (en) Insulating rod type grounding wire of power transmission line
CN201415627Y (en) Rigid contact line ground clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
CB03 Change of inventor or designer information

Inventor after: Zhou Tao

Inventor after: Huang Ting

Inventor after: Xue Lianliang

Inventor after: Jian Qing

Inventor after: Dong Chenzheng

Inventor after: Xu Yifei

Inventor after: Liu Cheng

Inventor after: Zhu Xiaoxia

Inventor after: Meng Shuo

Inventor after: Zhang Ying

Inventor after: Lu Jikui

Inventor after: Yang Bing

Inventor after: Pan Fujie

Inventor after: Xie Zhiping

Inventor after: Sun Yubin

Inventor after: Sun Fengjin

Inventor after: Sui Zhongdong

Inventor after: Wang Yong

Inventor after: Sun Kai

Inventor after: Zhang Yang

Inventor after: Liu Liyang

Inventor after: Zong Kejian

Inventor after: Qiu Yuanmin

Inventor after: Wang Xianming

Inventor after: Zhang Hongmin

Inventor after: Sun Weijie

Inventor after: Jiao Yuyan

Inventor after: Wei Xuemin

Inventor before: Zhou Tao

Inventor before: Pan Fujie

Inventor before: Sun Yubin

Inventor before: Xie Zhiping

Inventor before: Wang Yong

Inventor before: Sui Zhongdong

Inventor before: Sun Fengjin

COR Change of bibliographic data
GR01 Patent grant