Prior art keywords
grouting
soft rock
pressure
test specimen
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410205464.6A
Other languages
Chinese (zh)
Other versions
CN103954490B (en
Inventor
顾士坦
黄瑞峰
张瑞
李文帅
冯玉震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201410205464.6A priority Critical patent/CN103954490B/en
Publication of CN103954490A publication Critical patent/CN103954490A/en
Application granted granted Critical
Publication of CN103954490B publication Critical patent/CN103954490B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses an indoor simulation fabrication method and device of a soft rock grouting test piece for a mine and belongs to the geotechnical engineering field. The method comprises the following steps: firstly, machining a simulation fabrication device, wherein the simulation fabrication device comprises a test piece loading system, a slurry stirring system, a grouting system and a monitoring system; in a fabrication process, fixing fabricated soft rock test pieces in a loading oil cylinder, then simulating a field grouting environment, starting grouting, stopping grouting when reaching a preset grouting pressure trial value and preset grouting time, taking out the soft rock grouting test pieces after initial setting, maintaining the soft rock grouting test pieces, respectively carrying out a mechanical experiment on all the maintained soft rock grouting test pieces, and carrying out analysis according to the amount of seepage, the water-ash ratio of slurry and the moisture content of the soft rock test pieces so as to obtain a moisture transformation rule in the grouting process; and finally, analyzing experimental results, and preferably selecting grouting parameters suitable for grouting of field construction so as to provide basis to the grouting of field construction in the future, wherein the grouting parameters include a matching relation between the type of slurry and a grouted medium, grouting pressure and grouting time.

Description

Mine soft rock slip casting specimen chamber internal mold is intended method for making and producing device
Technical field
The invention belongs to Geotechnical Engineering field, be specifically related to a kind of mine soft rock slip casting specimen chamber internal mold and intend method for making and producing device.
Background technology
In the fields such as mine, tunnel, side slope and Hydraulic and Hydro-Power Engineering, soft rock for its engineering stability impact significantly, is mainly manifested in: (1) soft rock mechanics intensity is lower, occurs that the possibility of the disaster such as large deformation and unstable failure is large; (2) soft rock is how containing karst water, and its aggressivity to supporting is stronger, affects engineering serviceable life.Practice shows, for soft rock mass, the supporting means such as general anchor, net, canopy, frame are difficult to effectively control its deformation failure, and on-the-spot anchor pole-slip casting (being called for short anchor note) reinforcement means that adopt carry out modification to soft rock more, strengthen thereby make to be noted rock mass mechanics character, deformation failure is alleviated.
Slip casting link when anchor note is the key of soft rock reinforcing engineering success or not, and in research grouting and reinforcing process, slurries Diffusion Law and infiltration water variation characteristic are the bases of analyzing grouting mechanism, and test specimen after slip casting is carried out to the prerequisite that mechanical test is research slip casting effect.At present, along with the progress of slip casting machinery, material and technique, slurry injection technique is developed rapidly, but grouting mechanism development but relatively lags behind, and can not scientificlly and effectively instruct slip casting practice, has caused the drawback of site operation by empirical estimating.
In order effectively to instruct slip casting practice, conventionally on-the-spot soft rock test specimen need to be taken to the indoor slip casting of carrying out, test specimen after slip casting is researched and analysed again, determine in slip casting process, slurries type with by matching relationship, grouting pressure and the slip casting time etc. of note medium, thereby provide foundation for later site operation slip casting.
China Patent Publication No. (ZL200720310235.6) discloses a kind of " high pressure slip-casting pilot model apparatus ", while utilizing this device slip casting, only can consider uniaxial compression and grouting pressure, can not consider confined pressure impact, and can not ensure that slurries evenly inject by note test specimen, cause the rock sample after slip casting to be difficult to simulate actual slip casting environment, cannot accurately determine on-the-spot grouting parameter.
For these reasons, be necessary to design a kind of method for making that considers confined pressure, axial compression, grouting pressure and chemosmotic soft rock slip casting test specimen.
Summary of the invention
In order scientificlly and effectively to instruct slip casting practice, determine grouting parameter, for site operation slip casting later provides foundation, the invention provides a kind of mine soft rock slip casting specimen chamber internal mold and intend method for making, the actual slip casting environment of the abundant simulated field of the method, produces the soft rock slip casting test specimen that is applicable to researching and analysing.
The present invention provides a kind of device of implementing the method simultaneously.
A kind of mine soft rock slip casting specimen chamber internal mold is intended method for making, it is characterized in that, key step is as follows:
The first step, processing test specimen producing device
This device is made up of test specimen loading system, slurry agitation system, filling system and monitoring system;
Described test specimen loading system comprises a base and four test frameworks that column is welded to form, test framework is provided with vertical for laying the load cylinder of soft rock test specimen, the base of test framework is provided with hydraulic jack, and load cylinder and hydraulic jack withstand on same axis; Bottom in load cylinder is provided with rigidity entity pallet, the bottom surface of rigidity entity pallet and hydraulic jack top contact; The top of load cylinder is provided with hydraulic loaded control device, and hydraulic loaded control device is connected with high-strength bolt with load cylinder;
Described slurry agitation system is in agitator, to be provided with paddle wheel, and paddle wheel is realized agitating function by manual rocking bar; Agitator top is provided with material inlet, and material inlet top is provided with material lid, and both are threaded connection;
Described filling system comprises high-pressure injection pump, the import of high-pressure injection pump is communicated with agitator, high-pressure slip-casting delivery side of pump connects high pressure resistant pipeline, high pressure resistant pipeline stretches into hydraulic loaded control device and is connected with Grouting Pipe, and the outer rim that high pressure resistant pipeline is connected with hydraulic loaded control device adopts flange airtight; Pressure duct is provided with tensimeter, surplus valve and high pressure valve;
Described monitoring system comprises that pressure transducer, infiltration water pipeline and infiltration water receive measuring apparatus, pressure transducer is connected with outside pressure signal receiving trap by data line, infiltration water pipeline contacts with the piston of load cylinder through load cylinder outer wall, makes infiltration water flow into infiltration water by infiltration water pipeline and receives in measuring apparatus;
Second step, makes soft rock test specimen
The soft rock of preparing test is made to soft rock test specimen by standard size, on soft rock test specimen, bore grouting hole, in grouting hole, insert Grouting Pipe, pressure transducer is pasted on soft rock test specimen, and connect upper data line;
The 3rd step, is fixed on soft rock test specimen on load cylinder
Open the connection between hydraulic loaded control device and load cylinder, soft rock test specimen is put into load cylinder and is accurately placed on the rigidity perviousness piston of load cylinder, rigidity packing ring is installed on soft rock test specimen, high pressure resistant pipeline is passed to flange and hydraulic loaded control device, and be connected firmly with Grouting Pipe;
The 4th step derives and connects flange by the data line of pressure transducer along the pressure duct of filling system from hydraulic loaded control device, then load cylinder and hydraulic loaded control device is connected firmly with high-strength bolt;
The 5th step, cut-in pressure sensor and pressure signal receiving trap;
The 6th step, returns to zero to tensimeter;
The 7th step, opens material lid, pours slip casting material and water into slurry agitation bucket, and rotation manual rocking bar, makes slurry agitation even, in whipping process, can close material lid;
The 8th step, open load cylinder, make oil evenly fill up the gap between soft rock test specimen and oil cylinder, driving hydraulic loaded control device and hydraulic jack is that soft rock test specimen loads, the confined pressure of simulated field and axial compression, in the time that the force value of pressure receiving trap reaches the trial value that need to press in analog, shut-down operation hydraulic loaded control device and hydraulic jack, confined pressure and the axial compression of soft rock test specimen are remained unchanged, simulate on-the-spot slip casting environment;
The 9th step, sets grouting pressure trial value and the slip casting time of a series of correspondences according to on-site experience;
The tenth step: select one group of corresponding grouting pressure trial value and slip casting time as setting test value, then close high pressure valve, open grouting pump, in the time that the pressure of grouting pressure table reaches setting test value, open high pressure valve, make high pressure slurries inject soft rock test specimen, in the time reaching slurry time setting test value, stop slip casting, after initial set, take out soft rock slip casting test specimen, carry out maintenance; In slip casting process, infiltration water receiving trap quantitatively receives the infiltration water producing in slip casting process, i.e. free water; In this process, must shake manual rocking bar always, even to ensure to enter the grout coordinate ratio of high-pressure injection pump;
The 11 step: according to the tenth one step process, produce the different grouting pressure trial values of many groups and the soft rock slip casting test specimen under the slip casting time, and carry out maintenance;
The 12 step: all groups of good soft rock slip casting test specimens of maintenance are carried out respectively to Experiments of Machanics, draw water transform rule in slip casting process according to amount of seepage, the analysis of when soft rock slip casting of slurry water ash test specimen water percentage; Finally experimental result analysis is optimized to the grouting parameter that is applicable to site operation slip casting, comprise slurries type and matching relationship, grouting pressure and the slip casting time of being noted medium.
In order to realize said method, the invention provides a kind of mine soft rock slip casting specimen chamber internal mold and intend producing device, it is characterized in that, this device is made up of test specimen loading system, slurry agitation system, filling system and monitoring system;
Described test specimen loading system comprises a base and four test frameworks that column is welded to form, test framework is provided with vertical for laying the load cylinder of soft rock test specimen, the base of test framework is provided with hydraulic jack, and load cylinder and hydraulic jack withstand on same axis; Bottom in load cylinder is provided with rigidity entity pallet, the bottom surface of rigidity entity pallet and hydraulic jack top contact; The top of load cylinder is provided with hydraulic loaded control device, and hydraulic loaded control device is connected with high-strength bolt with load cylinder;
Described slurry agitation system is in agitator, to be provided with paddle wheel, and paddle wheel is realized agitating function by manual rocking bar; Agitator top is provided with material inlet, and material inlet top is provided with material lid, and both are threaded connection;
Described filling system comprises high-pressure injection pump, the import of high-pressure injection pump is communicated with agitator, high-pressure slip-casting delivery side of pump connects high pressure resistant pipeline, high pressure resistant pipeline stretches into hydraulic loaded control device and is connected with Grouting Pipe, and the outer rim that high pressure resistant pipeline is connected with hydraulic loaded control device adopts flange airtight; Pressure duct is provided with tensimeter, surplus valve and high pressure valve;
Described monitoring system comprises that pressure transducer, infiltration water pipeline and infiltration water receive measuring apparatus, pressure transducer is connected with outside pressure signal receiving trap by data line, infiltration water pipeline contacts with the piston of load cylinder through load cylinder outer wall, makes infiltration water flow into infiltration water by infiltration water pipeline and receives in measuring apparatus.
Good effect of the present invention:
1, by the effect of load cylinder and hydraulic jack, soft rock test specimen is imposed to confined pressure and axial compression, three axle collar borders of simulation soft rock test specimen, filling system can fully ensure grouting pressure, it is evenly reliable that slurry agitation system can ensure that overall process enters the slurries of slip casting machine, thereby accurately simulated field construction environment, makes the soft rock slip casting test specimen of making more be close to on-the-spot reality, for site operation slip casting later provides foundation.
2, the monitoring system of setting of the present invention can ensure that the whole process of test normally carries out, and receives the infiltration water of measuring apparatus in can accurate-metering slip casting process by infiltration water, and then water transform rule in analysis slip casting process.
3, the present invention is applied widely, the on-the-spot slip casting surrouding rock stress data that only need provide, just can utilize the inventive method to produce the soft rock slip casting test specimen of simulated field construction environment, according to soft rock slip casting test specimen mechanical analysis result and then optimize and be applicable to on-the-spot best grouting parameter, for mine slip casting provides a kind of method of practical convenient.
Brief description of the drawings
Fig. 1 is apparatus of the present invention structural representations, there is shown the load condition of test specimen;
Fig. 2 is A-A directional profile figure of the present invention.
Wherein, 1, manual rocking bar; 2, agitator; 3, material inlet; 4, material lid; 5, pipeline; 6, high-pressure injection pump; 7, surplus valve; 8, pressure signal receiving trap; 9, high pressure resistant pipeline; 10, data line; 11, tensimeter; 12, high pressure valve; 13, flange; 14, hydraulic loaded control device; 15, rigidity packing ring; 16, soft rock test specimen; 17, column; 18, Grouting Pipe; 19, load cylinder support; 20, load cylinder; 21, gap; 22, infiltration water pipeline; 23, pressure transducer; 24, support; 25, infiltration water receives measuring apparatus; 26, hydraulic jack; 27, base; 28, rigidity entity pallet; 29, rigidity perviousness piston; 30, paddle wheel; 31, rolling bearing.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment, technical solution of the present invention is described further.
Mine soft rock slip casting specimen chamber internal mold of the present invention is as depicted in figs. 1 and 2 intended the use constitutional diagram of producing device, as can be seen from the figure: it is made up of test specimen loading system, slurry agitation system, filling system and monitoring system;
Described test specimen loading system comprises by base 27 and four test frameworks that column 17 is welded to form, test framework is provided with vertical load cylinder 20, load cylinder 20 is arranged on test framework by load cylinder support 19, the base 27 of test framework is provided with hydraulic jack 26, and load cylinder and hydraulic jack 26 are on same axis; Bottom in load cylinder 20 is provided with rigidity entity pallet 28, and the bottom surface of rigidity entity pallet 28 is connected with hydraulic jack 26; The top of load cylinder 20 is provided with hydraulic loaded control device 14, and hydraulic loaded control device 14 is connected with load cylinder 20 use high-strength bolts; In load cylinder 20, arrange soft rock test specimen 16; Soft rock test specimen 16 internal placement Grouting Pipe 18, oil removal membrane closure is used on soft rock test specimen 16 surfaces, in the gap 21 of soft rock test specimen 16 and load cylinder 20, is full of hydraulic oil, to realize, the confined pressure of soft rock test specimen is loaded; Be provided with rigidity packing ring 15 at soft rock test specimen 16 end faces, bottom surface is provided with rigidity perviousness piston 29, all sides of rigidity packing ring 15 and rigidity perviousness piston 29 are provided with packoff.
Described slurry agitation system is in agitator 2, to be provided with to mix impeller 30, and paddle wheel 30 is realized agitating function by manual rocking bar 1, and manually rocking bar 1 is arranged on agitator 2 by rolling bearing 31; Agitator 2 tops are provided with material inlet 3, and material inlet 3 tops are provided with material lid 4, and both are threaded connection.
Described filling system comprises high-pressure injection pump 6, the import of high-pressure injection pump 6 is communicated with agitator 2 by pipeline 5, high-pressure injection pump 6 is connected with high pressure resistant management 9, high pressure resistant pipeline 9 is connected with hydraulic loaded control device 14 by flange 13 and stretches into hydraulic loaded control device 14, and then is communicated with the Grouting Pipe 18 of soft rock test specimen inside;
Described monitoring system is on high pressure resistant pipeline 9, to be provided with surplus valve 7, tensimeter 11 and high pressure valve 12, is pasted with pressure transducer 23 on soft rock test specimen, and pressure transducer 23 is connected with outside pressure signal receiving trap 8 by data line 10; Monitoring system also comprises infiltration water pipeline 22 and is arranged on the infiltration water reception measuring apparatus 25 on support 24, infiltration water pipeline 22 contacts with rigidity perviousness piston 29 through load cylinder 20 outer walls, makes infiltration water flow into infiltration water by this pipeline and receives in measuring apparatus 25.
The method of utilizing said apparatus to make soft rock slip casting test specimen at lab simulation is as follows:
The first step, makes soft rock test specimen 16 by the soft rock of preparing test by standard size, bores grouting hole on soft rock test specimen 16, according to testing requirements, pressure transducer 23 is pasted on soft rock test specimen 16, and connects upper data line 10;
Second step, open between hydraulic loaded control device 14 and load cylinder 20 and connect, put into successively rigidity entity pallet 28 and rigidity perviousness piston 29, connect infiltration water pipeline 22, soft rock test specimen 16 is put into load cylinder 20 and is accurately placed on rigidity perviousness piston 29, rigidity packing ring 15 is installed on soft rock test specimen 16;
The 3rd step, connect Grouting Pipe 18 and high pressure resistant pipeline 9, and both are connected firmly by flange 13 and hydraulic loaded control device 14, Grouting Pipe 18 is inserted in the grouting hole of soft rock test specimen 16, data line 10 is derived from hydraulic loaded control device 14 along grouting pipeline, then load cylinder 20 and hydraulic loaded control device 14 use high-strength bolts are connected firmly;
The 4th step, receives measuring apparatus 25 by infiltration water and is arranged on infiltration water receiving trap support 24, and infiltration water pipeline 22 is placed in to permeable reception measuring apparatus 25 inside;
The 5th step, is connected data line 10 with pressure transducer receiving trap 8;
The 6th step, is connected by connecting line 5 high-pressure injection pump 6 with slurry agitation bucket 2, grouting pump is connected with high pressure resistant pipeline 9, setting pressure table 11, surplus valve 7 and high pressure valve 12 on high pressure resistant pipeline, and tensimeter 11 is returned to zero;
The 7th step, opens material lid 4, pours slip casting material and water into slurry agitation bucket 2, and rotation manual rocking bar 1, makes slurry agitation even, in whipping process, can close material lid 4;
The 8th step, open load cylinder 20, make oil evenly fill up the gap 21 between soft rock test specimen 16 and oil cylinder, drive hydraulic loaded control device 14 and hydraulic jack 26 to load for soft rock test specimen 16, the confined pressure of simulated field and axial compression, in the time that the force value of pressure receiving trap 8 reaches the trial value that need to press in analog, shut-down operation hydraulic loaded control device 14 and hydraulic jack 26, confined pressure and the axial compression of soft rock test specimen 16 are remained unchanged, simulate on-the-spot slip casting environment;
The 9th step, sets grouting pressure trial value and the slip casting time of a series of correspondences according to on-site experience;
The tenth step, select one group of corresponding grouting pressure trial value and slip casting time as setting test value, then close high pressure valve 12, open grouting pump 6, in the time that the pressure of grouting pressure table 11 reaches setting test value, open high pressure valve 12, make high pressure slurries inject soft rock test specimen 16 by Grouting Pipe 18, when reaching the slip casting time when setting value, stop slip casting, after initial set, take out rock grouting test specimen 16, carry out maintenance; In slip casting process, infiltration water receiving trap 25 quantitatively receives the infiltration water producing in slip casting process, i.e. free water; In this process, must shake manual rocking bar 1 always, even to ensure to enter the grout coordinate ratio of high-pressure injection pump 6;
The 11 step, according to the tenth one step process, produces the different grouting pressure trial values of many groups and the rock grouting test specimen under the slip casting time, and carries out maintenance;
The 12 step, carries out respectively Experiments of Machanics by all groups of good rock grouting test specimens of maintenance, and according to amount of seepage, slurry water ash, when soft rock test specimen water percentage analysis draws water transform rule in slip casting process; Finally experimental result analysis is optimized to the grouting parameter that is applicable to site operation slip casting, comprise slurries type and matching relationship, grouting pressure and the slip casting time of being noted medium.

Claims (2)

1. mine soft rock slip casting specimen chamber internal mold is intended a method for making, it is characterized in that,
The first step, processing test specimen producing device
This device is made up of test specimen loading system, slurry agitation system, filling system and monitoring system;
Described test specimen loading system comprises a base and four test frameworks that column is welded to form, test framework is provided with vertical for laying the load cylinder of soft rock test specimen, the base of test framework is provided with hydraulic jack, and load cylinder and hydraulic jack withstand on same axis; Bottom in load cylinder is provided with rigidity entity pallet, the bottom surface of rigidity entity pallet and hydraulic jack top contact; The top of load cylinder is provided with hydraulic loaded control device, and hydraulic loaded control device is connected with high-strength bolt with load cylinder;
Described slurry agitation system is in agitator, to be provided with paddle wheel, and paddle wheel is realized agitating function by manual rocking bar; Agitator top is provided with material inlet, and material inlet top is provided with material lid, and both are threaded connection;
Described filling system comprises high-pressure injection pump, the import of high-pressure injection pump is communicated with agitator, high-pressure slip-casting delivery side of pump connects high pressure resistant pipeline, high pressure resistant pipeline stretches into hydraulic loaded control device and is connected with Grouting Pipe, and the outer rim that high pressure resistant pipeline is connected with hydraulic loaded control device adopts flange airtight; Pressure duct is provided with tensimeter, surplus valve and high pressure valve;
Described monitoring system comprises that pressure transducer, infiltration water pipeline and infiltration water receive measuring apparatus, pressure transducer is connected with outside pressure signal receiving trap by data line, infiltration water pipeline contacts with the piston of load cylinder through load cylinder outer wall, makes infiltration water flow into infiltration water by infiltration water pipeline and receives in measuring apparatus;
Second step, makes soft rock test specimen
The soft rock of preparing test is made to soft rock test specimen by standard size, on soft rock test specimen, bore grouting hole, in grouting hole, insert Grouting Pipe, pressure transducer is pasted on soft rock test specimen, and connect upper data line;
The 3rd step, is fixed on soft rock test specimen on load cylinder
Open the connection between hydraulic loaded control device and load cylinder, soft rock test specimen is put into load cylinder and is accurately placed on the rigidity perviousness piston of load cylinder, rigidity packing ring is installed on soft rock test specimen, high pressure resistant pipeline is passed to flange and hydraulic loaded control device, and be connected firmly with Grouting Pipe;
The 4th step derives and connects flange by the data line of pressure transducer along the pressure duct of filling system from hydraulic loaded control device, then load cylinder and hydraulic loaded control device is connected firmly with high-strength bolt;
The 5th step, cut-in pressure sensor and pressure signal receiving trap;
The 6th step, returns to zero to tensimeter;
The 7th step, opens material lid, pours slip casting material and water into slurry agitation bucket, and rotation manual rocking bar, makes slurry agitation even, in whipping process, can close material lid;
The 8th step, open load cylinder, make oil evenly fill up the gap between soft rock test specimen and oil cylinder, driving hydraulic loaded control device and hydraulic jack is that soft rock test specimen loads, the confined pressure of simulated field and axial compression, in the time that the force value of pressure receiving trap reaches the trial value that need to press in analog, shut-down operation hydraulic loaded control device and hydraulic jack, confined pressure and the axial compression of soft rock test specimen are remained unchanged, simulate on-the-spot slip casting environment;
The 9th step, sets grouting pressure trial value and the slip casting time of a series of correspondences according to on-site experience;
The tenth step: select one group of corresponding grouting pressure trial value and slip casting time as setting test value, then close high pressure valve, open grouting pump, in the time that the pressure of grouting pressure table reaches setting test value, open high pressure valve, make high pressure slurries inject soft rock test specimen, in the time reaching slurry time setting test value, stop slip casting, after initial set, take out soft rock slip casting test specimen, carry out maintenance; In slip casting process, infiltration water receiving trap quantitatively receives the infiltration water producing in slip casting process, i.e. free water; In this process, must shake manual rocking bar always, even to ensure to enter the grout coordinate ratio of high-pressure injection pump;
The 11 step: according to the tenth one step process, produce the different grouting pressure trial values of many groups and the soft rock slip casting test specimen under the slip casting time, and carry out maintenance;
The 12 step: all groups of good soft rock slip casting test specimens of maintenance are carried out respectively to Experiments of Machanics, draw water transform rule in slip casting process according to amount of seepage, the analysis of when soft rock slip casting of slurry water ash test specimen water percentage; Finally experimental result analysis is optimized to the grouting parameter that is applicable to site operation slip casting, comprise slurries type and matching relationship, grouting pressure and the slip casting time of being noted medium.
2. the mine soft rock slip casting specimen chamber internal mold that implements the claims method described in 1 is intended a producing device, it is characterized in that, this device is made up of test specimen loading system, slurry agitation system, filling system and monitoring system;
Described test specimen loading system comprises a base and four test frameworks that column is welded to form, test framework is provided with vertical for laying the load cylinder of soft rock test specimen, the base of test framework is provided with hydraulic jack, and load cylinder and hydraulic jack withstand on same axis; Bottom in load cylinder is provided with rigidity entity pallet, the bottom surface of rigidity entity pallet and hydraulic jack top contact; The top of load cylinder is provided with hydraulic loaded control device, and hydraulic loaded control device is connected with high-strength bolt with load cylinder;
Described slurry agitation system is in agitator, to be provided with paddle wheel, and paddle wheel is realized agitating function by manual rocking bar; Agitator top is provided with material inlet, and material inlet top is provided with material lid, and both are threaded connection;
Described filling system comprises high-pressure injection pump, the import of high-pressure injection pump is communicated with agitator, high-pressure slip-casting delivery side of pump connects high pressure resistant pipeline, high pressure resistant pipeline stretches into hydraulic loaded control device and is connected with Grouting Pipe, and the outer rim that high pressure resistant pipeline is connected with hydraulic loaded control device adopts flange airtight; Pressure duct is provided with tensimeter, surplus valve and high pressure valve;
Described monitoring system comprises that pressure transducer, infiltration water pipeline and infiltration water receive measuring apparatus, pressure transducer is connected with outside pressure signal receiving trap by data line, infiltration water pipeline contacts with the piston of load cylinder through load cylinder outer wall, makes infiltration water flow into infiltration water by infiltration water pipeline and receives in measuring apparatus.
CN201410205464.6A 2014-05-15 2014-05-15 Mine soft rock slip casting specimen chamber internal mold is intended preparation method and producing device Active CN103954490B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410205464.6A CN103954490B (en) 2014-05-15 2014-05-15 Mine soft rock slip casting specimen chamber internal mold is intended preparation method and producing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410205464.6A CN103954490B (en) 2014-05-15 2014-05-15 Mine soft rock slip casting specimen chamber internal mold is intended preparation method and producing device

Publications (2)

Publication Number Publication Date
CN103954490A true CN103954490A (en) 2014-07-30
CN103954490B CN103954490B (en) 2016-05-04

Family

ID=51331795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410205464.6A Active CN103954490B (en) 2014-05-15 2014-05-15 Mine soft rock slip casting specimen chamber internal mold is intended preparation method and producing device

Country Status (1)

Country Link
CN (1) CN103954490B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104215510A (en) * 2014-10-10 2014-12-17 山东科技大学 Simulation test device for drilling grouting
CN104297457A (en) * 2014-10-27 2015-01-21 山东科技大学 Three-dimensional grouting model test device and method
CN104330292A (en) * 2014-10-22 2015-02-04 山东大学 Device for automatically mixing similar materials and accurately pressing and molding test piece, and using method of device
CN105486835A (en) * 2015-05-22 2016-04-13 山东科技大学 Expansive-soft-rock roadway-surrounding-rock damage analog simulation test apparatus and test method
CN105973675A (en) * 2016-07-06 2016-09-28 山东科技大学 Controllable surface roughness artificial rock joint preparation device and application method thereof
CN106680467A (en) * 2017-02-13 2017-05-17 安徽理工大学 Simulation test device and simulation test method for high-pressure grouting of deep underground stratum
CN108020472A (en) * 2017-12-07 2018-05-11 武汉大学 Soft Rock Filling Materials deterioration test equipment and test method
CN108167153A (en) * 2017-12-30 2018-06-15 天津市九方煤矿机械制造有限公司 A kind of Manual grouting pump
CN108761040A (en) * 2018-06-04 2018-11-06 龙岩学院 Slurry filling imitation device with pressure and its application method in a kind of restricted clearance
CN109459315A (en) * 2018-11-07 2019-03-12 苏州恒信建设技术开发检测有限公司 Electric-liquid type pressure test machine
CN109540734A (en) * 2019-01-09 2019-03-29 重庆工业职业技术学院 Coal seam with gas High Pressure Absorption/the test device for desorption and method of controllable moisture
CN113049448A (en) * 2021-03-04 2021-06-29 太原理工大学 Organic grouting material diffusion test device and method based on transparent rock mass
CN113533693A (en) * 2021-07-19 2021-10-22 核工业井巷建设集团有限公司 Thixotropic slurry rock-carrying capacity simulation test platform
CN114046821A (en) * 2021-11-10 2022-02-15 山东高速股份有限公司 Prestressed beam grouting monitoring device and monitoring process
CN114659955A (en) * 2022-02-25 2022-06-24 西南交通大学 Micro-power grouting test device and using method thereof
CN117388440A (en) * 2023-10-23 2024-01-12 中国矿业大学 Device and method for grouting process test and effect detection between double-layer well walls

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201130176Y (en) * 2007-12-05 2008-10-08 郭密文 High pressure slip-casting pilot model apparatus
CN201716221U (en) * 2010-05-18 2011-01-19 中国矿业大学 Grouting sample preparation device
CN102419303A (en) * 2011-08-15 2012-04-18 山东科技大学 Crack grouting visualization tester under complex conditions
US20120193092A1 (en) * 2011-01-31 2012-08-02 Baker Hughes Incorporated Apparatus and methods for tracking the location of fracturing fluid in a subterranean formation
CN102680647A (en) * 2012-04-20 2012-09-19 天地科技股份有限公司 Coal-rock mass grouting reinforcement test bed and test method
CN103267722A (en) * 2013-05-07 2013-08-28 中国矿业大学 Pressure bearing permeation grouting strengthening test apparatus and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201130176Y (en) * 2007-12-05 2008-10-08 郭密文 High pressure slip-casting pilot model apparatus
CN201716221U (en) * 2010-05-18 2011-01-19 中国矿业大学 Grouting sample preparation device
US20120193092A1 (en) * 2011-01-31 2012-08-02 Baker Hughes Incorporated Apparatus and methods for tracking the location of fracturing fluid in a subterranean formation
CN102419303A (en) * 2011-08-15 2012-04-18 山东科技大学 Crack grouting visualization tester under complex conditions
CN102680647A (en) * 2012-04-20 2012-09-19 天地科技股份有限公司 Coal-rock mass grouting reinforcement test bed and test method
CN103267722A (en) * 2013-05-07 2013-08-28 中国矿业大学 Pressure bearing permeation grouting strengthening test apparatus and method

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104215510A (en) * 2014-10-10 2014-12-17 山东科技大学 Simulation test device for drilling grouting
CN104330292A (en) * 2014-10-22 2015-02-04 山东大学 Device for automatically mixing similar materials and accurately pressing and molding test piece, and using method of device
CN104297457A (en) * 2014-10-27 2015-01-21 山东科技大学 Three-dimensional grouting model test device and method
CN105486835A (en) * 2015-05-22 2016-04-13 山东科技大学 Expansive-soft-rock roadway-surrounding-rock damage analog simulation test apparatus and test method
CN105973675A (en) * 2016-07-06 2016-09-28 山东科技大学 Controllable surface roughness artificial rock joint preparation device and application method thereof
CN105973675B (en) * 2016-07-06 2018-09-28 山东科技大学 A kind of controlled surface roughness artificial rock joint preparation facilities and its application process
CN106680467A (en) * 2017-02-13 2017-05-17 安徽理工大学 Simulation test device and simulation test method for high-pressure grouting of deep underground stratum
CN108020472A (en) * 2017-12-07 2018-05-11 武汉大学 Soft Rock Filling Materials deterioration test equipment and test method
CN108167153B (en) * 2017-12-30 2024-03-22 天津市九方煤矿机械制造有限公司 Manual grouting pump
CN108167153A (en) * 2017-12-30 2018-06-15 天津市九方煤矿机械制造有限公司 A kind of Manual grouting pump
CN108761040A (en) * 2018-06-04 2018-11-06 龙岩学院 Slurry filling imitation device with pressure and its application method in a kind of restricted clearance
CN109459315A (en) * 2018-11-07 2019-03-12 苏州恒信建设技术开发检测有限公司 Electric-liquid type pressure test machine
CN109540734B (en) * 2019-01-09 2023-11-24 重庆工业职业技术学院 Gas-containing coal high-pressure adsorption/desorption test device and method capable of controlling moisture
CN109540734A (en) * 2019-01-09 2019-03-29 重庆工业职业技术学院 Coal seam with gas High Pressure Absorption/the test device for desorption and method of controllable moisture
CN113049448A (en) * 2021-03-04 2021-06-29 太原理工大学 Organic grouting material diffusion test device and method based on transparent rock mass
CN113533693A (en) * 2021-07-19 2021-10-22 核工业井巷建设集团有限公司 Thixotropic slurry rock-carrying capacity simulation test platform
CN114046821A (en) * 2021-11-10 2022-02-15 山东高速股份有限公司 Prestressed beam grouting monitoring device and monitoring process
CN114046821B (en) * 2021-11-10 2023-06-02 山东高速股份有限公司 Prestressed beam grouting monitoring device and monitoring technology
CN114659955A (en) * 2022-02-25 2022-06-24 西南交通大学 Micro-power grouting test device and using method thereof
CN117388440A (en) * 2023-10-23 2024-01-12 中国矿业大学 Device and method for grouting process test and effect detection between double-layer well walls

Also Published As

Publication number Publication date
CN103954490B (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN103954490B (en) Mine soft rock slip casting specimen chamber internal mold is intended preparation method and producing device
CN100390357C (en) Analogue experiment stand for interreaction of tunnel structure, surrounding rock and underground water
CN102419303B (en) Crack grouting visualization tester under complex conditions
CN203837993U (en) Laboratory simulation manufacturing device for mine soft rock grouting test piece
CN201464456U (en) High-pressure crack grouting simulation test bed
CN111208047B (en) Test method capable of simulating permeability of fractured rock mass under complex disturbance condition
CN203133053U (en) Indoor simulation grouting testing device
CN101620055B (en) Simple creep test device of rocks and test method thereof
CN110924933A (en) Visual experiment method for dynamically simulating shale fracturing fracture network
CN106053239B (en) The test system and test method of anchoring-bolt system Aging Characteristic based on reaction frame
CN107121371A (en) A kind of simulation laboratory test system and method suitable for layer of sand osmotic grouting
CN105865874B (en) A kind of sample preparation device suitable for sandy soil laboratory test
CN111189756B (en) Broken rock mass-water-power coupling test system
CN103869054B (en) Grouting test device with pressure and test method for rock sample
CN111006952A (en) Experimental test device and grouting method for reinforcing fractured rock sample through high-pressure permeation grouting
CN209878238U (en) Steel pipeline hydrostatic testing machine
CN109975177A (en) A kind of simulation test device and method of horizontal grouting mouth slip casting spreading morphology
CN104062408A (en) Layered grouting model test system
CN110658332B (en) Concrete lining pre-pressure measurement test device and test method thereof
CN106198890A (en) A kind of indoor grouting simulation test device and using method thereof
CN108120826A (en) A kind of sleeve grouting integrated experiment device and test method
CN105463218A (en) Testing device and testing method for pressurized column leaching of uranium ore by means of CO2 and O2
CN202916109U (en) Multifunctional experimental device for simulating pipe-clay effect
CN106198342A (en) Quickly measure the hydraulic pressure succusion pilot system of hypotonic rock permeability parameter
CN105067221A (en) Dynamic induction simulation device for broken surrounding rock grouting reinforcement, and testing method therefor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant