CN103951069A - Method for solving wetland clogging problem - Google Patents

Method for solving wetland clogging problem Download PDF

Info

Publication number
CN103951069A
CN103951069A CN201410204567.0A CN201410204567A CN103951069A CN 103951069 A CN103951069 A CN 103951069A CN 201410204567 A CN201410204567 A CN 201410204567A CN 103951069 A CN103951069 A CN 103951069A
Authority
CN
China
Prior art keywords
wetland
stopping
earthworm
turns
holidays
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410204567.0A
Other languages
Chinese (zh)
Inventor
华国芬
赵忠伟
孔俊
曾奕滔
赵联芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201410204567.0A priority Critical patent/CN103951069A/en
Publication of CN103951069A publication Critical patent/CN103951069A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Abstract

The invention discloses a method for solving a wetland clogging problem. The method comprises the following steps: in time, stopping clogged wetlands for one to ten days; in space, connecting multiple groups of wetlands in parallel, and stopping one or more wetlands for one to ten days; adding earthworms in the stopped wetlands so as to increase the permeability coefficient and further relieve the clogging. The method is simple and convenient to operate, capable of solving the wetland clogging problem on site without causing secondary pollution, and overcoming such defects of stopping by turns as long time and poor effect.

Description

A kind of method that solves Wetland clogging problem
Technical field
The invention belongs to protection of natural resources and environment technical field, be specifically related to a kind of method that utilization is had holidays by turns and added earthworm combination measure solution Wetland clogging problem.
Background technology
Obstruction is the Main Bottleneck that artificial swamp is applied.After stopping up, the permeability coefficient of filler sharply reduces, current can not carry out and directly overflow wet land system according to original mode, make wetland can not bring into play due processing capacity, and the long-term ponding on wetland surface has also brought hygienic issues such as mosquitos and flies grows, stench, cause the secondary pollution of environment.
For wet land filler blockage problem, current method is mainly pre-anticlogging generation (patent No.: CN101050027A, CN101708899A, CN1970473A, CN101638264A, CN102126791A, CN101723547A and CN101973632A), for the obvious deficiency of control measures of stopping up after occurring, the soil animal of utilization that only has of report is repaired blocking type drowned flow artificial wet land (patent No.: CN1923728A) at present, but also run into, to add the workload of soil animal large, and while adding, wetland such as can not normally move at the problem.Therefore be necessary to find the method for removing blockage after a kind of efficient solution Wetland clogging occurs.
Summary of the invention
Technical problem to be solved by this invention, is to provide a kind of method of effective solution Wetland clogging problem.
For solving the problems of the technologies described above, the technical solution used in the present invention is as follows:
Solve a method for Wetland clogging problem, on the time, the wetland having stopped up is stopped stopping 1~10 day; On space, several groups of wetland parallel connections, make one or more wetland wherein stop stopping 1~10 day; Stop, in the wetland of stopping, adding earthworm simultaneously, thereby being improved, permeability coefficient alleviates obstruction.
Wherein, stop not time, the frequency of having holidays by turns and determine according to the degree of Wetland clogging, generally select 1 day, 2 days, 3 days or 5 days.
Wherein, the input density of earthworm is 0.2-0.6kg/m 2d.
Wherein, while stopping not finishing, pour water from wetland bottom, utilize douche that earthworm is reclaimed from coming outbreak out in filler.
The inventive method one is temporal combination, exactly the wetland having stopped up is had holidays by turns the different time according to chocking-up degree, essence is to allow wetland certain hour out of service, in out of service, add a certain amount of earthworm, permeability coefficient is improved, alleviate obstruction with this, this kind of method is applicable to the artificial swamp that processing demands amount is little.Concrete steps: first settling time controller between wetland sewage reservoir and water distributor, carry out the operation in period, after, draining out of service Deng wetland is complete, add earthworm (on sale on the earthworm market adding, can directly buy), while adding, can take out some with tweezers and be put into wetland surface, also can be put into wet the earth's surface with directly getting earthworm after hand strap emgloves, approximately wait earthworm after 30-60 minute substantially to pierce wetland.Finally wait and have holidays by turns after end, from the water inlet of wetland bottom, utilize douche to impel earthworm to climb out of wetland, reclaim earthworm.Another kind is the combination on space, be exactly several groups of wetland parallel connections, make the wetland have holidays by turns (wetland of specifically having holidays by turns can be determined according to Wetland clogging and running condition) of operation, on the wetland of having holidays by turns, add earthworm, this kind of method be applicable to processing demands amount stable and also the larger situation of Wetland Area own.Essence is to allow wetland move in shifts, on the wetland of having holidays by turns, adds earthworm, utilizes the Overlay of having holidays by turns and add earthworm to solve the problem of Wetland clogging.And this wetland in shifts can carry out independent assortment according to stopping state and treatment capacity.Concrete steps: first on the water distributor between wetland sewage reservoir and each wetland, water pump is installed, by On/Off water pump, is controlled the operation of concrete wetland; On the wetland that stops fortune, add earthworm exactly subsequently, the method that adds and reclaim earthworm is the same.
The present invention is applicable to the obstruction causing because organic pollution load is excessive, has good remission effect.
Beneficial effect: what oxygen in air was had holidays by turns in process in utilization of the present invention is filled with filler hole, is oxidized the extracellular polymeric of bonding tamper, and polysaccharide content is reduced, and destroys the structure of tamper, reduces the water ratio of tamper; Also make some macromolecular substance oxidations become small-molecule substance simultaneously.In addition, in conjunction with earthworm like getting into the cave perch moist, venting capability good, life habit in the soil of degree of depth 10-20cm, like again organic soil ulmin to accumulate in matrix as food, tamper in minimizing or broken hole, make these tampers can the pore throat from filler hole in along with current flow out, stop up thereby alleviate.The inventive method has the feature of the obstruction of the solution wetland of efficient, easy, the original position of operation and non-secondary pollution.
Brief description of the drawings
Fig. 1 has holidays by turns on the time and adds the wetland that earthworm combines;
On Fig. 2 space, have holidays by turns and add the wetland that earthworm combines;
Fig. 3 artificial swamp model of element.
Embodiment
Embodiment 1:
At the experiment lab simulation plugging removal effect of measure to artificial swamp of having holidays by turns, select 5 artificial wetland unit models (seeing Fig. 3), be called wetland model A, B, C, D and E, each reactor diameter is 30cm, and high is 80cm (being equivalent to intercept taking plant spacing as unit a model of element in whole wetland).Wetland reactor bottom is filled the pebbles supporting layer (d of 10cm 10while being 10% for being less than the grogs weight accumulative total percentage ratio of certain particle diameter, corresponding particle diameter is called effective size of grain; d 10for 0.35mm, nonuniform coefficent Cu is 2.1), supporting layer ensures abundant draining and does not occur ponding situation.Above supporting layer, fill the coarse sand (d of 60cm 10for 0.15mm, nonuniform coefficent Cu is 2.2) as the main matrix of wetland, this is because the especially biological obstruction process of obstruction of wetland is very very long process, in order better to simulate obstruction process at laboratory yardstick, and has adopted coarse sand medium.Water distribution system and water gathering system are all arranged on wetland unit model bottom, and the stromal surface of reactor is all planted cattail.Be 500mg/L in water inlet BOD concentration, hydraulic load is under the condition of 500mm/d, operation 3 months continuously, wetland stops up (osmotic coefficient ratio original state reduces by 3 times) substantially, and occur that impeded drainage surface starts the phenomenon of ponding, now we start to adopt and have holidays by turns and add earthworm combination measure artificial swamp is carried out to de-plugging.Each wetland model of A to E carries out respectively temporal having holidays by turns (parameter of specifically having holidays by turns comprise at every turn stop not time, the interval time of having holidays by turns for twice, the number of times of having holidays by turns), contrasts and optimizes the parameter of having holidays by turns to reach best plugging removal effect.Detailed process is: A is as blank reference, and B only has holidays by turns and do not add earthworm, and the density that C, D and E add earthworm is 0.3kg/m 2d, the time of specifically having holidays by turns and the number of times of other wetland models, the effect of wetland de-plugging is in table 1.
Table 1
Embodiment 2:
For large-area wetland, can adopt the method that solves with the following method Wetland clogging problem, on the time, the wetland having stopped up is stopped stopping 1~10 day; On space, several groups of wetland parallel connections, make one or more wetland wherein stop stopping 1~10 day; Stop stop wetland in, add earthworm simultaneously, the input density of earthworm is 0.2-0.6kg/m 2d, alleviates obstruction thereby permeability coefficient is improved.Stopping not time, the frequency of having holidays by turns determines according to the degree of Wetland clogging.While stopping not finishing, pour water from wetland bottom, utilize douche that earthworm is reclaimed from coming outbreak out in filler.
The invention provides the method that a kind of utilization measure of having holidays by turns solves Wetland clogging; method and the approach of this technical scheme of specific implementation are a lot; the above is only the preferred embodiment of the present invention; should be understood that; for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.In the present embodiment not clear and definite each integral part all available prior art realized.

Claims (4)

1. a method that solves Wetland clogging problem, is characterized in that, on the time, the wetland having stopped up is stopped stopping 1~10 day; On space, several groups of wetland parallel connections, make one or more wetland wherein stop stopping 1~10 day; Stop, in the wetland of stopping, adding earthworm simultaneously, thereby being improved, permeability coefficient alleviates obstruction.
2. the method for solution Wetland clogging problem according to claim 1, is characterized in that, stops not time, the frequency of having holidays by turns and determines according to the degree of Wetland clogging.
3. the method for solution Wetland clogging problem according to claim 1, is characterized in that, the input density of earthworm is 0.2-0.6kg/m 2d.
4. the method for solution Wetland clogging problem according to claim 1, is characterized in that, while stopping not finishing, pours water from wetland bottom, utilizes douche that earthworm is reclaimed from coming outbreak out in filler.
CN201410204567.0A 2014-05-14 2014-05-14 Method for solving wetland clogging problem Pending CN103951069A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410204567.0A CN103951069A (en) 2014-05-14 2014-05-14 Method for solving wetland clogging problem

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410204567.0A CN103951069A (en) 2014-05-14 2014-05-14 Method for solving wetland clogging problem

Publications (1)

Publication Number Publication Date
CN103951069A true CN103951069A (en) 2014-07-30

Family

ID=51328462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410204567.0A Pending CN103951069A (en) 2014-05-14 2014-05-14 Method for solving wetland clogging problem

Country Status (1)

Country Link
CN (1) CN103951069A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110683649A (en) * 2019-09-25 2020-01-14 深圳文科园林股份有限公司 Treatment method for intercepting carbon source of water inlet particles by artificial wetland
CN112396939A (en) * 2020-11-17 2021-02-23 延安大学 Simulation device and method for responding to different wetlands by soil animals

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1923728A (en) * 2006-09-07 2007-03-07 李怀正 Method of restoring under-current artificial wetland water-percolating capacity by soil animal
CN103708671A (en) * 2012-09-28 2014-04-09 中国科学院烟台海岸带研究所 Multi-medium constructed wetland water treatment system and treatment method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1923728A (en) * 2006-09-07 2007-03-07 李怀正 Method of restoring under-current artificial wetland water-percolating capacity by soil animal
CN103708671A (en) * 2012-09-28 2014-04-09 中国科学院烟台海岸带研究所 Multi-medium constructed wetland water treatment system and treatment method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110683649A (en) * 2019-09-25 2020-01-14 深圳文科园林股份有限公司 Treatment method for intercepting carbon source of water inlet particles by artificial wetland
CN112396939A (en) * 2020-11-17 2021-02-23 延安大学 Simulation device and method for responding to different wetlands by soil animals

Similar Documents

Publication Publication Date Title
CN206308123U (en) Preprocessing insert-type hybrid constructed wetland system
CN101503265B (en) Constructed wetland processing and comprehensive utilization technique for farm household sewage water and rainwater
CN105461184B (en) One kind plants plant between and carries out sludge reduction and stabilized device and its technique
CN102329000A (en) Tandem type riverway water quality improvement and water resource storage adjustment method
CN101391855B (en) Method for treating rural disperse sewage by using high load vermibiofilter
CN106698811A (en) Surface runoff pollutant treatment system for small-catchment farmland
CN101880105A (en) Composite flow manual-rapid infiltration ecological field
CN204208345U (en) A kind of buried rainwater treatment device
CN205635295U (en) Ecological processing system of sewage
US11214952B2 (en) System for treatment of water
CN109179679A (en) It is a kind of can alternate run artificial swamp and its workflow
CN107500412A (en) A kind of campus rainwater ecological purifies integrated processing system
CN204982778U (en) High -efficient artifical lake system that adjusts that purifies
CN103951069A (en) Method for solving wetland clogging problem
CN105314797B (en) A kind of Worm biological filter tank of sewage sludge synchronization process and its application
CN102605853B (en) Facility for ecologically treating and recycling rainwater in central business district and method therefor
CN207619225U (en) A kind of subsurface wastewater infiltration system of processing sanitary sewage
CN209052461U (en) It is a kind of can alternate run artificial swamp
CN202625932U (en) Rainwater ecological purification use system for compound type medium
CN209053056U (en) A kind of step wetland beach safeguard structure
CN109592787A (en) A kind of efficient denitrification filters sewage water treatment method ecologically
CN208667259U (en) A kind of subsurface constructed wetland modular unit that anti-clogging is flushable
CN203866150U (en) Compound constructed wetland treatment system
CN210945018U (en) Strengthen wetland processing system of transpiration
CN104176882B (en) A kind of inlet method and device improving artificial filtration system nitric efficiency

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140730

RJ01 Rejection of invention patent application after publication