CN103950812B - A kind of construction elevator noise abatement assembly mounting process and construction elevator structure - Google Patents

A kind of construction elevator noise abatement assembly mounting process and construction elevator structure Download PDF

Info

Publication number
CN103950812B
CN103950812B CN201410149076.0A CN201410149076A CN103950812B CN 103950812 B CN103950812 B CN 103950812B CN 201410149076 A CN201410149076 A CN 201410149076A CN 103950812 B CN103950812 B CN 103950812B
Authority
CN
China
Prior art keywords
construction elevator
rubber strip
port
chassis body
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410149076.0A
Other languages
Chinese (zh)
Other versions
CN103950812A (en
Inventor
吴道平
金鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN YOUSHENGDA ELEVATOR Co Ltd
Original Assignee
FUJIAN YOUSHENGDA ELEVATOR Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN YOUSHENGDA ELEVATOR Co Ltd filed Critical FUJIAN YOUSHENGDA ELEVATOR Co Ltd
Priority to CN201410149076.0A priority Critical patent/CN103950812B/en
Publication of CN103950812A publication Critical patent/CN103950812A/en
Application granted granted Critical
Publication of CN103950812B publication Critical patent/CN103950812B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cage And Drive Apparatuses For Elevators (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to a kind of construction elevator noise abatement assembly mounting process, it is characterized in that: a construction elevator chassis body is provided, described chassis body offers port, there is provided one in order to cover the netted shrouding on port, its concrete mounting process is as follows: first construction elevator chassis body installed, and makes to have one of port side and to face up laying; With viscose, rubber strip is sticked in the perimembranous of port side again; Next, molded good netted shrouding is installed on above-mentioned rubber strip; Finally with rivet, netted shrouding is fixed in chassis body, and makes rivet penetrate rubber strip.Mounting process process of the present invention is simple, easy to operate, the construction elevator simple structure formed, and it is convenient to produce, and for lifting construction elevator structure intensity, reduces construction noise, stablizes power transmission and all have good guarantee effect.

Description

A kind of construction elevator noise abatement assembly mounting process and construction elevator structure
Technical field
Patent of the present invention relates to a kind of construction elevator noise abatement assembly mounting process and construction elevator structure, is applied to construction elevator.
Background technology
Construction elevator is widely used at building field, be mainly used in the conveying up and down of material and personnel, and existing construction elevator is in operational process, often there is forming the damage problem that the components such as the head tree of car agent structure occur due to undercapacity, run to equipment and add potential safety hazard; Further, existing car is in operational process, and the noise sent is comparatively large, have impact on construction environment; And existing construction elevator because transmission component is installed not good, causes its inner teeth to engage effect bad in order to the frame of installing motor-driven assembly, extreme influence power transmits effect.Therefore, are objects that the present invention studies for the problems referred to above.
Summary of the invention
In view of the deficiencies in the prior art, the invention provides a kind of construction elevator noise abatement assembly mounting process and construction elevator structure, contribute to solving the problems such as existing construction elevator structural strength is not good, operating noise large, transmission poor effect.
Technical program of the present invention lies in:
A kind of construction elevator noise abatement assembly mounting process, it is characterized in that: provide a construction elevator chassis body, described chassis body offers port, provide one in order to cover the netted shrouding on port, its concrete mounting process is as follows:
1) first construction elevator chassis body is installed, make to have one of port side and to face up laying;
2) with viscose, rubber strip is sticked in the perimembranous of port side;
3) molded good netted shrouding is installed on above-mentioned rubber strip;
4) with rivet, netted shrouding is fixed in chassis body, and makes rivet penetrate rubber strip.
A kind of construction elevator modified node method, comprise netted shrouding, in order to the frame of fixing construction elevator transmission component, form head tree and the doorframe of car frame main body, described transmission component is the worm-and-wheel gear that motor exports, described frame is fixed in construction elevator car frame main body, it is characterized in that: described head tree and doorframe are made up of the deformed steel flats of Q345, described deformed steel flats comprises the channel-shaped main body being positioned at middle part, and symmetry is positioned at channel-shaped main body two ends and turns shape portion to notch infolding, described chassis body offers a port, the perimembranous of described port is laid with one deck rubber strip, described rubber strip covers described netted shrouding, described frame is provided with one in order to install the mounting groove of worm-and-wheel gear shell.
Wherein, described netted shrouding is fixed in the port perimembranous of chassis body by the rivet running through rubber strip.
Described shape portion of turning becomes L shape to lay, its longitudinal section and channel-shaped main body two ends vertical runs, traversing section laying parallel with channel-shaped main body two ends.
The bottom land of described mounting groove is a planar structure, on the bottom land of described mounting groove along the circumferential direction on be evenly equipped with some in order to realize the connecting through hole that worm-and-wheel gear shell is fixedly connected with frame.
The invention has the advantages that: mounting process process of the present invention is simple, easy to operate, the construction elevator simple structure formed, and it is convenient to produce, for lifting construction elevator structure intensity, reduce construction noise, stablize power transmission and all have good guarantee effect.
Accompanying drawing explanation
The different in nature steel plate schematic cross-section of Fig. 1 embodiment of the present invention.
Connection structure schematic diagram between the chassis body of Fig. 2 embodiment of the present invention and netted shrouding.
Connection structure schematic diagram between the frame of Fig. 3 embodiment of the present invention and transmission component.
Detailed description of the invention
For above-mentioned feature and advantage of the present invention can be become apparent, special embodiment below, and coordinate accompanying drawing, be described in detail below.
With reference to figure 1, Fig. 2 and Fig. 3, the present invention relates to a kind of construction elevator noise abatement assembly mounting process, provide a construction elevator chassis body, described chassis body offers port, provide one in order to cover the netted shrouding on port, its concrete mounting process is as follows:
1) first construction elevator chassis body is installed, make to have one of port side and to face up laying;
2) with viscose, rubber strip is sticked in the perimembranous of port side;
3) molded good netted shrouding is installed on above-mentioned rubber strip;
4) with rivet, netted shrouding is fixed in chassis body, and makes rivet penetrate rubber strip.
The invention still further relates to a kind of construction elevator modified node method, comprise netted shrouding 1, in order to the frame 2 of fixing construction elevator transmission component, form head tree and the doorframe of car frame main body 3, described transmission component is the worm-and-wheel gear 4 that motor exports, described frame is fixed in construction elevator car frame main body, described head tree and doorframe are made up of the deformed steel flats of Q345, described deformed steel flats comprises the channel-shaped main body 5 being positioned at middle part, and symmetry is positioned at channel-shaped main body two ends and turns shape portion 6 to notch infolding, described chassis body offers a port, the perimembranous of described port is laid with one deck rubber strip 7, described rubber strip covers described netted shrouding, described frame is provided with one in order to install the mounting groove 8 of worm-and-wheel gear shell.
Above-mentioned netted shrouding is fixed in the port perimembranous of chassis body by the rivet 9 running through rubber strip.
Above-mentioned shape portion of turning becomes L shape to lay, its longitudinal section and channel-shaped main body two ends vertical runs, traversing section laying parallel with channel-shaped main body two ends.
The bottom land of above-mentioned mounting groove is a planar structure, on the bottom land of described mounting groove along the circumferential direction on be evenly equipped with some in order to realize the connecting through hole 10 that worm-and-wheel gear shell is fixedly connected with frame.
The invention process process: present invention employs novel main body steel plate materials and structure, bulk strength for construction elevator has significant increase, and in order to reduce the noise generation in operational process, ad hoc rubber strip, utilize the buffer action of rubber strip to realize noise reduction effect, also have, in order to realize the tooth engagement effect in Power output process, ad hoc mounting groove in frame is installed for transmission component, reduces the problems such as the engagement weak effect caused because plane of rack is not whole.
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.

Claims (5)

1. a construction elevator noise abatement assembly mounting process, is characterized in that: provide a construction elevator chassis body, described chassis body offers port, and provide one in order to cover the netted shrouding on port, its concrete mounting process is as follows:
First construction elevator chassis body is installed, make to have one of port side and to face up laying;
Rubber strip sticks with viscose by port side perimembranous;
Molded good netted shrouding is installed on above-mentioned rubber strip;
With rivet, netted shrouding is fixed in chassis body, and makes rivet penetrate rubber strip.
2. a construction elevator modified node method, comprise netted shrouding, in order to the frame of fixing construction elevator transmission component, form head tree and the doorframe of car frame main body, described transmission component is the worm-and-wheel gear that motor exports, described frame is fixed in construction elevator car frame main body, it is characterized in that: described head tree and doorframe are made up of the deformed steel flats of Q345, described deformed steel flats comprises the channel-shaped main body being positioned at middle part, and symmetry is positioned at channel-shaped main body two ends and turns shape portion to notch infolding, described chassis body offers a port, the perimembranous of described port is laid with one deck rubber strip, described rubber strip covers described netted shrouding, described frame is provided with one in order to install the mounting groove of worm-and-wheel gear shell.
3. a kind of construction elevator modified node method according to claim 2, is characterized in that: described netted shrouding is fixed in the port perimembranous of chassis body by the rivet running through rubber strip.
4. a kind of construction elevator modified node method according to claim 2, is characterized in that: described in turn shape portion and become L shape to lay, its longitudinal section and channel-shaped main body two ends vertical runs, traversing section laying parallel with channel-shaped main body two ends.
5. a kind of construction elevator modified node method according to claim 2, it is characterized in that: the bottom land of described mounting groove is a planar structure, on the bottom land of described mounting groove along the circumferential direction on be evenly equipped with some in order to realize the connecting through hole that worm-and-wheel gear shell is fixedly connected with frame.
CN201410149076.0A 2014-04-15 2014-04-15 A kind of construction elevator noise abatement assembly mounting process and construction elevator structure Expired - Fee Related CN103950812B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410149076.0A CN103950812B (en) 2014-04-15 2014-04-15 A kind of construction elevator noise abatement assembly mounting process and construction elevator structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410149076.0A CN103950812B (en) 2014-04-15 2014-04-15 A kind of construction elevator noise abatement assembly mounting process and construction elevator structure

Publications (2)

Publication Number Publication Date
CN103950812A CN103950812A (en) 2014-07-30
CN103950812B true CN103950812B (en) 2016-02-03

Family

ID=51328207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410149076.0A Expired - Fee Related CN103950812B (en) 2014-04-15 2014-04-15 A kind of construction elevator noise abatement assembly mounting process and construction elevator structure

Country Status (1)

Country Link
CN (1) CN103950812B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2811029B2 (en) * 1991-10-01 1998-10-15 隆司 上杉 Manufacturing method of cylinder for tunnel
CN202148120U (en) * 2011-07-15 2012-02-22 北京升华电梯集团有限公司 Noise reduction elevator cage bottom
CN202296696U (en) * 2011-10-12 2012-07-04 快意电梯有限公司 Car rope sheave device
CN102635127B (en) * 2012-04-01 2014-07-16 中国船舶重工集团公司第七○二研究所 Sandwich type ring rib cylindrical shell structure and technique thereof
CN203833427U (en) * 2014-04-15 2014-09-17 福建优胜达电梯有限公司 Improved structure on construction elevator

Also Published As

Publication number Publication date
CN103950812A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
GB201212531D0 (en) Composite tube
CN103401189B (en) Cable sheave
CN103950812B (en) A kind of construction elevator noise abatement assembly mounting process and construction elevator structure
CN203833427U (en) Improved structure on construction elevator
CN204607431U (en) A kind of trackless transfer crane
CN203976143U (en) elevator control dial
CN206844582U (en) A kind of stringcourse moulding component
CN204059622U (en) The heat insulation integrated system of LS composite plate
CN204022232U (en) Elevator two-folding door lintel structure
CN209429442U (en) A kind of split type preforming aluminum veneer
CN204490286U (en) A kind of door cutter be exclusively used on oblique elevator
CN203333122U (en) Novel heavy punch steel wire rope headstock
CN204873496U (en) Electric block's pulley roof beam assembly
CN204057601U (en) Elevator traction actuating device
CN203393590U (en) Pick rod fastener of pneumatic pick
CN204212802U (en) Be applicable to the mobile step of underworkings
CN203411213U (en) Fixing part for heavy water pipe on elevator cage door
CN204284371U (en) Simple welding formula biplate sprocket wheel
CN104214068B (en) concrete pump
CN204002475U (en) The outer sunshade roller shutter window with anti-theft device
CN206035296U (en) Door leaf
CN203393320U (en) Travelling cleaner walking track with reinforcing device
CN102677587B (en) Damping, buffering shrinkage joint and construction method thereof
CN201434050Y (en) Steel wire rope joint
CN103332571B (en) Novel counter weight steel wire rope head frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

CF01 Termination of patent right due to non-payment of annual fee