CN103944778B CN201410125856.1A CN201410125856A CN103944778B CN 103944778 B CN103944778 B CN 103944778B CN 201410125856 A CN201410125856 A CN 201410125856A CN 103944778 B CN103944778 B CN 103944778B
Authority
CN
China
Prior art keywords
event
injection
state
combined test
injector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410125856.1A
Other languages
Chinese (zh)
Other versions
CN103944778A (en
Inventor
王慧强
何占博
冯光升
吕宏武
郭方方
林俊宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Engineering University
Original Assignee
Harbin Engineering University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Engineering University filed Critical Harbin Engineering University
Priority to CN201410125856.1A priority Critical patent/CN103944778B/en
Publication of CN103944778A publication Critical patent/CN103944778A/en
Application granted granted Critical
Publication of CN103944778B publication Critical patent/CN103944778B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of distributed event injection device based on combined test collection the present invention relates to be directed to MATLAB software system.The present invention includes controller, combined test collection generation module, event injection module and state analyzing module.The present invention is in event injection technique, take into full account the Distributed Design structure that nowadays computer system is generally used, take into full account that different target unit is suitable for injection into different type failure and the in various degree problem of load, the distributed event injection mode based on combined test collection is introduced, more flexible, efficient event injection is realized.Therefore the present invention have the advantages that applied widely, resource consumption is few, event injection mode is flexible, with strong points, with customizability.Distributed Fault-Tolerance System is can be widely applied to, especially in the availability test and appraisal of special tolerant system.

Description

A kind of distributed event injection device based on combined test collection
Technical field
A kind of distributed event injection device based on combined test collection the present invention relates to be directed to MATLAB software system.
Background technology
With the development of computer technology, MATLAB software systematic difference field is more and more wider, and tolerant system sets Meter is also increasingly complicated with test and appraisal problem encountered.For traditional hardware and software failure, the test and appraisal of computer system availability are general Realized using fault filling method.However, at some in particular cases, such as the unplanned property failure of system, workload are notable Increase or the work of long-time saturation etc. can all cause the non-faulting class event such as machine of delaying, and then bring availability to decline, traditional event Barrier injection technique can not meet the availability test and appraisal demand of MATLAB software system.Therefore, extension conventional failure injection skill Art, it is considered to the availability impact factor outside failure, proposes a kind of thing of the application-oriented levels such as combination failure injection, pressure test Part injection technique.Event injection technique refers to inject event by goal systems, while observation and recovery system are to being injected The reaction of event is simultaneously analyzed to recovery information, so as to provide the process about result to tester.
At present, the research both at home and abroad for event injection is still less.Existing patent mainly includes:1)" based on event injection Computer network dependability evaluation device(200620020624.0)”.The patent be based on event injection technique, for Different stage fault tolerant mechanism, the problem in terms of various network events, major concern network security is injected to goal systems.It is main suitable For to simple target system injection network correlation type event, not considering the Special use environment of distributed system, do not have more The problems such as being related to the combination event of different target unit in goal systems to inject or apply load in various degree.2)A kind of " script Injection event-handling method and system(200710303986.X)”.The patent proposes that system is received from script and injects detecting system The script event of output, detects whether there is XSS attack behavior and with quantized versions output result, with patent application model of the present invention Enclose, it is different using method.3)" automatic intelligent single-particle fault injector(200510111494.1)" be directed to Space radiation environment is simulated when HDL is emulated or the medium situation of interface communication, and " Event-controlled is applied to error injection system(5008885)”、“Single-event transient injection simulation Method for high-frequency circuits (CN2013113637620130418) " is used with patent of the present invention Method or range of application are different.Existing document relates generally to the credibility based on event injection, reliability, security and software Debugging and robustness problems, are first to propose event model or evaluation and test model, for different target Systematic selection corresponding event class Type realizes that concurrent event injects, the correlation properties index of final evaluation and test goal systems or software.But do not surveyed using combination Examination diversity method, combination event injection or the different degrees of load of applying of different target unit in goal systems etc. is not accounted for more and is asked Topic(Including " Kang Jia are based on the research of the dependability evaluation instrument of event injection and realize [D] Harbin Institute of Technology 2007 ", " Liu Yu nanmus is based on the design of the reliability evaluating method of event injection and realizes [D] Harbin Institute of Technology 2009 ", " face state Flat is based on the research of the security evaluating method of event injection and realizes [D] Harbin Institute of Technology 2009 ", " yellow Yongping, often Roc flies, Guo Kai, and the kind of gold and jade is based on the software debugging method of event injection mechanism and realizes [J] Jilin University journal(Engineering Version)(09) " and " Zhang Dawei is based on application oriented software robustness evaluation and test [D] Harbin industry of event injection .2012 University 2009 ").
From the above analysis, the deficiency of the research of event injection at this stage is mainly:1)Based on a fixed event note Enter all goal systems of set pair and inject unified event, consumption is big, easily causes the wasting of resources;2)Distributed object is not accounted for Different target unit is suitable for injection into different type failure or in various degree load in system, i.e., injection mode is dumb, specific aim It is not strong;3)The customizability of event injection mode is not strong, is not suitable for the personalized index of test and appraisal.It is therefore proposed that one kind is directed to Distributed system, is very important with the event method for implanting that combined test mode set is realized, its benefit is to be capable of achieving more Specific aim, more flexibly, efficient event injection.
The content of the invention
Each object element in goal systems is had more with the injection of combined test mode set it is an object of the invention to realize Targetedly event, has reached flexible, efficient implementation event and has injected, and then obtained the purpose of computer system availability, energy Enough for the distributed event based on combined test collection that the test and appraisal of MATLAB software system provide efficient analyze data injects dress Put.
The object of the present invention is achieved like this:
The present invention includes controller, combined test collection generation module, event injection module and state analyzing module;
Controller control combination test set generation module receives user instruction and generates combined test collection parameter list;
Combined test collection generation module includes scanner and event model storehouse, and scanner receives user instruction, scans target System, analysis return including the scanning result including all fragile vertex types, it is determined that injection event type;Wrap in event model storehouse Include the fault type that fault model word bank and pressure model word bank two parts fault model word bank include be based on hardware, software or The failure of simulated implementation, pressure model word bank is responsible for output pressure load parameter, and scanner sends to fault model word bank and obtains The request of fault type parameter is injected, the fault type parameter list for returning is received, scanner sends to pressure model word bank and obtains The request of load generation mode and parameter is taken, the output loading parameter list for returning is received;Scanner is clear by fault type parameter Single and output loading parameter list merges, and generates combined test collection parameter list;Controller is to the event in event injection module Injector sends combined test collection generation module and completes signal, and combined test collection parameter list is finally sent to each thing by scanner The event injection engine of part injector, entry event injection module;
Event injection module includes the set of event injector and state monitor, and the set of event injector is injected including event Device 1, event injector 2 ..., event injector N1, wherein N1 are positive integer, and each event injector draws comprising event injection Hold up with event inject list, distributed object element set include object element 1, object element 2 ..., object element N2, its Middle N2 is positive integer;Under control of the controller, when combined test collection generation module completion signal is received, each event injector is received Combined test collection parameter list that scanner sends simultaneously is stored in injection engine, and the combined test collection parameter that will be injected in engine is clear Present event injector injection event type in single list with injection matches, and injection event type is determined after matching and to target Unit implements event injection, and after the completion of injection, combined test collection parameter list is sent to state monitor by event injector, Controller sends event injection and completes signal to state monitor;Signal, state monitor monitoring are completed when event injection is received Event injector injects success or not, and injection state set should include " success ", " failure " and "abnormal", and will injection state letter Breath is sent to controller, if injection state is " success ", event injection module task is completed, and controller is to state analyzing module In state acquisition device send event injection module and complete signal, be prepared to enter into state analyzing module;If injection state is " mistake Lose " or "abnormal", controller needs control scanner to send combined test collection parameter list to each event injector again, again Implementation event is injected, and until event injection module Mission Success is completed, finally enters state analyzing module;
State analyzing module includes state acquisition device, interpretation of result device and result display, under control of the controller, works as shape State collector receives event injection module and completes signal, and state acquisition device gathers the response shape after each object element injection event State information, the responsive state information aggregate of object element should include " correct ", " mistake ", "abnormal" and " time-out ", and will respond Status information is sent to interpretation of result device and result display;
Under control of the controller, interpretation of result device to the responsive state information that state acquisition device sends integrate and divided Analysis, increases according to the dramatically increasing of cpu busy percentage, the quick consumption of memory headroom, memory usage percentage or system delay Situation, using Fuzzy AHP, in interval [0,1], the availability of assay goal systems or each object element, (0.75,1] it is on " availability is good ",(0.5,0.75] it is on " availability is general ",(0.25,0.5 it is " availability on] It is poor ", it is " availability is extremely low " four ranks on [0,0.25], finally this assay result and data foundation are sent to As a result display;Under control of the controller, the data that as a result display reception state collector and interpretation of result device send, show Show the responsive state information of object element after event injection, including " correct ", " mistake ", "abnormal" and " time-out ", display target The assay result and data foundation of system or each object element, generation printed report feed back to user.
The beneficial effects of the invention are as follows:
The present invention is on the basis of Failure Injection Technique, it is also contemplated that the application layer non-faulting class of other infringement system availabilities Event, introduces pressure load, and simulation cycle is repeatedly injected event or simulation increases the situations such as workload.Skill is injected in event In art, the Distributed Design structure that nowadays computer system is generally used is taken into full account, take into full account that different target unit is suitable to Injection different type failure and the in various degree problem of load, introduce the distributed event injection mode based on combined test collection, Realize more flexible, efficient event injection.Therefore the present invention has that applied widely, resource consumption is few, event injection mode Flexibly, it is with strong points, there is customizability.Distributed Fault-Tolerance System is can be widely applied to, especially special fault-tolerant system In the availability test and appraisal of system.
Brief description of the drawings
Fig. 1 is based on the distributed event injection device function structure chart of combined test collection;
Fig. 2 is based on event injection module workflow diagram in the distributed event injection device of combined test collection;
Fig. 3 is based on the distributed event injection device specific implementation illustration of combined test collection.
Specific embodiment
1-3 is described further to the present invention below in conjunction with the accompanying drawings.
Event injection device based on combined test collection of the present invention, on the basis of direct fault location, it is also contemplated that its He damages the application layer non-faulting class event of system availability, such as pressure load.The present apparatus is realized to each in goal systems Object element has more targetedly event with the injection of combined test mode set, has reached flexible, efficient implementation event injection, enters And the purpose of computer system availability is obtained, efficient analyze data can be provided for the test and appraisal of MATLAB software system.
Present event injection device includes 4 main modulars, is respectively controller, combined test collection generation module, event note Enter module and state analyzing module.Function structure chart is shown in accompanying drawing 1.
1st, controller
It is responsible for control combination test set generation module to receive user instruction and generate combined test collection parameter list, event note Enter module reception combined test collection parameter list to inject and export responsive state information to implement event, state analyzing module is received Responsive state information and analyze, feedback event injection and availability evaluation result to user whole process.
2nd, combined test collection generation module
Combined test collection generation module includes scanner and event model storehouse.
Scanner receives user instruction first, scans goal systems, it is determined that the object element of the event of implementation injection,
Scanning object element, return should include all fragile vertex types of system scanning result, post analysis scanning result To determine injection event type, finally export combined test collection parameter list and be sent to event injection module.
Event model storehouse includes fault model word bank and pressure model word bank two parts.The failure that fault model word bank is included Type can be failure based on hardware, software or simulated implementation etc..Pressure model word bank is responsible for output pressure load parameter, tool It is repeated cyclically injection two kinds of pressing creation patterns of event schema and simulation output system workload pattern, if necessary two kinds Mode of operation can be carried out simultaneously.
Under control of the controller, combined test collection generation module workflow:(1)Scanner receives user instruction, scanning Goal systems, analysis return including the scanning result including all fragile vertex types, so that it is determined that injection event type;(2) Scanner sends the request for obtaining injection fault type parameter to fault model word bank, receives the fault type parameter for returning clear It is single.Meanwhile, scanner sends the request for obtaining load generation mode and parameter to pressure model word bank, receives the output for returning and bears Carry parameter list;(3)Scanner merges fault type parameter list and output loading parameter list, generation combined test collection ginseng Number inventory;(4)Controller sends combined test collection generation module and completes signal to the event injector in event injection module, sweeps The last event injection engine that combined test collection parameter list is sent to each event injector of device is retouched, event injection is prepared to enter into Module.
Generation on output loading parameter, two kinds of pressing creation patterns of pressure model word bank are as follows:
(1)It is repeated cyclically injection event schema
Event injector is repeated cyclically the same event of injection to its corresponding object element of combined test collection respectively Event, cycle Period.
(2)Simulation output system workload pattern
1. simulated target system worked well state, writes load reference program PROGRAM, is run on each object element Program PROGRAM, write or imprinting program PROGRAM perform script Script, respectively on each object element reset;2. create The pressure test scene scenario of output system workload is intended in modeling, and virtual work mission script Script is imported into field Scape.Scenario parameters include the horizontal Load of load pressure for each object element.The horizontal key element of its load pressure includes program PROGRAM performs iterations Iteration, iteration free time IterationFree, program PROGRAM and performs operation Simulation think time IterationThink;3. operating pressure test scene scenario, completes output and is directed to each object element The horizontal Load of load pressure.
3rd, event injection module
Event injection module includes the set of event injector and state monitor.Wherein, event injector set includes thing Part injector 1, event injector 2 ..., event injector N1, wherein N1 are positive integer.Each event injector includes event Injection engine and event injection list.Additionally, distributed object element set includes object element 1, object element 2 ..., mesh Mark unit N2, wherein N2 are positive integer.
Under control of the controller, when combined test collection generation module completion signal is received, each event injector receives scanning Combined test collection parameter list that device sends simultaneously is stored in injection engine, then the combined test collection parameter list that will be injected in engine Match with the present event injector injection event type in injection list, injection event type is determined after matching and to target list First implementation event injection.After the completion of injection, combined test collection parameter list is sent to state monitor by event injector, control Device processed sends event injection and completes signal to state monitor.
Signal, state monitor monitoring event injector injection success or not are completed when event injection is received.Injection state Set should include " success ", " failure " and "abnormal", and injection status information is sent into controller.If injection state for " into Work(", then event injection module task completion, controller sends event injection module to the state acquisition device in state analyzing module Signal is completed, state analyzing module is prepared to enter into;If injection state is " failure " or "abnormal", controller needs to control scanner Again combined test collection parameter list is sent to each event injector, is again carried out event injection, circulated according to this, until event note Enter module design task to successfully complete, finally enter state analyzing module.
4th, state analyzing module
State analyzing module includes state acquisition device, interpretation of result device and result display.
Under control of the controller, signal is completed when state acquisition device receives event injection module, the collection of state acquisition device is each Responsive state information after object element injection event, the responsive state information aggregate of object element should include " correct ", " mistake By mistake ", "abnormal" and " time-out " etc..And by responsive state information transmission to interpretation of result device and result display.
Under control of the controller, interpretation of result device to the responsive state information that state acquisition device sends integrate and divided Analysis, and increased according to the dramatically increasing of cpu busy percentage, the quick consumption of memory headroom, memory usage percentage or system delay Plus situations such as, using Fuzzy AHP, in interval [0,1], assay goal systems or each object element it is available Property,(0.75,1] it is on " availability is good ",(0.5,0.75] it is on " availability is general ",(0.25,0.5 it is on] " availability is poor ", is " availability is extremely low " four ranks on [0,0.25], finally by this assay result and data according to According to being sent to result display.
Under control of the controller, the data that as a result display reception state collector and interpretation of result device send, display The responsive state information of object element after event injection, including " correct ", " mistake ", "abnormal" and " time-out ", display target system The assay result and data foundation of system or each object element.Finally, generation printed report feeds back to user.
The present invention is using the distributed event injection device based on combined test collection come the availability of evaluation system, and it is right to test and assess As mainly for distributed computer tolerant system.The present embodiment is described in detail using present event injection device to four Program PROGRAM is carried out with combined test mode set injection event, acquisition system in the distributed system of Fedora system simulations The assessment process of availability.Thus the applications such as the availability test and appraisal of other Distributed Fault-Tolerance Systems be may extend into upper.
Present event injection device includes 4 main modulars, is respectively controller, combined test collection generation module, event note Enter module and state analyzing module.
First, installed on four computers and similarly configure Fedora systems, be respectively FM1, FM2, FM3 and FM4, simulation 4 distributed object units 1,2,3,4 of goal systems, same program PROGRAM is run on four computers simultaneously, its Basic function is:(1)When perceive the system due to injection event causes cpu busy percentage too high when, independently limit and reduce this Virtual machine cpu busy percentage;(2)When perceiving the system because injection event causes memory usage too high or internal memory free space When too small, dynamic assigning memory space reduces memory usage to meet system worked well demand;(3)This program can lead to Cross order line terminal(terminal)The cpu busy percentage, memory usage, the idle sky of internal memory of the system are shown and refreshed in real time Between, allocated memory headroom account for the information such as the percentage of the total internal memory of system.(4)Program PROGRAM is simultaneously as load reference Program, used as the carrier to each object element output loading pressure, simulation system is because of workload increase etc. caused by fault-tolerant Situation.
1st, controller and combined test collection generation module
Controller is responsible for control combination test set generation module and receives user instruction and generate combined test collection parameter list, Event injection module receives combined test collection parameter list and injects and export responsive state information to implement event, state analysis mould Block receive responsive state information and analyze, feedback event injection and availability evaluation result to user whole process.Combination is surveyed Examination collection generation module includes scanner and event model storehouse.Event model storehouse includes fault model word bank and pressure model again Storehouse.The fault type that fault model word bank is included can be failure based on hardware, software or simulated implementation etc..Pressure model Output pressure load parameter is responsible in storehouse, and event schema and simulation output system workload pattern two are injected with being repeated cyclically Pressing creation pattern is planted, two kinds of mode of operations can be carried out simultaneously if necessary.
(1)Scanner receives user instruction first, scans goal systems, and what analysis was returned exists including all fragile vertex types Interior scanning result with determine inject event type.
(2)Scanner sends the request of injection fault type parameter needed for obtaining to fault model word bank, receives what is returned Fault type parameter list.Correspondence FM1, FM2, FM3 and FM4, event injection object is respectively cpu busy percentage Ecpu1、Ecpu2, and Memory usage Ememory1、Ememory2, i.e., to computer system FM1, FM2 injects particularly for occupancy cpu busy percentage simultaneously(CPU Consumption-type)The event of type(Program)Eventcpu, to computer system FM3, FM4 injects empty particularly for committed memory simultaneously Between(Memory consumption type)The event of type(Program)Eventmemory
Meanwhile, scanner sends the request for obtaining load generation mode and parameter to pressure model word bank, receives what is returned Output loading parameter list.Load generation includes being repeated cyclically the two kinds of work of injection event and simulation output system workload Pattern.
When 1. using injection event schema is repeated cyclically
Setting is repeatedly injected the cycle of event, and correspondence four Fedora system FM1, FM2, FM3 and FM4 set thing respectively Part injection length is spaced(Cycle)It is Periodcpu1=1s、Periodcpu2=2s、Periodmem1=1s、Periodmem2=2s。
When 2. using simulation output system workload pattern
First, write or imprinting load reference program PROGRAM perform script Script, due to four Fedora systems Identical program PROGRAM is run simultaneously, therefore four Fedora systems FM1, FM2, FM3 and FM4 are also suitable same program Operation script Script is performed, for task of resetting;
Secondly, the pressure test scene of simulation output system workload is created(scenario), script Script is led Enter scene.Scenario parameters are included respectively for four load pressure levels of computer system FM1, FM2, FM3 and FM4 Loadcpu1、Loadcpu2、Loadmem1And Loadmem2.Wherein the horizontal key element of each load pressure includes that program PROGRAM execution changes Generation number Iterationcpu1、Iterationcpu2、Iterationmem1And Iterationmem2, iteration free time IterationFreecpu1、IterationFreecpu2、IterationFreemem1And IterationFreemem2, program PROGRAM performs the simulation think time IterationThink of operationcpu1、IterationThinkcpu2、 IterationThinkmem1And IterationThinkmem2
(3)Scanner merges fault type parameter list and output loading parameter list, generates combined test collection
Parameter list.
(4)Controller sends combined test collection generation module and completes signal to the event injector in event injection module, Scanner is last to inject engine by the event that combined test collection parameter list is sent to each event injector, is prepared to enter into event note Enter module.
2nd, event injection module
Event injection module includes the set of event injector and state monitor.Event injector set bag in the present embodiment Include event injector 1,2,3,4.Four event injectors 1,2,3,4 are directed to FM1, FM2, FM3 and FM4, i.e. object element respectively 1、2、3、4.In each event injector engine and event injection list are injected comprising event.Under control of the controller, when receiving Combined test collection generation module completes signal, and the combined test collection parameter list that each event injector receiver-scanner sends is simultaneously Injection engine is stored in, then the combined test collection parameter list that will be injected in engine injects with the present event injector in injection list Event type matches, and injection event type is determined after matching and implements event injection to object element.After the completion of injection, thing Combined test collection parameter list is sent to state monitor by part injector, and controller sends event and injected to state monitor Into signal.
Injection event class in combined test collection parameter list and injection list of the event injector in injection engine The matching result of type implements the event injection to object element, state monitor monitoring event injection result.
(1)According to fault type parameter list, for the test object E of Fedora systems FM1, FM2cpu1、Ecpu2, in thing The event for taking cpu busy percentage type is stored in part injector 1 and event injector 2(Program)Eventcpu;For Fedora systems The test object E of system FM3, FM4memory1、Ememory2, committed memory space is stored in event injector 3 and event injector 4 The event of type(Program)Eventmemory
(2)At the T1 moment, event injector 1 and event injector 2 inject event to Fedora systems FM1 and FM2(Journey Sequence)Eventcpu;At the T2 moment, event injector 3 and event injector 4 inject event to Fedora systems FM3 and FM4(Journey Sequence)Eventmemory
Meanwhile, according to output loading parameter list, output loading.
When 1. using injection event schema is repeated cyclically
Event injector 1 is every time cycle Periodcpu1Event Event is repeatedly injected to FM1cpuOnce;Event is injected Device 2 is every time cycle Periodcpu2Event Event is repeatedly injected to FM2cpuOnce;Event injector 3 is every the time cycle Periodmem1Event Event is repeatedly injected to FM3memoryOnce;Event injector 4 is every time cycle Periodmem2To FM4 It is repeatedly injected event EventmemoryOnce.
When 2. using simulation output system workload pattern
Run the pressure test scene of simulation output system workload(scenario), respectively for four Fedora systems System FM1, FM2, FM3 and FM4 output loading stress level Loadcpu1、Loadcpu2、Loadmem1And Loadmem2
(3)Signal, state monitor monitoring event injector injection success or not are completed when event injection is received.Injection shape State set should include " success ", " failure " and "abnormal", and injection status information is sent into controller.If injection state is " success ", then event injection module task completion, controller sends event and injects to the state acquisition device in state analyzing module Module completes signal, is prepared to enter into state analyzing module;If injection state is " failure " or "abnormal", controller needs control to sweep Retouch to think highly of and newly send combined test collection parameter list to each event injector, be again carried out event injection, circulate according to this, until thing Part injection module Mission Success is completed, and finally enters state analyzing module.
3rd, state analyzing module
State analyzing module includes state acquisition device, interpretation of result device and result display.
(1)Under control of the controller, signal, the collection of state acquisition device are completed when state acquisition device receives event injection module Four Fedora systems FM1, FM2, FM3 and FM4 the responsive state information of program PROGRAM and each after injection event The data variation information of Fedora system CPUs utilization rate or memory usage, the responsive state information of FM1, FM2, FM3 and FM4 Set includes that " correct ", " mistake ", "abnormal" and " time-out ", and the responsive state information that will be collected are sent to result through integration Analyzer and result display;
(2)Under control of the controller, interpretation of result device is integrated to the responsive state information that state acquisition device sends Analysis, and according to the dramatically increasing of cpu busy percentage, the quick consumption of memory headroom, memory usage percentage or system delay Situations such as increase, analyze the program PROGRAM run in four Fedora systems and can also after through present apparatus injection event Complete function(1)、(2)With(3).Using Fuzzy AHP, in interval [0,1], four Fedora systems of assay Availability,(0.75,1] it is on " availability is good ",(0.5,0.75] it is on " availability is general ",(0.25,0.5] Upper is " availability is poor ", is " availability is extremely low " four ranks on [0,0.25], finally by this assay result sum Result display is sent to according to foundation;
(3)Under control of the controller, the data that as a result display reception state collector and interpretation of result device send, show Show four responsive state information of Fedora systems after event injection, including " correct ", " mistake ", "abnormal" and " time-out ", it is aobvious Show four Fedora network analyses evaluation results and data foundation.Finally, generation printed report feeds back to user.
A kind of distributed event injection device based on combined test collection proposed by the invention, by load pressure and failure Injection technique is combined together, using based on combined test mode set, can more flexibly, be efficiently completed distributed fault-tolerance system System availability test and appraisal.With applied widely, resource consumption it is few, event injection mode is flexible, with strong points, with customizability The advantages of.Distributed Fault-Tolerance System is can be widely applied to, especially in the availability test and appraisal of special tolerant system.

Claims (1)

1. a kind of distributed event injection device based on combined test collection, including controller, combined test collection generation module, thing Part injection module and state analyzing module, it is characterised in that:
Controller control combination test set generation module receives user instruction and generates combined test collection parameter list;
Combined test collection generation module includes scanner and event model storehouse, and scanner receives user instruction, scans goal systems, Analysis return including the scanning result including all fragile vertex types, it is determined that injection event type;Event model storehouse includes event Barrier model word bank and pressure model word bank two parts;The fault type that fault model word bank is included is based on hardware, software or mould Intend the failure realized, pressure model word bank is responsible for output pressure load parameter, and scanner sends to fault model word bank and obtains note Enter the request of fault type parameter, receive the fault type parameter list for returning, scanner sends to pressure model word bank and obtains The request of load generation mode and parameter, receives the output loading parameter list for returning;Scanner is by fault type parameter list Merge with output loading parameter list, generate combined test collection parameter list;Controller is noted to the event in event injection module Enter device and send combined test collection generation module completion signal, combined test collection parameter list is finally sent to each event by scanner The event injection engine of injector, entry event injection module;
Event injection module includes the set of event injector and state monitor, and the set of event injector includes event injector 1, Event injector 2 ..., event injector N1, wherein N1 are positive integer, each event injector comprising event injection engine and Event injects list, and distributed object element set includes object element 1, object element 2 ..., wherein object element N2, N2 It is positive integer;Under control of the controller, when combined test collection generation module completion signal is received, each event injector receives scanning Combined test collection parameter list that device sends simultaneously is stored in injection engine, the combined test collection parameter list that will be injected in engine with Present event injector injection event type in event injection list matches, and injection event type is determined after matching and to target Unit implements event injection, and after the completion of injection, combined test collection parameter list is sent to state monitor by event injector, Controller sends event injection and completes signal to state monitor;Signal, state monitor monitoring are completed when event injection is received Event injector injects success or not, and injection state set should include " success ", " failure " and "abnormal", and will injection state letter Breath is sent to controller, if injection state is " success ", event injection module task is completed, and controller is to state analyzing module In state acquisition device send event injection module and complete signal, be prepared to enter into state analyzing module;If injection state is " mistake Lose " or "abnormal", controller needs control scanner to send combined test collection parameter list to each event injector again, again Implementation event is injected, and until event injection module Mission Success is completed, finally enters state analyzing module;
State analyzing module includes state acquisition device, interpretation of result device and result display, under control of the controller, when state is adopted Storage receives event injection module and completes signal, and state acquisition device gathers the responsive state letter after each object element injection event Breath, the responsive state information aggregate of object element should include " correct ", " mistake ", "abnormal" and " time-out ", and by responsive state Information transmission is to interpretation of result device and result display;
Under control of the controller, interpretation of result device carries out confluence analysis, root to the responsive state information that state acquisition device sends Increase situation according to the dramatically increasing of cpu busy percentage, the quick consumption of memory headroom, memory usage percentage or system delay, Using Fuzzy AHP, in interval [0,1], the availability of assay goal systems or each object element, (0.75,1] on be " availability is good ", (0.5,0.75] on be " availability is general ", (0.25,0.5] on be " availability It is poor ", it is " availability is extremely low " four ranks on [0,0.25], finally this assay result and data foundation are sent to As a result display;Under control of the controller, the data that as a result display reception state collector and interpretation of result device send, show Show the responsive state information of object element after event injection, including " correct ", " mistake ", "abnormal" and " time-out ", display target The assay result and data foundation of system or each object element, generation printed report feed back to user.
CN201410125856.1A 2014-03-31 2014-03-31 A kind of distributed event injection device based on combined test collection Expired - Fee Related CN103944778B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410125856.1A CN103944778B (en) 2014-03-31 2014-03-31 A kind of distributed event injection device based on combined test collection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410125856.1A CN103944778B (en) 2014-03-31 2014-03-31 A kind of distributed event injection device based on combined test collection

Publications (2)

Publication Number Publication Date
CN103944778A CN103944778A (en) 2014-07-23
CN103944778B true CN103944778B (en) 2017-06-20

Family

ID=51192271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410125856.1A Expired - Fee Related CN103944778B (en) 2014-03-31 2014-03-31 A kind of distributed event injection device based on combined test collection

Country Status (1)

Country Link
CN (1) CN103944778B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106201689B (en) * 2016-07-07 2019-10-18 哈尔滨工程大学 A kind of more queue events injection devices and method with timing control
CN106227605B (en) * 2016-07-26 2019-10-18 北京北森云计算股份有限公司 A kind of the dynamic micro services expansion method and device of multilingual cloud compiling
CN108268365B (en) * 2016-12-30 2020-12-18 腾讯科技(深圳)有限公司 Abnormal task injection method, device and system
CN108763039B (en) * 2018-04-02 2021-09-21 创新先进技术有限公司 Service fault simulation method, device and equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2894106Y (en) * 2006-04-19 2007-04-25 哈尔滨工程大学 Computer network credibility estimating device based on event implanting
CN101187952A (en) * 2007-12-14 2008-05-28 哈尔滨工程大学 A simulation judgment method for survival capability of network information system
CN101471781A (en) * 2007-12-24 2009-07-01 北京启明星辰信息技术股份有限公司 Method and system for processing script injection event

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8756569B2 (en) * 2007-12-17 2014-06-17 International Business Machines Corporation Deterministic pseudo-random fault event recordation and injection tool

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2894106Y (en) * 2006-04-19 2007-04-25 哈尔滨工程大学 Computer network credibility estimating device based on event implanting
CN101187952A (en) * 2007-12-14 2008-05-28 哈尔滨工程大学 A simulation judgment method for survival capability of network information system
CN101471781A (en) * 2007-12-24 2009-07-01 北京启明星辰信息技术股份有限公司 Method and system for processing script injection event

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《分布式系统中服务可生存性的定量分析》;郭渊博 等;《同济大学学报》;20021031;第30卷(第10期);第1190-1193页 *
《基于模糊层次分析的网络服务级安全态势评价方法》;刘磊 等;《计算机应用》;20090930;第29卷(第9期);第2327-2331页 *

Also Published As

Publication number Publication date
CN103944778A (en) 2014-07-23

Similar Documents

Publication Publication Date Title
Kuhn et al. Practical combinatorial testing: Beyond pairwise
CN103150228B (en) Synthesizable pseudorandom verification method and device for high-speed buffer memory
CN103150238B (en) A kind of service request processing method, simulated performance method of testing and device
CN103944778B (en) A kind of distributed event injection device based on combined test collection
CN101556551B (en) Hardware acquisition system and method for equipment failure log
CN108376221A (en) A kind of software system security verification and appraisal procedure based on AADL model extensions
US20090248390A1 (en) Trace debugging in a hardware emulation environment
CN104518924A (en) Automatic testing and result comparison method and system
CN103019921A (en) Operating system fault tolerance testing system and method based on fault injection
CN102479123A (en) System and method for testing chip operating system (COS)
CN104731698A (en) Abnormal test case automatic generation processing method and device based on automatic tests
CN107547261A (en) Cloud platform performance test methods and device
CN105589928A (en) Simulation testing method for distributed data processing system
Saluja et al. Optimized approach for antipattern detection in service computing architecture
CN103399813B (en) A kind of embedded system off-line trace analysis method based on Trace information
CN117077588A (en) Hardware acceleration simulation debugging system
CN102929778A (en) Control method for parallel tests on multi-core array and after-silicon verification system
Guan et al. Chaser: An enhanced fault injection tool for tracing soft errors in mpi applications
Thomm et al. Automated application of fault tolerance mechanisms in a component-based system
Baier et al. Waiting for locks: How long does it usually take?
CN114385258A (en) Automatic testing method and device, electronic equipment and storage medium
US8024168B2 (en) Detecting X state transitions and storing compressed debug information
CN110928705B (en) Communication characteristic analysis method and system for high-performance computing application
CN113704040A (en) Microprocessor memory reliability testing method
CN100426253C (en) Test method of a database depended software unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620