CN103944181A - Power generation and distribution intelligent monitoring system - Google Patents

Power generation and distribution intelligent monitoring system Download PDF

Info

Publication number
CN103944181A
CN103944181A CN201310693939.6A CN201310693939A CN103944181A CN 103944181 A CN103944181 A CN 103944181A CN 201310693939 A CN201310693939 A CN 201310693939A CN 103944181 A CN103944181 A CN 103944181A
Authority
CN
China
Prior art keywords
power
load
power generator
air switch
generator set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310693939.6A
Other languages
Chinese (zh)
Inventor
卜艳红
钟伟亮
喻小涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tellhow Sci Tech Co Ltd
Original Assignee
Tellhow Sci Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tellhow Sci Tech Co Ltd filed Critical Tellhow Sci Tech Co Ltd
Priority to CN201310693939.6A priority Critical patent/CN103944181A/en
Publication of CN103944181A publication Critical patent/CN103944181A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a power generation and distribution intelligent monitoring system comprising a touch screen, an integrated management device, multiple power generator set control devices, multiple load monitoring instruments, a commercial power monitoring instrument, a power generator set air switch, a load air switch and a commercial power switch. RS485 asynchronous serial communication is performed among the integrated management device and the power generator set control devices, the commercial power monitoring instrument and the load monitoring instrument respectively. The touch screen and the integrated management device are connected by adopting an RJ45 interface. The integrated management device controls the power generator set air switch, the load air switch and a commercial power switch closing-switching brake according to monitoring data. Commercial power, power generation and power utilization situations are monitored in a concentrated way; the number of power generator sets in use and the generated power of each power generator set are automatically controlled in a remote way according to the size of electricity loads; the power generator sets are managed in a remote and parallel connection way so that parallel operation of any combinations of the power generator sets can be realized; and automatic grid connection and seamless switching of the power generator sets and commercial power can be controlled in the remote way.

Description

One is transported to electric intelligent monitor system
Technical field
The present invention relates to one and be transported to electricity consumption monitoring system, relate in particular to a kind of remote monitoring that can realize being transported to electric system, simultaneously to the electric intelligent monitor system of being transported to of electric loading continued power.
Background technology
Due to the strong growth of need for electricity and the hysteresis of electric power development, imbalance between supply and demand becomes increasingly conspicuous, there is the situation of power cuts to limit consumption most areas, the whole nation in dry season or megathermal period, generating set, as emergency standby power, is widely applied in fields such as electric power system, industrial and mining enterprises, communal facility, intelligent building, communication base stations.Gen-set control system can be realized single unit control, Data Detection, and the functions such as status alert, and can carry out three remote control systems to unit by computer.
But separate unit generating set is owing to being subject to, and power is low, the restriction of factor such as a little less than Reliability Assurance ability, cannot meet the demand in high-power emergence power place.Generally according to load capacity now, adopt the pattern power supply of many Parallel Operation of Power Units, this pattern each unit in management is separate, be difficult to quick observation, detect all operating states of the units and data, load data, mains-supplied state and data, management cost is high, handling failure speed is slow, the inferior problem of inefficiency.For the occasion that has heavy load, common way of past is the capacity (2 ~ 2.5 times) that increases supporting with it generating set, and the power that generating set sends is in this case only 30% left and right of rated capacity.So not only increase the investment of equipment, caused the phenomenon of low load with strong power, and made generating set more easily produce fault because fuel oil can not fully burn.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, the long distance control system that provide a kind of and be applicable to multi-machine parallel connection, has heavy load, the occasion of power cuts to limit consumption is used, the core technologies such as application integrated management, serial communication, touch-screen software configuration, it has solved conventional electric generators group and has placed the shortcoming of disperseing, being difficult to centralized management, startup heavy load difficulty, civil power generating power-off switching etc.
The present invention realizes like this, it comprises touch-screen, comprehensive management apparatus, some generator set control devices, several load monitoring instrument, city's electrical instrumentation, generating set air switch, load air switch and urban electric power switch, comprehensive management apparatus and generator set control device, between civil power measuring instrument and load monitoring instrument, all adopt RS485 asynchronous serial communication, between touch-screen and comprehensive management apparatus, adopt RJ45 interface to connect, comprehensive management apparatus gathers generator set control device by RS485 interface, load monitoring instrument, the data of city's electrical instrumentation, process by analysis, transmit and be presented on touch-screen.
Generator set control device can be realized single unit control, the Data Detection such as voltage, electric current, rotating speed, power, oil pressure, water temperature;
Load monitoring instrument can realize the data monitoring such as load side voltage, electric current;
City's electrical instrumentation can be realized data monitorings such as line voltages;
Comprehensive management apparatus manages respectively each collected equipment, and generating to whole system and detecting with electric process, by comprehensive power management algorithm, according to the data that collect, reasonably control diesel generating set start and stop, multi-machine parallel connection, multi-machine parallel connection grid-connected and generating set and civil power seamless switching, thereby realize centralized control, realize uninterrupted power supply, energy-conservation power supply;
By comprehensive management apparatus, monitor city's electricity condition, and control on this basis the start and stop of generating set.After civil power dead electricity, powered to the load by separate unit or many generating set parallel connections; Behind city power recovery, first by grid-connected to generating set and the civil power of operation, then transferring load, by mains-supplied, avoid secondary to have a power failure, realize generating set and civil power seamless switching;
By comprehensive management apparatus, monitoring system load condition, and the corresponding generating set of start and stop on this basis, according to the power of the load generated output of every generating set of allotment in real time, solved heavy load and started the large problem of immediate current simultaneously;
Touch-screen shows the data message about generating set, civil power, load of comprehensive management apparatus transmission in real time, simultaneously, operator sends order by touch-screen to comprehensive management apparatus, control start-stop of generator set machine, and the closing point of air switch, realize multi-machine parallel connection, multi-machine parallel connection grid-connected and generating set and civil power seamless switching;
The present invention can realize the monitoring of the number of number of units to any generating set, civil power way, load, has extensibility.For a fairly large number of occasion of monitoring, can utilize the mode that increases communication interface, accelerate communication speed.
Technique effect of the present invention is: 1, centralized monitor, reduce management cost, and accelerate failure response speed, increase work efficiency; 2, touch screen operation is convenient, directly perceived, is easy to observe; 3, the start and stop of Long-distance Control generating set, parallel connection, grid-connected, realize centralized control; 4,, according to load, the corresponding unit of start and stop, solves heavy load and starts the large problem of transient starting electric current; 5, Long-distance Control generating set and civil power auto-parallel, seamless switching; 6, system has extensibility.
Brief description of the drawings
Fig. 1 is patent functional-block diagram of the present invention.
Fig. 2 is the embodiment 1 comprehensive management apparatus monitoring process flow chart of patent of the present invention.
Fig. 3 is the embodiment 2 comprehensive management apparatus control system figure of patent of the present invention.
Fig. 4 is the embodiment 2 comprehensive management apparatus control procedure flow charts of patent of the present invention.
Embodiment
Shown in Fig. 1, be transported to electric intelligent monitor system and comprise: touch-screen, comprehensive management apparatus, some generator set control devices, some load monitoring instrument, 1 city's electrical instrumentation.Between comprehensive management apparatus and generator set control device, civil power measuring instrument, load monitoring instrument, adopt RS485 asynchronous serial communication, between touch-screen and comprehensive management apparatus, adopt RJ45 interface to connect.Comprehensive management apparatus gathers generator set control device by RS485 interface, load monitoring instrument, and the data of city's electrical instrumentation, process by analysis, transmit and are presented on touch-screen, realize telemonitoring; According to monitor data, control generating set air switch, load air switch and urban electric power switch and open and close.
Described generator set control device can Real-Time Monitoring unit generating set the data such as voltage, electric current, frequency, rotating speed, power, oil pressure, water temperature;
Described load monitoring instrument can Real-Time Monitoring load voltage, electric current, by data such as power consumptions;
Described civil power measuring instrument can Real-Time Monitoring civil power the data such as voltage, frequency;
Shown in Fig. 2, in the present embodiment 1, contain 5 road generator groups, 1 road civil power, 2 tunnel loads.
1) comprehensive management apparatus reads the running state data of generating set, judges that by these data whether this generating set is in operation;
2) if this generating set reads the data of this generating set in operation, if this generating set is not in operation, read the running state data of next generating set, turn back to step 1;
3) whether touch screen scanning has write operation, for example, start, stop, in parallel, grid-connected etc., sends a command to corresponding slave station generator set control device and realizes start and stop operation, or send order and realize air switch on/off switch if having;
4) detect whether there is civil power, if there are the data that read civil power;
5) whether detection No. 2 load switches are closed, if 2 road complete closures, illustrative system, being with 2 tunnel loads, reads the data of 2 tunnel loads successively; If 1 way switch closure, reads the data of this road load.
6) judge whether the data acquisition of 5 generating sets of 1 circulation, started next circulation if complete, turned back to step 1; If do not complete the running state data that reads next unit, turn back to step 2.
Embodiment 2, shown in Fig. 3, comprehensive management apparatus receives the signal that load will access, according to the capacity of current operational system and load capacity, determine the quantity of wanting starter-generator group, and the corresponding generating set of startup of giving an order, the parallel connection same period of each generating set, finally close load switch, for the occasion that has civil power, preferentially carried by civil power band;
Shown in Fig. 4, comprehensive management apparatus control procedure is as follows:
1) comprehensive management apparatus scanning has load access request, if go to step 2, if do not go to step 8;
2) judge whether system has civil power, if there is civil power, close urban electric power switch, carried by civil power band; If there is no civil power, disconnect urban electric power switch, go to step 3;
3) this load of judgement access, whether idle capacity is greater than 20%, goes to step 4 if meet, if do not meet and go to step 6;
4) close load switch, go to step 5;
5) detect civil power and whether recover, if recover, go to step 7, if do not recover, go to step 1;
6) start next unit, the parallel operation same period, goes to step 3;
7) the generating set simultaneous interconnecting of civil power and operation, transfers load to civil power side, is carried by civil power band, and generating set off-the-line, shuts down, and goes to step 1;
8) comprehensive management apparatus scanning has load to exit request, if go to step 9, if do not go to step 1;
9) judge generating set of off-the-line, whether system idle capacity is greater than 20%, if meet, goes to step 10, if do not meet, goes to step 11;
10) this unit of off-the-line, goes to step 8;
Disconnected load switch, goes to step 2.

Claims (3)

1. be transported to electric intelligent monitor system for one kind, it comprises touch-screen, comprehensive management apparatus, some generator set control devices, several load monitoring instrument, city's electrical instrumentation, generating set air switch, load air switch and urban electric power switch, it is characterized in that, comprehensive management apparatus connects touch-screen, city's electrical instrumentation, several generator set control devices and several load monitoring instrument are all connected comprehensive management apparatus by communication interface, and comprehensive management apparatus also connects respectively generating set air switch, load air switch and urban electric power switch.
2. one as claimed in claim 1 is transported to electric intelligent monitor system, it is characterized in that, it is to connect by RJ45 interface that described comprehensive management apparatus connects touch-screen.
3. one as claimed in claim 1 is transported to electric intelligent monitor system, it is characterized in that, described communication interface is RS485 asynchronous serial communication interface.
CN201310693939.6A 2013-12-18 2013-12-18 Power generation and distribution intelligent monitoring system Pending CN103944181A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310693939.6A CN103944181A (en) 2013-12-18 2013-12-18 Power generation and distribution intelligent monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310693939.6A CN103944181A (en) 2013-12-18 2013-12-18 Power generation and distribution intelligent monitoring system

Publications (1)

Publication Number Publication Date
CN103944181A true CN103944181A (en) 2014-07-23

Family

ID=51191731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310693939.6A Pending CN103944181A (en) 2013-12-18 2013-12-18 Power generation and distribution intelligent monitoring system

Country Status (1)

Country Link
CN (1) CN103944181A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377809A (en) * 2014-11-25 2015-02-25 常熟市五爱电器设备有限公司 Intelligent control device of communication station low-voltage distribution system
CN107565685A (en) * 2017-09-21 2018-01-09 泰豪科技股份有限公司 A kind of power output control method and device
CN108614414A (en) * 2018-06-07 2018-10-02 江苏道康发电机组有限公司 Large-scale data center generating set dynamic redundancy control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1457123A (en) * 2003-05-08 2003-11-19 沈阳工业学院 Intelligent distributing and transforming devices
CN202260529U (en) * 2011-09-23 2012-05-30 沈阳黎明航空发动机(集团)有限责任公司 Direct-current power supply and UPS (Uninterrupted Power Supply) integrated power-supply system for gas turbine generator set
CN102801208A (en) * 2012-08-31 2012-11-28 安徽工业大学 Multi-path power supply intelligent scheduling manager and control method thereof
CN102882272A (en) * 2012-06-26 2013-01-16 兰州海红技术股份有限公司 Intelligent alternating current distribution lightning protection and branch energy consumption monitoring system of base station
US20130297090A1 (en) * 2011-01-06 2013-11-07 Koninklijke Philips N.V. Electrical energy distribution apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1457123A (en) * 2003-05-08 2003-11-19 沈阳工业学院 Intelligent distributing and transforming devices
US20130297090A1 (en) * 2011-01-06 2013-11-07 Koninklijke Philips N.V. Electrical energy distribution apparatus
CN202260529U (en) * 2011-09-23 2012-05-30 沈阳黎明航空发动机(集团)有限责任公司 Direct-current power supply and UPS (Uninterrupted Power Supply) integrated power-supply system for gas turbine generator set
CN102882272A (en) * 2012-06-26 2013-01-16 兰州海红技术股份有限公司 Intelligent alternating current distribution lightning protection and branch energy consumption monitoring system of base station
CN102801208A (en) * 2012-08-31 2012-11-28 安徽工业大学 Multi-path power supply intelligent scheduling manager and control method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377809A (en) * 2014-11-25 2015-02-25 常熟市五爱电器设备有限公司 Intelligent control device of communication station low-voltage distribution system
CN107565685A (en) * 2017-09-21 2018-01-09 泰豪科技股份有限公司 A kind of power output control method and device
CN108614414A (en) * 2018-06-07 2018-10-02 江苏道康发电机组有限公司 Large-scale data center generating set dynamic redundancy control system

Similar Documents

Publication Publication Date Title
CN102593832B (en) Three-wire DC microgrid system suitable for modern buildings and control method thereof.
CN202994943U (en) Overhead line fault detector
CN204440126U (en) The automatically-monitored controller of diesel generator set
CN101834464A (en) Charging pile for electric vehicle
CN101997335A (en) Power supply control system and control method
CN103944181A (en) Power generation and distribution intelligent monitoring system
CN201541055U (en) PLC-based distribution cabinet of medium and small sized wind/solar hybrid generation system
CN203119559U (en) Distributed direct-current power source monitoring device
CN207283254U (en) Stand-by power supply free switching system
CN203674797U (en) Station power microgrid main wiring system
CN102983628B (en) Photovoltaic combiner box
CN205157750U (en) Direct current back -up source capacity detection device
CN207652134U (en) Pumped storage Auxiliary Power Control System
CN208806479U (en) A kind of power distribution network ring network cabinet of automatic improving
CN116388374A (en) Method and equipment for quickly starting electric field scene emergency power supply suitable for unattended operation
CN203562822U (en) A system for the butt joint and the configuration between a multi-module backup battery management system and a DC bus
CN203205969U (en) Multi-energy and multi-mode uninterruptible power supply based on CAN bus
CN101741022B (en) PLC-based distribution cabinet of middle/small-size wind-solar hybrid generation system
CN201980872U (en) Uninterruptible power supply transfer system of rubber-tyred gantry crane
CN211405579U (en) Intelligent standby power system of integrated cabinet
CN203135554U (en) Power equipment monitoring device
CN109687535B (en) Comprehensive guarantee power supply system
CN207124489U (en) A kind of Intelligent power distribution system of high RST transmission stability
CN206524680U (en) Emergency power supply control system
CN203722327U (en) A bridging structure used for a high voltage direct current power supply apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140723