CN103944163A - 一种复合变电站系统 - Google Patents
一种复合变电站系统 Download PDFInfo
- Publication number
- CN103944163A CN103944163A CN201410171703.0A CN201410171703A CN103944163A CN 103944163 A CN103944163 A CN 103944163A CN 201410171703 A CN201410171703 A CN 201410171703A CN 103944163 A CN103944163 A CN 103944163A
- Authority
- CN
- China
- Prior art keywords
- transformer
- substation
- double
- substations
- bus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明涉及一种复合变电站系统,包括经电网连接的枢纽站、中心变电站、中间变电站及终端变电站,枢纽站设有4~8组变压器,采用一个半断路器接线,设置16-24回路的出线与中心变电站连接,中心变电站设有3-4台主变压器,采用双母线双分段接线从枢纽站或电厂受电,设置9-20回路的进出线与中间变电站和/或终端变电站连接,中间变电站采用双母线、双母线单分段、双母线双分段接线连接受电,设置6-12回进出线与中心变电站、其它中间变电站或终端变电站连接,终端变电站不向其它变电站传输电力,接线采用带有断路器线路的变压器。本发明将不同变电站进行连接、方便进行线路检测维修,电流输送安全。
Description
技术领域
本发明涉及一种变电站,尤其是涉及一种复合变电站系统。
背景技术
目前市场上现有的变电站的功能大多比较单一。另外,对于适用于不同情况及场合的变电站,无法通过有效的网络进行相互串联,从而使得变电站的应用趋于最大化,因此,如何设计得到适用广泛的复合变电站系统已经成为亟待解决的一个技术问题。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种将不同变电站进行连接、方便进行线路检测维修的复合变电站系统。
本发明的目的可以通过以下技术方案来实现:
一种复合变电站系统,包括经电网连接的枢纽站、中心变电站、中间变电站及终端变电站,
所述的枢纽站一般设有4台主变压器,变压器采用半断路器接线,设置16-24回路的出线与中心变电站连接,
所述的中心变电站设有3-4台主变压器,采用双母线双分段接线从枢纽站或电厂受电,设置9-20回路的进出线与中间变电站或终端变电站连接,
所述的中间变电站全部或部分回路从中心变电站或其它变电站受电,采用双母线、双母线单分段、双母线双分段接线连接受电,设置6-12回进出线与中心变电站、其它变电站或终端变电站连接,
所述的终端变电站不向其它变电站传输电力,接线采用带有断路器线路的变压器。
所述的枢纽站为500kV变电站,采用的主变压器为双绕组变压器,该变压器的容量为750MVA-1500MVA。
所述的主变压器的容量优选750MVA,1000MVA,1200MVA或1500MVA。
所述的中心变电站为220kV变电站,采用的主变压器为三绕组变压器,该变压器的容量为180MVA-300MVA。
所述的主变压器的容量优选180MVA、240MVA、300MVA。
所述的中间变电站为220kV变电站,在中间变电站内设置三绕组或双绕组变压器。
所述的终端变电站为220kV变电站,在终端变电站内设置三绕组变压器。
所述的电网为大截面架空线和电缆构成的输电网络。
与现有技术相比,本发明具有以下优点:
(1)对于适用不同电压的变电站采用不同容量的主变压器;
(2)针对不同的变电站采用了不同的回路以及接线方式,保证了电流传输的安全性能。
附图说明
图1为本发明的结构示意图。
图中,1为枢纽站、2为中心变电站、3为中间变电站、4为终端变电站、5为大截面架空线、6为双绕组变压器、7为三绕组变压器。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
一种复合变电站系统,其结构如图1所示,包括经电网连接的枢纽站1、中心变电站2、中间变电站3及终端变电站4,其中使用的电网为大截面架空线5构成的电流输送网络。
枢纽站1为500kV变电站,设有4台主变压器,为双绕组变压器6,变压器的容量为750MVA-1500MVA。在本实施例中,双绕组变压器6的容量为750MVA,1000MVA,1200MVA或1500MVA。采用一个半断路器接线,设置16-24回路的出线与中心变电站连接。中心变电站2为220kV变电站,设有3-4台主变压器,本实施例中设有3台三绕组变压器7,变压器的容量为180MVA-300MVA。在本实施例中,主变压器的容量为180MVA、240MVA、300MVA。采用双母线双分段接线从枢纽站或电厂受电,设置9-20回路的进出线与中间变电站或终端变电站连接,中间变电站为220kV变电站,3全部或部分回路从中心变电站或其它变电站受电,采用双母线、双母线单分段、双母线双分段接线连接受电,设置6-12回进出线与中心变电站2、其它变电站3或终端变电站4连接。终端变电站4为220kV变电站,不向其它变电站传输电力,接线采用带有断路器线路的变压器。
Claims (8)
1.一种复合变电站系统,其特征在于,包括经电网连接的枢纽站、中心变电站、中间变电站及终端变电站,
所述的枢纽站设有4台主变压器,变压器采用一个半断路器接线,设置16-24回路的出线与中心变电站连接,
所述的中心变电站设有3-4台主变压器,采用双母线双分段接线从枢纽站或电厂受电,设置9-20回路的进出线与中间变电站或终端变电站连接,
所述的中间变电站全部或部分回路从中心变电站或其它变电站受电,采用双母线、双母线单分段、双母线双分段接线连接受电,设置6-12回进出线与中心变电站、其它变电站或终端变电站连接,
所述的终端变电站不向其它变电站传输电力,接线采用带有断路器线路的变压器。
2.根据权利要求1所述的一种复合变电站系统,其特征在于,所述的枢纽站为500kV变电站,采用的主变压器为双绕组变压器,该变压器的容量为750MVA-1500MVA。
3.根据权利要求1所述的一种复合变电站系统,其特征在于,所述的主变压器的容量优选750MVA,1000MVA,1200MVA或1500MVA。
4.根据权利要求2所述的一种复合变电站系统,其特征在于,所述的中心变电站为220kV变电站,采用的主变压器为三绕组变压器,该变压器的容量为180MVA-300MVA。
5.根据权利要求4所述的一种复合变电站系统,其特征在于,所述的主变压器的容量优选180MVA、240MVA、300MVA。
6.根据权利要求3所述的一种复合变电站系统,其特征在于,所述的中间变电站为220kV变电站,在中间变电站内设置双绕组或三绕组变压器。
7.根据权利要求4所述的一种复合变电站系统,其特征在于,所述的终端变电站为220kV变电站,在终端变电站内设置三绕组变压器。
8.根据权利要求1-7中任一项所述的一种复合变电站系统,其特征在于,所述的电网为大截面架空线和电缆构成的输电网络。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410171703.0A CN103944163B (zh) | 2014-04-25 | 2014-04-25 | 一种复合变电站系统 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410171703.0A CN103944163B (zh) | 2014-04-25 | 2014-04-25 | 一种复合变电站系统 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103944163A true CN103944163A (zh) | 2014-07-23 |
| CN103944163B CN103944163B (zh) | 2016-06-08 |
Family
ID=51191713
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410171703.0A Active CN103944163B (zh) | 2014-04-25 | 2014-04-25 | 一种复合变电站系统 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103944163B (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106300032A (zh) * | 2016-10-12 | 2017-01-04 | 四川电力设计咨询有限责任公司 | 双母线单分段配电装置的母线立体布置结构 |
| CN106356724A (zh) * | 2016-10-11 | 2017-01-25 | 四川电力设计咨询有限责任公司 | 双母线双分段配电装置的母线立体布置结构 |
| CN112542839A (zh) * | 2020-12-11 | 2021-03-23 | 深圳供电局有限公司 | 一种电力系统结构 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101916988A (zh) * | 2010-06-11 | 2010-12-15 | 中铁电气化勘测设计研究院有限公司 | 一种供电环网的智能保护回路架构系统及智能保护方法 |
| CN102208811A (zh) * | 2011-05-18 | 2011-10-05 | 上海市电力公司 | 含微网的配电网络的接线结构 |
| CN103138171A (zh) * | 2013-02-08 | 2013-06-05 | 国家电网公司 | 一种电力电子变电站 |
| CN203839947U (zh) * | 2014-04-25 | 2014-09-17 | 国网上海市电力公司 | 一种复合结构的变电站系统 |
-
2014
- 2014-04-25 CN CN201410171703.0A patent/CN103944163B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101916988A (zh) * | 2010-06-11 | 2010-12-15 | 中铁电气化勘测设计研究院有限公司 | 一种供电环网的智能保护回路架构系统及智能保护方法 |
| CN102208811A (zh) * | 2011-05-18 | 2011-10-05 | 上海市电力公司 | 含微网的配电网络的接线结构 |
| CN103138171A (zh) * | 2013-02-08 | 2013-06-05 | 国家电网公司 | 一种电力电子变电站 |
| CN203839947U (zh) * | 2014-04-25 | 2014-09-17 | 国网上海市电力公司 | 一种复合结构的变电站系统 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106356724A (zh) * | 2016-10-11 | 2017-01-25 | 四川电力设计咨询有限责任公司 | 双母线双分段配电装置的母线立体布置结构 |
| CN106300032A (zh) * | 2016-10-12 | 2017-01-04 | 四川电力设计咨询有限责任公司 | 双母线单分段配电装置的母线立体布置结构 |
| CN112542839A (zh) * | 2020-12-11 | 2021-03-23 | 深圳供电局有限公司 | 一种电力系统结构 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103944163B (zh) | 2016-06-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102403780A (zh) | 旁路不停电作业供电设备 | |
| CN106099917A (zh) | 一种变电站负荷转供方案快速确定的方法 | |
| CN103344869B (zh) | 一种适用于6~35kV配电网的断线报警装置及报警方法 | |
| CN103944163B (zh) | 一种复合变电站系统 | |
| CN212114724U (zh) | 一种10kV固定式交流融冰装置 | |
| CN203839947U (zh) | 一种复合结构的变电站系统 | |
| CN201918730U (zh) | 特高压直流换流站直流场 | |
| CN103280777A (zh) | 双极高压直流输电系统的线路保护方法和系统 | |
| CN203871849U (zh) | 一种核电厂用高压开关站主变间隔t区的保护系统 | |
| CN203826779U (zh) | 一种35kV变电站接线系统 | |
| CN204857351U (zh) | 避雷器 | |
| CN106099916A (zh) | 一种110kV变电站负荷转供方案快速确定的方法 | |
| CN203596424U (zh) | 一种电缆终端接线装置 | |
| CN205921252U (zh) | 一种分布式电源并网专用配电箱 | |
| CN106059050B (zh) | 室外10kV开闭站四供二备供电系统 | |
| CN202840267U (zh) | 一种用于整体式计量柜的一次接线回路 | |
| CN203607729U (zh) | 紧凑型35kV变电站 | |
| CN218352256U (zh) | 一种特高压换流站站用电备用电源线路 | |
| CN104577928B (zh) | 三相架空导线 | |
| CN205864047U (zh) | 一种室外10kV开闭站四供二备供电系统 | |
| CN103354325A (zh) | 一种带负荷更换负荷开关的方法 | |
| CN205231295U (zh) | 一种负荷开关用高压绝缘保护线 | |
| CN204857994U (zh) | 35kV电缆金属护层外接式接地保护箱 | |
| CN204068255U (zh) | 一种终端k型站双环网供电结构 | |
| CN202473393U (zh) | 交叉互联无感同轴电缆 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |