CN103938889B - The Huge Steel Open that a kind of floor compartment connects supports and the practice - Google Patents
The Huge Steel Open that a kind of floor compartment connects supports and the practice Download PDFInfo
- Publication number
- CN103938889B CN103938889B CN201410144089.9A CN201410144089A CN103938889B CN 103938889 B CN103938889 B CN 103938889B CN 201410144089 A CN201410144089 A CN 201410144089A CN 103938889 B CN103938889 B CN 103938889B
- Authority
- CN
- China
- Prior art keywords
- floor
- web
- wing
- edge
- welds
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003466 welding Methods 0.000 claims abstract description 36
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 18
- 239000010959 steel Substances 0.000 claims abstract description 18
- 230000009286 beneficial effect Effects 0.000 claims abstract description 7
- 238000003032 molecular docking Methods 0.000 claims description 5
- 238000002360 preparation method Methods 0.000 claims 1
- 239000007787 solid Substances 0.000 abstract description 2
- 238000005728 strengthening Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The Huge Steel Open that the present invention relates to the connection of a kind of floor compartment supports and the practice, and this support comprises the edge of a wing, web, floor, floor connecting elements.Floor is arranged at web perpendicular bisector, and first welds with web, and after floor has welded with web, web welds with the edge of a wing again, and then assembly welding becomes box-type section, finally welds floor connecting elements.The present invention can obtain following beneficial effect: on web perpendicular bisector, weld floor and can lateral connection between strengthening web with connecting elements welding between floor, prevent web local buckling, meet the requirement of ratio of height to thickness, and solid plate frame is easier welds huge supporting section than using, can also rolled steel dosage be reduced, reduce cost.Solve the problem of supporting welding assembling inconvenience simultaneously, accelerate speed of application, the reduction of erection time, reduce cost.
Description
Technical field
The present invention relates to a kind of bracing or strutting arrangement of building structure, the Huge Steel Open that particularly a kind of floor compartment connects supports and the practice.
Background technology
Along with rising to of China's economic level, the progress of building technology, increasing complicated Super High stands erect in metropolis.These complicated super highrise buildings generally adopt the form of structure of " mega-frame-Core Walls Structure ".In order to structure can obtain larger integral rigidity and good shock resistance, Huge Steel Open to be set between colossal column and support.
The giant frame structure system adopting band Huge Steel Open to support, significantly alleviates the adverse effect that traditional Steel-concrete Composite " concrete inner core is strong, and shaped steel urceolus is weak " produces structure.Under the prerequisite realizing multi-way prevention, reduce concrete core cylinder Stiffness Deterioration, stress redistribution under rarely occurred earthquake and, to the detrimental effect of shaped steel outside framework, improve the general safety deposit of structure.
Because Huge Steel Open supporting section is larger, it generally adopts welding box-shaped steel cross section, and it will meet the flakiness ratio limit value of regulation and stipulation and prevent component partial unstability, and for this reason, Huge Steel Open supports often needs setting to put more energy into floor to meet code requirement.And arrange in the middle part of Huge Steel Open support webs full wafer put more energy into floor time, not only Huge Steel Open supports and not easily constructs with the connection of huge post and the close post of each floor, and to support self cross section welding procedure also not easily, also create the waste of steel, the construction period can be caused to extend, the construction quality supported not easily ensures, cost is also high.
Summary of the invention
The Huge Steel Open that the object of the present invention is to provide a kind of floor compartment to connect supports and the practice, Huge Steel Open can be solved support and huge post connection construction problem, under the prerequisite meeting its strength and stability, the problem of supporting welding assembling inconvenience can be solved, can also cost be saved again.
The technical solution adopted in the present invention is that the Huge Steel Open that a kind of floor compartment connects supports and the practice for achieving the above object, and the Huge Steel Open that this floor compartment connects supports and comprises the edge of a wing 1, web 2, floor 3, floor connecting elements 4; Article two, web 2 is parallel to each other, and two floors 3 are arranged at web 2 perpendicular bisector and are positioned at same plane, and welds respectively with each web 2, leaves gap in the middle of two floors 3; After floor 3 has welded with web 2, web 2 welds with the edge of a wing 1 again, and the described edge of a wing 1 is welded on floor 3 two ends, and two edges of a wing 1, the common assembly weldings of web 2 become box-type section; Article two, the gap location that floor 3 leaves finally welds floor connecting elements 4; All components are by the above-mentioned Huge Steel Open support connecting to form floor compartment and connect, and its cross section is day font.
The making step that this Huge Steel Open supports is as follows:
S1 web 2 welds with floor 3, and floor 3 is arranged on web perpendicular bisector, can open and get groove accurately to locate and to ensure welding quality, get groove if can ensure that welding quality also can not be opened and directly weld during welding floor 3;
S2 web 2 welds with the edge of a wing 1, and its welding position is apart from the twice edge of a wing, web 2 edge thickness of slab;
The component that S2 welds by S3 carries out assembly welding and becomes box-type section;
S4 welds floor connecting elements on floor 3, on itself and Kai Qu slope, floor 3 junction, is beneficial to carry out docking with floor 3 and welds, and final composition Huge Steel Open supports.
Compared with prior art, the present invention can obtain following beneficial effect.
Web perpendicular bisector welding floor and web local buckling can be prevented with connecting elements welding between floor, meet the requirement of ratio of height to thickness, and solid plate frame is easier welding huge supporting section than using, and can also reduce rolled steel dosage, reduces cost.Solve the problem of supporting welding assembling inconvenience simultaneously, accelerate speed of application, reduction of erection time, minimizing cost.
Accompanying drawing explanation
Fig. 1 is the Huge Steel Open supporting section schematic diagram that floor compartment of the present invention connects.
Fig. 2 is schematic perspective view of the present invention.
Fig. 3 is that the present invention assembles S1, S2 schematic diagram.
Fig. 4 is that the present invention assembles S3, S4 schematic diagram.
In figure: 1, the edge of a wing, 2, web, 3, floor, 4, floor connecting elements.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As Fig. 1-4, the Huge Steel Open that a kind of floor compartment connects supports and the practice, and the Huge Steel Open that this floor compartment connects supports and comprises the edge of a wing 1, web 2, floor 3, floor connecting elements 4; Article two, web 2 is parallel to each other, and two floors 3 are arranged at web 2 perpendicular bisector and are positioned at same plane, and welds respectively with each web 2, leaves gap in the middle of two floors 3; After floor 3 has welded with web 2, web 2 welds with the edge of a wing 1 again, and the described edge of a wing 1 is welded on floor 3 two ends, and two edges of a wing 1, the common assembly weldings of web 2 become box-type section; Article two, the gap location that floor 3 leaves finally welds floor connecting elements 4; All components are by the above-mentioned Huge Steel Open support connecting to form floor compartment and connect, and its cross section is day font.
The described edge of a wing 1 is rectangular steel plates, and its thickness will meet the requirement of flakiness ratio, and steel plate model selects Q235 or Q345.
Described web 2 is rectangular steel plates, and steel plate model is identical with the edge of a wing 1, and its thickness is general identical with the edge of a wing 1, welds floor 3 in the middle part of web 2.Can open during welding floor 3 and get groove accurately to locate and to ensure welding quality, get groove if can ensure that welding quality also can not be opened and directly weld.
The steel plate model that described floor 3 adopts is with web 2 or a low strength grade, and thickness is 1/3 ~ 1/2 of web 2 thickness.Floor 3 and web are welded to connect.
The steel plate model that described floor connecting elements 4 adopts with floor 3 or a low strength grade, the same floor of thickness, and on itself and Kai Qu slope, floor 3 junction, be beneficial to carry out docking with floor 3 and weld.
The making step that this Huge Steel Open supports is as follows:
S1 web 2 welds with floor 3, and floor 3 is arranged on web perpendicular bisector, can open and get groove accurately to locate and to ensure welding quality, get groove if can ensure that welding quality also can not be opened and directly weld during welding floor 3;
S2 web 2 welds with the edge of a wing 1, and its welding position is apart from the twice edge of a wing, web 2 edge thickness of slab;
The component that S2 welds by S3 carries out assembly welding and becomes box-type section;
S4 welds floor connecting elements on floor 3, on itself and Kai Qu slope, floor 3 junction, is beneficial to carry out docking with floor 3 and welds, and final composition Huge Steel Open supports.
Be more than exemplary embodiments of the present invention, enforcement of the present invention is not limited thereto.
Claims (2)
1. the Huge Steel Open of a floor compartment connection supports, and it is characterized in that: the Huge Steel Open that this floor compartment connects supports and comprises the edge of a wing (1), web (2), floor (3), floor connecting elements (4); Article two, web (2) is parallel to each other, and two floors (3) are arranged at web (2) perpendicular bisector and are positioned at same plane, and weld respectively with each web (2), leaves gap in the middle of two floors (3); After floor (3) has welded with web (2), web (2) welds with the edge of a wing (1) again, the described edge of a wing (1) is welded on floor (3) two ends, and two edges of a wing (1), the common assembly weldings of web (2) become box-type section; Article two, the gap location that floor (3) leaves finally welds floor connecting elements (4); All components are by the above-mentioned Huge Steel Open support connecting to form floor compartment and connect, and its cross section is day font;
The described edge of a wing (1) is rectangular steel plates, and its thickness will meet the requirement of flakiness ratio, and steel plate model selects Q235 or Q345;
Described web (2) is rectangular steel plates, and steel plate model is identical with the edge of a wing (1), and its thickness is identical with the edge of a wing (1), at web (2) middle part welding floor (3); During welding floor (3), open and get groove accurately to locate and to ensure welding quality, if can welding quality be ensured, do not open and get groove and directly weld;
The steel plate model that described floor (3) adopts an or low strength grade identical with web (2), thickness is 1/3 ~ 1/2 of web (2) thickness; Floor (3) and web are welded to connect;
The steel plate model that described floor connecting elements (4) adopts an or low strength grade identical with floor (3), the same floor of thickness, and on itself and Kai Qu slope, floor (3) junction, be beneficial to carry out docking with floor (3) and weld.
2. the preparation method step that the Huge Steel Open connected according to a kind of floor compartment according to claim 1 supports, is characterized in that:
S1 web (2) welds with floor (3), floor (3) is arranged on web perpendicular bisector, open during welding floor (3) and get groove accurately to locate and to ensure welding quality, if can welding quality be ensured, also can not open and get groove and directly weld;
S2 web (2) welds with the edge of a wing (1), and its welding position is apart from the twice edge of a wing, web (2) edge thickness of slab;
The component that S2 welds by S3 carries out assembly welding and becomes box-type section;
S4, at floor (3) upper welding floor connecting elements, on itself and Kai Qu slope, floor (3) junction, is beneficial to carry out docking with floor (3) and weld, finally form Huge Steel Open support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410144089.9A CN103938889B (en) | 2014-04-10 | 2014-04-10 | The Huge Steel Open that a kind of floor compartment connects supports and the practice |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410144089.9A CN103938889B (en) | 2014-04-10 | 2014-04-10 | The Huge Steel Open that a kind of floor compartment connects supports and the practice |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103938889A CN103938889A (en) | 2014-07-23 |
CN103938889B true CN103938889B (en) | 2016-04-27 |
Family
ID=51186739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410144089.9A Expired - Fee Related CN103938889B (en) | 2014-04-10 | 2014-04-10 | The Huge Steel Open that a kind of floor compartment connects supports and the practice |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103938889B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104818849B (en) * | 2015-05-17 | 2017-02-01 | 中铁二十局集团第六工程有限公司 | Construction method for space curved rib girder steel structure |
CN115095066A (en) * | 2022-06-25 | 2022-09-23 | 长沙巨星轻质建材股份有限公司 | Assembled self-bearing prestress rib-shaped member |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1849930A1 (en) * | 2006-04-26 | 2007-10-31 | Freyssinet | Support arm for a modular scaffolding system as well as modular scaffolding with such an arm |
CN201738597U (en) * | 2010-07-28 | 2011-02-09 | 中建三局建设工程股份有限公司 | Sectional steel and steel pipe combined type support system of beam with high and large cross section |
CN201786041U (en) * | 2010-09-27 | 2011-04-06 | 北京市新发京建工贸有限公司 | Steel support |
-
2014
- 2014-04-10 CN CN201410144089.9A patent/CN103938889B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1849930A1 (en) * | 2006-04-26 | 2007-10-31 | Freyssinet | Support arm for a modular scaffolding system as well as modular scaffolding with such an arm |
CN201738597U (en) * | 2010-07-28 | 2011-02-09 | 中建三局建设工程股份有限公司 | Sectional steel and steel pipe combined type support system of beam with high and large cross section |
CN201786041U (en) * | 2010-09-27 | 2011-04-06 | 北京市新发京建工贸有限公司 | Steel support |
Also Published As
Publication number | Publication date |
---|---|
CN103938889A (en) | 2014-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103184762B (en) | Multi-story/high-rise fabricated steel structural prestressed supporting system capable of realizing rigid connection of joints | |
CN103206014B (en) | Multi-high-rise assembled steel structure frame supporting system capable of realizing rigid connection of joints | |
CN102995756B (en) | Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method | |
CN202787569U (en) | Eccentric brace type steel plate shear wall | |
CN201850795U (en) | Hinge center support frame steel structure | |
CN106013506A (en) | Anti-buckling steel plate seismic shear wall provided with stiffening ribs | |
CN102758493A (en) | Steel plate built-in eccentric support type steel plate shear wall | |
CN103015535B (en) | A kind of the H weak direction of principal axis of type post and the firm access node structure of H type beam and preparation method thereof | |
CN103469933A (en) | Double steel plate embedded supporting composite thermal insulation shear wall and manufacturing method thereof | |
CN203487640U (en) | Beam column connection T type node applied in top-down method | |
CN103938889B (en) | The Huge Steel Open that a kind of floor compartment connects supports and the practice | |
CN103898975B (en) | Modular many high-rise assembling type steel structure framework eccentrical braces | |
CN201991226U (en) | Flange template support structure | |
CN203559504U (en) | Built-in supporting composite insulation shear wall with double layers of steel pipes | |
CN210636662U (en) | Steel bar truss floor support plate with detachable self-supporting structure | |
CN102191822A (en) | Shearing type parallel mild steel quake-proof damper for building structures | |
CN209585297U (en) | A kind of steel construction assembled beam-column connection structure | |
CN204298962U (en) | A kind of Novel connection node structure | |
CN202090457U (en) | Shearing earthquake-resistant damper for architectural structure with mild steels in parallel | |
CN103882941B (en) | Modular many high-rise assembling type steel structure frame center support systems | |
CN202430900U (en) | Lattice type component structural concrete column | |
CN205116431U (en) | Eccentric connection structure who aligns of beam column | |
CN204418423U (en) | A kind of built-in steel plate composite support shear wall structure | |
CN204112503U (en) | A kind of heating furnace steel structure frame beam column shock-resistant node | |
CN211690765U (en) | Novel horizontal floor supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160427 |
|
CF01 | Termination of patent right due to non-payment of annual fee |