Embodiment
With reference to accompanying drawing of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, shown
So, described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on the reality in the present invention
Example is applied, the every other embodiment that those skilled in the art are obtained belongs to the scope of protection of the invention.
For ease of understanding, especially several terms herein are illustrated, scheduling herein refers to finish receiving RAT events
Data source, system dispatching cycle refers to the supreme time span called time a little from being received network control message.GAP refers to
System is used to carry out the period for the processing of different frequency/different system event in the connection mode, for example, LTE system is deposited in connection mode
6ms length the GAP periods for the processing of different frequency/different system event, the GAP periods in system dispatching cycle in position it is not solid
Fixed, the GAP periods are per 40ms or 80ms reproduces once, as shown in Figure 1;For example TD-SCDMA exists in the connection mode
Interval, its length is 10ms, and every 40,80 or 160ms occurs once, and GGE has Cluster in the connection mode, and it is grown
Spend for 5.77ms, for ease of description, the present invention is unified to represent LTE, TD-SCDMA or GGE system with GAP in the connection mode
For carrying out the period for the processing of different frequency/different system event, and not merely referring to LTE systems is used to carry out in the connection mode
For the period of different frequency/different system event processing.
The communication pattern that the present invention is directed to includes LTE, TD-SCDMA and GGE, is deposited simultaneously in the communication system of above pattern
(It is denoted herein as LTE/TD-SCDMA/GGE multimodes), a kind of pattern is used as connection status(Abbreviation main mould), make for two kinds in addition
For notconnect state(Referred to as from mould)In the case of(The situation abbreviation multimode list is treated), propose user equipment to various RAT events
The method and apparatus being scheduled
As one embodiment of the present invention, multimode list of the present invention treats user equipment RAT event scheduling methods, such as Fig. 2 institutes
Show, including:
S201, basis determine RAT events from the control information of Network Capture;
Network sends control information to user equipment, and user equipment receives control information, then determined according to control information
Go out RAT events;
The control information includes serving cell access network technology pattern, frequency, cell ID etc., and serving cell is user
The cell that equipment is currently resident.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent
Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
S202, principle is determined according to RAT Event Priorities to RAT event orderings, obtain RAT event schedulings order;
In general, user equipment can handle multiple RAT events in a system dispatching cycle, to be processed for needing
Multiple RAT events, it is thus necessary to determine that these RAT Event Priorities;
RAT Event Priorities of the present invention determine principle, including:First priority between determination pattern, preferential in determination pattern again
Level, priority optimizes between finally entering row mode:
Priority includes between the pattern:Main mould is preferential, determined from mould according to evolution priority, and the evolution priority is
LTE>TD-SCDMA>GGE;
The main mould of current connection state has limit priority, other notconnect states from mould according to evolution priority come
Priority height is determined, for example, according to priority principle between above pattern, treating that user sets in LTE/TD-SCDMA/GGE multimode lists
Standby to reside under the connection mode of LTE moulds, priority is LTE between pattern>TD-SCDMA>GGE;It is many in LTE/TD-SCDMA/GGE
Mould list treats that user equipment is resided under the connection mode of TD-SCDMA moulds, and priority is TD-SCDMA between pattern>LTE>GGE, such as
Treat that user equipment is resided under the connection mode of GGE moulds in LTE/TD-SCDMA/GGE multimode lists, priority is GGE between pattern>
LTE>TD-SCDMA。
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>It is small
Area's frame synchronization.
By the processing of priority in priority between above pattern and pattern, at the beginning of a RAT Event Priority can be formed
Step sequence, but treated in view of multimode list under customer equipment connection state, the frequency blind check demand to main mould is minimum, and to real from mould
When synchro measure monitoring have higher demand, so as to gravity treatment/switching, therefore tentatively sorted for RAT Event Priorities, in addition it is also necessary to
Priority is excellent between entering row mode.
Priority optimization includes between the pattern:Presynchronization and measurement priority from mould is excellent higher than the frequency blind check of main mould
First level, the presynchronization from mould and the same principle in accordance with priority in above evolution priority and pattern of measurement.
The tentatively sequence of above RAT Event Priorities will be brought up to the blind check of main mould from the presynchronization of mould and measurement priority
Before, after optimization processing, that is, RAT event schedulings order is formed.
The RAT event schedulings order being here formed as is static priority order, if occurring without special raising priority
Operation, follow-up RAT event schedulings will be carried out successively in this order.
Illustrated below so that LTE/TD-SCDMA/GGE multimode lists treat user equipment as an example.
Found through statistics, the RAT events being related to include the blind check of LTE sign synchronizations, LTE presynchronization, LTE measurements, TDS frames
Synchronization, TDS presynchronization, TDS blind checks, TDS measurement, GGE BSIC initially confirm, GGE BSIC confirm again and GGE measurement;Adopt
Principle is determined with above RAT Event Priorities, it is LTE presynchronization to determine RAT event schedulings order>LTE is measured>TDS presynchronization>
TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured>BSIC initially confirms.
Typically, if system dispatching cycle long enough, each RAT events at least complete once to dispatch before time point is reported
There is residue afterwards, then can also increase measurement event after RAT event scheduling orders, measurement event can be suitable in RAT event schedulings
In sequence repeatedly, such as measurement event is increased behind above RAT event schedulings order, RAT event schedulings sequential update is LTE
Presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured
>BSIC initially confirms>LTE is measured>TDS is measured>GGE is measured;
RAT event schedulings order is obtained after the completion of RAT event orderings, subsequently can successively be dispatched according to the order.
S203, according to RAT event schedulings order, within the GAP periods dispatch RAT events.
Further comprise:The RAT events of highest priority in RAT event scheduling orders are extracted, output is currently needed for processing
RAT event relevant parameters, when the GAP times arrive, carry out the RAT events sample point collection.
It is preferred that, exportable multiple RAT event relevant parameters for being currently needed for processing carry out multiple RAT in same GAP
The collection of event sample point;The multiple RAT events, are limited the time required to being collected by GAP time spans and RAT events sample point
System, no more than two.
Dispatch after a RAT event, the RAT events labeled as non-scheduling, are not being reprocessed into the RAT events, or
Person is discharged to the end of RAT event scheduling orders, and the priority of the RAT events is preferably minimized.
Compared with prior art, the present embodiment is defined by RAT Event Priorities, carries out task to each RAT events in advance
Priority ranking obtains RAT event schedulings order, each task is scheduled according to RAT event schedulings order, it is ensured that each RAT
Event at least completes once to dispatch before time point is reported, and improves the accuracy and real-time to cell monitoring under each pattern.
Above example is considered for the longer situation of system dispatching cycle, but more situations are, system call
There is stricter limitation in cycle so that the time for scheduling is not abundant, in the case, and each RAT events are carried out in advance
Task priority sequence obtains RAT event schedulings order, will in the way of RAT event schedulings order is scheduled to each task
Being likely to result in emergency can not be scheduled, and can cause report time point possibly can not complete the risk of RAT events.
Further, the present invention provides another multimode list and treats user equipment RAT event scheduling embodiments of the method, such as Fig. 3
It is shown, including:
S301, basis determine RAT events from the control information of Network Capture;
The control information includes access network technology pattern, frequency, cell ID of Target cell etc., and Target cell is to work as
Preceding be resident cell.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent
Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
S302, RAT event orderings to be processed are needed to this according to RAT Event Priorities, obtain RAT event schedulings suitable
Sequence;
With specific reference to S202 description, it is necessary to explanation be obtain RAT event schedulings order, be not subsequently according to this
Order is sequentially completed scheduling, after a RAT event scheduling is completed, also needs to be judged, the result of judgement is possible to rear
Continuous dispatching sequence produces influence, as described in content herein below.In other words, the RAT event schedulings order of this step generation can
To regard static priority order as, and in follow-up deterministic process, static priority order may be disturbed, so as to form dynamic
State priority orders.
S303, according to RAT event schedulings order, within the GAP periods dispatch RAT events
With specific reference to S203 description,
S304, judge whether the effecting surplus time is abundant, i.e., whether the effecting surplus time, which is more than, all is not scheduled
The receipts number time of RAT events, if it is, returning to S303, the RAT events for not completing and once dispatching are dispatched in remaining time,
Otherwise, into S305;
The effecting surplus time refers to from the current supreme a little remaining all GAP time spans, i.e. residue GAP of calling time
Number × TGAP, wherein TGAP represent GAP time spans, when main mould is LTE system, and its value is 6ms, and main mould is TD-SCDMA systems
During system, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms.
The effecting surplus time can be obtained from timer, and timer is opened when from Network Capture control information, is passed
Subtract timing, timed length is the supreme time span called time a little from being received network control message.
Preferentially, the timed length be from being received network control message the supreme time span called time a little, reserve
Radio frequency conversion the time required to, report primitive assembling the time required to, it is synchronous recover the time required to sum.
The effecting surplus time can be obtained by GAP numbers, and calculation is,(GAP is always individual in system dispatching cycle
Number-use GAP numbers)×TGAP, wherein TGAPGAP time spans are represented, when main mould is LTE system, its value is 6ms, main mould
During for TD-SCDMA system, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms.
The receipts number time of the RAT events, it can receive the time of number to obtain by each RAT events of counting user equipment,
Relevant with the disposal ability of user equipment, this can be obtained by statistics, be no longer described in detail in Project Realization field.
S305, judge whether that effective remaining time not enough, the even effecting surplus time is to be less than 0 or effecting surplus time
The receipts number time of all RAT events, then into S307, otherwise, into S306;
It was found that the effecting surplus time is seldom or no effecting surplus time or effecting surplus time are less than
The receipts number time of all RAT events, then illustrate to carry out RAT event schedulings without the time.
S306, the RAT events to the receipts number time more than remaining time are scheduled.
What the RAT events that described pair of receipts number time exceedes remaining time were scheduled includes several situation formulas, handles respectively:
If the RAT events more than remaining time are 1, the RAT events are scheduled.
It is if having at least two more than the RAT events of remaining time, i.e., unscheduled in the presence of two kinds and above RAT events, then basis
The RAT events that Event Priority and event receive the determination scheduling of number time are scheduled.
The RAT events that the determination scheduling of number time is received according to Event Priority and event, including:
1)It is calculated over the time exceedance of the RAT events of remaining time
That is, the time difference the time required to sample point is collected is subtracted with the effecting surplus time
2) it is calculated over the weight coefficient of the RAT events of remaining time
The weight coefficient determines that described plus coefficient receives number with event jointly according to Event Priority and event receipts number time
Time is inversely proportional, and is directly proportional to Event Priority.
For example, as an example, treating that user equipment resides in LTE moulds with above LTE/TD-SCDMA/GGE multimode lists
Connection mode, it is determined that RAT event schedulings order be LTE presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC is true again
Recognize>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured>Exemplified by BSIC initially confirms, illustrate.
A)The priority level value of each RAT events is first determined, i.e., sets grade initial from the RAT events of lowest priority
Value, from low to high according to priority, increases successively;
For example, it is assumed that BSIC initially confirms that priority level value increases by 2 again for 10, GGE measurement increase by 2, TDS frame synchronization,
Increase successively, until LTE presynchronization priority levels value be 28,
B)RAT events are obtained according to the event receipts number time and receive the number factor, that is, obtains the receipts number time of each RAT events, takes most
Big value, with the receipts number time of the maximum divided by each RAT events, obtains each RAT events and receives the number factor.
For example, it is assumed that LTE presynchronization receive the number time be 1ms, LTE measurement receive the number time be 1ms, TDS presynchronization receive number when
Between be that to receive the number time be 5ms for 5ms, TDS measurement, it is 20ms, etc. that the number time is received in LTE blind checks, if receiving number time up to 20ms,
Then with 20ms divided by the receipts number time of each RAT events, obtain each RAT events and receive number factor
C)Will be more than the priority level value of the RAT events of remaining time and receipts number fac-tor, when obtaining more than residue
Between RAT events weight coefficient
3)The weight coefficient of RAT events more than remaining time is multiplied with the absolute value of time exceedance, tied being multiplied
The maximum event of fruit, is defined as scheduling events.
For the scheduling events of determination, first within the GAP times dispatch, if the GAP times has taken, occupancy GAP with
The outer time, it is scheduled.
S307, RAT event handling results are reported to network;
By in the RAT event handlings result assembling response primitive for dispatching completion, network is reported;
Unscheduled RAT reporting events result is the invalid value with network convention;
According to effecting surplus time and the priority of RAT events, dynamic dispatching RAT events disclosure satisfy that RAT reporting events
It is required that, and task object schedule information carries out current RAT event schedulings in real time, ensure that the requirement that satisfaction is reported
In the case of, the sample of the RAT events of more high priorities is obtained as far as possible, it is ensured that task real-time and high efficiency so that use
Family equipment has more preferable mobility.
A kind of multimode list treats the task scheduling apparatus of the RAT processes of user's user equipment, as shown in figure 4, including:
Control information acquiring unit, RAT things are determined for the control information from Network Capture, and according to the control information
Part;
Network sends control information to user equipment, and user equipment receives control information, then determined according to control information
Go out RAT events;
The control information includes serving cell access network technology pattern, frequency, cell ID etc., and serving cell is user
The cell that equipment is currently resident.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent
Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
RAT Event Priority determining units, for determining principle to the RAT event orderings according to RAT Event Priorities,
Obtain RAT event schedulings order;
In general, user equipment can handle multiple RATG events in a system dispatching cycle, for needing processing
Multiple RAT events, it is thus necessary to determine that these RAT Event Priorities;
RAT Event Priorities of the present invention determine principle, including:First priority between determination pattern, preferential in determination pattern again
Level, priority optimizes between finally entering row mode:
Priority includes between the pattern:Main mould is preferential, determined from mould according to evolution priority, and the evolution priority is
LTE>TD-SCDMA>GGE;
The main mould of current connection state has limit priority, other notconnect states from mould according to evolution priority come
Priority height is determined, for example, according to priority principle between above pattern, treating that user sets in LTE/TD-SCDMA/GGE multimode lists
Standby to reside under the connection mode of LTE moulds, priority is LTE between pattern>TD-SCDMA>GGE;It is many in LTE/TD-SCDMA/GGE
Mould list treats that user equipment is resided under the connection mode of TD-SCDMA moulds, and priority is TD-SCDMA between pattern>LTE>GGE, such as
Treat that user equipment is resided under the connection mode of GGE moulds in LTE/TD-SCDMA/GGE multimode lists, priority is GGE between pattern>
LTE>TD-SCDMA。
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>It is small
Area's frame synchronization.
By the processing of priority in priority between above pattern and pattern, at the beginning of a RAT Event Priority can be formed
Step sequence, but treat that user equipment is easy to pattern switching in view of multimode list, to also there is higher prior from mould presynchronization and measurement
The process demand of level, therefore tentatively sorted for RAT Event Priorities, in addition it is also necessary to priority is excellent between entering row mode.
Priority optimization includes between the pattern:Presynchronization and measurement priority from mould is excellent higher than the frequency blind check of main mould
First level, the presynchronization from mould and the same principle in accordance with priority in above evolution priority and pattern of measurement.
The tentatively sequence of above RAT Event Priorities will be brought up to the blind check of main mould from the presynchronization of mould and measurement priority
Before, after optimization processing, that is, RAT event schedulings order is formed.
The RAT event schedulings order being here formed as is static priority order, if occurring without special raising priority
Operation, follow-up RAT event schedulings will be carried out successively in this order.
Below so that LTE/TD-SCDMA/GGE multimode lists treat user equipment as an example, found through statistics, the RAT events being related to
Including the blind check of LTE sign synchronizations, LTE presynchronization, LTE measurements, TDS frame synchronization, TDS presynchronization, TDS blind checks, TDS measurements, GGE
BSIC initially confirm, GGE BSIC confirm again and GGE measurement, determine method by above RAT Event Priorities, determine RAT
Event scheduling order is LTE presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks>
TDS frame synchronization>GGE is measured>BSIC initially confirms.
Typically, if system dispatching cycle long enough, each RAT events at least complete once to dispatch before time point is reported
There is residue afterwards, then can also increase measurement event after RAT event scheduling orders, measurement event can be suitable in RAT event schedulings
In sequence repeatedly, such as measurement event is increased behind above RAT event schedulings order, RAT event schedulings sequential update is LTE
Presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured
>BSIC initially confirms>LTE is measured>TDS is measured>GGE is measured;
RAT event schedulings order is obtained after the completion of RAT event orderings, subsequently can successively be dispatched according to the order.
RAT event scheduling units, according to RAT event schedulings order, dispatch RAT events within the GAP periods.
The RAT events of highest priority in RAT event scheduling orders are extracted, output is currently needed for the RAT event phases of processing
Related parameter, when the GAP times arrive, carries out RAT events sample point collection.
It is preferred that, exportable multiple RAT event relevant parameters for being currently needed for processing carry out multiple RAT in same GAP
The collection of event sample point;The multiple RAT events, are limited the time required to being collected by GAP time spans and RAT events sample point
System, no more than two.
Dispatch after a RAT event, the RAT events labeled as non-scheduling, are not being reprocessed into the RAT events, or
Person is discharged to the end of RAT event scheduling orders, and the priority of the RAT events is preferably minimized.
Compared with prior art, the present embodiment is defined by RAT Event Priorities, carries out task to each RAT events in advance
Priority ranking obtains RAT event schedulings order, each task is scheduled according to RAT event schedulings order, it is ensured that each RAT
Event at least completes once to dispatch before time point is reported, and improves the accuracy and real-time to cell monitoring under each pattern.
Above example is considered for the longer situation of system dispatching cycle, but more situations are, system call
There is stricter limitation in cycle so that the time for scheduling is not abundant, in the case, and each RAT events are carried out in advance
Task priority sequence obtains RAT event schedulings order, will in the way of RAT event schedulings order is scheduled to each task
Being likely to result in emergency can not be scheduled, and can cause report time point possibly can not complete the risk of RAT events.
Further, the present invention provides another multimode list and treats user equipment RAT event scheduling device embodiments, such as Fig. 5
It is shown, including:
Control information acquiring unit, RAT things are determined for the control information from Network Capture, and according to the control information
Part;
The control information includes access network technology pattern, frequency, cell ID of Target cell etc., and Target cell is to work as
Preceding be resident cell.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent
Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
RAT Event Priority determining units, for determining principle to the RAT event orderings according to RAT Event Priorities,
Obtain RAT event schedulings order;
With specific reference to previous embodiment as described in RAT Event Priority determining units description, it is necessary to explanation be to obtain
RAT event schedulings order is obtained, is not subsequently that scheduling is sequentially sequentially completed according to this, after a RAT event scheduling is completed,
Also need to be judged, the result of judgement is possible to produce influence to follow-up dispatching sequence, as described in content herein below.It that is to say
Say, the RAT event schedulings order of this step generation can regard static priority order as, and in follow-up deterministic process, it is quiet
State priority orders may be disturbed, so as to form dynamic priority order.
RAT event scheduling units, according to RAT event schedulings order, dispatch RAT events within the GAP periods;
Content referring to upper one embodiment on RAT event scheduling units.
Effecting surplus time judging unit, for judging whether the effecting surplus time is more than all RAT not being scheduled
The receipts number time of event, when judging whether the effecting surplus time is 0 or the effecting surplus time is less than the receipts number of all RAT events
Between;
The effecting surplus time refers to from the current supreme a little remaining all GAP time spans, i.e. residue GAP of calling time
Number × TGAP, wherein TGAPGAP time spans are represented, when main mould is LTE system, its value is 6ms, and main mould is TD-SCDMA system
When, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms.
The effecting surplus time can be obtained from timer, and timer is opened when from Network Capture control information, is passed
Subtract timing, timed length is the supreme time span called time a little from being received network control message.
Preferentially, the timed length be from being received network control message the supreme time span called time a little, reserve
Radio frequency conversion the time required to, report primitive assembling the time required to, it is synchronous recover the time required to sum.
The effecting surplus time can be obtained by GAP numbers, and calculation is,(GAP is always individual in system dispatching cycle
Number-use GAP numbers)×TGAP, wherein TGAPGAP time spans are represented, when main mould is LTE system, its value is 6ms, main mould
During for TD-SCDMA system, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms
The receipts number time of the RAT events, it can receive the time of number to obtain by each RAT events of counting user equipment,
Relevant with the disposal ability of user equipment, this can be obtained by statistics, be no longer described in detail in Project Realization field.
It was found that the effecting surplus time is seldom or no effecting surplus time or effecting surplus time are less than
The receipts number time of all RAT events, then illustrate to carry out RAT event schedulings without the time.
The RAT event schedulings unit, is additionally operable to be scheduled more than the RAT events of remaining time to receiving the number time
What the RAT events that described pair of receipts number time exceedes remaining time were scheduled includes several situation formulas, handles respectively:
If the RAT events more than remaining time are 1, the RAT events are scheduled.
It is if having at least two more than the RAT events of remaining time, i.e., unscheduled in the presence of two kinds and above RAT events, then basis
The RAT events that Event Priority and event receive the determination scheduling of number time are scheduled.
The RAT events that the determination scheduling of number time is received according to Event Priority and event, including:
1)It is calculated over the time exceedance of the RAT events of remaining time
That is, the time difference the time required to sample point is collected is subtracted with the effecting surplus time.
2) it is calculated over the weight coefficient of the RAT events of remaining time
The weight coefficient determines that described plus coefficient receives number with event jointly according to Event Priority and event receipts number time
Time is inversely proportional, and is directly proportional to Event Priority.
For example, as an example, treating that user equipment resides in LTE moulds with above LTE/TD-SCDMA/GGE multimode lists
Connection mode, it is determined that RAT event schedulings order be LTE presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC is true again
Recognize>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured>Exemplified by BSIC initially confirms, illustrate.
A)The priority level value of each RAT events is first determined, i.e., sets grade initial from the RAT events of lowest priority
Value, from low to high according to priority, increases successively;
For example, it is assumed that BSIC initially confirms that priority level value increases by 2 again for 10, GGE measurement increase by 2, TDS frame synchronization,
Increase successively, until LTE presynchronization priority levels value be 28,
B)RAT events are obtained according to the event receipts number time and receive the number factor, that is, obtains the receipts number time of each RAT events, takes most
Big value, with the receipts number time of the maximum divided by each RAT events, obtains each RAT events and receives the number factor.
For example, it is assumed that LTE presynchronization receive the number time be 1ms, LTE measurement receive the number time be 1ms, TDS presynchronization receive number when
Between be that to receive the number time be 5ms for 5ms, TDS measurement, it is 20ms, etc. that the number time is received in LTE blind checks, if receiving number time up to 20ms,
Then with 20ms divided by the receipts number time of each RAT events, obtain each RAT events and receive number factor
C)Will be more than the priority level value of the RAT events of remaining time and receipts number fac-tor, when obtaining more than residue
Between RAT events weight coefficient
3)The weight coefficient of RAT events more than remaining time is multiplied with the absolute value of time exceedance, tied being multiplied
The maximum event of fruit, is defined as scheduling events.
For the scheduling events of determination, first within the GAP times dispatch, if the GAP times has taken, occupancy GAP with
The outer time, it is scheduled.
RAT event handling result reporting units, for reporting RAT event handling results to network;
By in the RAT event handlings result assembling response primitive for dispatching completion, network is reported;
Unscheduled RAT reporting events result is the invalid value with network convention;
According to effecting surplus time and the priority of RAT events, dynamic dispatching RAT events disclosure satisfy that RAT reporting events
It is required that, and task object schedule information carries out current RAT event schedulings in real time, ensure that the requirement that satisfaction is reported
In the case of, the sample of the RAT events of more high priorities is obtained as far as possible, it is ensured that task real-time and high efficiency so that use
Family equipment has more preferable mobility.
Treat that user equipment RAT event scheduling method and apparatus are preferable to carry out to multimode list provided in an embodiment of the present invention above
Example structure is described in detail, and specific case used herein is set forth to the principle and embodiment of the present invention,
The explanation of above example is only intended to the method and its core concept for helping to understand the present invention;Simultaneously for the one of this area
As technical staff, according to the present invention thought, will change in specific embodiments and applications, to sum up institute
State, this specification content should not be construed as limiting the invention.