CN103916970B - Multimode list treats user equipment RAT event scheduling method and apparatus - Google Patents

Multimode list treats user equipment RAT event scheduling method and apparatus Download PDF

Info

Publication number
CN103916970B
CN103916970B CN201210592429.5A CN201210592429A CN103916970B CN 103916970 B CN103916970 B CN 103916970B CN 201210592429 A CN201210592429 A CN 201210592429A CN 103916970 B CN103916970 B CN 103916970B
Authority
CN
China
Prior art keywords
rat
time
event
events
priority
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210592429.5A
Other languages
Chinese (zh)
Other versions
CN103916970A (en
Inventor
刘若堃
陈路
王清
黄利军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Spreadtrum Communications Shanghai Co Ltd
Original Assignee
Keen (chongqing) Microelectronics Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keen (chongqing) Microelectronics Technology Co Ltd filed Critical Keen (chongqing) Microelectronics Technology Co Ltd
Priority to CN201210592429.5A priority Critical patent/CN103916970B/en
Publication of CN103916970A publication Critical patent/CN103916970A/en
Application granted granted Critical
Publication of CN103916970B publication Critical patent/CN103916970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

User equipment RAT event scheduling methods are treated there is provided multimode list the present invention relates to moving communicating field, RAT events are determined according to from the control information of Network Capture;Principle is determined to the RAT event orderings according to RAT Event Priorities, RAT event schedulings order is obtained;According to RAT event schedulings order, RAT events are dispatched within the GAP periods;Multimode list is also provided and treats user equipment RAT event scheduling devices;Invention is defined by RAT Event Priorities, task priority sequence is carried out to each RAT events in advance and obtains RAT event schedulings order, each task is scheduled according to RAT event schedulings order, and according further to effecting surplus time and the priority of RAT events, dynamic dispatching RAT events, it ensure that each RAT events at least complete once to dispatch before time point is reported, improve the accuracy and real-time to cell monitoring under each pattern.

Description

Multimode list treats user equipment RAT event scheduling method and apparatus
Technical field
The present invention relates to moving communicating field, more particularly to a kind of multimode list treats user equipment(UserEquipment, letter Claim UE)Need to monitor a variety of wireless access technologys (Radio Acess Technology, abbreviation RAT), the situation of multiple cells Under, to the method and apparatus of different RAT event schedulings.
Background technology
In GSM, user equipment (UE) carries out information exchange with network node and completes to communicate;UE priority tasks in In the preferable cell of cell quality, and cell quality is embodied by the specific indexes related to network access technique, and UE needs prison Each cell quality of view network, monitored results are used for the trigger condition of UE gravity treatments/handover event.Generally, each cell sets different Quality offset value Qoffset and lag parameter Qhyst, when the quality of cell subtracts serving cell quality more than quality offset value Qoffset and lag parameter Qhyst's and when, trigger gravity treatment/handover event.
UE monitoring collection is by network signals, and the mode informed has broadcast and signaling, particularly, for LTE (LongTerm Evolution, Long Term Evolution), TD-SCDMA(Time Division-Synchronous CodeDivision Multiple Access, TD SDMA)、GGE(GSM or GPRS or EDGE)Multimode list treats UE, and UE synchronizations can only be at one Worked in cell under RAT, but UE needs to monitor the RAT cells of all supports.
Typically, the general process of RAT event schedulings, including:
1st, network is that UE configures control information:UE needs to report UE monitoring capacity information(Such as the RAT that UE is supported, UE energy Enough cells received simultaneously etc.), network is arranged net situation and network configuration according to UE ability, network, by control information according to UE Current working condition is handed down to UE using different message.Control information generally comprises the frequency of blind check, the row of measurement object The information such as table.RAT events can be a frequency or a specific cell, and network is optional, meeting configuration event Priority.
2nd, UE is handled according to the control information of network configuration for the RAT events in control information.UE should basis UE itself ability, such as can receive the ability of data on two different frequent points or multiple RAT events simultaneously, dispatch The processing of RAT events.
3rd, UE reports time point according to RAT events in control information, decides whether to report RAT event handling results Network, or UE voluntarily carry out appropriate operation according to RAT events.On give the correct time, UE also need to according to control information determine report Time point and report content.
RAT event handlings result is in order to effectively support UE mobility, it is necessary to ensure the real-time and accuracy of result.It is real When property is reported by the selection and recurrent event result of object and offers guarantee in the result triggered with event, and accuracy is by carrying High UE single events processing accuracy ensures with increase event sample point.
Illustrated exemplified by supporting LTE/TD-SCDMA/GGE multimode list to treat UE connection modes, no matter which kind of UE resides in RAT cells, network can configure control information and inform UE, and control information includes the information such as RAT types, frequency, according to waiting to locate The RAT events of reason, control information is also possible to that the Cell ID List under the frequency can be included, in addition to UE can be used under current state In the report cycle of the period of different frequency/different system event processing, and event.
If UE supports the same time to receive the signal of RAT cells in addition to the receiving and transmitting signal on persistent district, Then UE can complete RAT events in the case where not influenceing serving cell business.In this case, UE only needs to receive RAT things The data completion processing that part needs.Otherwise, UE is used for the period of different frequency/different system measurement under the connection mode of configuration Different frequency/different system event processing is carried out in GAP.The data volume that different RAT event objects need is limited to, possible one for different Frequently the period of/different system event can not meet the performance requirement of algorithm, it is therefore desirable to use multiple different frequency/different system measurements Period completes the processing of a different frequency/different system event.
Prior art is generally handled RAT events successively by evolution priority, if the dispatching sequence of RAT events is not When can have desired RAT reporting events time points possibly can not complete the risk of RAT events.Typically, with LTE/TD- SCDMA/GGE multimodes are exemplified by LTE connection modes, and evolution priority is LTE>TD-SCDMA>GGE, due to being sequentially completed RAT things Part, carries out LTE RAT event handlings first, then carries out TD-SCDMA RAT event handlings, finally carries out GGE RAT things Part processing.In the case that LTE RAT events and TD-SCDMA RAT events are more, the RAT events that may result in GGE can not Completion is handled before desired time point arrives.
The content of the invention
To solve problem above, the present invention provides a kind of multimode list and treats user equipment RAT event scheduling method and apparatus.
The multimode list of the present invention treats user equipment RAT event scheduling methods, including:According to the control information from Network Capture Determine RAT events;Principle is determined to the RAT event orderings according to RAT Event Priorities, RAT event schedulings order is obtained;Root According to RAT event schedulings order, RAT events are dispatched within the GAP periods;
The RAT Event Priorities determine that principle includes:First priority in priority, then determination pattern between determination pattern, Priority optimizes between finally entering row mode;
Priority includes between the determination pattern:Main mould is preferential, is determined from mould according to evolution priority, and the evolution is preferential Level is LTE>TD-SCDMA>GGE;
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>It is small Area's frame synchronization;
Priority optimization includes between the pattern:It is higher than the frequency of main mould from the cell presynchronization and cell measurement priority of mould Point blind check priority;
Wherein, GAP is the period under main mould connection mode for different frequency/different system measurement.
Preferably, methods described also includes:It is more than the receipts number of all RAT events not being scheduled when the effecting surplus time During the time, if the effecting surplus time is 0 or the effecting surplus time is less than the receipts number time of all RAT events, on network RAT event handling results are reported, otherwise, the RAT events that remaining time is exceeded to receiving the number time are scheduled, and RAT is reported to network Event handling result.
The multimode list of the present invention treats user equipment RAT event scheduling devices, including:
Control information acquiring unit, RAT things are determined for the control information from Network Capture, and according to the control information Part;
RAT Event Priority determining units, for determining principle to the RAT event orderings according to RAT Event Priorities, Obtain RAT event schedulings order;
RAT event scheduling units, according to RAT event schedulings order, dispatch RAT events within the GAP periods;
The RAT Event Priorities determine that principle includes:First priority in priority, then determination pattern between determination pattern, Priority optimizes between finally entering row mode;
Priority includes between the determination pattern:Main mould is preferential, is determined from mould according to evolution priority, and the evolution is preferential Level is LTE>TD-SCDMA>GGE;
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>It is small Area's frame synchronization;
Priority optimization includes between the pattern:It is higher than the frequency of main mould from the cell presynchronization and cell measurement priority of mould Point blind check priority;
Wherein, GAP is the period under main mould connection mode for different frequency/different system measurement.
It is preferred that, described device also include the effecting surplus time judging unit that is connected with RAT event scheduling units and RAT event handling result reporting units;
The effecting surplus time judging unit, all is not scheduled for judging whether the effecting surplus time is more than The receipts number time of RAT events, judge the effecting surplus time whether be 0 or the effecting surplus time be less than all RAT events receipts The number time;
The RAT event handlings result reporting unit, for reporting RAT event handling results to network;
The RAT event schedulings unit, is additionally operable to be scheduled more than the RAT events of remaining time to receiving the number time.
Compared with prior art, the present invention is defined by RAT Event Priorities, and it is excellent to carry out task to each RAT events in advance First level sequence obtains RAT event schedulings order, and each task is scheduled according to RAT event schedulings order, and further root According to effecting surplus time and the priority of RAT events, dynamic dispatching RAT events, it is ensured that each RAT events are before time point is reported At least complete once to dispatch, improve the accuracy and real-time to cell monitoring under each pattern.
Brief description of the drawings
Fig. 1 is prior art LTE system GAP structural models;
Fig. 2 is that multimode list of the present invention treats user equipment RAT event scheduling method preferred embodiment flow charts;
Fig. 3 is that multimode list of the present invention treats another preferred embodiment flow chart of user equipment RAT event scheduling methods;
Fig. 4 is that multimode list of the present invention treats user equipment RAT event scheduling device preferred embodiment structure charts;
Fig. 5 is that multimode list of the present invention treats another preferred embodiment structure chart of user equipment RAT event scheduling devices.
Embodiment
With reference to accompanying drawing of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, shown So, described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on the reality in the present invention Example is applied, the every other embodiment that those skilled in the art are obtained belongs to the scope of protection of the invention.
For ease of understanding, especially several terms herein are illustrated, scheduling herein refers to finish receiving RAT events Data source, system dispatching cycle refers to the supreme time span called time a little from being received network control message.GAP refers to System is used to carry out the period for the processing of different frequency/different system event in the connection mode, for example, LTE system is deposited in connection mode 6ms length the GAP periods for the processing of different frequency/different system event, the GAP periods in system dispatching cycle in position it is not solid Fixed, the GAP periods are per 40ms or 80ms reproduces once, as shown in Figure 1;For example TD-SCDMA exists in the connection mode Interval, its length is 10ms, and every 40,80 or 160ms occurs once, and GGE has Cluster in the connection mode, and it is grown Spend for 5.77ms, for ease of description, the present invention is unified to represent LTE, TD-SCDMA or GGE system with GAP in the connection mode For carrying out the period for the processing of different frequency/different system event, and not merely referring to LTE systems is used to carry out in the connection mode For the period of different frequency/different system event processing.
The communication pattern that the present invention is directed to includes LTE, TD-SCDMA and GGE, is deposited simultaneously in the communication system of above pattern (It is denoted herein as LTE/TD-SCDMA/GGE multimodes), a kind of pattern is used as connection status(Abbreviation main mould), make for two kinds in addition For notconnect state(Referred to as from mould)In the case of(The situation abbreviation multimode list is treated), propose user equipment to various RAT events The method and apparatus being scheduled
As one embodiment of the present invention, multimode list of the present invention treats user equipment RAT event scheduling methods, such as Fig. 2 institutes Show, including:
S201, basis determine RAT events from the control information of Network Capture;
Network sends control information to user equipment, and user equipment receives control information, then determined according to control information Go out RAT events;
The control information includes serving cell access network technology pattern, frequency, cell ID etc., and serving cell is user The cell that equipment is currently resident.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
S202, principle is determined according to RAT Event Priorities to RAT event orderings, obtain RAT event schedulings order;
In general, user equipment can handle multiple RAT events in a system dispatching cycle, to be processed for needing Multiple RAT events, it is thus necessary to determine that these RAT Event Priorities;
RAT Event Priorities of the present invention determine principle, including:First priority between determination pattern, preferential in determination pattern again Level, priority optimizes between finally entering row mode:
Priority includes between the pattern:Main mould is preferential, determined from mould according to evolution priority, and the evolution priority is LTE>TD-SCDMA>GGE;
The main mould of current connection state has limit priority, other notconnect states from mould according to evolution priority come Priority height is determined, for example, according to priority principle between above pattern, treating that user sets in LTE/TD-SCDMA/GGE multimode lists Standby to reside under the connection mode of LTE moulds, priority is LTE between pattern>TD-SCDMA>GGE;It is many in LTE/TD-SCDMA/GGE Mould list treats that user equipment is resided under the connection mode of TD-SCDMA moulds, and priority is TD-SCDMA between pattern>LTE>GGE, such as Treat that user equipment is resided under the connection mode of GGE moulds in LTE/TD-SCDMA/GGE multimode lists, priority is GGE between pattern> LTE>TD-SCDMA。
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>It is small Area's frame synchronization.
By the processing of priority in priority between above pattern and pattern, at the beginning of a RAT Event Priority can be formed Step sequence, but treated in view of multimode list under customer equipment connection state, the frequency blind check demand to main mould is minimum, and to real from mould When synchro measure monitoring have higher demand, so as to gravity treatment/switching, therefore tentatively sorted for RAT Event Priorities, in addition it is also necessary to Priority is excellent between entering row mode.
Priority optimization includes between the pattern:Presynchronization and measurement priority from mould is excellent higher than the frequency blind check of main mould First level, the presynchronization from mould and the same principle in accordance with priority in above evolution priority and pattern of measurement.
The tentatively sequence of above RAT Event Priorities will be brought up to the blind check of main mould from the presynchronization of mould and measurement priority Before, after optimization processing, that is, RAT event schedulings order is formed.
The RAT event schedulings order being here formed as is static priority order, if occurring without special raising priority Operation, follow-up RAT event schedulings will be carried out successively in this order.
Illustrated below so that LTE/TD-SCDMA/GGE multimode lists treat user equipment as an example.
Found through statistics, the RAT events being related to include the blind check of LTE sign synchronizations, LTE presynchronization, LTE measurements, TDS frames Synchronization, TDS presynchronization, TDS blind checks, TDS measurement, GGE BSIC initially confirm, GGE BSIC confirm again and GGE measurement;Adopt Principle is determined with above RAT Event Priorities, it is LTE presynchronization to determine RAT event schedulings order>LTE is measured>TDS presynchronization> TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured>BSIC initially confirms.
Typically, if system dispatching cycle long enough, each RAT events at least complete once to dispatch before time point is reported There is residue afterwards, then can also increase measurement event after RAT event scheduling orders, measurement event can be suitable in RAT event schedulings In sequence repeatedly, such as measurement event is increased behind above RAT event schedulings order, RAT event schedulings sequential update is LTE Presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured >BSIC initially confirms>LTE is measured>TDS is measured>GGE is measured;
RAT event schedulings order is obtained after the completion of RAT event orderings, subsequently can successively be dispatched according to the order.
S203, according to RAT event schedulings order, within the GAP periods dispatch RAT events.
Further comprise:The RAT events of highest priority in RAT event scheduling orders are extracted, output is currently needed for processing RAT event relevant parameters, when the GAP times arrive, carry out the RAT events sample point collection.
It is preferred that, exportable multiple RAT event relevant parameters for being currently needed for processing carry out multiple RAT in same GAP The collection of event sample point;The multiple RAT events, are limited the time required to being collected by GAP time spans and RAT events sample point System, no more than two.
Dispatch after a RAT event, the RAT events labeled as non-scheduling, are not being reprocessed into the RAT events, or Person is discharged to the end of RAT event scheduling orders, and the priority of the RAT events is preferably minimized.
Compared with prior art, the present embodiment is defined by RAT Event Priorities, carries out task to each RAT events in advance Priority ranking obtains RAT event schedulings order, each task is scheduled according to RAT event schedulings order, it is ensured that each RAT Event at least completes once to dispatch before time point is reported, and improves the accuracy and real-time to cell monitoring under each pattern.
Above example is considered for the longer situation of system dispatching cycle, but more situations are, system call There is stricter limitation in cycle so that the time for scheduling is not abundant, in the case, and each RAT events are carried out in advance Task priority sequence obtains RAT event schedulings order, will in the way of RAT event schedulings order is scheduled to each task Being likely to result in emergency can not be scheduled, and can cause report time point possibly can not complete the risk of RAT events.
Further, the present invention provides another multimode list and treats user equipment RAT event scheduling embodiments of the method, such as Fig. 3 It is shown, including:
S301, basis determine RAT events from the control information of Network Capture;
The control information includes access network technology pattern, frequency, cell ID of Target cell etc., and Target cell is to work as Preceding be resident cell.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
S302, RAT event orderings to be processed are needed to this according to RAT Event Priorities, obtain RAT event schedulings suitable Sequence;
With specific reference to S202 description, it is necessary to explanation be obtain RAT event schedulings order, be not subsequently according to this Order is sequentially completed scheduling, after a RAT event scheduling is completed, also needs to be judged, the result of judgement is possible to rear Continuous dispatching sequence produces influence, as described in content herein below.In other words, the RAT event schedulings order of this step generation can To regard static priority order as, and in follow-up deterministic process, static priority order may be disturbed, so as to form dynamic State priority orders.
S303, according to RAT event schedulings order, within the GAP periods dispatch RAT events
With specific reference to S203 description,
S304, judge whether the effecting surplus time is abundant, i.e., whether the effecting surplus time, which is more than, all is not scheduled The receipts number time of RAT events, if it is, returning to S303, the RAT events for not completing and once dispatching are dispatched in remaining time, Otherwise, into S305;
The effecting surplus time refers to from the current supreme a little remaining all GAP time spans, i.e. residue GAP of calling time Number × TGAP, wherein TGAP represent GAP time spans, when main mould is LTE system, and its value is 6ms, and main mould is TD-SCDMA systems During system, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms.
The effecting surplus time can be obtained from timer, and timer is opened when from Network Capture control information, is passed Subtract timing, timed length is the supreme time span called time a little from being received network control message.
Preferentially, the timed length be from being received network control message the supreme time span called time a little, reserve Radio frequency conversion the time required to, report primitive assembling the time required to, it is synchronous recover the time required to sum.
The effecting surplus time can be obtained by GAP numbers, and calculation is,(GAP is always individual in system dispatching cycle Number-use GAP numbers)×TGAP, wherein TGAPGAP time spans are represented, when main mould is LTE system, its value is 6ms, main mould During for TD-SCDMA system, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms.
The receipts number time of the RAT events, it can receive the time of number to obtain by each RAT events of counting user equipment, Relevant with the disposal ability of user equipment, this can be obtained by statistics, be no longer described in detail in Project Realization field.
S305, judge whether that effective remaining time not enough, the even effecting surplus time is to be less than 0 or effecting surplus time The receipts number time of all RAT events, then into S307, otherwise, into S306;
It was found that the effecting surplus time is seldom or no effecting surplus time or effecting surplus time are less than The receipts number time of all RAT events, then illustrate to carry out RAT event schedulings without the time.
S306, the RAT events to the receipts number time more than remaining time are scheduled.
What the RAT events that described pair of receipts number time exceedes remaining time were scheduled includes several situation formulas, handles respectively:
If the RAT events more than remaining time are 1, the RAT events are scheduled.
It is if having at least two more than the RAT events of remaining time, i.e., unscheduled in the presence of two kinds and above RAT events, then basis The RAT events that Event Priority and event receive the determination scheduling of number time are scheduled.
The RAT events that the determination scheduling of number time is received according to Event Priority and event, including:
1)It is calculated over the time exceedance of the RAT events of remaining time
That is, the time difference the time required to sample point is collected is subtracted with the effecting surplus time
2) it is calculated over the weight coefficient of the RAT events of remaining time
The weight coefficient determines that described plus coefficient receives number with event jointly according to Event Priority and event receipts number time Time is inversely proportional, and is directly proportional to Event Priority.
For example, as an example, treating that user equipment resides in LTE moulds with above LTE/TD-SCDMA/GGE multimode lists Connection mode, it is determined that RAT event schedulings order be LTE presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC is true again Recognize>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured>Exemplified by BSIC initially confirms, illustrate.
A)The priority level value of each RAT events is first determined, i.e., sets grade initial from the RAT events of lowest priority Value, from low to high according to priority, increases successively;
For example, it is assumed that BSIC initially confirms that priority level value increases by 2 again for 10, GGE measurement increase by 2, TDS frame synchronization, Increase successively, until LTE presynchronization priority levels value be 28,
B)RAT events are obtained according to the event receipts number time and receive the number factor, that is, obtains the receipts number time of each RAT events, takes most Big value, with the receipts number time of the maximum divided by each RAT events, obtains each RAT events and receives the number factor.
For example, it is assumed that LTE presynchronization receive the number time be 1ms, LTE measurement receive the number time be 1ms, TDS presynchronization receive number when Between be that to receive the number time be 5ms for 5ms, TDS measurement, it is 20ms, etc. that the number time is received in LTE blind checks, if receiving number time up to 20ms, Then with 20ms divided by the receipts number time of each RAT events, obtain each RAT events and receive number factor
C)Will be more than the priority level value of the RAT events of remaining time and receipts number fac-tor, when obtaining more than residue Between RAT events weight coefficient
3)The weight coefficient of RAT events more than remaining time is multiplied with the absolute value of time exceedance, tied being multiplied The maximum event of fruit, is defined as scheduling events.
For the scheduling events of determination, first within the GAP times dispatch, if the GAP times has taken, occupancy GAP with The outer time, it is scheduled.
S307, RAT event handling results are reported to network;
By in the RAT event handlings result assembling response primitive for dispatching completion, network is reported;
Unscheduled RAT reporting events result is the invalid value with network convention;
According to effecting surplus time and the priority of RAT events, dynamic dispatching RAT events disclosure satisfy that RAT reporting events It is required that, and task object schedule information carries out current RAT event schedulings in real time, ensure that the requirement that satisfaction is reported In the case of, the sample of the RAT events of more high priorities is obtained as far as possible, it is ensured that task real-time and high efficiency so that use Family equipment has more preferable mobility.
A kind of multimode list treats the task scheduling apparatus of the RAT processes of user's user equipment, as shown in figure 4, including:
Control information acquiring unit, RAT things are determined for the control information from Network Capture, and according to the control information Part;
Network sends control information to user equipment, and user equipment receives control information, then determined according to control information Go out RAT events;
The control information includes serving cell access network technology pattern, frequency, cell ID etc., and serving cell is user The cell that equipment is currently resident.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
RAT Event Priority determining units, for determining principle to the RAT event orderings according to RAT Event Priorities, Obtain RAT event schedulings order;
In general, user equipment can handle multiple RATG events in a system dispatching cycle, for needing processing Multiple RAT events, it is thus necessary to determine that these RAT Event Priorities;
RAT Event Priorities of the present invention determine principle, including:First priority between determination pattern, preferential in determination pattern again Level, priority optimizes between finally entering row mode:
Priority includes between the pattern:Main mould is preferential, determined from mould according to evolution priority, and the evolution priority is LTE>TD-SCDMA>GGE;
The main mould of current connection state has limit priority, other notconnect states from mould according to evolution priority come Priority height is determined, for example, according to priority principle between above pattern, treating that user sets in LTE/TD-SCDMA/GGE multimode lists Standby to reside under the connection mode of LTE moulds, priority is LTE between pattern>TD-SCDMA>GGE;It is many in LTE/TD-SCDMA/GGE Mould list treats that user equipment is resided under the connection mode of TD-SCDMA moulds, and priority is TD-SCDMA between pattern>LTE>GGE, such as Treat that user equipment is resided under the connection mode of GGE moulds in LTE/TD-SCDMA/GGE multimode lists, priority is GGE between pattern> LTE>TD-SCDMA。
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>It is small Area's frame synchronization.
By the processing of priority in priority between above pattern and pattern, at the beginning of a RAT Event Priority can be formed Step sequence, but treat that user equipment is easy to pattern switching in view of multimode list, to also there is higher prior from mould presynchronization and measurement The process demand of level, therefore tentatively sorted for RAT Event Priorities, in addition it is also necessary to priority is excellent between entering row mode.
Priority optimization includes between the pattern:Presynchronization and measurement priority from mould is excellent higher than the frequency blind check of main mould First level, the presynchronization from mould and the same principle in accordance with priority in above evolution priority and pattern of measurement.
The tentatively sequence of above RAT Event Priorities will be brought up to the blind check of main mould from the presynchronization of mould and measurement priority Before, after optimization processing, that is, RAT event schedulings order is formed.
The RAT event schedulings order being here formed as is static priority order, if occurring without special raising priority Operation, follow-up RAT event schedulings will be carried out successively in this order.
Below so that LTE/TD-SCDMA/GGE multimode lists treat user equipment as an example, found through statistics, the RAT events being related to Including the blind check of LTE sign synchronizations, LTE presynchronization, LTE measurements, TDS frame synchronization, TDS presynchronization, TDS blind checks, TDS measurements, GGE BSIC initially confirm, GGE BSIC confirm again and GGE measurement, determine method by above RAT Event Priorities, determine RAT Event scheduling order is LTE presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks> TDS frame synchronization>GGE is measured>BSIC initially confirms.
Typically, if system dispatching cycle long enough, each RAT events at least complete once to dispatch before time point is reported There is residue afterwards, then can also increase measurement event after RAT event scheduling orders, measurement event can be suitable in RAT event schedulings In sequence repeatedly, such as measurement event is increased behind above RAT event schedulings order, RAT event schedulings sequential update is LTE Presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC confirms again>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured >BSIC initially confirms>LTE is measured>TDS is measured>GGE is measured;
RAT event schedulings order is obtained after the completion of RAT event orderings, subsequently can successively be dispatched according to the order.
RAT event scheduling units, according to RAT event schedulings order, dispatch RAT events within the GAP periods.
The RAT events of highest priority in RAT event scheduling orders are extracted, output is currently needed for the RAT event phases of processing Related parameter, when the GAP times arrive, carries out RAT events sample point collection.
It is preferred that, exportable multiple RAT event relevant parameters for being currently needed for processing carry out multiple RAT in same GAP The collection of event sample point;The multiple RAT events, are limited the time required to being collected by GAP time spans and RAT events sample point System, no more than two.
Dispatch after a RAT event, the RAT events labeled as non-scheduling, are not being reprocessed into the RAT events, or Person is discharged to the end of RAT event scheduling orders, and the priority of the RAT events is preferably minimized.
Compared with prior art, the present embodiment is defined by RAT Event Priorities, carries out task to each RAT events in advance Priority ranking obtains RAT event schedulings order, each task is scheduled according to RAT event schedulings order, it is ensured that each RAT Event at least completes once to dispatch before time point is reported, and improves the accuracy and real-time to cell monitoring under each pattern.
Above example is considered for the longer situation of system dispatching cycle, but more situations are, system call There is stricter limitation in cycle so that the time for scheduling is not abundant, in the case, and each RAT events are carried out in advance Task priority sequence obtains RAT event schedulings order, will in the way of RAT event schedulings order is scheduled to each task Being likely to result in emergency can not be scheduled, and can cause report time point possibly can not complete the risk of RAT events.
Further, the present invention provides another multimode list and treats user equipment RAT event scheduling device embodiments, such as Fig. 5 It is shown, including:
Control information acquiring unit, RAT things are determined for the control information from Network Capture, and according to the control information Part;
The control information includes access network technology pattern, frequency, cell ID of Target cell etc., and Target cell is to work as Preceding be resident cell.
Typically, as LTE frequency point, the cell ID of serving cell, the frequency of co-frequency neighbor cell and cell ID, alien frequencies are adjacent Frequency and cell ID, the Measurement bandwidth of cell;TD-SCDMA frequencies, cell ID;GGE frequencies and, cell ID etc..
RAT Event Priority determining units, for determining principle to the RAT event orderings according to RAT Event Priorities, Obtain RAT event schedulings order;
With specific reference to previous embodiment as described in RAT Event Priority determining units description, it is necessary to explanation be to obtain RAT event schedulings order is obtained, is not subsequently that scheduling is sequentially sequentially completed according to this, after a RAT event scheduling is completed, Also need to be judged, the result of judgement is possible to produce influence to follow-up dispatching sequence, as described in content herein below.It that is to say Say, the RAT event schedulings order of this step generation can regard static priority order as, and in follow-up deterministic process, it is quiet State priority orders may be disturbed, so as to form dynamic priority order.
RAT event scheduling units, according to RAT event schedulings order, dispatch RAT events within the GAP periods;
Content referring to upper one embodiment on RAT event scheduling units.
Effecting surplus time judging unit, for judging whether the effecting surplus time is more than all RAT not being scheduled The receipts number time of event, when judging whether the effecting surplus time is 0 or the effecting surplus time is less than the receipts number of all RAT events Between;
The effecting surplus time refers to from the current supreme a little remaining all GAP time spans, i.e. residue GAP of calling time Number × TGAP, wherein TGAPGAP time spans are represented, when main mould is LTE system, its value is 6ms, and main mould is TD-SCDMA system When, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms.
The effecting surplus time can be obtained from timer, and timer is opened when from Network Capture control information, is passed Subtract timing, timed length is the supreme time span called time a little from being received network control message.
Preferentially, the timed length be from being received network control message the supreme time span called time a little, reserve Radio frequency conversion the time required to, report primitive assembling the time required to, it is synchronous recover the time required to sum.
The effecting surplus time can be obtained by GAP numbers, and calculation is,(GAP is always individual in system dispatching cycle Number-use GAP numbers)×TGAP, wherein TGAPGAP time spans are represented, when main mould is LTE system, its value is 6ms, main mould During for TD-SCDMA system, its value is 10ms, when main mould is GGE systems, and its value is 5.77ms
The receipts number time of the RAT events, it can receive the time of number to obtain by each RAT events of counting user equipment, Relevant with the disposal ability of user equipment, this can be obtained by statistics, be no longer described in detail in Project Realization field.
It was found that the effecting surplus time is seldom or no effecting surplus time or effecting surplus time are less than The receipts number time of all RAT events, then illustrate to carry out RAT event schedulings without the time.
The RAT event schedulings unit, is additionally operable to be scheduled more than the RAT events of remaining time to receiving the number time
What the RAT events that described pair of receipts number time exceedes remaining time were scheduled includes several situation formulas, handles respectively:
If the RAT events more than remaining time are 1, the RAT events are scheduled.
It is if having at least two more than the RAT events of remaining time, i.e., unscheduled in the presence of two kinds and above RAT events, then basis The RAT events that Event Priority and event receive the determination scheduling of number time are scheduled.
The RAT events that the determination scheduling of number time is received according to Event Priority and event, including:
1)It is calculated over the time exceedance of the RAT events of remaining time
That is, the time difference the time required to sample point is collected is subtracted with the effecting surplus time.
2) it is calculated over the weight coefficient of the RAT events of remaining time
The weight coefficient determines that described plus coefficient receives number with event jointly according to Event Priority and event receipts number time Time is inversely proportional, and is directly proportional to Event Priority.
For example, as an example, treating that user equipment resides in LTE moulds with above LTE/TD-SCDMA/GGE multimode lists Connection mode, it is determined that RAT event schedulings order be LTE presynchronization>LTE is measured>TDS presynchronization>TDS is measured>BSIC is true again Recognize>LTE blind checks>TDS blind checks>TDS frame synchronization>GGE is measured>Exemplified by BSIC initially confirms, illustrate.
A)The priority level value of each RAT events is first determined, i.e., sets grade initial from the RAT events of lowest priority Value, from low to high according to priority, increases successively;
For example, it is assumed that BSIC initially confirms that priority level value increases by 2 again for 10, GGE measurement increase by 2, TDS frame synchronization, Increase successively, until LTE presynchronization priority levels value be 28,
B)RAT events are obtained according to the event receipts number time and receive the number factor, that is, obtains the receipts number time of each RAT events, takes most Big value, with the receipts number time of the maximum divided by each RAT events, obtains each RAT events and receives the number factor.
For example, it is assumed that LTE presynchronization receive the number time be 1ms, LTE measurement receive the number time be 1ms, TDS presynchronization receive number when Between be that to receive the number time be 5ms for 5ms, TDS measurement, it is 20ms, etc. that the number time is received in LTE blind checks, if receiving number time up to 20ms, Then with 20ms divided by the receipts number time of each RAT events, obtain each RAT events and receive number factor
C)Will be more than the priority level value of the RAT events of remaining time and receipts number fac-tor, when obtaining more than residue Between RAT events weight coefficient
3)The weight coefficient of RAT events more than remaining time is multiplied with the absolute value of time exceedance, tied being multiplied The maximum event of fruit, is defined as scheduling events.
For the scheduling events of determination, first within the GAP times dispatch, if the GAP times has taken, occupancy GAP with The outer time, it is scheduled.
RAT event handling result reporting units, for reporting RAT event handling results to network;
By in the RAT event handlings result assembling response primitive for dispatching completion, network is reported;
Unscheduled RAT reporting events result is the invalid value with network convention;
According to effecting surplus time and the priority of RAT events, dynamic dispatching RAT events disclosure satisfy that RAT reporting events It is required that, and task object schedule information carries out current RAT event schedulings in real time, ensure that the requirement that satisfaction is reported In the case of, the sample of the RAT events of more high priorities is obtained as far as possible, it is ensured that task real-time and high efficiency so that use Family equipment has more preferable mobility.
Treat that user equipment RAT event scheduling method and apparatus are preferable to carry out to multimode list provided in an embodiment of the present invention above Example structure is described in detail, and specific case used herein is set forth to the principle and embodiment of the present invention, The explanation of above example is only intended to the method and its core concept for helping to understand the present invention;Simultaneously for the one of this area As technical staff, according to the present invention thought, will change in specific embodiments and applications, to sum up institute State, this specification content should not be construed as limiting the invention.

Claims (15)

1. multimode list treats user equipment RAT event scheduling methods, including:RAT things are determined according to from the control information of Network Capture Part;Principle is determined to the RAT event orderings according to RAT Event Priorities, RAT event schedulings order is obtained;According to the RAT Event scheduling order, dispatches RAT events within the GAP periods;
It is characterized in that:
The RAT Event Priorities determine that principle includes:First priority in priority, then determination pattern between determination pattern, finally Priority optimizes between entering row mode;
Priority includes between the determination pattern:Main mould is preferential, is determined from mould according to evolution priority, and the evolution priority is LTE>TD-SCDMA>GGE;
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>Cell frame It is synchronous;
Priority optimization includes between the pattern:Cell presynchronization and cell measurement priority from mould is blind higher than the frequency of main mould Examine priority;
Wherein, GAP is the period under main mould connection mode for different frequency/different system measurement.
2. multimode list treats user equipment RAT event scheduling methods according to claim 1, it is characterised in that also include:When having When effect remaining time is more than the receipts number time of all RAT events not being scheduled, dispatches and do not completed once in remaining event The RAT events of scheduling;If the effecting surplus time is 0 or the effecting surplus time is less than the receipts number time of all RAT events, to Network reports RAT event handling results, otherwise, and the RAT events that remaining time is exceeded to receiving the number time are scheduled, on network Report RAT event handling results;The effecting surplus time refers to long from current supreme a little remaining all GAP times of calling time Degree.
3. multimode list according to claim 1 or claim 2 treats user equipment RAT event scheduling methods, it is characterised in that the RAT Event scheduling order includes:Increase measurement event after the RAT event schedulings order, the measurement event at least repeats one It is secondary.
4. multimode list treats user equipment RAT event scheduling methods according to claim 2, it is characterised in that described effectively surplus The remaining time obtains from timer, and the timer opens when from Network Capture control information, timing of successively decreasing, timed length be from Receive network control message and play the supreme time span called time a little.
5. multimode list treats user equipment RAT event scheduling methods according to claim 2, it is characterised in that described effectively surplus The remaining time obtains from timer, and the timer opens when from Network Capture control information, timing of successively decreasing, timed length be from The supreme time span called time a little of network control message, reserved radio frequency is received to change required time, report primitive to assemble Sum the time required to required time, synchronous recovery.
6. multimode list treats user equipment RAT event scheduling methods according to claim 2, it is characterised in that described effectively surplus The remaining time is obtained by GAP numbers, and calculation is:(GAP total numbers in system dispatching cycle-use GAP numbers) × TGAP, wherein TGAPRepresent GAP time spans;The system dispatching cycle calls time a little to be supreme from being received network control message Time span.
7. multimode list treats user equipment RAT event scheduling methods according to claim 2, it is characterised in that to receiving the number time RAT events more than remaining time are scheduled, including:If the RAT events more than remaining time are 1, to the RAT events It is scheduled.
8. multimode list treats user equipment RAT event scheduling methods according to claim 2, it is characterised in that to receiving the number time RAT events more than remaining time are scheduled, including:If having at least two more than the RAT events of remaining time, according to thing The RAT events that part priority and event receive the determination scheduling of number time are scheduled;It is described that number is received according to Event Priority and event Time determines the RAT events of scheduling, including:
1) it is calculated over the time exceedance of the RAT events of remaining time;
2) it is calculated over the weight coefficient of the RAT events of remaining time;
3) weight coefficient of the RAT events more than remaining time is multiplied with the absolute value of time exceedance, by multiplied result most Big event, is defined as scheduling events.
9. multimode list treats user equipment RAT event scheduling devices, it is characterised in that including:
Control information acquiring unit, RAT events are determined for the control information from Network Capture, and according to the control information;
RAT Event Priority determining units, for determining that principle, to the RAT event orderings, is obtained according to RAT Event Priorities RAT event schedulings order;
RAT event scheduling units, according to RAT event schedulings order, dispatch RAT events within the GAP periods;
The RAT Event Priorities determine that principle includes:First priority in priority, then determination pattern between determination pattern, finally Priority optimizes between entering row mode;
Priority includes between the determination pattern:Main mould is preferential, is determined from mould according to evolution priority, and the evolution priority is LTE>TD-SCDMA>GGE;
Priority is determined according to event type in the pattern, including:Cell presynchronization>Cell measurement>Frequency blind check>Cell frame It is synchronous;
Priority optimization includes between the pattern:Cell presynchronization and cell measurement priority from mould is blind higher than the frequency of main mould Examine priority;
Wherein, GAP is the period under main mould connection mode for different frequency/different system measurement.
10. multimode list treats user equipment RAT event scheduling devices according to claim 9, it is characterised in that also including with Effecting surplus time judging unit and RAT event handling result reporting units that RAT event scheduling units are connected;
The effecting surplus time judging unit, for judging whether the effecting surplus time is more than all RAT not being scheduled The receipts number time of event, when judging whether the effecting surplus time is 0 or the effecting surplus time is less than the receipts number of all RAT events Between;
The RAT event handlings result reporting unit, for be 0 in the effecting surplus time or the effecting surplus time be less than it is all During the receipts number time of RAT events, RAT event handling results are reported to network, and surpass to receiving the number time in RAT event schedulings unit The RAT events for spending remaining time are scheduled backward network and report RAT event handling results;
The RAT event schedulings unit, for when the effecting surplus time be more than all RAT events not being scheduled receipts number when Between when, dispatched in remaining event and do not complete the RAT events once dispatched;It is additionally operable in the effecting surplus time 0 or to have When effect remaining time is not less than the receipts number time of all RAT events, the RAT events that remaining time is exceeded to receiving the number time are carried out Scheduling;
The effecting surplus time refers to from the current supreme a little remaining all GAP time spans that call time.
11. multimode list treats user equipment RAT event scheduling devices according to claim 10, it is characterised in that described effective Remaining time is obtained from timer, and the timer is opened when from Network Capture control information, timing of successively decreasing, and timed length is The supreme time span called time a little from being received network control message.
12. multimode list treats user equipment RAT event scheduling devices according to claim 10, it is characterised in that described effective Remaining time is obtained from timer, and the timer is opened when from Network Capture control information, timing of successively decreasing, and timed length is The time required to the supreme time span called time a little, reserved radio frequency are changed from being received network control message, report primitive group Sum the time required to dress, the time required to synchronous recovery.
13. multimode list treats user equipment RAT event scheduling devices according to claim 10, it is characterised in that described effective Remaining time is obtained by GAP numbers, and calculation is:(GAP total numbers in system dispatching cycle-use GAP numbers) × TGAP, wherein TGAPRepresent GAP time spans;The system dispatching cycle calls time a little to be supreme from being received network control message Time span.
14. multimode list treats user equipment RAT event scheduling devices according to claim 10, it is characterised in that to receiving during number Between exceed remaining time RAT events be scheduled, including:If the RAT events more than remaining time are 1, to the RAT things Part is scheduled.
15. multimode list treats user equipment RAT event scheduling devices according to claim 10, it is characterised in that to receiving during number Between exceed remaining time RAT events be scheduled, including:If having at least two, basis more than the RAT events of remaining time The RAT events that Event Priority and event receive the determination scheduling of number time are scheduled;It is described to be received according to Event Priority and event The number time determines the RAT events of scheduling, including:
1) it is calculated over the time exceedance of the RAT events of remaining time;
2) it is calculated over the weight coefficient of the RAT events of remaining time;
3) weight coefficient of the RAT events more than remaining time is multiplied with the absolute value of time exceedance, by multiplied result most Big event, is defined as scheduling events.
CN201210592429.5A 2012-12-30 2012-12-30 Multimode list treats user equipment RAT event scheduling method and apparatus Active CN103916970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210592429.5A CN103916970B (en) 2012-12-30 2012-12-30 Multimode list treats user equipment RAT event scheduling method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210592429.5A CN103916970B (en) 2012-12-30 2012-12-30 Multimode list treats user equipment RAT event scheduling method and apparatus

Publications (2)

Publication Number Publication Date
CN103916970A CN103916970A (en) 2014-07-09
CN103916970B true CN103916970B (en) 2017-08-01

Family

ID=51042272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210592429.5A Active CN103916970B (en) 2012-12-30 2012-12-30 Multimode list treats user equipment RAT event scheduling method and apparatus

Country Status (1)

Country Link
CN (1) CN103916970B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016134522A1 (en) * 2015-02-27 2016-09-01 Qualcomm Incorporated Predictive scheduling of shared transmitter resources
CN106612514B (en) * 2015-10-21 2020-02-21 中国移动通信集团公司 Measurement scheduling method, device and terminal
CN107548078B (en) * 2016-06-29 2020-11-10 辰芯科技有限公司 Control method for measurement gap resource and multi-mode terminal
CN110710315B (en) * 2017-11-16 2021-03-02 Oppo广东移动通信有限公司 Method for reporting capability of terminal and related product

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1905737A (en) * 2005-07-29 2007-01-31 华为技术有限公司 Measuring method based on different measuring purposes for user terminal and user terminal thereof
CN101686551A (en) * 2008-09-22 2010-03-31 大唐移动通信设备有限公司 Communication control method based on priority management and device
CN101754384A (en) * 2008-12-05 2010-06-23 大唐移动通信设备有限公司 Method and system of reselection priority indication in cell
CN102395139A (en) * 2011-10-08 2012-03-28 中兴通讯股份有限公司 Multimode single-standby terminal different-mode type neighbor cell measurement time distribution method and device
CN102573073A (en) * 2011-01-04 2012-07-11 中兴通讯股份有限公司 Resource allocation method and system for physical layer of terminal
GB2492183A (en) * 2011-10-03 2012-12-26 Renesas Mobile Corp Prioritising radio access technologies for measurement based on signal strength of the serving cell

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009020356A1 (en) * 2007-08-07 2009-02-12 Lg Electronics Inc. Method of performing radio link measurement in wireless communication system
WO2009054702A1 (en) * 2007-10-25 2009-04-30 Lg Electronics Inc. Method of measuring cell in wireless communication system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1905737A (en) * 2005-07-29 2007-01-31 华为技术有限公司 Measuring method based on different measuring purposes for user terminal and user terminal thereof
CN101686551A (en) * 2008-09-22 2010-03-31 大唐移动通信设备有限公司 Communication control method based on priority management and device
CN101754384A (en) * 2008-12-05 2010-06-23 大唐移动通信设备有限公司 Method and system of reselection priority indication in cell
CN102573073A (en) * 2011-01-04 2012-07-11 中兴通讯股份有限公司 Resource allocation method and system for physical layer of terminal
GB2492183A (en) * 2011-10-03 2012-12-26 Renesas Mobile Corp Prioritising radio access technologies for measurement based on signal strength of the serving cell
CN102395139A (en) * 2011-10-08 2012-03-28 中兴通讯股份有限公司 Multimode single-standby terminal different-mode type neighbor cell measurement time distribution method and device

Also Published As

Publication number Publication date
CN103916970A (en) 2014-07-09

Similar Documents

Publication Publication Date Title
CN104066126B (en) A kind of method, system and the equipment of progress D2D switchings
CN103916970B (en) Multimode list treats user equipment RAT event scheduling method and apparatus
CN102870451B (en) For activating method and the infrastructure of telecommunication of inertia community
CN104040948B (en) Network coordinator device
CN104349409B (en) A kind of cell switching method and base station
CN101667874B (en) Method and system for partial cooperative spectrum sensing
CN106576275A (en) Ambient network sensing and handoff for device optimization in heterogeneous networks
US8861444B2 (en) Method and system for interactively selecting auxiliary cell
CN106376056A (en) Implementation method for shortwave-based fast link establishing system
CN106471839A (en) The method and system avoiding for path predictability congestion
CN103929781A (en) Cross-layer interference coordination optimization method in super dense heterogeneous network
CN103580898A (en) Network coordination method and device
CN103583012B (en) The synchronous method of heart beating behavior and device
CN103813370B (en) The method set up and safeguarded for the automatic neighbor lists of WLAN
CN109314896A (en) Cell switching method, device and readable storage medium storing program for executing
CN113170414A (en) User equipment tracking and paging area selection in a wireless communication system
CN109362122A (en) The transmission dispatching method and system of communication data in a kind of low-power consumption wide area network
CN103841605B (en) A kind of method and apparatus for realizing multiple BBU equipment rooms baseband signal collaboration processing
CN102186229B (en) Independent basic service set (IBSS) system and power management method thereof
CN102238749B (en) Channel competition method and AP (access point) equipment
CN104301953A (en) Method and device for coordinating multi-point transmission control during cell switching
CN103188723A (en) Measurement scheduling method and device of multimode one-standby user equipment
CN104813716A (en) Method for transmitting and receiving data
CN107659943A (en) A kind of load equalization method and device
CN105992284A (en) Communication processing method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170420

Address after: Nanping Street 400060 Chongqing Nan'an District Nancheng Road No. 199 left attached to the floor 403

Applicant after: Keen (Chongqing) Microelectronics Technology Co.,Ltd.

Address before: 400065 Chongqing Nan'an District huangjuezhen pass Fort Park No. 1

Applicant before: CHONGQING CYIT COMMUNICATION TECHNOLOGIES Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181107

Address after: 201203 Building 1, exhibition hall, 2288 lane, 2288 Chong, road, Zhangjiang hi tech park, Shanghai

Patentee after: SPREADTRUM COMMUNICATIONS (SHANGHAI) Co.,Ltd.

Address before: 400060 Nanping Road 199, Nanping Street, Nan'an District, Chongqing, 403

Patentee before: Keen (Chongqing) Microelectronics Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190327

Address after: 361006 Xiamen Free Trade Pilot Area, Xiamen, Fujian Province, Unit X, 8th Floor, Unit 05, Building D, Xiamen International Shipping Center, 97 Xiangyu Road, Xiamen Section

Patentee after: Xinxin Finance Leasing (Xiamen) Co.,Ltd.

Address before: 201203 Building 1, exhibition hall, 2288 lane, 2288 Chong, road, Zhangjiang hi tech park, Shanghai

Patentee before: SPREADTRUM COMMUNICATIONS (SHANGHAI) Co.,Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140709

Assignee: SPREADTRUM COMMUNICATIONS (SHANGHAI) Co.,Ltd.

Assignor: Xinxin Finance Leasing (Xiamen) Co.,Ltd.

Contract record no.: X2021110000009

Denomination of invention: Multi mode single user equipment rat event scheduling method and device

Granted publication date: 20170801

License type: Exclusive License

Record date: 20210317

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221027

Address after: 201203 Shanghai city Zuchongzhi road Pudong New Area Zhangjiang hi tech park, Spreadtrum Center Building 1, Lane 2288

Patentee after: SPREADTRUM COMMUNICATIONS (SHANGHAI) Co.,Ltd.

Address before: 361006 Xiamen Free Trade Pilot Area, Xiamen, Fujian Province, Unit X, 8th Floor, Unit 05, Building D, Xiamen International Shipping Center, 97 Xiangyu Road, Xiamen Section

Patentee before: Xinxin Finance Leasing (Xiamen) Co.,Ltd.