CN103913611A - Device allowing electric energy meter to be plugged and unplugged without outage - Google Patents

Device allowing electric energy meter to be plugged and unplugged without outage Download PDF

Info

Publication number
CN103913611A
CN103913611A CN201410132885.0A CN201410132885A CN103913611A CN 103913611 A CN103913611 A CN 103913611A CN 201410132885 A CN201410132885 A CN 201410132885A CN 103913611 A CN103913611 A CN 103913611A
Authority
CN
China
Prior art keywords
gauge outfit
base
plug
electric energy
conductor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410132885.0A
Other languages
Chinese (zh)
Inventor
张建伟
曹敏
高尚飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Power Grid Corp Technology Branch
Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute
Original Assignee
Yunnan Power Grid Corp Technology Branch
Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Power Grid Corp Technology Branch, Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute filed Critical Yunnan Power Grid Corp Technology Branch
Priority to CN201410132885.0A priority Critical patent/CN103913611A/en
Publication of CN103913611A publication Critical patent/CN103913611A/en
Pending legal-status Critical Current

Links

Landscapes

  • Details Of Connecting Devices For Male And Female Coupling (AREA)

Abstract

The invention discloses a device allowing an electric energy meter to be plugged and unplugged without an outage. The device comprises a meter head and a base. The device is characterized in that the meter head (2) and the base (1) are of a separate structure, a base plate (3) is arranged between the meter head (2) and the base (1), and an incoming line connecting pedestal (4) and an outgoing line connecting pedestal (8) are arranged on the base plate (3); a meter head incoming line post (5) is connected with the incoming line connecting pedestal (4), and a meter head outgoing line post (6) is connected with the outgoing line connecting pedestal (8). The device has the advantages that plug-and-play of the electric energy meter can be realized, and the electric energy meter is as convenient to connect or remove as an electric appliance. The base is of a mechanical structure, so that reliability is high.

Description

A kind of device that makes the continuous hot-line insertion and extraction of electric energy meter
Technical field
The present invention relates to plug and play electric energy meter field, it is a kind of physical construction that realizes the continuous hot-line insertion and extraction of electric energy meter.
Background technology
" only stop one second electricity, all can exert an influence to client.Therefore computer data may be lost, and the work of household electrical appliances cut easily causes fault." it is reported, the ammeter that each province changes every year or newly applies to install reaches up to a million, originally changes an ammeter and need have a power failure 10 minutes, and change ammeter without power failure, can make annual power off time reduce 5 minutes.
Along with technical development and managerial promotion, client's power off time declines gradually.In particular cases non-, only change ammeter and just need to stop client's electricity, this has become to be avoided last one obstacle of having a power failure.
For promoting intelligent grid construction, improve the technical merit of intelligent power, formulate the AMI Technical Standard System that faces the future new, reduce client's power off time, advance electric energy metrical intelligent development, research and develop continuous hot-line insertion and extraction, plug and play electric energy meter is imperative.
Summary of the invention
The object of this invention is to provide a kind of reliable, through-current capability strong, have the electric energy meter device of continuous hot-line insertion and extraction.
The technical solution used in the present invention is as follows:
Make a device for the continuous hot-line insertion and extraction of electric energy meter, the present invention includes gauge outfit and base, gauge outfit is adopted to the structure separating with base, substrate is arranged between gauge outfit and base, and inlet wire wiring pedestal and outlet wiring pedestal are located at respectively on substrate; Gauge outfit inlet wire post is connected with inlet wire wiring pedestal, and gauge outfit outlet column is connected with outlet wiring pedestal; On base, be connected with movable conductor plate, plug A, plug B are fixed on movable conductor plate; Plug A, plug B be positioned at movable conductor plate under position be respectively equipped with spring; In gauge outfit, between inlet wire wiring pedestal and outlet wiring pedestal, be provided with insulating knockout pin, insulating knockout pin lower end is connected with movable conductor plate; It is not identical that gauge outfit and the plug length on movable conductor plate are set to, by the transitional processes in the length control gauge outfit insertion process of insulating knockout pin.
The length of insulating knockout pin has guaranteed that ammeter access is that equipotential is connected with the process of removing, so both guaranteed continuous hot-line insertion and extraction, has eliminated again the spark in common plug process.
Below movable conductor plate on base, there is spring supporting, in the time extracting gauge outfit, spring promotes that movable conductor plate moves up and the current path of connecting base, base final molding is as a common plate, and wiring pedestal is encapsulated in end box, and user does not reach electrified body.
For the current method such as electricity meter, protection against electric shock, base and gauge outfit are all introduced intelligent metering part live wire and zero line.
Beneficial effect of the present invention: be to realize the plug and play of electric energy meter, realize electric energy meter and access easily as electrical appliance or remove.Because adopting physical construction, realizes base, so there is extreme high reliability.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention three-view diagram;
Fig. 2 is embodiment of the present invention cut-open view.
Embodiment
Below in conjunction with the cut-open view in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described.
Make a device for the continuous hot-line insertion and extraction of electric energy meter, the present invention includes gauge outfit and base, gauge outfit 2 adopts with base 1 structure separating, and substrate 3 is arranged between gauge outfit 2 and base 1, and inlet wire wiring pedestal 4 is located at respectively on substrate 3 with outlet wiring pedestal 8; Gauge outfit inlet wire post 5 is connected with inlet wire wiring pedestal 4, and gauge outfit outlet column 6 is connected with outlet wiring pedestal 8; On base 1, be connected with movable conductor plate 9, plug A 10, plug B 11 are fixed on movable conductor plate 9; Plug A 10, plug B 11 be positioned at movable conductor plate 9 under position be respectively equipped with spring 12; In gauge outfit 2, between inlet wire wiring pedestal 4 and outlet wiring pedestal 8, be provided with insulating knockout pin 7, insulating knockout pin 7 lower ends are connected with movable conductor plate 9; It is not identical that gauge outfit 2 and the plug length on movable conductor plate 9 are set to, by the transitional processes in the length control gauge outfit insertion process of insulating knockout pin.
As shown in Figure 2, the present embodiment structure comprises base 1, and gauge outfit 2, for installing the substrate 3 of wiring pedestal, inlet wire wiring pedestal 4, gauge outfit inlet wire post 5, gauge outfit outlet column 6, insulating knockout pin 7, outlet wiring pedestal 8, movable conductor plate 9, plug A 10, plug B 11 on movable conductor plate, spring 12.
In the time not inserting gauge outfit, the plug that spring promotes on movable conductor plate 9 and plate moves up, the current path of composition base: 4---10---9---11---8.
In gauge outfit insertion process, gauge outfit inlet wire post 5, gauge outfit inlet wire post 6 first contact with inlet wire wiring pedestal 4, outlet wiring pedestal 8, insulating knockout pin 7 contacts with movable conductor plate 9 again, current path now has two: 4---10---9---11---8 and 4---5---2---6---8, this process has guaranteed continuous hot-line insertion and extraction, and effectively eliminates the spark of outlet in common plug process.
After gauge outfit is inserted, insulating knockout pin separates plug A 10, plug B 11 on movable conductor plate 9 and plate with inlet wire wiring pedestal 4, outlet wiring pedestal 8, cut off the current path of base.Only remaining one of current path now: 4---5---2---6---8.
Base is substantially the same with common socket in appearance, and Jian is complete in, reliable, attractive in appearance one.And gauge outfit is as a common electrical appliance, just have two plugs and an insulating knockout pin.
Such design has reached the real plug and play of electric energy meter, has overturned the mode of in the past changing electric energy meter.The table that changes in the future will be safety, convenient, efficient.

Claims (1)

1. one kind makes the device of the continuous hot-line insertion and extraction of electric energy meter, comprise gauge outfit and base, it is characterized in that, gauge outfit (2) is adopted to the structure separating with base (1), substrate (3) is arranged between gauge outfit (2) and base (1), and inlet wire wiring pedestal (4) is located at respectively on substrate (3) with outlet wiring pedestal (8); Gauge outfit inlet wire post (5) is connected with inlet wire wiring pedestal (4), and gauge outfit outlet column (6) is connected with outlet wiring pedestal (8); On base (1), be connected with movable conductor plate (9), plug A(10), plug B(11) be fixed on movable conductor plate (9); At plug A(10), plug B(11) be positioned at movable conductor plate (9) under position be respectively equipped with spring (12); In gauge outfit (2), be positioned between inlet wire wiring pedestal (4) and outlet wiring pedestal (8) and be provided with insulating knockout pin (7), insulating knockout pin (7) lower end is connected with movable conductor plate (9); Gauge outfit (2) is set to not identical with the plug length on movable conductor plate (9).
CN201410132885.0A 2014-04-03 2014-04-03 Device allowing electric energy meter to be plugged and unplugged without outage Pending CN103913611A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410132885.0A CN103913611A (en) 2014-04-03 2014-04-03 Device allowing electric energy meter to be plugged and unplugged without outage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410132885.0A CN103913611A (en) 2014-04-03 2014-04-03 Device allowing electric energy meter to be plugged and unplugged without outage

Publications (1)

Publication Number Publication Date
CN103913611A true CN103913611A (en) 2014-07-09

Family

ID=51039449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410132885.0A Pending CN103913611A (en) 2014-04-03 2014-04-03 Device allowing electric energy meter to be plugged and unplugged without outage

Country Status (1)

Country Link
CN (1) CN103913611A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104316734A (en) * 2014-10-27 2015-01-28 中国神华能源股份有限公司 Electric measuring instrument, mounting base of electric measuring instrument and current measuring device
CN104793029A (en) * 2015-05-05 2015-07-22 国家电网公司 Spring compression type electric energy measuring and wiring device with control loop access function
CN104977445A (en) * 2015-06-15 2015-10-14 苏州市新瑞奇节电科技有限公司 Smart electric meter with magnetic three-phase line
CN105424999A (en) * 2015-11-30 2016-03-23 宁波功成电气有限公司 Connector capable of replacing electric meter rapidly without cutting off power
CN107831337A (en) * 2017-10-23 2018-03-23 济南铂朗电气有限公司 One kind exempts from the hot-swappable formula electric instrument that has a power failure
CN109085396A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109085399A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement presses detection switch structure with multifunctional combined junction box
CN109085401A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined terminal box of electrical energy measurement with test fixture
CN109085398A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109085400A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined junction box stream detection switch structure of electrical energy measurement
CN109085397A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement multifunctional combined terminal box test fixture structure
CN109188337A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box voltage detection switch structure of field-checking equipment
CN109188336A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box current detection switch structure of field-checking equipment
CN112415241A (en) * 2020-08-26 2021-02-26 国网浙江省电力有限公司嘉兴供电公司 Novel low-voltage uninterrupted meter-changing plug-in base

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2302608Y (en) * 1997-06-24 1998-12-30 洛阳航空电器厂 Wire spring type electric coupling device
US20030161092A1 (en) * 2002-02-27 2003-08-28 Keun-Suk Cho Distribution board with uninterruptible socket terminal block
CN101403767A (en) * 2008-09-11 2009-04-08 上海联能仪表有限公司 Uninterrupted meter-changing structure of inserted electric energy meter
JP2009139284A (en) * 2007-12-07 2009-06-25 Chugoku Electric Power Co Inc:The Switch-type uninterruptible terminal and bypass plug with switch
CN101557057A (en) * 2008-04-10 2009-10-14 贵州航天电器股份有限公司 Electric connector capable of realizing short circuit and open circuit switching between contact elements
CN201897609U (en) * 2010-12-08 2011-07-13 广西电网公司 Plug-in type electricity meter
CN102313829A (en) * 2010-12-08 2012-01-11 深圳华立南方电子技术有限公司 Plugging-in type electric energy meter
CN102570213A (en) * 2012-01-20 2012-07-11 中能深思(北京)节能技术有限公司 Detection combination plugboard with uninterruptible power supply, hot-pluggable detection plugboard and power supply plugboard
CN202770877U (en) * 2012-09-19 2013-03-06 威胜集团有限公司 Plug-pull electric energy meter

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2302608Y (en) * 1997-06-24 1998-12-30 洛阳航空电器厂 Wire spring type electric coupling device
US20030161092A1 (en) * 2002-02-27 2003-08-28 Keun-Suk Cho Distribution board with uninterruptible socket terminal block
JP2009139284A (en) * 2007-12-07 2009-06-25 Chugoku Electric Power Co Inc:The Switch-type uninterruptible terminal and bypass plug with switch
CN101557057A (en) * 2008-04-10 2009-10-14 贵州航天电器股份有限公司 Electric connector capable of realizing short circuit and open circuit switching between contact elements
CN101403767A (en) * 2008-09-11 2009-04-08 上海联能仪表有限公司 Uninterrupted meter-changing structure of inserted electric energy meter
CN201897609U (en) * 2010-12-08 2011-07-13 广西电网公司 Plug-in type electricity meter
CN102313829A (en) * 2010-12-08 2012-01-11 深圳华立南方电子技术有限公司 Plugging-in type electric energy meter
CN102570213A (en) * 2012-01-20 2012-07-11 中能深思(北京)节能技术有限公司 Detection combination plugboard with uninterruptible power supply, hot-pluggable detection plugboard and power supply plugboard
CN202770877U (en) * 2012-09-19 2013-03-06 威胜集团有限公司 Plug-pull electric energy meter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘家欣 等: "带电插拔技术建模分析", 《电子世界》 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104316734A (en) * 2014-10-27 2015-01-28 中国神华能源股份有限公司 Electric measuring instrument, mounting base of electric measuring instrument and current measuring device
CN104316734B (en) * 2014-10-27 2017-08-04 中国神华能源股份有限公司 Electric measuring instrument and its mounting seat, magnitude of current measuring apparatus
CN104793029A (en) * 2015-05-05 2015-07-22 国家电网公司 Spring compression type electric energy measuring and wiring device with control loop access function
CN104977445A (en) * 2015-06-15 2015-10-14 苏州市新瑞奇节电科技有限公司 Smart electric meter with magnetic three-phase line
CN105424999A (en) * 2015-11-30 2016-03-23 宁波功成电气有限公司 Connector capable of replacing electric meter rapidly without cutting off power
CN105424999B (en) * 2015-11-30 2018-02-06 宁波功成电气有限公司 Can quick continuous charged renewal electric energy meter connector
CN107831337A (en) * 2017-10-23 2018-03-23 济南铂朗电气有限公司 One kind exempts from the hot-swappable formula electric instrument that has a power failure
CN109085397A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement multifunctional combined terminal box test fixture structure
CN109188336B (en) * 2018-08-30 2021-08-03 中国电力科学研究院有限公司 Multifunctional joint junction box current detection switch structure for field calibration equipment
CN109085401A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined terminal box of electrical energy measurement with test fixture
CN109085398A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109085400A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined junction box stream detection switch structure of electrical energy measurement
CN109085396A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109188337A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box voltage detection switch structure of field-checking equipment
CN109188336A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box current detection switch structure of field-checking equipment
CN109188337B (en) * 2018-08-30 2022-03-04 中国电力科学研究院有限公司 Multifunctional joint junction box voltage detection switch structure for field calibration equipment
CN109085399A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement presses detection switch structure with multifunctional combined junction box
CN109085398B (en) * 2018-08-30 2021-08-03 中国电力科学研究院有限公司 Multifunctional combined junction box with meter replacing tool for electric energy metering
CN109085401B (en) * 2018-08-30 2021-08-03 中国电力科学研究院有限公司 Multifunctional combined junction box with test tool for electric energy metering
CN109085397B (en) * 2018-08-30 2021-08-06 中国电力科学研究院有限公司 Test tool structure for multifunctional combined junction box for electric energy metering
CN109085396B (en) * 2018-08-30 2021-09-17 中国电力科学研究院有限公司 Multifunctional combined junction box with meter replacing tool for electric energy metering
CN109085399B (en) * 2018-08-30 2021-09-28 中国电力科学研究院有限公司 Voltage detection switch structure for multifunctional combined junction box for electric energy metering
CN109085400B (en) * 2018-08-30 2021-09-28 中国电力科学研究院有限公司 Current detection switch structure for multifunctional combined junction box for electric energy metering
CN112415241A (en) * 2020-08-26 2021-02-26 国网浙江省电力有限公司嘉兴供电公司 Novel low-voltage uninterrupted meter-changing plug-in base

Similar Documents

Publication Publication Date Title
CN103913611A (en) Device allowing electric energy meter to be plugged and unplugged without outage
CN103913613A (en) Device allowing electric energy meter to be plugged and unplugged without outage
CN102290264A (en) Conductive contact spring touch finger type connecting device
CN104183434B (en) A kind of residual current circuit breaker with reverse wiring structure
CN204012621U (en) GIS miniaturization cable terminal structure
CN106159549B (en) Magnetic electric connector and its connector
CN204142947U (en) Secondary terminals shorting stub is used in mutual inductor test
CN104466482A (en) Lantern-shaped contact head
CN201994480U (en) Multifunctional safety socket device
CN203218119U (en) Plug-in safety switch
CN204696290U (en) Socket and plug thereof
CN103166043B (en) Data transmission device
CN204424518U (en) Annular multipurpose socket
CN201075504Y (en) Electric shock preventing safety socket
CN203326186U (en) Novel cable reel
US10847921B2 (en) Test plug for a FT switch
CN208888277U (en) A kind of electrical equipment test auxiliary contact pin
CN202333208U (en) Relay socket
CN104659514A (en) Annular multipurpose socket
CN201845968U (en) Power plug
CN204255986U (en) With the socket of hot-swappable formula intelligent electric meter
CN204651615U (en) A kind of safety plug
CN206976605U (en) A kind of cable connection devices of switch cubicle
CN203859082U (en) Residual current circuit breaker with socket
CN203312630U (en) Integrated head knife switch ground wire device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140709