CN103912313B - A kind of mine motive force harmonic extraction method - Google Patents

A kind of mine motive force harmonic extraction method Download PDF

Info

Publication number
CN103912313B
CN103912313B CN201410148404.5A CN201410148404A CN103912313B CN 103912313 B CN103912313 B CN 103912313B CN 201410148404 A CN201410148404 A CN 201410148404A CN 103912313 B CN103912313 B CN 103912313B
Authority
CN
China
Prior art keywords
motive force
danger
mine
mine motive
measures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410148404.5A
Other languages
Chinese (zh)
Other versions
CN103912313A (en
Inventor
陈蓥
郭超
宋卫华
李胜
吕鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201410148404.5A priority Critical patent/CN103912313B/en
Publication of CN103912313A publication Critical patent/CN103912313A/en
Application granted granted Critical
Publication of CN103912313B publication Critical patent/CN103912313B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of mine motive force harmonic extraction method, this mine motive force harmonic extraction method comprises the following steps: application two grades of predictive software systems of mine motive force disaster, it is achieved the subdivision probabilistic forecasting that work surface is dangerous;According to different dangerous marginal values, the danger of mine motive force disaster regional prediction is divided into different brackets;According to the dangerous probit of each predicting unit, first select when condition is suitable for regional danger releasing measures to clear, or take corresponding local danger releasing measures to reduce degree of danger;In time coal and rock state is detected while the engineering progress of down-hole, the effectiveness of inspection danger releasing measures, take the precautionary measures according to assay in time, for different danger classes, use corresponding Preventing Countermeasures.The present invention carries out two grades of predictions to mine working face, and after taking gas pumping control measures, mathematical expectation of probability is greatly reduced, and control measures effect is notable.

Description

A kind of mine motive force harmonic extraction method
Technical field
The invention belongs to pit mining technical field, particularly relate to a kind of mine motive force harmonic extraction method.
Background technology
The preventing and treating of mine motive force disaster is a systematic engineering of business, mainly includes regional prediction, local detection, solution danger and security protection Four parts.Research in terms of local detection and danger releasing measures is closely ripe the most both at home and abroad, from preventing and treating mine motive force disaster side Face is seen, these methods are all effective, but still suffers from certain difficulty for implementing, and is in a kind of passive harness status.
Summary of the invention
It is an object of the invention to provide a kind of mine motive force harmonic extraction method, it is intended to according to the dangerous probability of each predicting unit Value, first selects regional danger releasing measures to clear when condition is suitable for, or takes corresponding local danger releasing measures to reduce danger Danger degree, according to testing result, decides to continue with engineering activity or takes safety prevention measure in time.
The present invention is achieved in that a kind of mine motive force harmonic extraction method comprises the following steps:
Step one, application two grades of predictive software systems of mine motive force disaster, it is achieved the subdivision probabilistic forecasting that work surface is dangerous;
Step 2, according to different dangerous marginal values, the danger of mine motive force disaster regional prediction is divided into different brackets, In actual exploitation work, when tunnelling or working face extraction enter into different predicting unit, engineering present position can be known a priori by Danger, take corresponding prophylactico-therapeutic measures in advance;
Step 3, dangerous probit according to each predicting unit, first select regional danger releasing measures to solve when condition is suitable for Except danger, or corresponding local danger releasing measures is taked to reduce degree of danger;
Step 4, in time coal and rock state is detected while the engineering progress of down-hole, the effectiveness of inspection danger releasing measures, Take the precautionary measures according to assay in time, for different danger classes, use corresponding Preventing Countermeasures.
Further, two grades of predictive software systems of described mine motive force disaster by stress and strain model subsystem, data import subsystem, Dynamic calculation subsystem, mine motive force hazard prediction subsystem and grade of risk subsystem composition, each subsystem is connect by data Mouthful realizing data communication with AutoCAD, database system uses Access, in order to preserve coal seam thickness, rift structure, Mining induced stress value, gas pressure, gas bearing capacity, drilling gas are gushed out the parameters of mining face such as initial velocity q and coal powder quantity of bore S, figure File uses AutoCAD general file dwg form, it was predicted that result can use printer or drawing apparatus output.
Further, two grades of predictive software systems of described mine motive force disaster are to analyze and one based on mine motive force disaster occurrence condition Level predicts the outcome, and using coal-face as object of study, then estimation range is divided into some unit, calculates naturalness The dynamic disaster that goes down into a mine is dangerous and predicts the outcome relative analysis with one-level, the influence factor chosen be the stress of primary rock, coal seam thickness, The zoned parameters such as gas pressure, gas bearing capacity, rift structure and drilling gas are gushed out initial velocity q, coal powder quantity of bore S, Gas The parameters of mining faces such as amount, are calculated by mining induced stress calculating, gas remainder quantity and protective coat extracted calculate, analysis project activity Impact on mine motive force disasters danger, mine motive force hazard management is had by the assessment measure such as protective coat extracted, gas pumping Effect property.
Further, described mine motive force harmonic extraction method uses different prevention and controls for different grades, for grade Be I grade without hazardous area, normally detect, can be with back production, for the threat district that grade is II grade, strengthen detection, strengthen local Danger releasing measures, for the hazardous area that grade is III grade, strengthens release and dredges pressure measure, improve danger releasing measures parameter, when increasing extraction Between.
Effect collects
The present invention carries out two grades of predictions to mine working face, and after taking gas pumping control measures, mathematical expectation of probability is greatly reduced, and controls Reason measure effect is notable.
Accompanying drawing explanation
Fig. 1 is the mine motive force harmonic extraction method flow diagram that the embodiment of the present invention provides;
Fig. 2 is two grades of prognoses system structure charts of mine motive force disasters danger that the embodiment of the present invention provides;
Fig. 3 is the Mining CAD System structure based on AutoCAD that the embodiment of the present invention provides.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, to this Bright it is further elaborated.Should be appreciated that specific embodiment described herein, and need not only in order to explain the present invention In limiting the present invention.
Fig. 1 shows the mine motive force harmonic extraction method flow of the present invention, as it can be seen, the present invention is achieved in that one Plant mine motive force harmonic extraction method to comprise the following steps:
S101: application two grades of predictive software systems of mine motive force disaster, it is achieved the subdivision probabilistic forecasting that work surface is dangerous;Respectively Unit danger probit is the concentrated expression on mine motive force disaster impacts such as coal and gas prominent of multiple factor, is a unification Prediction index.
S102: the danger of mine motive force disaster regional prediction is divided into different brackets according to different dangerous marginal values.Real In the exploitation work of border, when tunnelling or working face extraction enter into different predicting unit, engineering present position can be known a priori by Danger, takes corresponding prophylactico-therapeutic measures in advance;
S103: according to the dangerous probit of each predicting unit, first selects regional danger releasing measures to release when condition is suitable for Danger, or take corresponding local danger releasing measures to reduce degree of danger;
S104: in time coal and rock state is detected while the engineering progress of down-hole, the effectiveness of inspection danger releasing measures, root Take the precautionary measures according to assay in time, for different danger classes, use corresponding Preventing Countermeasures.
Further, as it is shown on figure 3, described two grades of predictive software systems of mine motive force disaster are by stress and strain model subsystem, data Import subsystem, dynamic calculation subsystem, mine motive force hazard prediction subsystem and grade of risk subsystem composition, each subsystem Uniting and realize data communication by data-interface and AutoCAD, database system uses Access, in order to preserve coal seam thickness, Rift structure, mining induced stress value, gas pressure, gas bearing capacity, drilling gas are gushed out the work surface such as initial velocity q and coal powder quantity of bore S Parameter, graphic file uses AutoCAD general file dwg form, it is possible to call the mining operation plane of dwg form easily The graph datas such as figure, gas-geologic map, it was predicted that result can use printer or drawing apparatus output.
Further, as in figure 2 it is shown, described two grades of predictive software systems of mine motive force disaster are to occur based on mine motive force disaster Condition analysis and one-level predict the outcome, and using coal-face as object of study, then estimation range are divided into some unit, Calculating the naturalness dynamic disaster that goes down into a mine dangerous and predict the outcome relative analysis with one-level, the influence factor chosen answers for protolith The zoned parameters such as power, coal seam thickness, gas pressure, gas bearing capacity, rift structure and drilling gas are gushed out initial velocity q, brill The parameters of mining faces such as bits amount S, gas emission, are calculated and protective coat extracted meter by mining induced stress calculating, gas remainder quantity Calculating, the analysis project activity impact on mine motive force disasters danger, the assessment measure such as protective coat extracted, gas pumping is to mine The effectiveness that dynamic disaster is administered.
Further, described mine motive force harmonic extraction method uses different prevention and controls for different grades, for grade Be I grade without hazardous area, normally detect, can be with back production, for the threat district that grade is II grade, strengthen detection, strengthen local Danger releasing measures, for the hazardous area that grade is III grade, strengthens release and dredges pressure measure, improve danger releasing measures parameter, when increasing extraction Between.
The present invention carries out two grades of predictions to mine working face, and after taking gas pumping control measures, mathematical expectation of probability is greatly reduced, and controls Reason measure effect is notable.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not limit to scope System, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art need not pay Go out various amendments or deformation that performing creative labour can make still within protection scope of the present invention.

Claims (4)

1. a mine motive force harmonic extraction method, it is characterised in that described mine motive force harmonic extraction method includes:
Step one, application two grades of predictive software systems of mine motive force disaster, it is achieved the subdivision probabilistic forecasting that work surface is dangerous;
Step 2, according to different dangerous marginal values, the danger of mine motive force disaster regional prediction is divided into different brackets, In actual exploitation work, when tunnelling or working face extraction enter into different predicting unit, engineering present position can be known a priori by Danger, take corresponding prophylactico-therapeutic measures in advance;
Step 3, dangerous probit according to each predicting unit, first select regional danger releasing measures to solve when condition is suitable for Except danger, or corresponding local danger releasing measures is taked to reduce degree of danger;
Step 4, in time coal and rock state is detected while the engineering progress of down-hole, the effectiveness of inspection danger releasing measures, Take the precautionary measures according to assay in time, for different danger classes, use corresponding Preventing Countermeasures.
2. mine motive force harmonic extraction method as claimed in claim 1, it is characterised in that described mine motive force disaster two Level predictive software systems is imported subsystem, dynamic calculation subsystem, mine motive force hazard prediction by stress and strain model subsystem, data Subsystem and grade of risk subsystem composition, each subsystem realizes data communication, after system by data-interface with AutoCAD Platform data base uses Access, in order to preserve coal seam thickness, rift structure, mining induced stress value, gas pressure, gas bearing capacity, Drilling gas is gushed out initial velocity q and these parameters of mining faces of coal powder quantity of bore S, and graphic file uses AutoCAD general file dwg Form, it was predicted that result printer or drawing apparatus output.
3. mine motive force harmonic extraction method as claimed in claim 1, it is characterised in that described mine motive force disaster two Level predictive software systems is to predict the outcome, using coal-face as research based on mine motive force disaster occurrence condition analysis and one-level Object, is then divided into some unit by estimation range, calculates the naturalness dynamic disaster that goes down into a mine dangerous and predict with one-level Comparative result analyze, the influence factor chosen be the stress of primary rock, coal seam thickness, gas pressure, gas bearing capacity, rift structure this A little zoned parameters and drilling gas are gushed out initial velocity q, coal powder quantity of bore S, these parameters of mining faces of gas emission, answer by adopting Power calculates, gas remainder quantity calculates and protective coat extracted calculates, the analysis project activity impact on mine motive force disasters danger, Assessment protective coat extracted, these measures of the gas pumping effectiveness to mine motive force hazard management.
4. mine motive force harmonic extraction method as claimed in claim 1, it is characterised in that described mine motive force is coordinated to open Mining method uses different prevention and controls for different grade, for grade be I grade without hazardous area, normally detect, carry out Back production, for the threat district that grade is II grade, strengthens detection, strengthens local danger releasing measures, for the hazardous area that grade is III grade, Strengthen release and dredge pressure measure, improve danger releasing measures parameter, increase the extraction time.
CN201410148404.5A 2014-04-14 2014-04-14 A kind of mine motive force harmonic extraction method Active CN103912313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410148404.5A CN103912313B (en) 2014-04-14 2014-04-14 A kind of mine motive force harmonic extraction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410148404.5A CN103912313B (en) 2014-04-14 2014-04-14 A kind of mine motive force harmonic extraction method

Publications (2)

Publication Number Publication Date
CN103912313A CN103912313A (en) 2014-07-09
CN103912313B true CN103912313B (en) 2016-08-17

Family

ID=51038278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410148404.5A Active CN103912313B (en) 2014-04-14 2014-04-14 A kind of mine motive force harmonic extraction method

Country Status (1)

Country Link
CN (1) CN103912313B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2354789B (en) * 1998-04-30 2002-07-24 Us Gov Health & Human Serv Method and apparatus for load rate monitoring
US8595176B2 (en) * 2009-12-16 2013-11-26 The Boeing Company System and method for network security event modeling and prediction
CN102644482B (en) * 2012-05-18 2014-04-02 河南大有能源股份有限公司 Rock burst predicting and warning method
CN103256073B (en) * 2013-04-28 2015-07-29 中国矿业大学 Underground coal mine impulsion pressure degree and zoning Forecasting Methodology
CN103410568B (en) * 2013-08-27 2015-05-13 辽宁工程技术大学 Dynamic mine disaster integral early warning method and device

Also Published As

Publication number Publication date
CN103912313A (en) 2014-07-09

Similar Documents

Publication Publication Date Title
Yucesan et al. Risk evaluation and prevention in hydropower plant operations: A model based on Pythagorean fuzzy AHP
Marnika et al. Sustainable development indicators for mining sites in protected areas: tool development, ranking and scoring of potential environmental impacts and assessment of management scenarios
CN102628373B (en) Impact ground pressure split source comprehensive early-warning method of coal mine
Mohammadi et al. Performance measurement of mining equipment
CN103984995B (en) The decision method of deep-foundation pit engineering risk warning indexes based on profit danger equalization point
Angeles et al. Optimal inspection and preventive maintenance scheduling of mining equipment
Chi et al. Timeliness evaluation of emergency resource scheduling
Al-Chalabi et al. Downtime analysis of drilling machines and suggestions for improvements
CN103469780A (en) Method of calculating deep antiskid stable critical slipping plane of dam foundation of gravity dam
Tang et al. A framework for making maintenance decisions for oil and gas drilling and production equipment
Wang et al. Selection of an appropriate mechanized mining technical process for thin coal seam mining
Jung et al. An approach for risk reduction (methodology) based on optimizing the facility layout and siting in toxic gas release scenarios
Rahimi et al. Investigating the impact of gas emission uncertainty on airflow distribution in an auxiliary ventilation system using CFD and Monte-Carlo simulation
Nell Optimising production through improving the efficiency of mine compressed air networks with limited infrastructure
Canbulat et al. Risk management in open cut coal mines
Rong et al. Temporal uncertainty analysis of human errors based on interrelationships among multiple factors: a case of Minuteman III missile accident
Joughin et al. A risk evaluation model for support design in Bushveld Complex underground mines: Part I-Description of the model
CN103912313B (en) A kind of mine motive force harmonic extraction method
Medhurst et al. Investigation of the relationship between strata characteristics and longwall caving behaviour
Johansson et al. 'The new attractive mine': 36 research areas for attractive workplaces in future deep metal mining
Masir et al. Availability simulation and analysis of armored face conveyor machine in longwall mining
Doig et al. Improvements in truck requirement estimations using detailed haulage analysis
Nosal et al. Determination of the injury probability among coal mine workers
Joughin Dealing with uncertainty and risk in rock engineering design
Achelpohl The effect of overloading on reliability of wheel loader structural components

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Ying

Inventor after: Guo Chao

Inventor after: Song Weihua

Inventor after: Li Sheng

Inventor after: Lv Pengfei

Inventor before: Guo Chao

Inventor before: Chen Ying

Inventor before: Song Weihua

Inventor before: Li Sheng

Inventor before: Lv Pengfei

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140709

Assignee: Liaoning Xinying Mining Technology Co.,Ltd.

Assignor: LIAONING TECHNICAL University

Contract record no.: X2023210000045

Denomination of invention: A Method for Coordinated Mining of Mine Power

Granted publication date: 20160817

License type: Common License

Record date: 20230628