CN103906101A - Base station transmission circuit batch scheduling method and system - Google Patents

Base station transmission circuit batch scheduling method and system Download PDF

Info

Publication number
CN103906101A
CN103906101A CN201210583482.9A CN201210583482A CN103906101A CN 103906101 A CN103906101 A CN 103906101A CN 201210583482 A CN201210583482 A CN 201210583482A CN 103906101 A CN103906101 A CN 103906101A
Authority
CN
China
Prior art keywords
transmission circuit
base
station transmission
service path
create
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210583482.9A
Other languages
Chinese (zh)
Other versions
CN103906101B (en
Inventor
马学刚
刘艳青
汤云峰
魏春来
单雷光
杨朝晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyi Shuzhi Technology Co ltd
Original Assignee
China Mobile Group Hebei Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Hebei Co Ltd filed Critical China Mobile Group Hebei Co Ltd
Priority to CN201210583482.9A priority Critical patent/CN103906101B/en
Publication of CN103906101A publication Critical patent/CN103906101A/en
Application granted granted Critical
Publication of CN103906101B publication Critical patent/CN103906101B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a base station transmission circuit batch scheduling method and system. The method comprises the steps that the application information of base station transmission circuit batch scheduling is received; the association relation table of a transmission network element and a BSC port is called according to the application information; according to the association relation table, a base station transmission circuit batch scheduling scheme is generated; the business configuration information of each base station transmission circuit in the base station transmission circuit batch scheduling scheme is analyzed; and service configuration issuing is carried out according to a method provided by a network management interface. According to the invention, the disadvantage that the existing base station transmission circuit batch scheduling only supports a same office direction batch scheduling method is overcome; through the association relation table of the transmission network element and the BSC port, automatic base station transmission batch scheduling is completed; the link and the process of interdisciplinary man-made transmission resource information confirmation is eliminated; automatic transmission service configuration issuing and activation functions are realized; and the opening speed and efficiency of a base station transmission circuit service is enhanced.

Description

A kind of base-station transmission circuit batch dispatching method and system
Technical field
The present invention relates to transmission circuit technical field in the communications field, particularly, relate to base-station transmission circuit batch dispatching method and system.
Background technology
Along with the continuous growth of mobile communication subscriber, transmission network scale constantly increases, and transmission circuit particularly base-station transmission circuit increases sharply in number.
In transmission integrated network management system, circuit allocation is the important component part of transmission resource management.Circuit allocation refers to after both sides' the starting point (A end) and terminal (Z end) of determining communication, finds the available resources in each stage of transmitting procedure, the process that circuit is run through.Circuit allocation process is divided into application, designs, constructs, opens four processes.
According to dividing on scheduled transmission circuit quantity, two kinds of circuit allocation support single channel scheduling and lot size schedulings.
In addition optimize and cutover adjustment along with the wireless base station in one or more wireless signals overlay area is frequent, so as the base-station transmission circuit of service bearer, also be forced to carry out large batch of cutover and adjustment, this just must relate to the lot size scheduling of base-station transmission circuit so.
Base-station transmission circuit batch dispatching patcher comprises following part: transmission static resource management system, transmission circuit configuration-system, base-station transmission circuit allocation flow system.Wherein, between base-station transmission circuit allocation flow system and transmission static resource management system, transmission circuit configuration-system, by data-interface, realization is shared in whole circuit allocation flow process, reasonable distribution is transmitted the data such as static resource and Circnit Layout.
Existing base-station transmission circuit batch dispatching method comprises: business department proposes the request slip of base station activating transmission circuit, and request slip comprises base station controller (BSC) title and base station title; Transmission department receives after request slip, and transmission equipment port (being generally light mouth) the Time Slot Occupancy situation that needs manual confirmation to dock with BSC, determines whether transfer resource meets application demand; Then start to carry out base-station transmission circuit allocation conceptual design, if A, Z hold identical circuit, can carry out transmission circuit lot size scheduling, different if A, Z hold, can only carry out single channel scheduling; Design complete forwarding to after construction link, need operating personnel to sign in on the transmission EMS of producer Network Management Equipment, complete the configuration distributing of the transfer resources such as transmission network element, port, time slot in artificial mode; After construction, also need to transmit that business that professional configures transmission circuit carries out that craft activates and open-minded, whole transmission circuit scheduling process so far finishes.
There is following defect in existing base-station transmission circuit allocation method:
(1) different if the A of base-station transmission circuit, Z hold, cannot use circuit allocation method in batches, do not support the batch circuit allocation of different office directions.
(2) transmission professional need clearly know the light mouth incidence relation between transmission equipment and BSC, comprises the information such as corresponding light mouth, time slot of transmission network element, transmit port, transmission time slot and opposite end BSC equipment.But in most of the cases, transmission professional cannot know above-mentioned incidence relation.Therefore in this case, cannot realize automatic generation bulk transfer circuit allocation scheme, need manually to check one by one consuming time and inefficiency completely.
(3) in existing base-station transmission circuit allocation method, if complete the service fulfillment of base-station transmission circuit, need transmission professional to sign in in the transmission EMS of producer Network Management Equipment, the rank of human configuration transmission circuit service path, configure this transmission circuit and hold from A the information such as transmission network element, port, time slot of Z end process, then the resource information in EMS Network Management Equipment, these being configured is issued to instruction mode the line activating of going forward side by side in each transmission equipment, so just can complete transmission circuit service fulfillment.Said process all adopts manual type, and time-consuming and inefficiency can not meet the business demand of rapid batch base station activating transmission circuit.
Summary of the invention
The present invention dispatches in order to overcome base-station transmission circuit batch in prior art the defect of only supporting identical office direction lot size scheduling, according to an aspect of the present invention, proposes a kind of base-station transmission circuit batch dispatching method.
According to the base-station transmission circuit batch dispatching method of the embodiment of the present invention, comprising:
Receive the application information of base-station transmission circuit batch scheduling, call transmission network element and BSC port association relation table according to application information;
According to incidence relation table, generate base-station transmission circuit batch scheduling scheme;
The service configuration information of analyzing every base-station transmission circuit in the transmission circuit lot size scheduling scheme of base station, the method providing according to network management interface is carried out issuing of business configuration.
The present invention dispatches in order to overcome base-station transmission circuit batch in prior art the defect of only supporting identical office direction lot size scheduling, according to another aspect of the present invention, proposes a kind of base-station transmission circuit batch dispatching patcher.
According to the base-station transmission circuit batch dispatching patcher of the embodiment of the present invention, comprising:
Base-station transmission circuit batch scheduling scheme design system, for receiving the application information of base-station transmission circuit batch scheduling, call transmission network element and BSC port association relation table according to application information, according to incidence relation table, generate base-station transmission circuit batch scheduling scheme;
Transport service configuration issues and activation system automatically, and for analyzing the service configuration information of every base-station transmission circuit of base station transmission circuit lot size scheduling scheme, the method providing according to network management interface is carried out issuing of business configuration.
Base-station transmission circuit batch dispatching method of the present invention and system, base-station transmission circuit is held different in the situation that at A, Z, be under different office directions, automatically to complete the scheduling of circuit in batches, make up existing base-station transmission circuit batch scheduling and only supported the deficiency of identical office direction lot size scheduling method, by transmission network element and BSC port association relation table, realized automatically completing of base-station transmission lot size scheduling, saved multi-disciplinary between link and the process of manual confirmation resource information; Also realized transport service configuration and automatically issued and mobilizing function, promoted base-station transmission Circuit Service and opened speed and efficiency simultaneously.
Other features and advantages of the present invention will be set forth in the following description, and, partly from specification, become apparent, or understand by implementing the present invention.Object of the present invention and other advantages can be realized and be obtained by specifically noted structure in write specification, claims and accompanying drawing.
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for specification, for explaining the present invention, is not construed as limiting the invention together with embodiments of the present invention.In the accompanying drawings:
Fig. 1 is the interface schematic diagram of base-station transmission circuit batch dispatching patcher of the present invention;
Fig. 2 is the schematic flow sheet of base-station transmission circuit batch dispatching method of the present invention;
Fig. 3 is the present invention generates resource information pond schematic diagram by transmitting network element and BSC port association relation table;
Fig. 4 is the flow chart of the automatic configuration distributing of the present invention and automatic activation system;
Fig. 5 is the structural representation of base-station transmission circuit batch dispatching patcher of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail, but is to be understood that protection scope of the present invention is not subject to the restriction of embodiment.
The present invention will realize base-station transmission circuit allocation exactly in different A, Z end (being different office directions) situation, and system can automatically generate bulk transfer circuit allocation scheme and realize the automatically open-minded of base-station transmission Circuit Service.
As shown in Figure 1, base-station transmission circuit batch dispatching patcher of the present invention mainly comprises that transmission static resource management system, transmission circuit configuration-system, transmission network element and BSC port association relation table, base-station transmission circuit batch scheduling scheme design system, transport service configuration issue and activation system automatically.
Be described as follows:
Transmission static resource management system:
Transmission static resource management system is responsible for transmitting static resource, the management work of the data models such as such as machine room, website, DDF/ODF and terminal port annexation.
Transmission circuit configuration-system:
Transmission circuit configuration-system can be realized dynamic acquisition and synchronously upgrade the data such as the transmission network element device of mobile transmission network, veneer, port, passage, time slot;
Transmission network element and BSC port association relation table:
By transmission network networking structure and service data transmission configuration are analyzed, set up the port association relation table of transmission network element and BSC, as shown in table 1; This table comprised transmission network element and the BSC incidence relation that docks, transmission network element and dock the port association relation of BSC, transmit network element port and dock BSC port time slot incidence relation, transmit the situation that takies of time interval resource on network element port.
Table 1
Figure BDA00002652946400051
Base-station transmission circuit batch scheduling scheme design system:
The critical function of base-station transmission circuit batch scheduling scheme design system is according to specific base transmission circuit A/Z end, by means of the port association relation table of transmission network element and BSC, and the design of the automatic generation of system and outputting base station transmission circuit lot size scheduling.
Transport service configuration issues and activation system automatically:
This main function of system is according to the base-station transmission circuit design scheme of base-station transmission circuit batch scheduling scheme design system output, to every transfer resource configuration data (comprising network element, port, time slot, SNC and the TL etc. of this transmission circuit process) that transmission circuit is required, by being automatically issued on corresponding transmission equipment with the interface of transmission EMS Network Management Equipment, and then issue activation instruction to transmission equipment, realize transport service open-minded automatically.
To be scheduling to example at the base-station transmission circuit batch carrying out under different office directions, in conjunction with Fig. 2-3, base-station transmission circuit batch dispatching method of the present invention is further described below.
Step 1, the application of base-station transmission circuit allocation can be passed through interface automatic flow, or the scheduling template of use system customization itself;
Step 2, confirms to scheduling application, whether verification application information meets the demands;
Step 3, base-station transmission circuit batch scheduling scheme design system, according to scheduling application information, is carried out the design of base-station transmission circuit batch scheduling scheme;
Step 4, because of in base-station transmission circuit allocation application information, the BSC of A end can be multiple different BSC, and corresponding Z end group station is also multiple different base stations, namely needs many A ends, different (the being office direction difference) transmission circuits of Z end to carry out lot size scheduling conceptual design.Then, base-station transmission circuit batch scheduling scheme design system is according to the BSC(A end providing in scheduling application information) and base station title (Z end), call transmission network element and BSC port association relation table, according to the information in above-mentioned incidence relation table, system can go out relevant resource information by auto-associating, generates a resource information pond.In this resource information pond, can the corresponding resource information of flexible combination, system can be according to the resource information of customization, automatically generate the design of a set of base-station transmission circuit batch scheduling.This scheme has comprised that many base-station transmission circuit design schemes describe, and comprising: A/Z end transmission equipment, port, time slot, and the information such as the network element of transmission circuit process and the port of network element, time slot, SNC and TL.The design of final system meeting outputting base station transmission circuit lot size scheduling.
It should be noted that, in table, recorded transmission corresponding with this BSC element name, with the VC4 of the port title of the corresponding transmission of BSC port network element, this BSC corresponding transmit network element port VC4 number, with the VC4 of BSC port in the corresponding transmission of VC12 time slot network element port VC12 time-gap number.
It is example to motionless circuit design that commmunication company of Yi Mou city carries out three A/Z end office (EO)s in batches, after the BSC title of the A end in base-station transmission circuit batch scheduling scheme design system acquisition cuicuit scheduling application information, auto-associating goes out passable idle BSC port, automatically generate idle available port and time slot on transmission element name, the veneer that transmits network element and veneer by calling transmission network element and BSC port association relation table, form a resource information pond, as shown in Figure 3.
Step 5, transport service configuration automatically issues with activation system and receives after the design of base-station transmission circuit batch scheduling, can analyze one by one in design the required service configuration information of base-station transmission circuit of every, then the method providing by calling the EMS of producer webmaster corba interface, carry out automatically issuing of business configuration, as shown in Figure 4, specific as follows:
Step 51, calls checkValid SNC method, judges that whether every required service path of transmission circuit can create, if can create, just forwards step 52 to, otherwise forwards step 53 to.
In step 51, service path rank is generally VC12/VC3, and this transmission circuit is held the route descriptor between the transmission equipment of Z end and middle process from A.
Step 52, calls create SNC method and creates service path, is then issued to transmission equipment; Then call get Route method, from transmission equipment, inquire about and return the route descriptor of the service path of new establishment, and in a temporary temporary table; Then call activate SNC method, under send instructions to activating service path on transmission equipment.After activation of service success, the service path route descriptor being temporarily stored in temporary table, be synchronized in base-station transmission circuit allocation design system, form base-station transmission circuit and hold complete, concrete route descriptor between the transmission equipment of Z end and middle process from A, and persistence gets off.
Whether step 53, from transmission circuit A end, lack service path between the port of any two transmission equipments of system automatic decision.If lacked, call create SNC method and create service path, then call activate SNC method and activate this service path, and then get back to step 51, re-start the judgement whether every required service path of base-station transmission circuit can create; If do not lacked, and then get back to step 51, re-start the judgement whether every required service path of base-station transmission circuit can create.
In step 53, the rank of service path is generally VC4, and it is upper that service path VC12 will be carried on service path VC4, in the time creating 2M service, must first create VC4 service path so; Between the path of different stage, have containment relationship, comprise many low level paths in high-level path, therefore carry other low-level high-level paths and be called as service path, low level path is called as service path.
Step 6, after business automatic activation, has realized the automatically open-minded of transmission circuit.So far, whole base-station transmission circuit batch finishing scheduling.
Base-station transmission circuit batch dispatching method of the present invention, base-station transmission circuit is held different in the situation that at A, Z, be under different office directions, automatically to complete the scheduling of circuit in batches, make up existing base-station transmission circuit batch scheduling and only supported the deficiency of identical office direction lot size scheduling method, by transmission network element and BSC port association relation table, realized automatically completing of base-station transmission lot size scheduling, saved multi-disciplinary between link and the process of manual confirmation resource information; Also realized transport service configuration and automatically issued and mobilizing function, promoted base-station transmission Circuit Service and opened speed and efficiency simultaneously.
As shown in Figure 5, be the structural representation of base-station transmission circuit batch dispatching patcher of the present invention, comprising:
Base-station transmission circuit batch scheduling scheme design system 10, for receiving the application information of base-station transmission circuit batch scheduling, call transmission network element and BSC port association relation table according to application information, according to incidence relation table, generate base-station transmission circuit batch scheduling scheme;
Transport service configuration issues and activation system 20 automatically, and for analyzing the service configuration information of every base-station transmission circuit of base station transmission circuit lot size scheduling scheme, the method providing according to network management interface is carried out issuing of described business configuration.
Wherein:
Transport service configuration automatically issues with activation system 20 and comprises:
Create judge module 21, for calling check Valid SNC method, judge whether every required service path of base-station transmission circuit can create;
Instruction issues module 22, if can create for service path, creates service path and is issued to transmission equipment, issues the instruction in activating service path to transmission equipment;
Path judge module 23, if can not create for service path, judge between the port of any two transmission equipments and whether lack service path: if lacked, create and activate service path, then re-start the judgement whether every required service path of base-station transmission circuit can create; If do not lacked, re-start the judgement whether every required service path of base-station transmission circuit can create.
Wherein:
Instruction issues module 22, create service path specifically for calling create SNC method, be issued to transmission equipment, then call get Route method, from transmission equipment, inquire about and return the route descriptor of the service path of new establishment, and in a temporary temporary table; Call activate SNC method, issue the instruction in activating service path to transmission equipment; After activation of service, by the service path route descriptor being temporarily stored in temporary table, be synchronized in base-station transmission circuit batch scheduling scheme design system, form the route descriptor of base-station transmission circuit.
Wherein:
Path judge module 23, creates service path specifically for calling create SNC method, then calls activate SNC method and activates this service path.
Wherein:
Base-station transmission circuit batch scheduling scheme design system 10 also comprises:
Scheme generation module 11, for according to incidence relation table, association goes out relevant resource information, generates resource information pond, generates base-station transmission circuit batch scheduling scheme according to resource information pond.
Base-station transmission circuit batch dispatching patcher of the present invention, base-station transmission circuit is held different in the situation that at A, Z, be under different office directions, automatically to complete the scheduling of circuit in batches, make up existing base-station transmission circuit batch scheduling and only supported the deficiency of identical office direction lot size scheduling method, by transmission network element and BSC port association relation table, realized automatically completing of base-station transmission lot size scheduling, saved multi-disciplinary between link and the process of manual confirmation resource information; Also realized transport service configuration and automatically issued and mobilizing function, promoted base-station transmission Circuit Service and opened speed and efficiency simultaneously.
The present invention can have multiple multi-form embodiment; above take Fig. 1-Fig. 5 as example is by reference to the accompanying drawings to technical scheme of the present invention explanation for example; this does not also mean that the applied instantiation of the present invention can only be confined in specific flow process or example structure; those of ordinary skill in the art should understand; the specific embodiments that above provided is some examples in multiple its preferred usage, and the execution mode of any embodiment the claims in the present invention all should be within technical solution of the present invention scope required for protection.
Finally it should be noted that: the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although the present invention is had been described in detail with reference to previous embodiment, for a person skilled in the art, its technical scheme that still can record aforementioned each embodiment is modified, or part technical characterictic is wherein equal to replacement.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (10)

1. a base-station transmission circuit batch dispatching method, is characterized in that, comprising:
Receive the application information of base-station transmission circuit batch scheduling, call transmission network element and BSC port association relation table according to described application information;
According to described incidence relation table, generate base-station transmission circuit batch scheduling scheme;
The service configuration information of analyzing every base-station transmission circuit in described base-station transmission circuit batch scheduling scheme, the method providing according to network management interface is carried out issuing of described business configuration.
2. method according to claim 1, is characterized in that, the step issuing that the described method providing according to network management interface is carried out described business configuration comprises:
Call checkValidSNC method, judge whether every required service path of base-station transmission circuit can create;
If can create, create service path and be issued to transmission equipment, issue the instruction in activating service path to described transmission equipment;
If can not create, judge between the port of any two transmission equipments whether lack service path: if lacked, create and activate service path, then re-start the judgement whether every required service path of base-station transmission circuit can create;
If do not lacked, re-start the judgement whether every required service path of base-station transmission circuit can create.
3. method according to claim 2, is characterized in that, in the situation that described service path can create, the step that described establishment service path is issued to transmission equipment comprises:
Call createSNC method and create service path, be issued to transmission equipment, then call getRoute method, from described transmission equipment, inquire about and return the route descriptor of the service path of new establishment, and in a temporary temporary table;
The described step that issues the instruction in activating service path to transmission equipment comprises:
Call activateSNC method, issue the instruction in activating service path to transmission equipment;
After activation of service, by the service path route descriptor being temporarily stored in described temporary table, be synchronized in base-station transmission circuit batch scheduling scheme design system, form the route descriptor of base-station transmission circuit.
4. according to the method in claim 2 or 3, it is characterized in that, described, in the situation that service path can not create, described establishment the step that activates service path comprise:
Call createSNC method and create service path, then call activateSNC method and activate this service path.
5. method according to claim 1, is characterized in that, described according to incidence relation table, and the step that generates base-station transmission circuit batch scheduling scheme comprises:
According to described incidence relation table, association goes out relevant resource information, generates resource information pond, generates base-station transmission circuit batch scheduling scheme according to described resource information pond.
6. a base-station transmission circuit batch dispatching patcher, is characterized in that, comprising:
Base-station transmission circuit batch scheduling scheme design system, for receiving the application information of base-station transmission circuit batch scheduling, call transmission network element and BSC port association relation table according to described application information, according to described incidence relation table, generate base-station transmission circuit batch scheduling scheme;
Transport service configuration issues and activation system automatically, and for analyzing the service configuration information of every base-station transmission circuit of described base-station transmission circuit batch scheduling scheme, the method providing according to network management interface is carried out issuing of described business configuration.
7. system according to claim 6, is characterized in that, described transport service configuration automatically issues with activation system and comprises:
Create judge module, for calling check ValidSNC method, judge whether every required service path of base-station transmission circuit can create;
Instruction issues module, if can create for service path, creates service path and is issued to transmission equipment, issues the instruction in activating service path to described transmission equipment;
Path judge module, if can not create for service path, judge between the port of any two transmission equipments and whether lack service path: if lacked, create and activate service path, then re-start the judgement whether every required service path of base-station transmission circuit can create; If do not lacked, re-start the judgement whether every required service path of base-station transmission circuit can create.
8. system according to claim 7, it is characterized in that, described instruction issues module, create service path specifically for calling create SNC method, be issued to transmission equipment, then call getRoute method, from described transmission equipment, inquire about and return the route descriptor of the service path of new establishment, and in a temporary temporary table; Call activate SNC method, issue the instruction in activating service path to transmission equipment; After activation of service, by the service path route descriptor being temporarily stored in described temporary table, be synchronized in base-station transmission circuit batch scheduling scheme design system, form the route descriptor of base-station transmission circuit.
9. according to the system described in claim 7 or 8, it is characterized in that, described path judge module, creates service path specifically for calling create SNC method, then calls activate SNC method and activates this service path.
10. system according to claim 6, is characterized in that, described base-station transmission circuit batch scheduling scheme design system also comprises:
Scheme generation module, for according to described incidence relation table, association goes out relevant resource information, generates resource information pond, generates base-station transmission circuit batch scheduling scheme according to described resource information pond.
CN201210583482.9A 2012-12-26 2012-12-26 A kind of base station transmission circuit lot size scheduling method and system Active CN103906101B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210583482.9A CN103906101B (en) 2012-12-26 2012-12-26 A kind of base station transmission circuit lot size scheduling method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210583482.9A CN103906101B (en) 2012-12-26 2012-12-26 A kind of base station transmission circuit lot size scheduling method and system

Publications (2)

Publication Number Publication Date
CN103906101A true CN103906101A (en) 2014-07-02
CN103906101B CN103906101B (en) 2017-08-25

Family

ID=50997205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210583482.9A Active CN103906101B (en) 2012-12-26 2012-12-26 A kind of base station transmission circuit lot size scheduling method and system

Country Status (1)

Country Link
CN (1) CN103906101B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105991317A (en) * 2015-02-04 2016-10-05 中国移动通信集团安徽有限公司 PTN service circuit dispatching method and system, and automatic dispatching subsystem of PTN circuit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050013259A1 (en) * 2001-12-31 2005-01-20 Israel Papoushado Technique of determining connectivity solutions for network elements
CN101309492A (en) * 2008-07-14 2008-11-19 中国移动通信集团北京有限公司 Method and apparatus for acquiring end-to-end circuit information in network management system
CN101448329A (en) * 2008-10-30 2009-06-03 浪潮通信信息系统有限公司 Method for automatically opening transmission circuit on the basis of flow
CN201360356Y (en) * 2008-11-28 2009-12-09 中国移动通信集团广东有限公司 Circuit dispatching system of base station
CN102833772A (en) * 2012-09-07 2012-12-19 北京直真科技股份有限公司 Method and device for judging base transceiver station single-route and service configuration hidden trouble

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050013259A1 (en) * 2001-12-31 2005-01-20 Israel Papoushado Technique of determining connectivity solutions for network elements
CN101309492A (en) * 2008-07-14 2008-11-19 中国移动通信集团北京有限公司 Method and apparatus for acquiring end-to-end circuit information in network management system
CN101448329A (en) * 2008-10-30 2009-06-03 浪潮通信信息系统有限公司 Method for automatically opening transmission circuit on the basis of flow
CN201360356Y (en) * 2008-11-28 2009-12-09 中国移动通信集团广东有限公司 Circuit dispatching system of base station
CN102833772A (en) * 2012-09-07 2012-12-19 北京直真科技股份有限公司 Method and device for judging base transceiver station single-route and service configuration hidden trouble

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105991317A (en) * 2015-02-04 2016-10-05 中国移动通信集团安徽有限公司 PTN service circuit dispatching method and system, and automatic dispatching subsystem of PTN circuit

Also Published As

Publication number Publication date
CN103906101B (en) 2017-08-25

Similar Documents

Publication Publication Date Title
MXPA05013708A (en) Apparatus, system, and method for managing reverse link communication resources in a distributed communication system.
US9325429B2 (en) Providing digital data services as electrical signals and radio-frequency (RF) communications over optical fiber in distributed communications systems, and related components and methods
CN101340390B (en) Scheduling apparatus and method for real-time service
CN104113926A (en) WTRU and method of using same, and B node and method of using same
CN105245301A (en) Time-triggered based airborne optical network simulation system
CN102984604A (en) System and method for data interaction
CN102647246A (en) D2D (Dimension To Dimension) pair/D2D cluster communication building method
CA2581490A1 (en) Quality-of-service (qos)-aware scheduling for uplink transmissions on dedicated channels
CN104836736A (en) Spectrum sensing-based energy efficiency resource allocation and path reconfiguration method in elastic optical network
CN102186265B (en) Distributed base station and networking method thereof
CN101090525B (en) Multicast broadcast service dispatching method
CN101616024B (en) Method and system of service opening/blocking
CN109787791A (en) Communication means and communication equipment
CN101425838A (en) Data channel configuration method and device
CN104185290A (en) Data scheduling method, relay equipment, relay node and system
CN103582186A (en) Method and device for BBU interframe data interaction in wireless soft base station
WO2022001332A1 (en) Networking device and method for nsa, and mobile communication system
CN103906101A (en) Base station transmission circuit batch scheduling method and system
CN103686602B (en) Ship wireless transmission control device and method
CN102217327A (en) Method, apparatus, system for hybrid-transmitting and bridging of circuit service and packet service
CN102307268A (en) Voice scheduling system of passenger service systems among railway stations, and integrated management platform
CN106937265B (en) Ship communication method and device
CN101491048A (en) Transmission pattern for the transmission of data in a radio communications system
CN102223684B (en) Time slot resource distribution method and device
CN101247156B (en) Data synchronization implementing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231124

Address after: 100080, 9th floor, Building C, No. 16 Danling Street, Haidian District, Beijing

Patentee after: Zhongyi Shuzhi Technology Co.,Ltd.

Address before: 050021 No. 136 Dongfeng Road, Hebei, Shijiazhuang

Patentee before: CHINA MOBILE GROUP HEBEI Co.,Ltd.

TR01 Transfer of patent right