CN103900211B - A kind of air-conditioning work mode switching method and a kind of air-conditioning - Google Patents

A kind of air-conditioning work mode switching method and a kind of air-conditioning Download PDF

Info

Publication number
CN103900211B
CN103900211B CN201410114330.3A CN201410114330A CN103900211B CN 103900211 B CN103900211 B CN 103900211B CN 201410114330 A CN201410114330 A CN 201410114330A CN 103900211 B CN103900211 B CN 103900211B
Authority
CN
China
Prior art keywords
mode
operation mode
judged result
air
current operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410114330.3A
Other languages
Chinese (zh)
Other versions
CN103900211A (en
Inventor
李昱兵
高向军
王剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Changhong Electric Co Ltd
Original Assignee
Sichuan Changhong Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Changhong Electric Co Ltd filed Critical Sichuan Changhong Electric Co Ltd
Priority to CN201410114330.3A priority Critical patent/CN103900211B/en
Publication of CN103900211A publication Critical patent/CN103900211A/en
Application granted granted Critical
Publication of CN103900211B publication Critical patent/CN103900211B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a kind of air-conditioning work mode switching method and a kind of air-conditioning, it is applied to include in the air-conditioning of air-conditioner body, described air-conditioner body at least has wind and starts building operation mode with people and advevse flow of QI due to wind pathogen people starts building operation mode, described method includes: when the current operation mode of described air-conditioner body is the first mode of operation, it is thus achieved that the first status information of the state of at least one user in the space characterizing described air-conditioning place;When based on described first status information, determining when described current operation mode should be the second mode of operation, it is thus achieved that for judging whether at least one parameter information maintaining described current operation mode to be described the second mode of operation;Based at least one parameter information described, it may be judged whether maintaining described current operation mode is described the second mode of operation, it is thus achieved that the first judged result;When described first judged result is no, controlling described current operation mode is the first mode of operation described.

Description

A kind of air-conditioning work mode switching method and a kind of air-conditioning
Technical field
The present invention relates to electronic technology field, particularly relate to a kind of air-conditioning work mode switching method and a kind of sky Adjust.
Background technology
Along with the development of electronic technology, increasing electronic equipment occurs in the life of people, such as: Air-conditioning, refrigerator etc., these electronic equipments have brought comfortable and convenient.
In prior art, air-conditioning has multiple-working mode, as refrigeration work pattern, heat mode of operation, Dehumidifying mode of operation, circulated air mode of operation, automatic operation mode etc., people can select sky as required The mode of operation adjusted.
But present inventor during inventive technique scheme, finds above-mentioned in realizing the embodiment of the present application At least there is following technical problem in technology:
In prior art, when the current operation mode of air-conditioning is the first mode of operation, air-conditioning can continue with The first mode of operation, without judging air-conditioning according to the status information of user in space, air-conditioning place Whether current operating state should be adjusted to the second mode of operation, more will not determine adjustment according to parameter information The first mode of operation also it is to maintain for the second mode of operation.Therefore, the technical problem that prior art exists It is: when the current operation mode of air-conditioning is the first mode of operation, it is impossible to judge to adjust according to parameter information The first mode of operation also it is to maintain for the second mode of operation.
Summary of the invention
The embodiment of the present application, by providing a kind of air-conditioning work mode switching method and a kind of air-conditioning, solves existing Have in technology when the current operation mode of air-conditioning is the first mode of operation, it is impossible to judge according to parameter information It is adjusted to the second mode of operation and is also to maintain the technical problem of the first mode of operation, it is achieved that when air-conditioning When current operation mode is the first mode of operation, judge to be adjusted to the second mode of operation according to parameter information Also it is to maintain the first mode of operation, it is provided that intelligentized Working mode switching method.
On the one hand, the embodiment of the present application provides a kind of air-conditioning work mode switching method, is applied to include sky Adjusting in the air-conditioning of main body, described air-conditioner body at least has wind and starts building operation mode with people and advevse flow of QI due to wind pathogen people moves Working mould Formula, described method includes:
When the current operation mode of described air-conditioner body is the first mode of operation, it is thus achieved that be used for characterizing described First status information of the state of at least one user in the space at air-conditioning place, wherein, the first work described Operation mode is described wind with people starts building operation mode or described advevse flow of QI due to wind pathogen people starts building operation mode;
When based on described first status information, determining that described current operation mode should be the second mode of operation Time, it is thus achieved that for judging whether maintain described current operation mode to be described the second mode of operation at least one Individual parameter information, wherein, described the second mode of operation is described wind starts building operation mode and described advevse flow of QI due to wind pathogen with people The mode of operation that people starts building in operation mode in addition to described first mode of operation;
Based at least one parameter information described, it may be judged whether maintaining described current operation mode is described second Plant mode of operation, it is thus achieved that the first judged result;
When described first judged result is no, controlling described current operation mode is the first Working mould described Formula.
Optionally, described based at least one parameter information described, it may be judged whether maintain described work at present Pattern is described the second mode of operation, it is thus achieved that after the first judged result, described method also includes:
When described first judged result is for being, maintaining described current operation mode is described the second Working mould Formula.
Optionally, described acquisition is used for judging whether that maintaining described current operation mode is the work of described the second At least one parameter information of pattern, particularly as follows:
Obtain in characterizing the space at described air-conditioning place except described at least one with other users of open air The second status information of state;Or
Certain customers at least one user described in obtaining the space for characterizing described air-conditioning place The third state information of state;Or
The body of the condition of at least one user described in obtaining the space for characterizing described air-conditioning place Body status information.
Optionally, described the second mode of operation be described advevse flow of QI due to wind pathogen people start building operation mode time, described based on institute State at least one parameter information, it may be judged whether maintaining described current operation mode is described the second Working mould Formula, it is thus achieved that the first judged result, specifically includes:
When determining that other users described are kept in motion based on described second status information, it is thus achieved that described its The quantity of he user is the second quantity;
Judge that described second quantity is less than also being no less than first quantity of at least one user described, it is thus achieved that Second judged result;
Based on described second judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described second judged result shows described second quantity less than described first quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described second judged result shows described second quantity not less than described first quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
Optionally, described the second mode of operation be described advevse flow of QI due to wind pathogen people start building operation mode time, described based on institute State at least one parameter information, it may be judged whether maintaining described current operation mode is described the second Working mould Formula, it is thus achieved that the first judged result, specifically includes:
When determining that described certain customers are kept in motion based on described third state information, it is thus achieved that described portion The quantity at demultiplexing family is the 3rd quantity;
Judge that described 3rd quantity is less than also being no less than at least one user described except described part is used 4th quantity of outdoor another part user, it is thus achieved that the 3rd judged result;
Based on described 3rd judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described 3rd judged result shows described 3rd quantity less than described four quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described 3rd judged result shows described 3rd quantity not less than described four quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
Optionally, described based at least one parameter information described, it may be judged whether to maintain described work at present mould Formula is described the second mode of operation, it is thus achieved that the first judged result, specifically includes:
The corresponding mode of operation corresponding with described condition information is being determined based on described condition information Time, it is judged that described corresponding mode of operation is the most identical with described second mode of operation, it is thus achieved that the 4th judged result;
Wherein, described corresponding mode of operation and described second mode of operation phase are shown in described 4th judged result Meanwhile, described first judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is described second Mode of operation;Described corresponding mode of operation is shown with described second mode of operation not in described 4th judged result Meanwhile, described first judged result is no, i.e. shows that need not maintain described current operation mode is described Two mode of operations, controlling described current operation mode is described first mode of operation.
On the other hand, the embodiment of the present application provides a kind of air-conditioning, and described air-conditioning includes:
Air-conditioner body, described air-conditioner body at least has wind and starts building operation mode with people and advevse flow of QI due to wind pathogen people moves Working mould Formula;
Processor, is arranged in described air-conditioner body, for the current operation mode in described air-conditioner body is During the first mode of operation, it is thus achieved that the state of at least one user in the space characterizing described air-conditioning place The first status information, wherein, the first mode of operation described is described wind starts building operation mode or described with people Advevse flow of QI due to wind pathogen people starts building operation mode;And based on described first status information, determine that described current operation mode should be During the second mode of operation, it is thus achieved that be used for judging whether that maintaining described current operation mode is described the second work At least one parameter information of operation mode, wherein, described the second mode of operation is that described wind starts building to make with people The mode of operation that pattern and described advevse flow of QI due to wind pathogen people start building in operation mode in addition to described first mode of operation;Based on described At least one parameter information, it may be judged whether maintaining described current operation mode is described the second mode of operation, Obtain the first judged result;When described first judged result is no, controlling described current operation mode is institute State the first mode of operation.
Optionally, described processor is additionally operable to:
When described first judged result is for being, maintaining described current operation mode is described the second Working mould Formula.
Optionally, described processor specifically for:
Obtain in characterizing the space at described air-conditioning place except described at least one with other users of open air The second status information of state;Or
Certain customers at least one user described in obtaining the space for characterizing described air-conditioning place The third state information of state;Or
The body of the condition of at least one user described in obtaining the space for characterizing described air-conditioning place Body status information.
Optionally, described processor specifically for:
When determining that other users described are kept in motion based on described second status information, it is thus achieved that described its The quantity of he user is the second quantity;
Judge that described second quantity is less than also being no less than first quantity of at least one user described, it is thus achieved that Second judged result;
Based on described second judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described second judged result shows described second quantity less than described first quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described second judged result shows described second quantity not less than described first quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
Optionally, described processor specifically for:
When determining that described certain customers are kept in motion based on described third state information, it is thus achieved that described portion The quantity at demultiplexing family is the 3rd quantity;
Judge that described 3rd quantity is less than also being no less than at least one user described except described part is used 4th quantity of outdoor another part user, it is thus achieved that the 3rd judged result;
Based on described 3rd judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described 3rd judged result shows described 3rd quantity less than described four quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described 3rd judged result shows described 3rd quantity not less than described four quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
Optionally, described processor specifically for:
The corresponding mode of operation corresponding with described condition information is being determined based on described condition information Time, it is judged that described corresponding mode of operation is the most identical with described second mode of operation, it is thus achieved that the 4th judged result;
Wherein, described corresponding mode of operation and described second mode of operation phase are shown in described 4th judged result Meanwhile, described first judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is described second Mode of operation;Described corresponding mode of operation is shown with described second mode of operation not in described 4th judged result Meanwhile, described first judged result is no, i.e. shows that need not maintain described current operation mode is described Two mode of operations, controlling described current operation mode is described first mode of operation.
The one or more technical schemes provided in the embodiment of the present application, at least have the following technical effect that or excellent Point:
Have employed when the current operation mode of described air-conditioner body is the first mode of operation, it is thus achieved that for table Levy the first status information of the state of at least one user in the space at described air-conditioning place, wherein, described A kind of mode of operation is described wind with people starts building operation mode or described advevse flow of QI due to wind pathogen people starts building operation mode;When based on described First status information, determines when described current operation mode should be the second mode of operation, it is thus achieved that be used for sentencing Disconnected at least one parameter information whether maintaining described current operation mode to be described the second mode of operation, its In, described the second mode of operation is described wind with people starts building operation mode and described advevse flow of QI due to wind pathogen people starts building in operation mode Mode of operation in addition to described first mode of operation;Based at least one parameter information described, it may be judged whether dimension Holding described current operation mode is described the second mode of operation, it is thus achieved that the first judged result;Described first When judged result is no, control the technological means that described current operation mode is the first mode of operation described.
In space according to air-conditioning place the first status information of the state of at least one user and at least one Parameter information, it is judged that the mode of operation of air-conditioner body should be adjusted to the second mode of operation and also be to maintain first Plant mode of operation, so, solve in prior art when the current operation mode of air-conditioning is the first Working mould During formula, it is impossible to judge that being adjusted to the second mode of operation is also to maintain the first mode of operation according to parameter information Technical problem, it is achieved that when the current operation mode of air-conditioning is the first mode of operation, according to parameter believe Breath judgement is adjusted to the second mode of operation and is also to maintain the first mode of operation, it is provided that intelligentized work Mode switching method.
Accompanying drawing explanation
Fig. 1 is the flow chart of a kind of air-conditioning work mode switching method in the embodiment of the present application one;
Fig. 2 is the module map of air-conditioning in the embodiment of the present application two.
Detailed description of the invention
The embodiment of the present application, by providing a kind of air-conditioning work mode switching method and a kind of air-conditioning, solves existing Have in technology when the current operation mode of air-conditioning is the first mode of operation, it is impossible to judge according to parameter information It is adjusted to the second mode of operation and is also to maintain the technical problem of the first mode of operation, it is achieved that when air-conditioning When current operation mode is the first mode of operation, judge to be adjusted to the second mode of operation according to parameter information Also it is to maintain the first mode of operation, it is provided that intelligentized Working mode switching method.
Technical scheme in the embodiment of the present application is for solving above-mentioned technical problem, and general thought is as follows:
In space according to air-conditioning place the first status information of the state of at least one user and at least one Parameter information, it is judged that the mode of operation of air-conditioner body should be adjusted to the second mode of operation and also be to maintain first Plant mode of operation, so, solve in prior art when the current operation mode of air-conditioning is the first Working mould During formula, it is impossible to judge that being adjusted to the second mode of operation is also to maintain the first mode of operation according to parameter information Technical problem, it is achieved that when the current operation mode of air-conditioning is the first mode of operation, according to parameter believe Breath judgement is adjusted to the second mode of operation and is also to maintain the first mode of operation, it is provided that intelligentized work Mode switching method.
In order to be better understood from technique scheme, below in conjunction with Figure of description and concrete embodiment party Technique scheme is described in detail by formula.
Embodiment one
The embodiment of the present application provides a kind of air-conditioning work mode switching method, is applied to include air-conditioner body In air-conditioning, described air-conditioner body at least has wind and starts building operation mode with people and advevse flow of QI due to wind pathogen people starts building operation mode.
As it is shown in figure 1, the air-conditioning work mode switching method that the embodiment of the present application provides, comprise the following steps:
S1: when the current operation mode of described air-conditioner body is the first mode of operation, it is thus achieved that be used for characterizing First status information of the state of at least one user in the space at described air-conditioning place, wherein, described first Kind of mode of operation is described wind with people starts building operation mode or described advevse flow of QI due to wind pathogen people starts building operation mode;
S2: when based on described first status information, determining that described current operation mode should be the second work During pattern, it is thus achieved that for judge whether to maintain described current operation mode be described the second mode of operation extremely A few parameter information, wherein, described the second mode of operation is described wind starts building operation mode and described with people The mode of operation that advevse flow of QI due to wind pathogen people starts building in operation mode in addition to described first mode of operation;
S3: based at least one parameter information described, it may be judged whether it is described for maintaining described current operation mode The second mode of operation, it is thus achieved that the first judged result;
S4: when described first judged result is no, controlling described current operation mode is the first work described Operation mode.
Further, described method also includes: when described first judged result is for being, maintain described currently Mode of operation is described the second mode of operation.
In the embodiment of the present application, described acquisition is used for judging whether that it is described for maintaining described current operation mode At least one parameter information of the second mode of operation, has and is not limited to following three kinds of implementations:
The first implementation: remove at least one use described in obtaining the space for characterizing described air-conditioning place Second status information of the state of other outdoor users.
The second implementation: at least one user described in obtaining the space for characterizing described air-conditioning place In the third state information of state of certain customers.
The third implementation: at least one user described in obtaining the space for characterizing described air-conditioning place The condition information of condition.
Different owing to obtaining the implementation of at least one parameter information described, described in judge whether to remain described Current operation mode is described the second mode of operation, it is thus achieved that the implementation of the first judged result is the most different.
When the implementation obtaining at least one parameter information described is the first implementation above-mentioned, described Judge whether that maintaining described current operation mode is described the second mode of operation, it is thus achieved that the first judged result Implementation is:
Described the second mode of operation be described advevse flow of QI due to wind pathogen people start building operation mode time, based on described second state Information determines when other users described are kept in motion, it is thus achieved that the quantity of other users described is the second number Amount;Judge that described second quantity is less than also being no less than first quantity of at least one user described, it is thus achieved that Second judged result;Based on described second judged result, it may be judged whether maintaining described current operation mode is institute State advevse flow of QI due to wind pathogen people to start building operation mode, it is thus achieved that described first judged result;Wherein, at described second judged result table When bright described second quantity is less than described first quantity, described first judged result is yes, i.e. demonstrates the need for dimension Holding described current operation mode is that described advevse flow of QI due to wind pathogen people starts building operation mode;Show described in described second judged result When second quantity is not less than described first quantity, described first judged result is no, i.e. shows to need not maintain Described current operation mode is that described advevse flow of QI due to wind pathogen people starts building operation mode, and controlling described current operation mode is described wind Start building operation mode with people.
Below above-mentioned implementation is elaborated.
Current operation mode in air-conditioner body be wind with people start building operation mode time, detected by infrared sensor There is child walking about in the parlor at air-conditioning place, for avoiding child to blow air-conditioning flu, determine air-conditioner body Current operation mode should be that advevse flow of QI due to wind pathogen people starts building operation mode, meanwhile, also has 6 people to be sitting on sofa in parlor, Assume have 2 guests to come into parlor, then the first judged result is yes, i.e. demonstrate the need for maintaining described currently Mode of operation is that described advevse flow of QI due to wind pathogen people starts building operation mode, then the current operation mode of air-conditioner body is switched to advevse flow of QI due to wind pathogen People starts building operation mode, the air-conditioner body 6 people's air-supplies on sofa.Assume have 8 guests to come into parlor, So first judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, controlling described current operation mode, to be described wind start building operation mode with people, and air-conditioning is to 8 guests Air-supply.
When the implementation obtaining at least one parameter information described is above-mentioned the second implementation, described Judge whether that maintaining described current operation mode is described the second mode of operation, it is thus achieved that the first judged result Implementation is:
Described the second mode of operation be described advevse flow of QI due to wind pathogen people start building operation mode time, based on the described third state Information determines when described certain customers are kept in motion, it is thus achieved that the quantity of described certain customers is the 3rd number Amount;Judge that described 3rd quantity is less than also being no less than at least one user described except described certain customers 4th quantity of outer another part user, it is thus achieved that the 3rd judged result;Based on described 3rd judged result, Judging whether to maintain described current operation mode is that described advevse flow of QI due to wind pathogen people starts building operation mode, it is thus achieved that described first judges Result;Wherein, when described 3rd judged result shows described 3rd quantity less than described four quantity, institute It is yes for stating the first judged result, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people starts building to make Pattern;When described 3rd judged result shows described 3rd quantity not less than described four quantity, described the One judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
Below above-mentioned implementation is elaborated.
Current operation mode in air-conditioner body be wind with people start building operation mode time, detected by infrared sensor There is child walking about in the parlor at air-conditioning place, for avoiding child to blow air-conditioning flu, determine air-conditioner body Current operation mode should be that advevse flow of QI due to wind pathogen people starts building operation mode, meanwhile, also has 6 people to be sitting on sofa in parlor, Assuming that 2 people in be sitting on sofa 6 people move towards balcony and make a phone call, remaining 4 people are sitting on sofa, So first judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people starts building Operation mode, then switch to advevse flow of QI due to wind pathogen people to start building operation mode by the current operation mode of air-conditioner body, air-conditioner body to Still be seated 4 people's air-supplies on sofa.Assume that 4 people in be sitting on sofa 6 people move towards balcony Making a phone call, remaining 2 people are sitting on sofa, then the first judged result is no, i.e. show to need not maintain Described current operation mode is that described advevse flow of QI due to wind pathogen people starts building operation mode, and controlling described current operation mode is described wind Starting building operation mode with people, air-conditioning is to 4 the people's air-supplies moving towards balcony.
When the implementation obtaining at least one parameter information described is the third implementation above-mentioned, described Judge whether that maintaining described current operation mode is described the second mode of operation, it is thus achieved that the first judged result Implementation is:
The corresponding mode of operation corresponding with described condition information is being determined based on described condition information Time, it is judged that described corresponding mode of operation is the most identical with described second mode of operation, it is thus achieved that the 4th judged result;
Wherein, described corresponding mode of operation and described second mode of operation phase are shown in described 4th judged result Meanwhile, described first judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is described second Mode of operation;Described corresponding mode of operation is shown with described second mode of operation not in described 4th judged result Meanwhile, described first judged result is no, i.e. shows that need not maintain described current operation mode is described Two mode of operations, controlling described current operation mode is described first mode of operation.
Below above-mentioned implementation is elaborated.
Current operation mode in air-conditioner body be wind with people start building operation mode time, sky detected by infrared sensor There is child walking about in adjusting the parlor at place, for avoiding child to blow air-conditioning flu, determine the current of air-conditioner body Mode of operation should be that advevse flow of QI due to wind pathogen people starts building operation mode, if the body surface of this child detected by temperature sensor Temperature is 34 degrees Celsius, less than the normal shell temperature of people 35 degrees Celsius-37 degrees Celsius, with shell temperature is 34 degree of corresponding corresponding mode of operations are that advevse flow of QI due to wind pathogen people starts building operation mode, and the most described first judged result is yes, i.e. Demonstrating the need for maintaining described current operation mode is described second mode of operation, then by the current work of air-conditioner body Operation mode switches to advevse flow of QI due to wind pathogen people to start building operation mode, and this child walked about no longer is blown by air-conditioner body.
If being detected that by temperature sensor the shell temperature of this child is 38 degrees Celsius, normal higher than people Shell temperature 35 degrees Celsius-37 degrees Celsius, with shell temperature be 38 degree of corresponding corresponding mode of operations be wind Starting building operation mode with people, the most described first judged result is no, i.e. shows to need not maintain described work at present Pattern is described second mode of operation, then the current operation mode controlling air-conditioner body is that wind moves Working mould with people Formula, this child walked about is blown by air-conditioner body.
Embodiment two
Based on same inventive concept, the embodiment of the present invention additionally provides a kind of air-conditioning, owing to this air-conditioning solves The principle of problem is similar to air-conditioning work mode switching method, and therefore the enforcement of this air-conditioning may refer to method Implement, repeat no more in place of repetition.
As in figure 2 it is shown, the embodiment of the present application provides a kind of air-conditioning, including:
Air-conditioner body 1, described air-conditioner body at least has wind and starts building operation mode with people and advevse flow of QI due to wind pathogen people moves Working mould Formula;
Processor 2, is arranged in described air-conditioner body, for the current operation mode in described air-conditioner body During for the first mode of operation, it is thus achieved that the shape of at least one user in the space characterizing described air-conditioning place First status information of state, wherein, the first mode of operation described is described wind starts building operation mode or institute with people State advevse flow of QI due to wind pathogen people to start building operation mode;And based on described first status information, determine that described current operation mode should When being the second mode of operation, it is thus achieved that be used for judging whether that maintaining described current operation mode is described the second At least one parameter information of mode of operation, wherein, described the second mode of operation is that described wind is started building with people The mode of operation that operation mode and described advevse flow of QI due to wind pathogen people start building in operation mode in addition to described first mode of operation;Based on institute State at least one parameter information, it may be judged whether maintaining described current operation mode is described the second Working mould Formula, it is thus achieved that the first judged result;When described first judged result is no, control described current operation mode For the first mode of operation described.
Optionally, described processor is additionally operable to:
When described first judged result is for being, maintaining described current operation mode is described the second Working mould Formula.
Optionally, described processor specifically for:
Obtain in characterizing the space at described air-conditioning place except described at least one with other users of open air The second status information of state;Or
Certain customers at least one user described in obtaining the space for characterizing described air-conditioning place The third state information of state;Or
The body of the condition of at least one user described in obtaining the space for characterizing described air-conditioning place Body status information.
Optionally, described processor specifically for:
When determining that other users described are kept in motion based on described second status information, it is thus achieved that described its The quantity of he user is the second quantity;
Judge that described second quantity is less than also being no less than first quantity of at least one user described, it is thus achieved that Second judged result;
Based on described second judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described second judged result shows described second quantity less than described first quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described second judged result shows described second quantity not less than described first quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
Optionally, described processor specifically for:
When determining that described certain customers are kept in motion based on described third state information, it is thus achieved that described portion The quantity at demultiplexing family is the 3rd quantity;
Judge that described 3rd quantity is less than also being no less than at least one user described except described part is used 4th quantity of outdoor another part user, it is thus achieved that the 3rd judged result;
Based on described 3rd judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described 3rd judged result shows described 3rd quantity less than described four quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described 3rd judged result shows described 3rd quantity not less than described four quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
Optionally, described processor specifically for:
The corresponding mode of operation corresponding with described condition information is being determined based on described condition information Time, it is judged that described corresponding mode of operation is the most identical with described second mode of operation, it is thus achieved that the 4th judged result;
Wherein, described corresponding mode of operation and described second mode of operation phase are shown in described 4th judged result Meanwhile, described first judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is described second Mode of operation;Described corresponding mode of operation is shown with described second mode of operation not in described 4th judged result Meanwhile, described first judged result is no, i.e. shows that need not maintain described current operation mode is described Two mode of operations, controlling described current operation mode is described first mode of operation.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know base This creativeness concept, then can make other change and amendment to these embodiments.So, appended right is wanted Ask and be intended to be construed to include preferred embodiment and fall into all changes and the amendment of the scope of the invention.

Claims (12)

1. an air-conditioning work mode switching method, is applied to include in the air-conditioning of air-conditioner body, described sky Adjust main body at least to have wind and start building operation mode with people and advevse flow of QI due to wind pathogen people starts building operation mode, it is characterised in that described side Method includes:
When the current operation mode of described air-conditioner body is the first mode of operation, it is thus achieved that be used for characterizing described First status information of the state of at least one user in the space at air-conditioning place, wherein, the first work described Operation mode is described wind with people starts building operation mode or described advevse flow of QI due to wind pathogen people starts building operation mode;
When based on described first status information, determining that described current operation mode should be the second mode of operation Time, it is thus achieved that for judging whether maintain described current operation mode to be described the second mode of operation at least one Individual parameter information, wherein, described the second mode of operation is described wind starts building operation mode and described advevse flow of QI due to wind pathogen with people The mode of operation that people starts building in operation mode in addition to the first mode of operation described;
Based at least one parameter information described, it may be judged whether maintaining described current operation mode is described second Plant mode of operation, it is thus achieved that the first judged result;
When described first judged result is no, controlling described current operation mode is the first Working mould described Formula.
2. the method for claim 1, it is characterised in that described based at least one ginseng described Number information, it may be judged whether maintaining described current operation mode is described the second mode of operation, it is thus achieved that first sentences After disconnected result, described method also includes:
When described first judged result is for being, maintaining described current operation mode is described the second Working mould Formula.
3. the method for claim 1, it is characterised in that described acquisition is used for judging whether to maintain Described current operation mode is at least one parameter information of described the second mode of operation, particularly as follows:
Obtain in characterizing the space at described air-conditioning place except described at least one with other users of open air The second status information of state;Or
Certain customers at least one user described in obtaining the space for characterizing described air-conditioning place The third state information of state;Or
The body of the condition of at least one user described in obtaining the space for characterizing described air-conditioning place Body status information.
4. method as claimed in claim 3, it is characterised in that be institute in described the second mode of operation State advevse flow of QI due to wind pathogen people start building operation mode time, described based at least one parameter information described, it may be judged whether to maintain described Current operation mode is described the second mode of operation, it is thus achieved that the first judged result, specifically includes:
When determining that other users described are kept in motion based on described second status information, it is thus achieved that described its The quantity of he user is the second quantity;
Judge that described second quantity is less than also being no less than first quantity of at least one user described, it is thus achieved that Second judged result;
Based on described second judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described second judged result shows described second quantity less than described first quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described second judged result shows described second quantity not less than described first quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
5. method as claimed in claim 3, it is characterised in that be institute in described the second mode of operation State advevse flow of QI due to wind pathogen people start building operation mode time, described based at least one parameter information described, it may be judged whether to maintain described Current operation mode is described the second mode of operation, it is thus achieved that the first judged result, specifically includes:
When determining that described certain customers are kept in motion based on described third state information, it is thus achieved that described portion The quantity at demultiplexing family is the 3rd quantity;
Judge that described 3rd quantity is less than also being no less than at least one user described except described part is used 4th quantity of outdoor another part user, it is thus achieved that the 3rd judged result;
Based on described 3rd judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described 3rd judged result shows described 3rd quantity less than described four quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described 3rd judged result shows described 3rd quantity not less than described four quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
6. method as claimed in claim 3, it is characterised in that described based at least one parameter described Information, it may be judged whether maintaining described current operation mode is described the second mode of operation, it is thus achieved that first judges As a result, specifically include:
The corresponding mode of operation corresponding with described condition information is being determined based on described condition information Time, it is judged that described corresponding mode of operation is the most identical with described the second mode of operation, it is thus achieved that the 4th judges knot Really;
Wherein, described corresponding mode of operation and described the second mode of operation are shown in described 4th judged result Time identical, described first judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is described Two kinds of mode of operations;Show that described corresponding mode of operation works with described the second in described 4th judged result During pattern difference, described first judged result is no, i.e. shows to need not to maintain the described current operation mode be Described the second mode of operation, controlling described current operation mode is the first mode of operation described.
7. an air-conditioning, it is characterised in that described air-conditioning includes:
Air-conditioner body, described air-conditioner body at least has wind and starts building operation mode with people and advevse flow of QI due to wind pathogen people moves Working mould Formula;
Processor, is arranged in described air-conditioner body, for the current operation mode in described air-conditioner body is During the first mode of operation, it is thus achieved that the state of at least one user in the space characterizing described air-conditioning place The first status information, wherein, the first mode of operation described is described wind starts building operation mode or described with people Advevse flow of QI due to wind pathogen people starts building operation mode;And based on described first status information, determine that described current operation mode should be During the second mode of operation, it is thus achieved that be used for judging whether that maintaining described current operation mode is described the second work At least one parameter information of operation mode, wherein, described the second mode of operation is that described wind starts building to make with people The mode of operation that pattern and described advevse flow of QI due to wind pathogen people start building in operation mode in addition to the first mode of operation described;Based on institute State at least one parameter information, it may be judged whether maintaining described current operation mode is described the second Working mould Formula, it is thus achieved that the first judged result;When described first judged result is no, control described current operation mode For the first mode of operation described.
8. air-conditioning as claimed in claim 7, it is characterised in that described processor is additionally operable to:
When described first judged result is for being, maintaining described current operation mode is described the second Working mould Formula.
9. air-conditioning as claimed in claim 7, it is characterised in that described processor specifically for:
Obtain in characterizing the space at described air-conditioning place except described at least one with other users of open air The second status information of state;Or
Certain customers at least one user described in obtaining the space for characterizing described air-conditioning place The third state information of state;Or
The body of the condition of at least one user described in obtaining the space for characterizing described air-conditioning place Body status information.
10. air-conditioning as claimed in claim 9, it is characterised in that described processor specifically for:
When determining that other users described are kept in motion based on described second status information, it is thus achieved that described its The quantity of he user is the second quantity;
Judge that described second quantity is less than also being no less than first quantity of at least one user described, it is thus achieved that Second judged result;
Based on described second judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described second judged result shows described second quantity less than described first quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described second judged result shows described second quantity not less than described first quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
11. air-conditionings as claimed in claim 9, it is characterised in that described processor specifically for:
When determining that described certain customers are kept in motion based on described third state information, it is thus achieved that described portion The quantity at demultiplexing family is the 3rd quantity;
Judge that described 3rd quantity is less than also being no less than at least one user described except described part is used 4th quantity of outdoor another part user, it is thus achieved that the 3rd judged result;
Based on described 3rd judged result, it may be judged whether maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Mode of operation, it is thus achieved that described first judged result;
Wherein, when described 3rd judged result shows described 3rd quantity less than described four quantity, described First judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula;When described 3rd judged result shows described 3rd quantity not less than described four quantity, described first Judged result is no, i.e. shows that need not maintain described current operation mode is that described advevse flow of QI due to wind pathogen people moves Working mould Formula, controlling described current operation mode, to be described wind start building operation mode with people.
12. air-conditionings as claimed in claim 9, it is characterised in that described processor specifically for:
The corresponding mode of operation corresponding with described condition information is being determined based on described condition information Time, it is judged that described corresponding mode of operation is the most identical with described the second mode of operation, it is thus achieved that the 4th judges knot Really;
Wherein, described corresponding mode of operation and described the second mode of operation are shown in described 4th judged result Time identical, described first judged result is yes, and i.e. demonstrating the need for maintaining described current operation mode is described Two kinds of mode of operations;Show that described corresponding mode of operation works with described the second in described 4th judged result During pattern difference, described first judged result is no, i.e. shows to need not to maintain the described current operation mode be Described the second mode of operation, controlling described current operation mode is the first mode of operation described.
CN201410114330.3A 2014-03-25 2014-03-25 A kind of air-conditioning work mode switching method and a kind of air-conditioning Active CN103900211B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410114330.3A CN103900211B (en) 2014-03-25 2014-03-25 A kind of air-conditioning work mode switching method and a kind of air-conditioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410114330.3A CN103900211B (en) 2014-03-25 2014-03-25 A kind of air-conditioning work mode switching method and a kind of air-conditioning

Publications (2)

Publication Number Publication Date
CN103900211A CN103900211A (en) 2014-07-02
CN103900211B true CN103900211B (en) 2016-10-05

Family

ID=50991699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410114330.3A Active CN103900211B (en) 2014-03-25 2014-03-25 A kind of air-conditioning work mode switching method and a kind of air-conditioning

Country Status (1)

Country Link
CN (1) CN103900211B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104898448B (en) * 2015-05-29 2018-12-25 四川长虹电器股份有限公司 A kind of intelligent home equipment control method and Intelligent home device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089024A (en) * 1992-12-28 1994-07-06 新典自动化股份有限公司 The air-supply arrangement that adapts to control according to position of human body
US6827284B2 (en) * 2002-01-10 2004-12-07 Denso Corporation Vehicle air conditioner with automatic air-conditioning control
CN101660829A (en) * 2008-08-29 2010-03-03 日立空调·家用电器株式会社 Air-conditioner
CN101769570A (en) * 2008-12-26 2010-07-07 Lg电子株式会社 Air conditioner and operation method thereof
CN102245974A (en) * 2008-12-23 2011-11-16 Lg电子株式会社 Method for controlling air conditioner
CN102418986A (en) * 2010-09-27 2012-04-18 松下电器产业株式会社 Air conditioner

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089024A (en) * 1992-12-28 1994-07-06 新典自动化股份有限公司 The air-supply arrangement that adapts to control according to position of human body
US6827284B2 (en) * 2002-01-10 2004-12-07 Denso Corporation Vehicle air conditioner with automatic air-conditioning control
CN101660829A (en) * 2008-08-29 2010-03-03 日立空调·家用电器株式会社 Air-conditioner
CN102245974A (en) * 2008-12-23 2011-11-16 Lg电子株式会社 Method for controlling air conditioner
CN101769570A (en) * 2008-12-26 2010-07-07 Lg电子株式会社 Air conditioner and operation method thereof
CN102418986A (en) * 2010-09-27 2012-04-18 松下电器产业株式会社 Air conditioner

Also Published As

Publication number Publication date
CN103900211A (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN103884079B (en) A kind of air-conditioning work mode switching method and a kind of air-conditioning
CN104697118B (en) The adjusting method of air conditioner, the regulating device of air conditioner and air conditioner
CN104501354B (en) The method of adjustment and system of air conditioner air supply mode
CN104776547B (en) Control method, terminal and the air conditioner of air conditioner
CN106288163B (en) Air conditioner and one key start-up control method
CN105444336B (en) The control method and air conditioner of air conditioner
CN105258296B (en) Air-conditioner control method and system, air conditioner
EP1935768A3 (en) Mobile apparatus and control method thereof
JP2020505577A (en) Outdoor air conditioner and method and apparatus for controlling cold air prevention
CN103185384A (en) Air conditioner as well as humidity control method and device for air conditioner
CN104374055B (en) Control method and system for air conditioner unit
CN106052027A (en) Control method and device of air conditioner
CN107110543B (en) Air-conditioning device
AU2007326543B2 (en) Air conditioning system
CN106500243B (en) The method and apparatus for controlling air conditioner output temperature
CN106352476A (en) Control method and device for evaporator self-cleaning process of air conditioner
CN107655172A (en) Control method, air-conditioning and the computer-readable recording medium of air-conditioning
CN103900211B (en) A kind of air-conditioning work mode switching method and a kind of air-conditioning
CN104089372A (en) Method for controlling air conditioner and air conditioner
CN109323377A (en) Air conditioner and its control method and control device
CN108709293B (en) Air conditioner control method and device, storage medium and air conditioner
JP2017075727A (en) Air conditioning device
JP5278575B1 (en) Floor heating system and temperature control system
JP2017101871A (en) Air conditioner
CN106556114B (en) The humidity control method of air conditioner, humidification control device and its air conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant