CN103899271A - 突出煤层采煤工作面长钻孔脉动注水防突方法 - Google Patents

突出煤层采煤工作面长钻孔脉动注水防突方法 Download PDF

Info

Publication number
CN103899271A
CN103899271A CN201410165921.3A CN201410165921A CN103899271A CN 103899271 A CN103899271 A CN 103899271A CN 201410165921 A CN201410165921 A CN 201410165921A CN 103899271 A CN103899271 A CN 103899271A
Authority
CN
China
Prior art keywords
coal
water
water injection
hole
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410165921.3A
Other languages
English (en)
Inventor
聂百胜
李祥春
孟筠青
徐冬
王亮
高俊杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongkuang Heng'an Technology Co ltd
China University of Mining and Technology Beijing CUMTB
Original Assignee
Beijing Zhongkuang Heng'an Technology Co ltd
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongkuang Heng'an Technology Co ltd, China University of Mining and Technology Beijing CUMTB filed Critical Beijing Zhongkuang Heng'an Technology Co ltd
Priority to CN201410165921.3A priority Critical patent/CN103899271A/zh
Publication of CN103899271A publication Critical patent/CN103899271A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Instructional Devices (AREA)

Abstract

本发明公开了一种突出厚煤层采煤工作面低频脉动长钻孔注水防突方法,首先通过钻机垂直采煤工作面钻多个深度大于或等于20m的注水孔,钻到预定深度停钻,用封孔器进行封孔,封孔深度大于或等于10m;然后利用煤层低频脉动注水泵向注水孔内注水,注水直到周围煤体潮湿或有水从钻孔周围缓慢渗出为止。防突效果更有效。

Description

突出煤层采煤工作面长钻孔脉动注水防突方法
技术领域
本发明涉及一种矿井安全开采技术,尤其涉及一种突出煤层采煤工作面长钻孔脉动注水防突方法。
背景技术
煤层注水作为防治煤与瓦斯突出的水力化措施之一,在前苏联得到较广泛的应用,煤层注水既可以作为区域性防突措施,也可以作为局部防突措施,为选择和确定合理的煤层注水参数,前苏联进行过较多的研究和试验,并对注水防突效果进行了考察和检验。相关研究和试验表明,煤层注水后,煤的物理力学性质发生明显变化,其弹性和强度减小,塑性增大,从而使煤层的应力分布发生根本变化,即高应力区向煤体深部转移,应力集中系数减小,地应力和瓦斯压力梯度减小,弹性潜能降低,其释放的速度变小,大大减小了突然释放弹性潜能的概率水平,水进入煤的孔隙,降低了瓦斯放散初速度(可减少90%),增加了瓦斯流动的阻力,从而削弱了瓦斯在突出过程中的作用。国外多采用深孔中压长时注水,效果较好。我国在煤层注水防突方面进行过初步的尝试和试验,如阳泉一矿北头嘴井,在综采工作面进行浅孔注水,使工作面压出次数减少了82%,煤尘降低了48%。可见煤层注水湿润煤体,可消除或降低煤层和近工作面处的突出危险。目前,我国大多数突出矿井采用超前排放钻孔作为煤巷掘进工作面的消突措施。超前排放钻孔措施虽然能有效地消除突出危险性,但由于措施的实施周期长,消突效率较低,其结果会使煤巷掘进速度极低,矿井采掘比例严重失调。研究高效消突技术措施、提高突出煤层煤巷掘进速度已成为我国突出煤层开采的当务之急。水力挤出是近期我国试验成功的一种新型防突技术措施,部分突出矿井的应用情况表明,同使用超前排放钻孔措施相比,具有高效消突的效果,可提高掘进速度50%~100%。
现有技术中的煤层注水工艺采用的注水孔深一般为10m,由于孔深不足使得注水效果不理想,防突效果欠佳。
发明内容
本发明的目的是提供一种防突效果好的突出煤层采煤工作面长钻孔脉动注水防突方法。
本发明的目的是通过以下技术方案实现的:
本发明的突出煤层采煤工作面长钻孔脉动注水防突方法,包括步骤:
首先,通过钻机垂直采煤工作面钻多个注水孔,钻到预定深度停钻,用封孔器进行封孔;
然后,利用煤层低频脉动注水泵向注水孔内注水,注水直到周围煤体潮湿或有水从钻孔周围缓慢渗出为止。
由上述本发明提供的技术方案可以看出,本发明实施例提供的突出煤层采煤工作面长钻孔脉动注水防突方法,由于首先通过钻机垂直采煤工作面钻多个注水孔,钻到预定深度停钻,用封孔器进行封孔;然后利用煤层低频脉动注水泵向注水孔内注水,注水直到周围煤体潮湿或有水从钻孔周围缓慢渗出为止,防突效果更有效。
附图说明
图1为本发明实施例提供的突出煤层采煤工作面长钻孔脉动注水防突方法的注水钻孔布置示意图。
具体实施方式
下面将对本发明实施例作进一步地详细描述。
本发明的突出煤层采煤工作面长钻孔脉动注水防突方法,其较佳的具体实施方式包括步骤:
首先,通过钻机垂直采煤工作面钻多个注水孔,钻到预定深度停钻,用封孔器进行封孔;
然后,利用煤层低频脉动注水泵向注水孔内注水,注水直到周围煤体潮湿或有水从钻孔周围缓慢渗出为止。
所述注水孔的深度大于或等于20m。
采煤工作面的每循环留有不小于10m的注水孔超前距。
所述多个注水孔覆盖整个采煤工作面并且每循环施工一组注水钻孔,所述多个注水孔采用三花眼布置方式。
所述注水钻孔的封孔深度大于或等于10m,注水时煤体的注水压力控制在6MPa-10MPa之间。
所述煤层低频脉动注水泵的频率在1-10HZ。
所述脉动注水时间为当注水钻孔周围煤体均匀渗出水珠为止。
在链接每个钻孔的橡胶管和供水干管之间安装水表和截止阀,供水干管上安装压力表。
本发明的突出煤层采煤工作面长钻孔脉动注水防突方法,防突效果更有效。
具体实施例:
如图1所示,根据注水参数要求选定合适的煤层注水的设备,包括钻机、煤层低频脉动注水泵和封孔器等,然后进行钻孔,钻到预定深度停钻封孔,接好注水泵进行注水,注水直到周围煤体潮湿或有水从钻孔周围缓慢渗出为止。
所述的注水钻孔要求不小于20m。
所述的采用长孔注水时,在链接每个钻孔的橡胶管和供水干管之间安装水表和截止阀,干管上安装压力表,用以计量注水量及观测注水压力。
所述的注水钻孔要求覆盖整个回采工作面并且每循环必须施工一组短臂注水钻孔,要求钻孔采用三花眼布置方式。
所述的注水钻孔要使用专用封孔器进行封孔,要求每个注水孔封孔不得少于10m,注水时保证煤体的注水压力不得小于6MPa、不得大于10MPa。
所述的工作面每循环要求留有不小于10m的注水孔超前距。
所述煤层低频脉动注水泵的频率在1-10HZ。
所述脉动注水时间为当注水钻孔周围煤体均匀渗出水珠为止。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。

Claims (8)

1.一种突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,包括步骤:
首先,通过钻机垂直采煤工作面钻多个注水孔,钻到预定深度停钻,用封孔器进行封孔;
然后,利用煤层低频脉动注水泵向注水孔内注水,注水直到周围煤体潮湿或有水从钻孔周围缓慢渗出为止。
2.根据权利要求1所述的突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,所述注水孔的深度大于或等于20m。
3.根据权利要求2所述的突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,采煤工作面的每循环留有不小于10m的注水孔超前距。
4.根据权利要求3所述的突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,所述多个注水孔覆盖整个采煤工作面并且每循环施工一组注水钻孔,所述多个注水孔采用三花眼布置方式。
5.根据权利要求4所述的突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,所述注水钻孔的封孔深度大于或等于10m,注水时煤体的注水压力控制在6MPa-10MPa之间。
6.根据权利要求1至5任一项所述的突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,所述煤层低频脉动注水泵的频率为1-10HZ。
7.根据权利要求6所述的突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,在链接每个钻孔的橡胶管和供水干管之间安装水表和截止阀,供水干管上安装压力表。
8.根据权利要求1所述的突出煤层采煤工作面长钻孔脉动注水防突方法,其特征在于,脉动注水时间为当注水钻孔周围煤体均匀渗出水珠为止。
CN201410165921.3A 2014-04-23 2014-04-23 突出煤层采煤工作面长钻孔脉动注水防突方法 Pending CN103899271A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410165921.3A CN103899271A (zh) 2014-04-23 2014-04-23 突出煤层采煤工作面长钻孔脉动注水防突方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410165921.3A CN103899271A (zh) 2014-04-23 2014-04-23 突出煤层采煤工作面长钻孔脉动注水防突方法

Publications (1)

Publication Number Publication Date
CN103899271A true CN103899271A (zh) 2014-07-02

Family

ID=50990818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410165921.3A Pending CN103899271A (zh) 2014-04-23 2014-04-23 突出煤层采煤工作面长钻孔脉动注水防突方法

Country Status (1)

Country Link
CN (1) CN103899271A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481452A (zh) * 2014-12-05 2015-04-01 中国矿业大学 一种变频脉动式注浆钻孔封孔方法
CN112709530A (zh) * 2021-01-05 2021-04-27 窑街煤电集团有限公司 一种长短孔交叉式煤层注水方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0523328A2 (de) * 1991-07-17 1993-01-20 Richard Voss Grubenausbau Gmbh Einstellbares Bedüsungsventil
US20050189441A1 (en) * 2004-02-27 2005-09-01 Southern Philip W. Water spray assembly
CN1975111A (zh) * 2005-11-28 2007-06-06 高建顺 掘进工作面煤层注水工艺及其应用
CN101403314A (zh) * 2008-11-18 2009-04-08 河南理工大学 煤矿井下钻孔水力压裂增透抽采瓦斯工艺
CN101539028A (zh) * 2009-04-30 2009-09-23 中国矿业大学(北京) 高压脉动注水防治煤岩动力灾害的方法及装备
CN103670320A (zh) * 2013-12-25 2014-03-26 大同煤矿集团有限责任公司 大采高工作面综合防尘方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0523328A2 (de) * 1991-07-17 1993-01-20 Richard Voss Grubenausbau Gmbh Einstellbares Bedüsungsventil
US20050189441A1 (en) * 2004-02-27 2005-09-01 Southern Philip W. Water spray assembly
CN1975111A (zh) * 2005-11-28 2007-06-06 高建顺 掘进工作面煤层注水工艺及其应用
CN101403314A (zh) * 2008-11-18 2009-04-08 河南理工大学 煤矿井下钻孔水力压裂增透抽采瓦斯工艺
CN101539028A (zh) * 2009-04-30 2009-09-23 中国矿业大学(北京) 高压脉动注水防治煤岩动力灾害的方法及装备
CN103670320A (zh) * 2013-12-25 2014-03-26 大同煤矿集团有限责任公司 大采高工作面综合防尘方法

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
于京阁等: "井下低频脉动注水工具设计及仿真计算", 《石油矿场机械》, vol. 38, no. 10, 25 October 2009 (2009-10-25), pages 46 - 49 *
尹文波等: "井下低频脉动注水技术分析", 《石油机械》, vol. 38, no. 1, 10 January 2010 (2010-01-10), pages 66 - 69 *
尹文波等: "井下低频脉动注水技术理论及方法", 《石油矿场机械》, vol. 38, no. 11, 25 November 2009 (2009-11-25), pages 5 - 7 *
李全贵等: "煤层脉动水力压裂中脉动参量作用特性的实验研究", 《煤炭学报》 *
李卫东: "利用煤层注水进行煤与瓦斯突出防治", 《科技信息》, no. 9, 25 March 2012 (2012-03-25), pages 381 - 399 *
李龙达: "低频水力振动注水器的特性分析", 《采油工程》 *
杨胜强主编: "《粉尘防治理论及技术》", 31 December 2007, article "粉尘防治理论及技术", pages: 158-167 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481452A (zh) * 2014-12-05 2015-04-01 中国矿业大学 一种变频脉动式注浆钻孔封孔方法
CN112709530A (zh) * 2021-01-05 2021-04-27 窑街煤电集团有限公司 一种长短孔交叉式煤层注水方法

Similar Documents

Publication Publication Date Title
CN101575983B (zh) 煤矿井下定向压裂增透消突方法及压裂增透消突装置
CN101915083B (zh) 煤矿井上下联合抽采煤层气的方法
CN103835651B (zh) 一种单孔定向钻进局部注浆反井钻井工艺
CN102877884B (zh) 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法
CN103233738B (zh) 一种急倾斜特厚煤层顶煤综合弱化方法
CN108952796A (zh) 一种基于梳状底板穿层钻孔压裂增透的模块化抽采方法
CN102937011B (zh) 瓦斯抽采钻孔群区域性裂隙场二次注浆封堵装置及方法
CN102116169A (zh) 被保护层卸压瓦斯底板岩巷抽采方法
CN102383828A (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
CN104314607B (zh) 一种多阶段提高煤层钻孔瓦斯抽采浓度的方法
CN104653161A (zh) 煤矿井下脉冲水力割缝-压裂一体化增透抽采装置及方法
CN102536240B (zh) 一种高压致裂防治冲击地压的方法
CN207073410U (zh) 向煤层循环注入热水和液氮的增透系统
CN102619552A (zh) 导向槽定向水力压穿增透及消突方法
CN103147734A (zh) 煤矿井下顺煤层多段水力压裂方法
CN105239984A (zh) 一种煤矿井下压裂裂缝扩展控制方法
CN106639971A (zh) 一种射孔炮眼高承压封堵方法
CN102678166B (zh) 单一厚煤层区域增透提高瓦斯抽采率的方法
CN109578058B (zh) 一种通过辅助钻孔提高抽采钻孔瓦斯抽采浓度的方法
CN110725700B (zh) 一种煤层喷涂加固与分级注胶协同封孔方法
CN105019935A (zh) 一种井上井下联合卸压消突煤层快速掘巷法
CN103899271A (zh) 突出煤层采煤工作面长钻孔脉动注水防突方法
CN104612649A (zh) 低压低渗透储层煤层气井化学增透压裂增透增产方法及其设备
CN110566155B (zh) 一种采动区抗变形瓦斯抽采钻孔循环注浆封孔方法
RU2507376C1 (ru) Способ герметизации эксплуатационной колонны

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140702