CN103898911A - Static pressure construction method for rough and fine hard sand bed concrete tubular pile - Google Patents

Static pressure construction method for rough and fine hard sand bed concrete tubular pile Download PDF

Info

Publication number
CN103898911A
CN103898911A CN201410152457.4A CN201410152457A CN103898911A CN 103898911 A CN103898911 A CN 103898911A CN 201410152457 A CN201410152457 A CN 201410152457A CN 103898911 A CN103898911 A CN 103898911A
Authority
CN
China
Prior art keywords
pressure
sand bed
tubular pile
water
concrete tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410152457.4A
Other languages
Chinese (zh)
Inventor
王庆革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN TUBULAR PILE Co Ltd
Original Assignee
HARBIN TUBULAR PILE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN TUBULAR PILE Co Ltd filed Critical HARBIN TUBULAR PILE Co Ltd
Priority to CN201410152457.4A priority Critical patent/CN103898911A/en
Publication of CN103898911A publication Critical patent/CN103898911A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a static pressure construction method for a rough and fine hard sand bed concrete tubular pile. In the static pressure construction process of the tubular pile, people often encounter the problems that because geological structures are different, working can not proceed, the tubular tile can not be constructed, and the construction period is delayed. The method includes the steps that firstly, a high-pressure water pump impacts a hard sand bed in the concrete tubular pile (2) with high-pressure water through a high-pressure steel wire rubber tube (1), so that the surface of the sand bed is softened layer by layer, a water and sand sucking tube is used for sucking the sand bed, and meanwhile a coining press is used for work pressurization to sink the tubular pile. The static pressure construction method is used for construction of the concrete tubular pile.

Description

The hard sand bed concrete tubular pile of thickness static-pressure construction method
technical field:
the present invention relates to the hard sand bed concrete tubular pile of a kind of thickness static-pressure construction method.
background technology:
in pipe pile static-pressure work progress, often run into because geologic structure is different and cause work not carry out, cannot construct, occasion a delay the duration.
at present the construction technology in this field be with static pressure equipment directly to pile tube yes, subject matter is, while running into the hard sand bed of thickness, can not exert pressure, impact construction, causes stopping production.
summary of the invention:
the object of the present invention is to provide the hard sand bed concrete tubular pile of a kind of thickness static-pressure construction method.
the object of the present invention is achieved like this:
the hard sand bed concrete tubular pile of a kind of thickness static-pressure construction method, its step comprises: first utilize high-pressure hydraulic pump, by high pressure steel wire sebific duct, the hard sand bed in concrete tubular pile is carried out to high pressure water impact, make sand bed surface successively soft, utilize the husky suction pipe of water sand bed sucking-off, smoothing press carries out work pressurization simultaneously, and pile tube is sunk.
the hard sand bed concrete tubular pile of described thickness static-pressure construction method, high-pressure hydraulic pump connects with the high-pressure wire rubber hose pipe flange of 1.0 cun, the husky suction pipe of high pressure steel wire sebific duct and water inserts in described pile tube, described high-pressure wire rubber hose tube end installation high-voltage shower nozzle, described high pressure steel wire sebific duct connects with water pipe fixed mechanism, described high-pressure nozzle, apart from pile tube termination 50mm, is provided with coupling arrangement between the husky suction pipe of described high pressure steel wire sebific duct and water, and the described husky suction pipe of water lower end is provided with bottom valve.
the hard sand bed concrete tubular pile of described thickness static-pressure construction method, the pressure of described high-pressure hydraulic pump is 12.5mpa, outlet diameter is 1.2 cun.
beneficial effect:
1. first the present invention utilizes high-pressure hydraulic pump, by high pressure steel wire sebific duct, the hard sand bed in concrete tubular pile is carried out to high pressure water impact, make sand bed surface successively soft, replace the technique of traditional spiral reaming, saved fund, utilized the husky suction pipe of water sand bed sucking-off, smoothing press carries out work pressurization simultaneously, pile tube is sunk, speed of application is fast, sprays water, exerts pressure and carry out simultaneously, saves equipment investment amount.
2. the husky suction pipe of high pressure steel wire sebific duct and water inserts in described pile tube, high-pressure hydraulic pump connects with high-pressure wire rubber hose pipe flange, high-pressure wire rubber hose tube end installation high-voltage shower nozzle, described high pressure steel wire sebific duct connects with water pipe fixed mechanism, between the husky suction pipe of high pressure steel wire sebific duct and water, be provided with coupling arrangement, selected lectotype selection is simply compact, works convenient and time-saving laborsaving.
brief description of the drawings:
accompanying drawing 1 is structure diagram of the present invention.
detailed description of the invention:
embodiment 1:
the hard sand bed concrete tubular pile of a kind of thickness static-pressure construction method, its step comprises: first utilize high-pressure hydraulic pump, by high pressure steel wire sebific duct 1, the hard sand bed in concrete tubular pile 2 is carried out to high pressure water impact, make sand bed surface successively soft, utilize the husky suction pipe 3 of water sand bed sucking-off, smoothing press carries out work pressurization simultaneously, and pile tube is sunk.
embodiment 2:
according to the hard sand bed concrete tubular pile of the thickness static-pressure construction method described in embodiment 1, high-pressure hydraulic pump connects with the high-pressure wire rubber hose pipe flange of 1.0 cun, the husky suction pipe of high pressure steel wire sebific duct and water inserts in described pile tube, described high-pressure wire rubber hose tube end installation high-voltage shower nozzle 4, described high pressure steel wire sebific duct connects with water pipe fixed mechanism 5, described high-pressure nozzle is apart from pile tube termination 50mm, between the husky suction pipe of described high pressure steel wire sebific duct and water, be provided with coupling arrangement 6, the described husky suction pipe of water lower end is provided with bottom valve 7.
embodiment 3:
according to the hard sand bed concrete tubular pile of the thickness static-pressure construction method described in embodiment 1, the pressure of described high-pressure hydraulic pump is 12.5mpa, and outlet diameter is 1.2 cun.

Claims (3)

1. the hard sand bed concrete tubular pile of a thickness static-pressure construction method, it is characterized in that: its step comprises: first utilize high-pressure hydraulic pump, by high pressure steel wire sebific duct, the hard sand bed in concrete tubular pile is carried out to high pressure water impact, make sand bed surface successively soft, utilize the husky suction pipe of water sand bed sucking-off, smoothing press carries out work pressurization simultaneously, and pile tube is sunk.
2. the hard sand bed concrete tubular pile of thickness according to claim 1 static-pressure construction method, it is characterized in that: high-pressure hydraulic pump connects with the high-pressure wire rubber hose pipe flange of 1.0 cun, described high-pressure wire rubber hose tube end installation high-voltage shower nozzle, the husky suction pipe of high pressure steel wire sebific duct and water inserts in described pile tube, described high pressure steel wire sebific duct connects with water pipe fixed mechanism, described high-pressure nozzle is apart from pile tube termination 50mm, between the husky suction pipe of described high pressure steel wire sebific duct and water, be provided with coupling arrangement, the described husky suction pipe of water lower end is provided with bottom valve.
3. the hard sand bed concrete tubular pile of thickness according to claim 1 static-pressure construction method, is characterized in that: the pressure of described high-pressure hydraulic pump is 12.5mpa, outlet diameter is 1.2 cun.
CN201410152457.4A 2014-04-16 2014-04-16 Static pressure construction method for rough and fine hard sand bed concrete tubular pile Pending CN103898911A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410152457.4A CN103898911A (en) 2014-04-16 2014-04-16 Static pressure construction method for rough and fine hard sand bed concrete tubular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410152457.4A CN103898911A (en) 2014-04-16 2014-04-16 Static pressure construction method for rough and fine hard sand bed concrete tubular pile

Publications (1)

Publication Number Publication Date
CN103898911A true CN103898911A (en) 2014-07-02

Family

ID=50990464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410152457.4A Pending CN103898911A (en) 2014-04-16 2014-04-16 Static pressure construction method for rough and fine hard sand bed concrete tubular pile

Country Status (1)

Country Link
CN (1) CN103898911A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529713A (en) * 2021-08-03 2021-10-22 何雪平 Hydraulic engineering pile casing embedding device and construction method thereof
CN113931184A (en) * 2021-11-08 2022-01-14 山河智能装备股份有限公司 Stirring static pile press

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53132114A (en) * 1977-04-23 1978-11-17 Kiyotaka Mukaiyama Method and device for driving hollow pile by jointly using highhpressure water jet
JPH05222727A (en) * 1992-02-10 1993-08-31 Tokyo Gas Co Ltd Press-in method for pile
CN1605684A (en) * 2004-11-09 2005-04-13 李毓锦 PHC pile and water flush gas lift static pressure pile-sinking method
CN1916296A (en) * 2006-09-06 2007-02-21 刘小檀 Construction technique for self-leading hole at pile tip of embrace press type PHC tubular pile to enter rock through static pressure
WO2007040477A1 (en) * 2005-09-21 2007-04-12 Glass James O Method and apparatus for inserting sheet piles within highly resistant earth formations
CN101255695A (en) * 2008-04-15 2008-09-03 黄秋生 PHC pile inner-opposition inner-arrange auxiliary driven pile construction method
CN101307599A (en) * 2007-05-16 2008-11-19 郝运成 Prefabricated hollow pile sinking method
CN102628270A (en) * 2012-04-23 2012-08-08 山东电力工程咨询院有限公司 Great-diameter variable section irregularly-shaped resistance-increased steel pipe pile system and construction method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53132114A (en) * 1977-04-23 1978-11-17 Kiyotaka Mukaiyama Method and device for driving hollow pile by jointly using highhpressure water jet
JPH05222727A (en) * 1992-02-10 1993-08-31 Tokyo Gas Co Ltd Press-in method for pile
CN1605684A (en) * 2004-11-09 2005-04-13 李毓锦 PHC pile and water flush gas lift static pressure pile-sinking method
WO2007040477A1 (en) * 2005-09-21 2007-04-12 Glass James O Method and apparatus for inserting sheet piles within highly resistant earth formations
CN1916296A (en) * 2006-09-06 2007-02-21 刘小檀 Construction technique for self-leading hole at pile tip of embrace press type PHC tubular pile to enter rock through static pressure
CN101307599A (en) * 2007-05-16 2008-11-19 郝运成 Prefabricated hollow pile sinking method
CN101255695A (en) * 2008-04-15 2008-09-03 黄秋生 PHC pile inner-opposition inner-arrange auxiliary driven pile construction method
CN102628270A (en) * 2012-04-23 2012-08-08 山东电力工程咨询院有限公司 Great-diameter variable section irregularly-shaped resistance-increased steel pipe pile system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529713A (en) * 2021-08-03 2021-10-22 何雪平 Hydraulic engineering pile casing embedding device and construction method thereof
CN113931184A (en) * 2021-11-08 2022-01-14 山河智能装备股份有限公司 Stirring static pile press

Similar Documents

Publication Publication Date Title
CN101929158B (en) Statically pressed pile high-pressure whirl jet lead hole construction method
CN203905869U (en) High-pressure water-flushing air-lift reverse circulation hole cleaning device
CN204266614U (en) A kind of concrete structure crack slip casting repair apparatus
CN102704871A (en) Method and device for further washing well in water source heat pump system
CN107083944A (en) A kind of Oil/gas Well hydraulic fracturing underground low frequency hydraulic pulse generating means
CN102562017A (en) Sand blasting, perforating and fracturing method
MY192204A (en) A method of plugging and abandoning a well
CN106592998A (en) House crack repairing device
CN103898911A (en) Static pressure construction method for rough and fine hard sand bed concrete tubular pile
MX2017008912A (en) Coiled tubing spiral venturi tool.
CN203782708U (en) Static pressure construction device for coarse and fine hard sand layer concrete pipe pile
CN205676764U (en) A kind of concrete disintegrating road roller
CN105113530A (en) Caisson aid-sinking process adopting high-pressure injection
CN107414681A (en) A kind of stone sander with water injector
CN103437338A (en) Reinforcing dredger fill foundation construction method combining drainage well and air pressure splitting
CN203879424U (en) Novel continuous sand removal device for oil and water well
CN203755325U (en) Unplasticized polyvinyl chloride (UPVC) composite downcast pipe
CN103243759B (en) Hydraulic drive trenching machine
CN102434168A (en) Pipe connecting device
CN104274129B (en) Wallboard cleaning machine
CN202596614U (en) Well flushing device for further flushing well in water source heat pump system
CN105804690A (en) In-situ leaching process hole drilling reverse cement slurry injection device
CN204327167U (en) A kind of dynamic purification dustfall water proscenia
CN204126582U (en) Sleeve pipe can't harm reshaper
CN204571888U (en) Rotate sand washing head

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140702