CN103883810A - Steel wire mesh framework plastic composite pipe and construction method - Google Patents

Steel wire mesh framework plastic composite pipe and construction method Download PDF

Info

Publication number
CN103883810A
CN103883810A CN201410114438.2A CN201410114438A CN103883810A CN 103883810 A CN103883810 A CN 103883810A CN 201410114438 A CN201410114438 A CN 201410114438A CN 103883810 A CN103883810 A CN 103883810A
Authority
CN
China
Prior art keywords
pipe
steel wire
wire mesh
plastic composite
pipe fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410114438.2A
Other languages
Chinese (zh)
Other versions
CN103883810B (en
Inventor
赵栋
崔博
赵根根
王国振
邬曙光
许建国
刘慧�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAI HIGHWAY ENGINEERING Co Ltd
Original Assignee
WUHAI HIGHWAY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAI HIGHWAY ENGINEERING Co Ltd filed Critical WUHAI HIGHWAY ENGINEERING Co Ltd
Priority to CN201410114438.2A priority Critical patent/CN103883810B/en
Publication of CN103883810A publication Critical patent/CN103883810A/en
Application granted granted Critical
Publication of CN103883810B publication Critical patent/CN103883810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/14Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups
    • F16L9/147Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups comprising only layers of metal and plastics with or without reinforcement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The invention discloses a steel wire mesh framework plastic composite pipe which is mainly composed of a pipe body, a pipe wall, a pipe reinforcing framework, a pipe fitting body, a pipe fitting reinforcing framework, and a connecting flange. The pipe reinforcing framework is embedded into the middle of the pipe wall of the pipe body. The pipe fitting reinforcing framework is inlaid in the middle of the pipe wall of the pipe fitting body. The steel wire mesh framework plastic composite pipe can effectively solve the interface stripping problem of steel-HDPE, a pipe end sealing technology which is extremely strictly required in the past can become convenient and reliable, the creep resistance is good, mechanical strength is durable, rigidity is high, shock resistance is good, size stability is good, moderate flexibility is achieved, and two materials of hard steel and flexible plastics are composited evenly and reliably.

Description

A kind of steel wire mesh frame plastic composite tube and method of construction
Technical field
The invention belongs to composite pipe construction application field, relate in particular to a kind of steel wire mesh frame plastic composite tube and method of construction.
Background technique
At present, along with expanding economy and social progress, steel wire mesh frame plastic composite tube is a kind of patent Novel composite pipe with independent intellectual property right.This steel wire mesh frame plastic composite tube adopts through the coated high-tensile steel wires of processing existing pure PE pipe is wound around to enhancing, make the nominal pressure of tubing be easy to reach: 5MPa above (bore≤φ 200), 2MPa (bore≤φ 400), and also tube wall thickness is managed lower than pure PE.From current research situation, the research of the method for construction of steel wire mesh frame plastic composite tube in engineering is less, it is poor that the method for construction of existing steel wire mesh frame plastic composite tube exists wear-corrosion resistance, heatproof, impact resistance, rigidity, dimensional stability and creep-resistant property, the lasting low problem of mechanical strength.
Therefore, invent a kind of steel wire mesh frame plastic composite tube and method of construction and seem very necessary.
Summary of the invention
The object of the present invention is to provide a kind of steel wire mesh frame plastic composite tube and method of construction, it is poor that the method for construction that is intended to existing steel wire mesh frame plastic composite tube exists wear-corrosion resistance, heatproof, impact resistance, rigidity, dimensional stability and creep-resistant property, the lasting low problem of mechanical strength.The present invention is achieved in that
A kind of steel wire mesh frame plastic composite tube, described composite pipe mainly contains tubing body, tube wall, tubing web frame, pipe fitting body; Pipe fitting web frame and adpting flange composition, wherein, described tubing web frame is embedded in the tube wall neutral position of tubing body; Described pipe fitting web frame is embedded in the tube wall neutral position of pipe fitting body.
Described tubing web frame is specifically set to be wound around and the tubular steel silk screen of welding fabrication is made.
After described pipe fitting web frame specifically adopts the even punching of sheet metal, reel welding is made.
Steel wire mesh frame plastic composite tube provided by the invention efficiently solves the interface peel problem of steel-HDPE, makes the very strict tubing end sealer technique of historical requirement become convenient and reliable; Become comparatively easy in tube wall upper shed branch; Sealing process after tube wall upper shed is also very easy, reliable; Creep-resistant property is good, and the lasting high rigidity of mechanical strength, impact resistance are good, good stability of the dimension, have again appropriateness flexible, and the steel of tempering toughness with gentleness, to mould bi-material compound evenly reliable.
Brief description of the drawings
Fig. 1 is the method for construction flow chart of the steel wire mesh frame plastic composite tube that provides of the embodiment of the present invention.
Fig. 2 is the pipe structure schematic diagram of the steel wire mesh frame plastic composite tube that provides of the embodiment of the present invention.
Fig. 3 is the fitting structure schematic diagram of the steel wire mesh frame plastic composite tube that provides of the embodiment of the present invention.
Embodiment
A kind of steel wire mesh frame plastic composite tube, mainly by tubing wall 1, tubing body 2, tubing web frame 3, pipe fitting body 4, pipe wall 5, pipe fitting web frame 6 and adpting flange 7 form, and wherein, described tubing web frame 3 is embedded in tubing wall 1 neutral position of tubing body 2; Described pipe fitting web frame 6 is embedded in pipe wall 5 neutral positions of pipe fitting body 4; Described adpting flange 7 is arranged on the link position of tubing body 2 and pipe fitting body 4.
Further, described tubing web frame 3 is specifically set to be wound around and the tubular steel silk screen 10 of welding fabrication is made, and is conducive to improve the intensity of tubing main body 2, further improves working life.
Further, the tubular steel silk screen 10 of the latticed tubing web frame intersecting is spent in the concrete employing 45 of the tubular steel silk screen 10 of described tubing web frame 3, is conducive to improve the intensity of tubing web frame 3, further improves utilization efficiency.
Further, described pipe fitting web frame 6 is concrete adopts the welding of steel-sheet reel to make, and is conducive to improve intensity, reduces maintenance cost, further improves working life.
Further, the upper mask body of the reel 9 of described pipe fitting web frame 6 adopts the punching of sheet metal Homogeneous Circular to make, and is conducive to improve the drum strength of pipe fitting web frame 6, reduces maintenance cost, further improves working life.
The present invention is achieved in that a kind of method of construction of steel wire mesh frame plastic composite tube comprises,
S101: pipe canal digging;
S102: tubing, pipe fitting site inspection are in place;
S103: tubing, pipe fitting docking;
S104: electric fusion welding;
S105: cooling, lower pipe;
S106: pipeline is backfilled to 500mm after installing and having managed with laying is lower for the first time;
S107: the pipeline laying is carried out to segmentation intensity, tight pressure test;
S108: to the pipeline Integral sealing pressure test laying;
S109: pipeline is backfilled to terrace absolute altitude after installing and having managed with laying is lower for the second time;
S110: the acceptance of work.
A kind of less important technological scheme of steel wire mesh frame plastic composite tube structure:
Further, described tubing web frame is specifically set to be wound around and the tubular steel silk screen of welding fabrication is made, and is conducive to improve the intensity of tubing main body, further improves working life;
Further, after described pipe fitting web frame specifically adopts the even punching of sheet metal, reel welding is made, and is conducive to improve intensity, reduces maintenance cost, further improves working life.
A kind of less important technological scheme of method of construction of steel wire mesh frame plastic composite tube:
Further, at S101, on the basis of Practical Project demand, pipe trench is excavated;
Further, at S102, tubing, pipe fitting site inspection are in place, specifically comprise stringing before reply tubing check, especially end socket position checks and wants carefully, as found crackle or the repair welding immediately of damaging, or on tubing, make visible marking, repair welding again while having ready conditions; Tubing must prevent damage in lifting and putting, mustn't pull on the ground; When ditch inner lower tube, want holding tube quantum balancing, light rising put down gently, forbids to get rid of throwing.While installation at the pipe end, should dig in joint operation hole, the big or small degree of depth in hole is advisable with easy-to-operat; While connection on ditch, will ensure that butt tube is on same axis, range estimation should not have the obvious angle of cut;
Further, at S103, dock to be welded to tubing, pipe fitting;
Further, at S104, electric fusion welding, specific as follows, become pipe nipple to carry out electric smelting connection pipe cutting, for preventing that material from leaking along steel wire in pipeline, need to seal tube head steel wire.Before general sealing, the tube head steel wire of should first polishing, grinding depth ≮ 3~5mm, and answer the degree of depth consistent, level and smooth.The connecting end that electric smelting socket joint connects tubing should cut vertically.When polishing steel wire, should select grinding wheel specification according to caliber, wall thickness.The width of polishing steel wire trough should be even, the thickness of necessary guarantee internal layer rubber and complete, and the width of groove is unsuitable wide.Groove planted agent clean out.In groove, as circuitous hoop steel wire, must remove, and steel wire head is hammered in plastics.Longitudinal steel wire muscle in polishing steel wire trough, must remove thoroughly, must not have the part of connection with cell wall.Duct sealing polishing groove sealing use welding wire thickness should be even, and welding wire should be removed spot before use.Before welding, should check whether power supply contact is good, welding gun carried out to preheating and generally gear is adjusted to 3~5 grades, preheating 3~5min, when the temperature that blows out wind when welding gun is comparatively stablized, can welding.When welding, should be started by the inwall of groove, the continuous welding of turn-taking successively from inside to outside, every layer face mutually between two root wires must ensure nearly d/4 overlapping (d is gage of wire); Facing mutually beginning place of two-layer welding wire should stagger, and ensures that beginning place of lower floor is evenly capped; The welding wire of beginning place, before welding, can be whittled into oblique angle with blade, so that next lap welding silk herein can rounding off, sealing is good.After sealing, must use emery wheel that sealing part is polished flat, end face run-out must not exceed 2mm;
Further, at S105, after elder generation is cooling.When cooling, the lower pipe type of cooling can adopt nature cooling and manually cooling, ensures that joint is not subject to any external force in cooling procedure.In the time that temperature is down to normal temperature, can dismantle pipe clamp, if affect construction speed because lacking pipe clamp, can after 4 of a pipe clamp stayed mast is all loosening, unload pipe clamp, but will ensure that joint is not affected by any external force, guarantee that face of weld is not impaired in contraction process; When lower pipe, many pipelines that connect on ditch can hyposulculus after fully cooling, and as caliber is large or ditch is darker, available rope catches pipe, and pipe is lifted to the rear bottom of trench of slowly putting into.
Further, at S106, backfill immediately after pipeline installation and laying, backfill should be carried out when temperature is lower, in backfill, should not contain gravel/frozen soil and other hard thing, backfill for the first time, when tubing, should use the both sides of fine sand backfill pipeline, primary backfill is highly preferably 0.1~0.2m.
Further, at S107, the pipeline laying is carried out to segmentation intensity, tight pressure test, weld after 12 hours and carried out, pressure test purges pipeline before, and blow valve port should select that landform is higher, the place of scarcity, avoids casualties; Slowly in pipeline, inject test medium, pressure test segmentation.
Further, at S108, pipeline is carried out after segmentation pressure test, can carry out Integral sealing pressure test, specific requirement is as follows, leak test pressure is 1.25 times of design pressure, voltage stabilizing 30 minutes, Strengh testing pressure is design pressure 1.5 times, voltage stabilizing 15 minutes, in the time that temperature variation or other factors affect pressure testing accuracy, can the proper extension voltage stabilizing time; When pressure rise to test pressure 2/3 time, start line walking; After pressure testing, the water in pipeline or gas are discharged; The pipeline that flange connects is answered after pressure testing bolt fastening a time again.
Further, at S109, pipeline is installed and is laid while being backfilled to for the second time terrace absolute altitude after lower pipe, and the backfill second layer again after compacting, pushes up above 0.6m place until be backfilling into pipe, after use fine earth instead and be backfilling and compacted to terrace.In backfilling process, pipeline bottom and the space of pipe between the end must be tamped, must not backfill within the scope of 0.2m before and after pipe joint; Pipeline is before pressure testing, and the above backfill thickness in pipe top is no less than 0.5m, in case pipeline moves when pressure testing.
Further, at S110, according to the relevant requirements of the relevant requirements of " code for construction and acceptance of water supply and sewerage pipeline engineering " GB50268-97 and " steel frame-plastic (polyethylene) composite pipe " CJ/T189-2007, engineering is carried out an acceptance inspection.Meanwhile, specific requirement below be met, after melting connection, flange should be formed, and flange shape size uniformity, pore-free, bubbling and crack; Joint has along the level and smooth symmetrical flanging of tube coupling circumference, and the degree of depth of flanging lowest part is not less than tube coupling outer surface; Tube wall in-flanges should be evened out; Docking alignment tolerance is not more than 10% of tube wall thickness, and is not more than 3mm.
The method of construction of steel wire mesh frame plastic composite tube provided by the invention efficiently solves the interface peel problem of steel-HDPE, makes the very strict tubing end sealer technique of historical requirement become convenient and reliable; Become comparatively easy in tube wall upper shed branch; Sealing process after tube wall upper shed is also very easy, reliable; Creep-resistant property is good, and the lasting high rigidity of mechanical strength, impact resistance are good, good stability of the dimension, have again appropriateness flexible, and the steel of tempering toughness with gentleness, to mould bi-material compound evenly reliable.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technological scheme of the present invention, those skilled in the art do not need to pay various amendments that performing creative labour can make or distortion still within protection scope of the present invention.

Claims (3)

1. a steel wire mesh frame plastic composite tube, is characterized in that, described composite pipe mainly contains tubing body, tube wall, tubing web frame, pipe fitting body; Pipe fitting web frame and adpting flange composition, wherein, described tubing web frame is embedded in the tube wall neutral position of tubing body; Described pipe fitting web frame is embedded in the tube wall neutral position of pipe fitting body.
2. steel wire mesh frame plastic composite tube according to claim 1, is characterized in that, described tubing web frame is specifically set to be wound around and the tubular steel silk screen of welding fabrication is made.
3. steel wire mesh frame plastic composite tube according to claim 1, is characterized in that, after described pipe fitting web frame specifically adopts the even punching of sheet metal, reel welding is made.
CN201410114438.2A 2014-03-26 2014-03-26 A kind of steel wire mesh frame plastic composite tube and construction method Active CN103883810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410114438.2A CN103883810B (en) 2014-03-26 2014-03-26 A kind of steel wire mesh frame plastic composite tube and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410114438.2A CN103883810B (en) 2014-03-26 2014-03-26 A kind of steel wire mesh frame plastic composite tube and construction method

Publications (2)

Publication Number Publication Date
CN103883810A true CN103883810A (en) 2014-06-25
CN103883810B CN103883810B (en) 2016-07-06

Family

ID=50952856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410114438.2A Active CN103883810B (en) 2014-03-26 2014-03-26 A kind of steel wire mesh frame plastic composite tube and construction method

Country Status (1)

Country Link
CN (1) CN103883810B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106442035A (en) * 2016-05-18 2017-02-22 中国能源建设集团甘肃省电力设计院有限公司 Production apparatus and production method for concrete-frozen soil contact surface direct shear test sample
CN115217133A (en) * 2022-07-29 2022-10-21 上海宝冶集团有限公司 Construction process of foundation pit drainage system in coastal region

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU94028252A (en) * 1994-07-27 1996-06-27 Научно-производственное предприятие "Мембранная технология" Method for manufacture of roll membrane member
CN2498432Y (en) * 2001-06-30 2002-07-03 李富春 Plastic pipe with spring net
EP1577077A2 (en) * 2004-03-16 2005-09-21 Harbin Institute of Technology Starway Industrial Co. Ltd. Piping made of steel mesh reinforced plastic composite pipe and method for making the pipe
CN2878848Y (en) * 2006-04-06 2007-03-14 上海贵盈科技发展有限公司 High strength steel plate skeleton plastic compound pipeline
CN200999926Y (en) * 2006-03-16 2008-01-02 山东九环石油机械有限公司 High pressure intensity plastic steel tube
CN201866426U (en) * 2010-12-06 2011-06-15 联塑科技发展(武汉)有限公司 Steel wire net framework compound pipeline
CN103185177A (en) * 2012-07-10 2013-07-03 河南联塑实业有限公司 Novel steel wire mesh skeleton plastic composite pipe and preparation method thereof
CN203049110U (en) * 2012-10-19 2013-07-10 河北达瑞化纤机械有限公司 Flow arranging cylinder of annular air blowing device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU94028252A (en) * 1994-07-27 1996-06-27 Научно-производственное предприятие "Мембранная технология" Method for manufacture of roll membrane member
CN2498432Y (en) * 2001-06-30 2002-07-03 李富春 Plastic pipe with spring net
EP1577077A2 (en) * 2004-03-16 2005-09-21 Harbin Institute of Technology Starway Industrial Co. Ltd. Piping made of steel mesh reinforced plastic composite pipe and method for making the pipe
CN200999926Y (en) * 2006-03-16 2008-01-02 山东九环石油机械有限公司 High pressure intensity plastic steel tube
CN2878848Y (en) * 2006-04-06 2007-03-14 上海贵盈科技发展有限公司 High strength steel plate skeleton plastic compound pipeline
CN201866426U (en) * 2010-12-06 2011-06-15 联塑科技发展(武汉)有限公司 Steel wire net framework compound pipeline
CN103185177A (en) * 2012-07-10 2013-07-03 河南联塑实业有限公司 Novel steel wire mesh skeleton plastic composite pipe and preparation method thereof
CN203049110U (en) * 2012-10-19 2013-07-10 河北达瑞化纤机械有限公司 Flow arranging cylinder of annular air blowing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106442035A (en) * 2016-05-18 2017-02-22 中国能源建设集团甘肃省电力设计院有限公司 Production apparatus and production method for concrete-frozen soil contact surface direct shear test sample
CN115217133A (en) * 2022-07-29 2022-10-21 上海宝冶集团有限公司 Construction process of foundation pit drainage system in coastal region

Also Published As

Publication number Publication date
CN103883810B (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN103883797A (en) Construction method of steel wire mesh framework plastic composite pipe
CN104089089B (en) Pressure backfill type elasticity pipe laying method of construction
CN104482298B (en) HDPE (high-density polyethylene) steel-plastic composite spiral winding drainage pipe installation construction method
CN110645418B (en) Connecting method for mounting large-diameter pipeline
CN109944314B (en) Rapid construction method for rainfall-free large-diameter wound pipe composite joint
CN103437417B (en) Part repair structure for steel lining of drainage pipeline
CN107672155A (en) A kind of Pneumatic turnover equipment and renovation technique for pipeline rehabilitation
CN105805414A (en) Stirring and polishing tension device for large-aperture flexible socket concrete pipes and using method of stirring and polishing tension device
CN103591377B (en) Directly-buried thermal insulation pipes is by the method for construction of marsh district
CN103883810B (en) A kind of steel wire mesh frame plastic composite tube and construction method
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN207378273U (en) A kind of direct-buried thermal insulation pipe duct device
CN108119701B (en) Construction method of circulating water glass reinforced plastic pipeline
CN110159866B (en) Construction method for reinforcing and reinforcing buried steel pipe
CN114526398A (en) Construction method for repairing drainage pipeline by newly added lining pipe
CN103629474B (en) For repairing the restorative procedure connecting aqueduct of impaired cast iron fire protection pipeline
CN104653902A (en) Water-saving irrigation pipeline and construction method thereof
CN110005870A (en) A kind of complex ground buried-pipe laying pipeline support backfill construction method
CN109237199A (en) Underground piping detects non-excavation rehabilitation and dredges maintaining process process
CN204459519U (en) Water-saving irrigation pipeline
CN213839806U (en) Underground direct buried pipe reinforcing structure
CN201281184Y (en) Top pipe deviation rectifying subjoint
CN210484850U (en) PCCP culvert pipe with connect protect function
CN203498985U (en) Local repair structure for steel lining of exhaust pipeline
WO2002012772A1 (en) Pipe joining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Xiaoxia

Inventor after: Zhao Dong

Inventor after: Cui Bo

Inventor after: Zhao Gengen

Inventor after: Wang Guozhen

Inventor after: Xu Yunling

Inventor after: Qiao Hong

Inventor before: Zhao Dong

Inventor before: Cui Bo

Inventor before: Zhao Gengen

Inventor before: Wang Guozhen

Inventor before: Wu Shuguang

Inventor before: Xu Jianguo

Inventor before: Liu Hui

CB03 Change of inventor or designer information