CN103874210B - A kind of uplink shared resources Pooled resources distribution method and base station - Google Patents

A kind of uplink shared resources Pooled resources distribution method and base station Download PDF

Info

Publication number
CN103874210B
CN103874210B CN201210548154.5A CN201210548154A CN103874210B CN 103874210 B CN103874210 B CN 103874210B CN 201210548154 A CN201210548154 A CN 201210548154A CN 103874210 B CN103874210 B CN 103874210B
Authority
CN
China
Prior art keywords
uplink
numbers
frame
sub
allocationflag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210548154.5A
Other languages
Chinese (zh)
Other versions
CN103874210A (en
Inventor
孙继忠
闫金凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201210548154.5A priority Critical patent/CN103874210B/en
Priority to PCT/CN2013/083840 priority patent/WO2014094474A1/en
Publication of CN103874210A publication Critical patent/CN103874210A/en
Application granted granted Critical
Publication of CN103874210B publication Critical patent/CN103874210B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal

Abstract

The invention discloses a kind of uplink shared resources Pooled resources distribution method and base station, wherein, methods described includes:According to each remaining bandwidth resource for treating dispatching uplink subframe for treating scheduling user's set (UE) at the uplink authorization moment, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling identifies AllocationFlag;According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource allocation, second of resource allocation and final resource block (RB) number are carried out successively and is determined, the RB numbers for each UE distribution to be dispatched are obtained;According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched are obtained, generation descending control information format 0 (DCI0), the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.

Description

A kind of uplink shared resources Pooled resources distribution method and base station
Technical field
The present invention relates to moving communicating field, more particularly to a kind of uplink shared resources Pooled resources distribution method and base station.
Background technology
In third generation partner program (3rd Generation Partner Project, 3GPP) Long Term Evolution In the Frequency Division Multiplexing system of (Long Term Evolution, LTE), LTE air interface is with OFDM Based on (Orthogonal Frequency Division Multiplexing, OFDM) technology, using 15kHz subcarrier Width, variable system bandwidth (1.4 to 20MHz) is realized by different number of sub carrier wave (being usually 72 to 1200).LTE Two kinds of frame structures are supported, Class1 (Type1) and Type2, wherein Type1 are used for FDD (Frequency Division Duplexing, FDD), Type2 is used for time division duplex (Time Division Duplexing, TDD).Type2TDD frame structures 7 kinds of different proportionings of time scale up and down (matching 0~6) are supported, can be configured according to the characteristic of system business amount.Cell Maximum uplink traffic depends on different time proportions, and the sub-frame of uplink number of proportioning 1 to proportioning 6 is 5 to the maximum, authorizes scheduling letter Cease descending control information format 0 (Downlink Control Information format0, DCI0) only scheduling one up (subframe reserves the band of Physical Uplink Shared Channel (Physical UplinkShared CHannel, PUSCH) occupancy to subframe It is wide), sub-frame of uplink is less equal than descending sub frame (including special subframe S), and a descending sub frame only dispatches a sub-frame of uplink. In order to ensure cell uplink maximum flow, it is necessary to the frequency domain resource of each sub-frame of uplink of reasonable distribution, no matter cell is present Single-user equipment (UserEquipment, UE) or many UE are required for maximum reasonable to utilize sub-frame of uplink remaining bandwidth resource, should Remaining bandwidth resource is that the sub-frame of uplink is that the reserved maximum residual bandwidth resources of PUSCH (remove physical uplink link control letter Road (Physical Uplink Control CHannel, PUCCH) resource and Physical Random Access Channel The band of the occupancy such as (PhysicalRandom Access Channel, PRACH) resource, Msg3 scheduling, retransmission process, single-shot UCI Remaining bandwidth resources after width), it is equivalent to the resource bitmap rationally using upstream bandwidth.
However, including 6 sub-frame of uplink and 4 descending sub frames from a radio frames for unlike proportioning 1~6, matching 0 (including special subframe S), i.e. DSUUU DSUUU, as shown in figure 1, wherein D represents descending sub frame (Downlink subframe), S represents special subframe (Special subframe), and U represents sub-frame of uplink (Uplink subframe).Under sub-frame of uplink is more than Row number of sub frames (including special subframe) a, it may appear that descending sub frame (including special subframe S) is while dispatch two sub-frame of uplink The situation of (the maximum residual bandwidth resources only taken including PUSCH), eventually through the upper line identifier (ULindex) in DCI0 (UL index=10 indicate that resource allocation is final in the first sub-frame of uplink, and UL index=01 indicate that resource allocation is final the Two sub-frame of uplink, UL index=11 indicate that resource allocation is final simultaneously in first and second sub-frame of uplink public resource Bitmap) indicate that UE realizes time domain (first sub-frame of uplink and second sub-frame of uplink) and frequency domain (sub-frame of uplink system bandwidth) knot Close, because UL index values are different, cause the resource of the UE predistribution on different sub-frame of uplink, match somebody with somebody relative to other Than being authorized for a sub-frame of uplink frequency domain distribution, proportioning 0 is more complicated.At present, by by two sub-frame of uplink maximum residual bandwidth Resource simply cumulative mode distributes ascending resource, but this method can not rationally using two sub-frame of uplink system bandwidths, Cell uplink maximum flow can not be made.
The content of the invention
In view of this, it is a primary object of the present invention to provide a kind of uplink shared resources Pooled resources distribution method and base Stand, cell uplink maximum flow can be made rationally using waiting to dispatch two sub-frame of uplink system bandwidth resources.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
The invention provides a kind of uplink shared resources Pooled resources distribution method, applied to base station, methods described includes:
According to each remaining bandwidth for treating dispatching uplink subframe money for treating scheduling user's set (UE) at the uplink authorization moment Source, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling is identified AllocationFlag;
According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource is carried out successively Distribution, second of resource allocation and final resource block (RB) number are determined, obtain the RB numbers for each UE distribution to be dispatched;
According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched, generation are obtained Descending control information format 0 (DCI0), the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.
It is preferred that each the remaining bandwidths for the treatment of dispatching uplink subframe of the UE to be dispatched at the uplink authorization moment is provided the basis Source, it is determined that virtual shared resource pond, is:
According to the subframe structure of time division duplex (TDD) proportioning 0, count authorize the moment to wait to dispatch first sub-frame of uplink respectively Remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink remaining bandwidth resource ucSecondRbNum;Will UcFirstRbNum is added with ucSecondRbNum obtains VirtualResourcePoolRbNum multiplied by with percentage specific factor, Wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/ (ucFirstRbNum+ucSecondRbNum);β is the value determined by system testing, and span is [α, 1].
It is preferred that described treating the dispatch situation of two sub-frame of uplink of scheduling according to UE, the presetting scale of resource allocation is determined Know, be:
Dispatched when retransfer scheduling, ascending control information (UCI) is not present in first sub-frame of uplink in UE, it is up at second When subframe has retransfer scheduling, UCI scheduling etc., it is 1 to determine the AllocationFlag, represents resource in advance on first Row subframe is distributed;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two The new data of sub-frame of uplink hybrid automatic repeat-request (HARQ) process indicates that (NDI) is identical, it is determined that described AllocationFlag is 3, represent resource in advance in first and the distribution simultaneously of second sub-frame of uplink public resource bitmap and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and Second sub-frame of uplink is distributed simultaneously and NDI is differed.
It is preferred that described identify according to the virtual shared resource pond of determination and resource allocation pre-scheduling, first time money is carried out Source is distributed, and is:
When UE queues to be dispatched not are space-time, UE in UE queues to be dispatched is taken successively;
When UE historical traffic is more than or equal to equivalent guarantee bit rate (GBR), current UE to be dispatched transmission is obtained Block size TBSize and modulation and coding strategy (MCS), the RB numbers for obtaining pre-allocating for the first time according to TBSize and MCS RbFirstAllcom;
UE ability rating and UE buffer region state reporting (BSR) are taken small, obtain the UE in a sub-frame of uplink Maximum supports the transport block size MaxTB of schedulingFirstSecond, according to MaxTBFirstSecondThe UE is obtained with the MCS of the UE In the RB numbers Rb of a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken small, obtain the UE and support scheduling in two sub-frame of uplink maximum Transmission block size MaxTBThird, according to MaxTBThirdThe UE is obtained simultaneously in two sub-frame of uplink with the MCS of the UE The RB numbers Rb of the maximum scheduling of transmissionBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, M1 is that the UE is sent when power headroom reporting (PHR) is 0 Maximum TBSize, M2 are that can demodulate correct maximum TBSize under the UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE (MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)And two (MaxTB) Small value is taken in times tetra- values of M2;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 tetra- (MaxTB) Small value is taken in individual value;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
It is preferred that second of resource allocation of the progress, is:
Work as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic is more than or equal to equivalent maximum bit rate (MBR) When, the allocative decision configured according to system background on the basis of VirtualResourcePoolRbNum in the updated is calculated To the RB numbers RbSecondAllcom of second of predistribution;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after ucSecondRbNum, after M2, renewal and renewal Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecordFor RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra- The medium and small value of value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
It is preferred that the final RB numbers are determined, it is:
According to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that finally The Tbsize of distributionAllocationTotalNun
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited Corresponding RB numbers, and it is defined as the corresponding MCS of RB numbers of UE distribution to be dispatched.
The invention provides a kind of base station, the base station includes:
Virtual shared resource pond determining unit, for treating dispatching uplink at the uplink authorization moment according to each UE to be dispatched The remaining bandwidth resource of subframe, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Resource allocation pre-scheduling identifies determining unit, for treating the dispatch situation of two sub-frame of uplink of scheduling according to UE, Determine that resource allocation pre-scheduling identifies AllocationFlag;
RB number determining units, for the VirtualResourcePoolRbNum and AllocationFlag according to determination, First time resource allocation, second of resource allocation and final RB numbers are carried out successively to determine, obtain distributing for each UE to be dispatched RB numbers;
Descending control information format generation unit, for according to the RB numbers for each UE distribution to be dispatched, obtaining to be each The RB resource bitmaps of UE distribution to be dispatched, generate DCI0, it is up that the DCI0 indicates that UE is carried out on scheduled sub-frame of uplink Business is transmitted.
It is preferred that the virtual shared resource pond determining unit, the subframe structure specifically for matching 0 according to TDD, respectively Statistics authorizes the moment to treat the remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink of first sub-frame of uplink of scheduling Remaining bandwidth resource ucSecondRbNum;
UcFirstRbNum is added with ucSecondRbNum and obtained multiplied by with percentage specific factor VirtualResourcePoolRbNum, wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+ucSecondRbNum);β is to be determined by system testing Value, span be [α, 1].
It is preferred that resource allocation pre-scheduling mark determining unit, specifically for when UE in first sub-frame of uplink not There is retransfer scheduling, UCI scheduling, when second sub-frame of uplink has retransfer scheduling, UCI scheduling etc., it is determined that described AllocationFlag is 1, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two The NDI of sub-frame of uplink HARQ processes is identical, and it is 3 to determine the AllocationFlag, represents resource in advance at first and the Two sub-frame of uplink public resource bitmaps are distributed simultaneously and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and Second sub-frame of uplink is distributed simultaneously and NDI is differed.
It is preferred that the RB numbers determining unit, specifically for when UE historical traffic is more than or equal to equivalent G BR, obtaining Current UE to be dispatched TBSize and MCS, the RB numbers RbFirstAllcom for obtaining pre-allocating for the first time according to TBSize and MCS;
The BSR of UE ability rating and the UE is taken and small obtains MaxTBFirstSecond, according to MaxTBFirstSecondWith MCS obtains RB number Rbs of the UE in a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain MaxTBThird, according to MaxTBThirdWith the UE's MCS obtains the UE simultaneously in the RB numbers Rb of two maximum scheduling of sub-frame of uplink transmissionBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 are Correct maximum TBSize can be demodulated under the UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE (MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)And two (MaxTB) Small value is taken in times tetra- values of M2;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers finally distributed for the first time RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 tetra- (MaxTB) Small value is taken in individual value;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
It is preferred that the RB numbers determining unit, specifically for working as RbAllocationMaxNmu_FirstMore than 0, and UE history stream When amount is more than or equal to equivalent MBR, configured on the basis of VirtualResourcePoolRbNum in the updated according to system background Allocative decision, calculate and obtain the RB numbers RbSecondAllcom of second of predistribution;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after, the ucSecondRbNum after M2, renewal updates Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra- Small value is taken in value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
It is preferred that the RB numbers determining unit, specifically for according to RbAllocationMaxNmu_FirstWith RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that the Tbsize finally distributedAllocationTotalNun
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited Corresponding RB numbers, and it is defined as the corresponding MCS of RB numbers of UE distribution to be dispatched.
From the foregoing, it will be observed that technical scheme includes:According to each UE to be dispatched the uplink authorization moment wait dispatch The remaining bandwidth resource of sub-frame of uplink, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling is identified AllocationFlag;
According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource is carried out successively Distribution, second of resource allocation and final resource block (RB) number are determined, obtain the RB numbers for each UE distribution to be dispatched;
According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched, generation are obtained DCI0, the DCI0 indicate that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.Thus, it is possible to ensure under proportioning 0 Sub-frame of uplink time-frequency domain resources are authorized to maximize, so that all up-link time-frequency bandwidth of reasonable distribution to a greater extent so that on Row maximum flow.
Brief description of the drawings
Fig. 1 is the structural representation of a radio frames;
Fig. 2 is the first embodiment implementation process figure of uplink shared resources Pooled resources distribution method of the present invention;
Fig. 3 is the structural representation of the embodiment of base station of the present invention;
Fig. 4 is the second embodiment implementation process figure of uplink shared resources Pooled resources distribution method of the present invention.
Embodiment
A kind of first embodiment for uplink shared resources Pooled resources distribution method that the present invention is provided, applied to base station, such as Shown in Fig. 2, comprise the following steps:
Step 201, each treat scheduling user's set (UE) the uplink authorization moment according to treat the surplus of dispatching uplink subframe Remaining bandwidth resources, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Step 202, according to UE waiting dispatch two sub-frame of uplink dispatch situation, determine resource allocation pre-scheduling identify AllocationFlag;
Step 203, VirtualResourcePoolRbNum and AllocationFlag according to determination, carry out successively First resource distribution, second of resource allocation and final resource block (RB) number are determined, are obtained as each UE distribution to be dispatched RB numbers;
Step 204, basis are the RB numbers of each UE distribution to be dispatched, and obtain the RB resource-niches for each UE distribution to be dispatched Figure, generates DCI0, and the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.
It is preferred that, step 201 can be:According to the subframe structure of time division duplex (TDD) proportioning 0, when statistics is authorized respectively Carve the remaining bandwidth money of the remaining bandwidth resource ucFirstRbNum for treating first sub-frame of uplink of scheduling and second sub-frame of uplink Source ucSecondRbNum;
UcFirstRbNum is added with ucSecondRbNum and obtains virtual shared resource pond multiplied by with percentage specific factor, Wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/ (ucFirstRbNum+ucSecondRbNum);β is the value determined by system testing, and span is [α, 1].
It is preferred that, step 202 can be:As UE in first sub-frame of uplink in the absence of retransfer scheduling, ascending control information (Uplink Control Information, UCI) is dispatched, and there is retransfer scheduling, UCI scheduling etc. in second sub-frame of uplink When, it is 1 to determine the AllocationFlag, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two The new data of sub-frame of uplink hybrid automatic repeat-request (HARQ) process indicates that (NDI) is identical, it is determined that described AllocationFlag is 3, represent resource in advance in first and the distribution simultaneously of second sub-frame of uplink public resource bitmap and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and Second sub-frame of uplink is distributed simultaneously and NDI is differed.
Preferably, the progress first time resource allocation in the step 203 can be:When UE queues to be dispatched not are sky When, UE in UE queues to be dispatched is taken successively;
When UE historical traffic is more than or equal to equivalent guarantee bit rate (Guaranteed Bit Rate, GBR), obtain Obtain currently UE to be dispatched transmission block (Transport Block) size TBSize and modulation and coding strategy (Modulation And Coding Scheme, MCS), the RB numbers RbFirstAllcom for obtaining pre-allocating for the first time according to TBSize and MCS;
UE ability rating and UE buffer region state reporting (Buffer Status Report, BSR) are taken small, obtained The UE supports the transport block size MaxTB of scheduling in a sub-frame of uplink maximumFirstSecond, according to MaxTBFirstSecondWith The MCS of the UE obtains RB number Rbs of the UE in a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain the UE simultaneously in the maximum branch of two sub-frame of uplink transmission Hold the transport block size MaxTB of schedulingThird, according to MaxTBThirdIt is simultaneously up at two that the UE is obtained with the MCS of the UE The RB numbers Rb of sub-frame transmission maximum schedulingBRS4(2*UE)(MaxTB);
Obtain current UE dispatch M1 and M2, wherein, M1 for power headroom reporting (PowerHeadroom Report, PHR) the maximum TBSize that the UE is sent when being 0, M2 are that can demodulate correct maximum TBSize under present channel;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBrS4(2*UE)(MaxTB) and Small value is taken in twice of M2, tetra- values;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 (MaxTB) Small value is taken in four values;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
Preferably, second of resource allocation of carry out in the step 203 can be:
Work as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic is more than or equal to equivalent maximum bit rate When (Maximum Bit Rate, MBR), according to system background on the basis of VirtualResourcePoolRbNum in the updated The allocative decision of configuration, calculates the RB numbers RbSecondAllcom for obtaining second of predistribution;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucFirstRbNum, after M2, renewal and more Small value is taken in five values of VirtualResourcePoolRbNum after new;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucSecondRbNum, after M2, renewal and Small value is taken in five values of VirtualResourcePoolRbNum after renewal;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4(2*UE)(MaxTB), after twice M2, renewal Small value is taken in tetra- values of VirtualResourcePoolRbNum;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) and after renewal Small value is taken in tri- values of VirtualResourcePoolRbNum;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
Preferably, the final RB numbers in the step 203 determine can be:
According to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that finally The Tbsize of distributionAllocationTotalNun
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited To RB numbers, and be defined as the corresponding MCS of RB numbers of UE to be dispatched distribution.
The embodiment for a kind of base station that the present invention is provided, as shown in figure 3, the base station includes:
Virtual shared resource pond determining unit, each dispatching uplink is treated for basis with scheduling UE at the uplink authorization moment The remaining bandwidth resource of subframe, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Resource allocation pre-scheduling identifies determining unit, for treating the dispatch situation of two sub-frame of uplink of scheduling according to UE, Determine that resource allocation pre-scheduling identifies AllocationFlag;
RB number determining units, for the VirtualResourcePoolRbNum and AllocationFlag according to determination, First time resource allocation, second of resource allocation and final RB numbers are carried out successively to determine, obtain distributing for each UE to be dispatched RB numbers;
Descending control information format generation unit, for according to the RB numbers for each UE distribution to be dispatched, obtaining to be each The RB resource bitmaps of UE distribution to be dispatched, generate DCI0, it is up that the DCI0 indicates that UE is carried out on scheduled sub-frame of uplink Business is transmitted.
Preferably, the virtual shared resource pond determining unit, the subframe structure specifically for matching 0 according to TDD, respectively Statistics authorizes the moment to treat the remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink of first sub-frame of uplink of scheduling Remaining bandwidth resource ucSecondRbNum;
UcFirstRbNum is added with ucSecondRbNum and obtains virtual shared resource pond multiplied by with percentage specific factor VirtualResourcePoolRbNum, wherein, percentage specific factor=α (1 one β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+ucSecondRbNum);β is to be determined by system testing Value, span be [α, 1].
Preferably, resource allocation pre-scheduling mark determining unit, specifically for when UE in first sub-frame of uplink not There is retransfer scheduling, UCI scheduling, when second sub-frame of uplink has retransfer scheduling, UCI scheduling etc., it is determined that described AllocationFlag is 1, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two The NDI of sub-frame of uplink HARQ processes is identical, and it is 3 to determine the AllocationFlag, represents resource in advance at first and the Two sub-frame of uplink public resource bitmaps are distributed simultaneously and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and Second sub-frame of uplink is distributed simultaneously and NDI is differed.
Preferably, the RB numbers determining unit, specifically for not being space-time when UE queues to be dispatched, takes UE to be dispatched successively UE in queue;
When UE historical traffic is more than or equal to equivalent G BR, current UE to be dispatched TBSize and MCS is obtained, according to TBSize and MCS obtain the RB numbers RbFirstAllcom pre-allocated for the first time;
The BSR of UE ability rating and UE is taken into the small transmission for obtaining the UE in a sub-frame of uplink maximum support scheduling The size MaxTB of blockFirstSecond, according to MaxTBFirstSecondThe UE is obtained with the MCS of the UE in a sub-frame of uplink most The RB numbers Rb dispatched greatlyBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain the UE simultaneously in the maximum branch of two sub-frame of uplink transmission Hold the size MaxTB of the transmission block of schedulingThird, according to MaxTBThirdThe UE is obtained with the MCS of the UE while on two The RB numbers Rb of row sub-frame transmission maximum schedulingBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 are Correct maximum TBSize can be demodulated under the UE present channels;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)(MaxTB) and Small value is taken in twice of M2, tetra- values;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 (MaxTB) Small value is taken in four values;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
Preferably, the RB numbers determining unit, specifically for working as RbAllocationMaxNmu_FirstMore than 0, and UE history stream When amount is more than or equal to equivalent MBR, configured on the basis of VirtualResourcePoolRbNum in the updated according to system background Allocative decision, calculate and obtain the RB numbers RbSecondAllcom of second of predistribution;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucFirstRbNum, after M2, renewal and more Small value is taken in five values of VirtualResourcePoolRbNum after new;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucSecondRbNum, after M2, renewal and Small value is taken in five values of VirtualResourcePoolRbNum after renewal;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4(2*UE)(MaxTB), twice of M2 and update after Small value is taken in tetra- values of VirtualResourcePoolRbNum;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) and after renewal Small value is taken in tri- values of VirtualResourcePoolRbNum;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
Preferably, the RB numbers determining unit, specifically for according to RbAllocationMaxNmu_FirstWith RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that the Tbsize finally distributedAllocationTotalNun
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited To RB numbers, and be defined as the corresponding MCS of RB numbers of UE to be dispatched distribution.
The second embodiment of uplink shared resources Pooled resources distribution method of the present invention is introduced with reference to Fig. 4.
Step 401, the subframe structure according to TDD proportionings 0, count authorize the moment to treat first sub-frame of uplink of scheduling respectively Remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink remaining bandwidth resource ucSecondRbNum;
Here, the remaining bandwidth resource refers to remove PUCCH resource, PRACH resources, Msg3 scheduling, retransmission process, single-shot PUSCH bandwidth resources outside the bandwidth of the occupancy such as UCI.
Step 402, according to ucFirstRbNum and ucSecondRbNum, obtain virtual resource shared pool VirtualResourcePoolRbNum;
VirtualResourcePoolRbNum is obtained specifically, being calculated according to formula (1),
VirtualResourcePoolRbNum=(ucFirstRbNum+ucSecondRbNum) * Percentfactor (1)
Wherein, percentage specific factor Percentfactor=α (1 one β)+β, β are the value determined by system testing, and β's takes It is [α, 1] to be worth scope, and α is definite value, α=max (ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+ UcSecondRbNum), Percentfactor spans [α, 1];
For example in a radio frame, 9U and 2U, 2U and 3U, 4U and 7U, 7U and 8U separately constitute virtual shared resource pond, During wherein 9U and 2U combinations, 9U is first sub-frame of uplink, and 2U is second sub-frame of uplink, and other combinations are similar.Implementation One:The 5D of moment current radio frames is being authorized to the 9U of current radio frames and 2U mandates, the current radio frames of next radio frames 6S authorized to the 2U and 3U of next radio frames, the 0D of current radio frames is authorized to current radio frames 4U and 7U, current wireless The 1S of frame is authorized to the 7U and 8U of current radio frames;Or, implementation two:Given authorizing the 5D/6S of moment current radio frames Authorized to the 9U of current radio frames and the 2U of next radio frames, the 6S of current radio frames is awarded to the 2U and 3U of next radio frames Power, the 0D/1S of current radio frames are authorized to the 4U and 7U of current radio frames, the 1S of current radio frames is to current radio frames 7U and 8U Authorize;
Using virtual shared resource pond as one foundation of UE resource allocations, can avoid upstream bandwidth distribution it is excessive cause it is excellent The low UE distribution of first level can also avoid the too small up band for causing single UE or many UE to distribute of upstream bandwidth distribution less than resource The waste of wide resource, more rationally distributes up-link resource for UE, improves cell uplink flow system flow.
Step 403, according to UE waiting dispatch two sub-frame of uplink dispatch situation, determine resource allocation pre-scheduling mark money Source distribution pre-scheduling mark AllocationFlag;
If specifically, retransfer scheduling, UCI scheduling etc. is not present in first sub-frame of uplink in UE, in second up son When frame has retransfer scheduling, UCI scheduling etc., the AllocationFlag is entered as 1, represents resource in advance on first Row subframe is distributed;
If UE has retransfer scheduling, UCI scheduling etc. in first sub-frame of uplink, re-transmission is not deposited in second sub-frame of uplink When scheduling, UCI scheduling etc., the AllocationFlag is entered as 2, represents resource in advance in second sub-frame of uplink point Match somebody with somebody;
If UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two The new data of individual sub-frame of uplink hybrid automatic repeat-request (Hybrid Automatic Repeat Request, HARQ) process When indicating that (New Data indication, NDI) is identical, the AllocationFlag is entered as 3, represents that resource is advance Distributed simultaneously with second sub-frame of uplink public resource bitmap at first and NDI is identical;
If UE is in first sub-frame of uplink and second sub-frame of uplink not retransfer scheduling, UCI scheduling etc., and two When the NDI of sub-frame of uplink HARQ processes is differed, the AllocationFlag is entered as 4, represents resource in advance first Individual and second sub-frame of uplink is distributed simultaneously and NDI is differed.Two DCI0 can be now issued by same descending sub frame For sub-frame of uplink mandate, or DCI0 issued for sub-frame of uplink mandate by different descending sub frames respectively;
Because PRACH resources and Msg3 scheduling can only a sub-frame of uplink, therefore without resource allocation pre-scheduling wherein Mark;
The effect of the AllocationFlag is similar but different with UL index effect, and UL index values are Determined after final resource allocation success, and AllocationFlag carries out resource point for mark UE in advance in which sub-frame of uplink The subframe index matched somebody with somebody, can determine that UL index guide direction to be final, for example, AllocationFlag=1 UE resources point With the UL index=10 after success;UL index=01 after AllocationFlag=2 UE resource allocations success; UL index after AllocationFlag=3 UE resource allocations success are generally 10,01 or 11;AllocationFlag= ULindex is 01 or 10 after 4 UE resource allocations success, can so reduce the time of system resource allocation, lifting user's money Source allocative efficiency.
Step 404, when UE queues to be dispatched not be sky, and UE (Buffer Status Reporting, BSR) BSREquivalent G BR(the BSR of > 0Equivalent G BRIt is not 0 logic channel BSR sums for the BSR with GBR and PBR in logic channel group) when, root Identified according to the virtual shared resource pond of determination and resource allocation pre-scheduling, carry out first time resource allocation and obtain final for the first time point The RB numbers Rb matched somebody with somebodyAllocationMaxNmu_First
Specifically, when UE queues to be dispatched not are space-time, UE in UE queues to be dispatched is taken successively, when UE historical traffic is big When equal to equivalent G BR, current UE to be dispatched TBSize and MCS is obtained, is obtained pre-allocating for the first time according to TBSize and MCS RB numbers RbFirstAllcom;
The BSR of UE ability rating and the UE is taken and small obtain the UE in sub-frame of uplink maximum and supports scheduling The size MaxTB of transmission blockFirstSecond, according to MaxTBFirstSecondThe UE is obtained with MCS to adjust in a sub-frame of uplink maximum The RB numbers Rb of degreeBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain the UE simultaneously in the maximum branch of two sub-frame of uplink transmission Hold the size MaxTB of the transmission block of schedulingThird, according to MaxTBThirdThe UE is obtained with MCS to adjust in a sub-frame of uplink maximum The RB numbers Rb of degreeBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 are Correct maximum TBSize can be demodulated under present channel;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)(MaxTB) and Small value is taken in twice of M2, tetra- values;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the first time Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 (MaxTB) Small value is taken in four values.
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
Step 405, according to resource allocation pre-scheduling identify, update after VirtualResourcePoolRbNum, UcFirstRbNum and ucSecondRbNum, carries out the RB numbers that second of resource allocation obtains finally distributing for the second time RbAllocationMaxNmu_Second
Specifically, working as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic be more than or equal to equivalent MBR when, more The allocative decision configured on the basis of VirtualResourcePoolRbNum after new according to system background, calculating is obtained second The RB numbers RbSecondAllcom of predistribution;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor the ucFirstRbNum after renewal, the VirtualResourcePoolRbNum after renewal, RbSecondAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor the ucSecondRbNum after renewal, the VirtualResourcePoolRbNum after renewal, RbSecondAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor VirtualResourcePoolRbNum, the RbSecondAllcom after renewal, RbBRS4(2*UE)(MaxTB) and in twice of M2, tetra- values small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the second time Number RbAllocationMaxNmu_SecondFor the VirtualResourcePoolRbNum after renewal, RbSecondAllcom and RbBRS4UE(MaxTB)Small value is taken in three values.
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolRbNum。
Step 406, the RB numbers Rb finally distributed according to resource allocation pre-scheduling mark, first timeAllocationMaxNmu_First The RB numbers Rb finally distributed for the second timeAllocationMaxNmu_Second, carry out final RB numbers and determine, obtain as each UE to be dispatched The RB numbers Rb of distributionAllocationTotalNmu
Specifically, according to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, It is determined that the Tbsize finally distributedAllocationTotalNun
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is defined as treating Dispatch the RB numbers Rb of UE distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched The RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited To RB numbers, and be defined as the corresponding MCS of RB numbers of UE to be dispatched distribution.
Step 407, the RB numbers Rb distributed for UE to be dispatched according to determinationAllocationTotalNmu, it is generated as each waiting to dispatch The RB resource bitmaps of UE distribution, obtain sub-frame of uplink authorization message, and the sub-frame of uplink authorization message are handed down to corresponding UE。
Step 408, UE demodulate corresponding DCI0 from the sub-frame of uplink authorization message received, are indicated by DCI0 described UE's carries out uplink traffic transmission on which sub-frame of uplink.
To sum up, the present invention causes up-link bandwidth resources of the UE more rationally using proportioning 0 by virtual shared resource pond, The efficiency more having for instructing UE to lift resource allocation is identified by pre-scheduling, finally cell uplink flow is optimal.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.

Claims (12)

1. a kind of uplink shared resources Pooled resources distribution method, applied to base station, it is characterised in that methods described includes:
According to each remaining bandwidth resource for treating dispatching uplink subframe for treating scheduling user's set (UE) at the uplink authorization moment, really Fixed virtual shared resource pond VirtualResourcePoolRbNum;
The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling is identified AllocationFlag;
According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource point is carried out successively Match somebody with somebody, second of resource allocation and final resource block (RB) number are determined, obtain the RB numbers for each UE distribution to be dispatched;
According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched are obtained, are generated descending Control information form 0 (DCI0), the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.
2. according to the method described in claim 1, it is characterised in that the basis each UE to be dispatched at the uplink authorization moment The remaining bandwidth resource of dispatching uplink subframe is treated, it is determined that virtual shared resource pond, is:
According to the subframe structure of time division duplex (TDD) proportioning 0, count authorize the moment to treat the surplus of first sub-frame of uplink of scheduling respectively Remaining bandwidth resources ucFirstRbNum and second sub-frame of uplink remaining bandwidth resource ucSecondRbNum;Will UcFirstRbNum is added with ucSecondRbNum obtains VirtualResourcePoolRbNum multiplied by with percentage specific factor, Wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/ (ucFirstRbNum+ucSecondRbNum);β is the value determined by system testing, and span is [α, 1].
3. according to the method described in claim 1, it is characterised in that described that the scheduling of two sub-frame of uplink of scheduling is being treated according to UE Situation, determines that resource allocation pre-scheduling is identified, is:
Dispatched when retransfer scheduling, ascending control information (UCI) is not present in first sub-frame of uplink in UE, in second sub-frame of uplink When there is retransfer scheduling, UCI scheduling etc., it is 1 to determine the AllocationFlag, represents resource in advance in first up son Frame is distributed;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, retransfer scheduling, UCI are not deposited in second sub-frame of uplink During scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is dispatched etc. in first sub-frame of uplink and second sub-frame of uplink UE without retransfer scheduling, UCI, and two up The new data of subframe hybrid automatic repeat-request (HARQ) process indicates that (NDI) is identical, determines that the AllocationFlag is 3, represent that resource is distributed simultaneously at first with second sub-frame of uplink public resource bitmap in advance and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and two up sons When the NDI of frame HARQ processes is differed, it is 4 to determine the AllocationFlag, represents resource in advance at first and second Individual sub-frame of uplink is distributed simultaneously and NDI is differed.
4. method according to claim 3, it is characterised in that described according to the virtual shared resource pond of determination and resource point With pre-scheduling mark, first time resource allocation is carried out, is:
When UE queues to be dispatched not are space-time, UE in UE queues to be dispatched is taken successively;
When UE historical traffic is more than or equal to equivalent guarantee bit rate (GBR), the transmission block for obtaining current UE to be dispatched is big Small TBSize and modulation and coding strategy (MCS), the RB numbers for obtaining pre-allocating for the first time according to TBSize and MCS RbFirstAllcom;
UE ability rating and UE buffer region state reporting (BSR) are taken small, obtain the UE in a sub-frame of uplink maximum Support the transport block size MaxTB of schedulingFirstSecond, according to MaxTBFirstSecondThe UE is obtained one with the MCS of the UE The RB numbers Rb of individual sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken small, obtain the biography that the UE supports scheduling in two sub-frame of uplink maximum Defeated piece of size MaxTBThird, according to MaxTBThirdThe UE is obtained simultaneously in two sub-frame of uplink transmission with the MCS of the UE The RB numbers Rb of maximum schedulingBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, M1 is the maximum that the UE is sent when power headroom reporting (PHR) is 0 TBSize, M2 are that can demodulate correct maximum TBSize under the UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor ucFirstRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) and in five values of M2 Take small value;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor ucSecondRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) it is worth with M2 five In take small value;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4(2*UE)(MaxTB) and in twice of M2, tetra- values take small Value;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4UE(MaxTB) and in tetra- values of M2 small value is taken;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolR bNum。
5. method according to claim 4, it is characterised in that described second of resource allocation of carry out, is:
Work as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic be more than or equal to equivalent maximum bit rate (MBR) when, The allocative decision configured on the basis of VirtualResourcePoolRbNum after renewal according to system background, calculating obtains second The RB numbers RbSecondAllcom of secondary predistribution;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after ucSecondRbNum, after M2, renewal and renewal Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra- The medium and small value of value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePool RbNum。
6. method according to claim 5, it is characterised in that the final RB numbers are determined, are:
According to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that final distribution TbsizeAllocationTotalNun
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that final distribution RB numbers RbAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, it is determined that The RB numbers Rb distributed for UE to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE distribution to be dispatched The corresponding MCS of RB numbers;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstWith RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2) during > M1, it is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and determine The corresponding MCS of RB numbers distributed for UE to be dispatched.
7. a kind of base station, it is characterised in that the base station includes:
Virtual shared resource pond determining unit, for treating dispatching uplink subframe at the uplink authorization moment according to each UE to be dispatched Remaining bandwidth resource, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Resource allocation pre-scheduling identifies determining unit, for treating the dispatch situation of two sub-frame of uplink of scheduling according to UE, it is determined that Resource allocation pre-scheduling identifies AllocationFlag;
RB number determining units, for the VirtualResourcePoolRbNum and AllocationFlag according to determination, successively Carry out first time resource allocation, second of resource allocation and final RB numbers to determine, obtain the RB for each UE distribution to be dispatched Number;
Descending control information format generation unit, for according to the RB numbers for each UE distribution to be dispatched, obtaining waiting to adjust to be each The RB resource bitmaps of UE distribution are spent, DCI0 is generated, the DCI0 indicates that UE carries out uplink service on scheduled sub-frame of uplink Transmission.
8. base station according to claim 7, it is characterised in that the virtual shared resource pond determining unit, specifically for According to the subframe structure of TDD proportionings 0, count authorize the moment to wait to dispatch the remaining bandwidth resource of first sub-frame of uplink respectively The remaining bandwidth resource ucSecondRbNum of ucFirstRbNum and second sub-frame of uplink;
UcFirstRbNum is added with ucSecondRbNum and obtained multiplied by with percentage specific factor VirtualResourcePoolRbNum, wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+ucSecondRbNum);β is to be determined by system testing Value, span be [α, 1].
9. base station according to claim 7, it is characterised in that the resource allocation pre-scheduling identifies determining unit, specifically For when UE first sub-frame of uplink be not present retransfer scheduling, UCI dispatch, second sub-frame of uplink exist retransfer scheduling, During UCI scheduling etc., it is 1 to determine the AllocationFlag, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, retransfer scheduling, UCI are not deposited in second sub-frame of uplink During scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is dispatched etc. in first sub-frame of uplink and second sub-frame of uplink UE without retransfer scheduling, UCI, and two up The NDI of subframe HARQ processes is identical, and it is 3 to determine the AllocationFlag, represents resource in advance in first and second Sub-frame of uplink public resource bitmap is distributed simultaneously and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and two up sons When the NDI of frame HARQ processes is differed, it is 4 to determine the AllocationFlag, represents resource in advance at first and second Individual sub-frame of uplink is distributed simultaneously and NDI is differed.
10. base station according to claim 9, it is characterised in that the RB numbers determining unit, specifically for when UE history When flow is more than or equal to equivalent G BR, current UE to be dispatched TBSize and MCS is obtained, is obtained for the first time according to TBSize and MCS The RB numbers RbFirstAllcom of predistribution;
The BSR of UE ability rating and the UE is taken and small obtains MaxTBFirstSecond, according to MaxTBFirstSecondObtained with MCS RB number Rbs of the UE in a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain MaxTBThird, according to MaxTBThirdObtained with the MCS of the UE The UE is simultaneously in the RB numbers Rb of two maximum scheduling of sub-frame of uplink transmissionBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 is described Correct maximum TBSize can be demodulated under UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor ucFirstRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) and in five values of M2 Take small value;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor ucSecondRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) it is worth with M2 five In take small value;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4(2*UE)(MaxTB) and in twice of M2, tetra- values take small Value;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4UE(MaxTB) and in tetra- values of M2 small value is taken;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolR bNum。
11. base station according to claim 10, it is characterised in that the RB numbers determining unit, specifically for working as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic be more than or equal to equivalent MBR when, in the updated The allocative decision configured on the basis of VirtualResourcePoolRbNum according to system background, calculating obtains second of predistribution RB numbers RbSecondAllcom;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) after, the ucSecondRbNum after M2, renewal updates Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra- Small value is taken in value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePool RbNum。
12. base station according to claim 11, it is characterised in that the RB numbers determining unit, specifically for basis RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that finally distribute TbsizeAllocationTotalNun
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that final distribution RB numbers RbAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, it is determined that The RB numbers Rb distributed for UE to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE distribution to be dispatched The corresponding MCS of RB numbers;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstWith RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/ 2) during > M1, it is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and determine The corresponding MCS of RB numbers distributed for UE to be dispatched.
CN201210548154.5A 2012-12-17 2012-12-17 A kind of uplink shared resources Pooled resources distribution method and base station Active CN103874210B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210548154.5A CN103874210B (en) 2012-12-17 2012-12-17 A kind of uplink shared resources Pooled resources distribution method and base station
PCT/CN2013/083840 WO2014094474A1 (en) 2012-12-17 2013-09-18 Resource allocation method for uplink shared resource pool and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210548154.5A CN103874210B (en) 2012-12-17 2012-12-17 A kind of uplink shared resources Pooled resources distribution method and base station

Publications (2)

Publication Number Publication Date
CN103874210A CN103874210A (en) 2014-06-18
CN103874210B true CN103874210B (en) 2017-09-12

Family

ID=50912245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210548154.5A Active CN103874210B (en) 2012-12-17 2012-12-17 A kind of uplink shared resources Pooled resources distribution method and base station

Country Status (2)

Country Link
CN (1) CN103874210B (en)
WO (1) WO2014094474A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018000362A1 (en) * 2016-06-30 2018-01-04 华为技术有限公司 Resource scheduling method and corresponding device
CN106533982B (en) * 2016-11-14 2019-05-21 西安电子科技大学 The dynamic queue's dispatching device and method borrowed based on bandwidth
EP4132179A1 (en) 2017-03-21 2023-02-08 Telefonaktiebolaget LM Ericsson (publ) Method and apparatus for transmitting and receiving data in a wireless communication system
CN107426822B (en) * 2017-09-11 2021-04-02 西北工业大学 Overhead-free resource reallocation method in wireless network

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286946A (en) * 2008-05-30 2008-10-15 北京北方烽火科技有限公司 Method of service flow access control and bandwidth allocation based on OFDM system
CN101494589A (en) * 2008-01-22 2009-07-29 中兴通讯股份有限公司 Management system and method for transmission resource
CN101529957A (en) * 2006-11-01 2009-09-09 富士通株式会社 Wireless communication apparatus and wireless communication method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101179361B (en) * 2006-11-08 2012-01-11 中兴通讯股份有限公司 Method of distributing enhanced mixture automatic retransmission request indicating channel
KR20080092222A (en) * 2007-04-11 2008-10-15 엘지전자 주식회사 Data transmission method in tdd system
EP2341678A1 (en) * 2010-01-05 2011-07-06 Panasonic Corporation Signaling of resource assignments in cross-carrier scheduling scenarios

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101529957A (en) * 2006-11-01 2009-09-09 富士通株式会社 Wireless communication apparatus and wireless communication method
CN101494589A (en) * 2008-01-22 2009-07-29 中兴通讯股份有限公司 Management system and method for transmission resource
CN101286946A (en) * 2008-05-30 2008-10-15 北京北方烽火科技有限公司 Method of service flow access control and bandwidth allocation based on OFDM system

Also Published As

Publication number Publication date
WO2014094474A1 (en) 2014-06-26
CN103874210A (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN102918896B (en) transmission power control for physical random access channel
CN103313402B (en) The method of a kind of ascending resource distribution, Apparatus and system
JP6157643B2 (en) Method and apparatus for reporting power headroom in case of carrier aggregation
CN102742212B (en) Traffic scheduling method of guaranteed bit rate based on quality of service
EP2654358A1 (en) Resource scheduling method, apparatus, and base station
CN104469946B (en) A kind of physical uplink control channel resource distribution method
CN102415187A (en) Logical channel prioritization procedure for generating multiple uplink transport blocks
CN103857054B (en) Multiplexing and combined dispatch processing method in long evolving system MAC layer
CN101132225B (en) Transmission method for sharing unscheduled and scheduled resource in ascending reinforcement system
CN103874210B (en) A kind of uplink shared resources Pooled resources distribution method and base station
CN106102169B (en) PUCCH resource configuration method and base station in a kind of LTE system
JPWO2005039229A1 (en) Method and system for capacity scheduling
CN107567105B (en) PUCCH resource scheduling method and device
CN110198565A (en) The distribution method and device of ascending resource in a kind of small bandwidth system
CN105611638B (en) A kind of method of dispatch terminal and base station
CN105992325B (en) Method and apparatus for the power control in carrier wave polymerization enhancing
CN104981020A (en) Uplink GBR (Guaranteed Bit Rate) service scheduling method and base station
WO2014090005A1 (en) Resource allocation method and device
CN102595609B (en) A kind of method and system of realizing uplink sub-frame dispatch in sub-frame binding
CN101877905B (en) Method and device for controlling power of downlink control channel
CN102124715B (en) Channel allocation method and apparatus
CN104394597A (en) A semi-persistent scheduling method based on a priority in VoLTE service
CN101741413A (en) Dispatching method of HSUPA (high speed uplink packet access) system
CN104684086B (en) The distribution method of control channel unit
CN107820216A (en) Dispatching method and device based on SC MTCH

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant