CN103874210B - A kind of uplink shared resources Pooled resources distribution method and base station - Google Patents
A kind of uplink shared resources Pooled resources distribution method and base station Download PDFInfo
- Publication number
- CN103874210B CN103874210B CN201210548154.5A CN201210548154A CN103874210B CN 103874210 B CN103874210 B CN 103874210B CN 201210548154 A CN201210548154 A CN 201210548154A CN 103874210 B CN103874210 B CN 103874210B
- Authority
- CN
- China
- Prior art keywords
- uplink
- numbers
- frame
- sub
- allocationflag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
Abstract
The invention discloses a kind of uplink shared resources Pooled resources distribution method and base station, wherein, methods described includes:According to each remaining bandwidth resource for treating dispatching uplink subframe for treating scheduling user's set (UE) at the uplink authorization moment, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling identifies AllocationFlag;According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource allocation, second of resource allocation and final resource block (RB) number are carried out successively and is determined, the RB numbers for each UE distribution to be dispatched are obtained;According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched are obtained, generation descending control information format 0 (DCI0), the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.
Description
Technical field
The present invention relates to moving communicating field, more particularly to a kind of uplink shared resources Pooled resources distribution method and base station.
Background technology
In third generation partner program (3rd Generation Partner Project, 3GPP) Long Term Evolution
In the Frequency Division Multiplexing system of (Long Term Evolution, LTE), LTE air interface is with OFDM
Based on (Orthogonal Frequency Division Multiplexing, OFDM) technology, using 15kHz subcarrier
Width, variable system bandwidth (1.4 to 20MHz) is realized by different number of sub carrier wave (being usually 72 to 1200).LTE
Two kinds of frame structures are supported, Class1 (Type1) and Type2, wherein Type1 are used for FDD (Frequency Division
Duplexing, FDD), Type2 is used for time division duplex (Time Division Duplexing, TDD).Type2TDD frame structures
7 kinds of different proportionings of time scale up and down (matching 0~6) are supported, can be configured according to the characteristic of system business amount.Cell
Maximum uplink traffic depends on different time proportions, and the sub-frame of uplink number of proportioning 1 to proportioning 6 is 5 to the maximum, authorizes scheduling letter
Cease descending control information format 0 (Downlink Control Information format0, DCI0) only scheduling one up
(subframe reserves the band of Physical Uplink Shared Channel (Physical UplinkShared CHannel, PUSCH) occupancy to subframe
It is wide), sub-frame of uplink is less equal than descending sub frame (including special subframe S), and a descending sub frame only dispatches a sub-frame of uplink.
In order to ensure cell uplink maximum flow, it is necessary to the frequency domain resource of each sub-frame of uplink of reasonable distribution, no matter cell is present
Single-user equipment (UserEquipment, UE) or many UE are required for maximum reasonable to utilize sub-frame of uplink remaining bandwidth resource, should
Remaining bandwidth resource is that the sub-frame of uplink is that the reserved maximum residual bandwidth resources of PUSCH (remove physical uplink link control letter
Road (Physical Uplink Control CHannel, PUCCH) resource and Physical Random Access Channel
The band of the occupancy such as (PhysicalRandom Access Channel, PRACH) resource, Msg3 scheduling, retransmission process, single-shot UCI
Remaining bandwidth resources after width), it is equivalent to the resource bitmap rationally using upstream bandwidth.
However, including 6 sub-frame of uplink and 4 descending sub frames from a radio frames for unlike proportioning 1~6, matching 0
(including special subframe S), i.e. DSUUU DSUUU, as shown in figure 1, wherein D represents descending sub frame (Downlink subframe),
S represents special subframe (Special subframe), and U represents sub-frame of uplink (Uplink subframe).Under sub-frame of uplink is more than
Row number of sub frames (including special subframe) a, it may appear that descending sub frame (including special subframe S) is while dispatch two sub-frame of uplink
The situation of (the maximum residual bandwidth resources only taken including PUSCH), eventually through the upper line identifier (ULindex) in DCI0
(UL index=10 indicate that resource allocation is final in the first sub-frame of uplink, and UL index=01 indicate that resource allocation is final the
Two sub-frame of uplink, UL index=11 indicate that resource allocation is final simultaneously in first and second sub-frame of uplink public resource
Bitmap) indicate that UE realizes time domain (first sub-frame of uplink and second sub-frame of uplink) and frequency domain (sub-frame of uplink system bandwidth) knot
Close, because UL index values are different, cause the resource of the UE predistribution on different sub-frame of uplink, match somebody with somebody relative to other
Than being authorized for a sub-frame of uplink frequency domain distribution, proportioning 0 is more complicated.At present, by by two sub-frame of uplink maximum residual bandwidth
Resource simply cumulative mode distributes ascending resource, but this method can not rationally using two sub-frame of uplink system bandwidths,
Cell uplink maximum flow can not be made.
The content of the invention
In view of this, it is a primary object of the present invention to provide a kind of uplink shared resources Pooled resources distribution method and base
Stand, cell uplink maximum flow can be made rationally using waiting to dispatch two sub-frame of uplink system bandwidth resources.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
The invention provides a kind of uplink shared resources Pooled resources distribution method, applied to base station, methods described includes:
According to each remaining bandwidth for treating dispatching uplink subframe money for treating scheduling user's set (UE) at the uplink authorization moment
Source, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling is identified
AllocationFlag;
According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource is carried out successively
Distribution, second of resource allocation and final resource block (RB) number are determined, obtain the RB numbers for each UE distribution to be dispatched;
According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched, generation are obtained
Descending control information format 0 (DCI0), the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.
It is preferred that each the remaining bandwidths for the treatment of dispatching uplink subframe of the UE to be dispatched at the uplink authorization moment is provided the basis
Source, it is determined that virtual shared resource pond, is:
According to the subframe structure of time division duplex (TDD) proportioning 0, count authorize the moment to wait to dispatch first sub-frame of uplink respectively
Remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink remaining bandwidth resource ucSecondRbNum;Will
UcFirstRbNum is added with ucSecondRbNum obtains VirtualResourcePoolRbNum multiplied by with percentage specific factor,
Wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/
(ucFirstRbNum+ucSecondRbNum);β is the value determined by system testing, and span is [α, 1].
It is preferred that described treating the dispatch situation of two sub-frame of uplink of scheduling according to UE, the presetting scale of resource allocation is determined
Know, be:
Dispatched when retransfer scheduling, ascending control information (UCI) is not present in first sub-frame of uplink in UE, it is up at second
When subframe has retransfer scheduling, UCI scheduling etc., it is 1 to determine the AllocationFlag, represents resource in advance on first
Row subframe is distributed;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust
When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two
The new data of sub-frame of uplink hybrid automatic repeat-request (HARQ) process indicates that (NDI) is identical, it is determined that described
AllocationFlag is 3, represent resource in advance in first and the distribution simultaneously of second sub-frame of uplink public resource bitmap and
NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two
When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and
Second sub-frame of uplink is distributed simultaneously and NDI is differed.
It is preferred that described identify according to the virtual shared resource pond of determination and resource allocation pre-scheduling, first time money is carried out
Source is distributed, and is:
When UE queues to be dispatched not are space-time, UE in UE queues to be dispatched is taken successively;
When UE historical traffic is more than or equal to equivalent guarantee bit rate (GBR), current UE to be dispatched transmission is obtained
Block size TBSize and modulation and coding strategy (MCS), the RB numbers for obtaining pre-allocating for the first time according to TBSize and MCS
RbFirstAllcom;
UE ability rating and UE buffer region state reporting (BSR) are taken small, obtain the UE in a sub-frame of uplink
Maximum supports the transport block size MaxTB of schedulingFirstSecond, according to MaxTBFirstSecondThe UE is obtained with the MCS of the UE
In the RB numbers Rb of a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken small, obtain the UE and support scheduling in two sub-frame of uplink maximum
Transmission block size MaxTBThird, according to MaxTBThirdThe UE is obtained simultaneously in two sub-frame of uplink with the MCS of the UE
The RB numbers Rb of the maximum scheduling of transmissionBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, M1 is that the UE is sent when power headroom reporting (PHR) is 0
Maximum TBSize, M2 are that can demodulate correct maximum TBSize under the UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE
(MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)And two (MaxTB)
Small value is taken in times tetra- values of M2;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 tetra- (MaxTB)
Small value is taken in individual value;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
It is preferred that second of resource allocation of the progress, is:
Work as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic is more than or equal to equivalent maximum bit rate (MBR)
When, the allocative decision configured according to system background on the basis of VirtualResourcePoolRbNum in the updated is calculated
To the RB numbers RbSecondAllcom of second of predistribution;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after ucSecondRbNum, after M2, renewal and renewal
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecordFor
RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra-
The medium and small value of value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small
Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
It is preferred that the final RB numbers are determined, it is:
According to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that finally
The Tbsize of distributionAllocationTotalNun;
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally
The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows,
It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched
The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor
RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited
Corresponding RB numbers, and it is defined as the corresponding MCS of RB numbers of UE distribution to be dispatched.
The invention provides a kind of base station, the base station includes:
Virtual shared resource pond determining unit, for treating dispatching uplink at the uplink authorization moment according to each UE to be dispatched
The remaining bandwidth resource of subframe, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Resource allocation pre-scheduling identifies determining unit, for treating the dispatch situation of two sub-frame of uplink of scheduling according to UE,
Determine that resource allocation pre-scheduling identifies AllocationFlag;
RB number determining units, for the VirtualResourcePoolRbNum and AllocationFlag according to determination,
First time resource allocation, second of resource allocation and final RB numbers are carried out successively to determine, obtain distributing for each UE to be dispatched
RB numbers;
Descending control information format generation unit, for according to the RB numbers for each UE distribution to be dispatched, obtaining to be each
The RB resource bitmaps of UE distribution to be dispatched, generate DCI0, it is up that the DCI0 indicates that UE is carried out on scheduled sub-frame of uplink
Business is transmitted.
It is preferred that the virtual shared resource pond determining unit, the subframe structure specifically for matching 0 according to TDD, respectively
Statistics authorizes the moment to treat the remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink of first sub-frame of uplink of scheduling
Remaining bandwidth resource ucSecondRbNum;
UcFirstRbNum is added with ucSecondRbNum and obtained multiplied by with percentage specific factor
VirtualResourcePoolRbNum, wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max
(ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+ucSecondRbNum);β is to be determined by system testing
Value, span be [α, 1].
It is preferred that resource allocation pre-scheduling mark determining unit, specifically for when UE in first sub-frame of uplink not
There is retransfer scheduling, UCI scheduling, when second sub-frame of uplink has retransfer scheduling, UCI scheduling etc., it is determined that described
AllocationFlag is 1, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust
When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two
The NDI of sub-frame of uplink HARQ processes is identical, and it is 3 to determine the AllocationFlag, represents resource in advance at first and the
Two sub-frame of uplink public resource bitmaps are distributed simultaneously and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two
When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and
Second sub-frame of uplink is distributed simultaneously and NDI is differed.
It is preferred that the RB numbers determining unit, specifically for when UE historical traffic is more than or equal to equivalent G BR, obtaining
Current UE to be dispatched TBSize and MCS, the RB numbers RbFirstAllcom for obtaining pre-allocating for the first time according to TBSize and MCS;
The BSR of UE ability rating and the UE is taken and small obtains MaxTBFirstSecond, according to MaxTBFirstSecondWith
MCS obtains RB number Rbs of the UE in a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain MaxTBThird, according to MaxTBThirdWith the UE's
MCS obtains the UE simultaneously in the RB numbers Rb of two maximum scheduling of sub-frame of uplink transmissionBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 are
Correct maximum TBSize can be demodulated under the UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom, RbBRS4UE
(MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)And two (MaxTB)
Small value is taken in times tetra- values of M2;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers finally distributed for the first time
RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 tetra- (MaxTB)
Small value is taken in individual value;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
It is preferred that the RB numbers determining unit, specifically for working as RbAllocationMaxNmu_FirstMore than 0, and UE history stream
When amount is more than or equal to equivalent MBR, configured on the basis of VirtualResourcePoolRbNum in the updated according to system background
Allocative decision, calculate and obtain the RB numbers RbSecondAllcom of second of predistribution;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after, the ucSecondRbNum after M2, renewal updates
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra-
Small value is taken in value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small
Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
It is preferred that the RB numbers determining unit, specifically for according to RbAllocationMaxNmu_FirstWith
RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that the Tbsize finally distributedAllocationTotalNun;
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally
The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows,
It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched
The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor
RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited
Corresponding RB numbers, and it is defined as the corresponding MCS of RB numbers of UE distribution to be dispatched.
From the foregoing, it will be observed that technical scheme includes:According to each UE to be dispatched the uplink authorization moment wait dispatch
The remaining bandwidth resource of sub-frame of uplink, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling is identified
AllocationFlag;
According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource is carried out successively
Distribution, second of resource allocation and final resource block (RB) number are determined, obtain the RB numbers for each UE distribution to be dispatched;
According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched, generation are obtained
DCI0, the DCI0 indicate that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.Thus, it is possible to ensure under proportioning 0
Sub-frame of uplink time-frequency domain resources are authorized to maximize, so that all up-link time-frequency bandwidth of reasonable distribution to a greater extent so that on
Row maximum flow.
Brief description of the drawings
Fig. 1 is the structural representation of a radio frames;
Fig. 2 is the first embodiment implementation process figure of uplink shared resources Pooled resources distribution method of the present invention;
Fig. 3 is the structural representation of the embodiment of base station of the present invention;
Fig. 4 is the second embodiment implementation process figure of uplink shared resources Pooled resources distribution method of the present invention.
Embodiment
A kind of first embodiment for uplink shared resources Pooled resources distribution method that the present invention is provided, applied to base station, such as
Shown in Fig. 2, comprise the following steps:
Step 201, each treat scheduling user's set (UE) the uplink authorization moment according to treat the surplus of dispatching uplink subframe
Remaining bandwidth resources, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Step 202, according to UE waiting dispatch two sub-frame of uplink dispatch situation, determine resource allocation pre-scheduling identify
AllocationFlag;
Step 203, VirtualResourcePoolRbNum and AllocationFlag according to determination, carry out successively
First resource distribution, second of resource allocation and final resource block (RB) number are determined, are obtained as each UE distribution to be dispatched
RB numbers;
Step 204, basis are the RB numbers of each UE distribution to be dispatched, and obtain the RB resource-niches for each UE distribution to be dispatched
Figure, generates DCI0, and the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.
It is preferred that, step 201 can be:According to the subframe structure of time division duplex (TDD) proportioning 0, when statistics is authorized respectively
Carve the remaining bandwidth money of the remaining bandwidth resource ucFirstRbNum for treating first sub-frame of uplink of scheduling and second sub-frame of uplink
Source ucSecondRbNum;
UcFirstRbNum is added with ucSecondRbNum and obtains virtual shared resource pond multiplied by with percentage specific factor,
Wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/
(ucFirstRbNum+ucSecondRbNum);β is the value determined by system testing, and span is [α, 1].
It is preferred that, step 202 can be:As UE in first sub-frame of uplink in the absence of retransfer scheduling, ascending control information
(Uplink Control Information, UCI) is dispatched, and there is retransfer scheduling, UCI scheduling etc. in second sub-frame of uplink
When, it is 1 to determine the AllocationFlag, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust
When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two
The new data of sub-frame of uplink hybrid automatic repeat-request (HARQ) process indicates that (NDI) is identical, it is determined that described
AllocationFlag is 3, represent resource in advance in first and the distribution simultaneously of second sub-frame of uplink public resource bitmap and
NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two
When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and
Second sub-frame of uplink is distributed simultaneously and NDI is differed.
Preferably, the progress first time resource allocation in the step 203 can be:When UE queues to be dispatched not are sky
When, UE in UE queues to be dispatched is taken successively;
When UE historical traffic is more than or equal to equivalent guarantee bit rate (Guaranteed Bit Rate, GBR), obtain
Obtain currently UE to be dispatched transmission block (Transport Block) size TBSize and modulation and coding strategy (Modulation
And Coding Scheme, MCS), the RB numbers RbFirstAllcom for obtaining pre-allocating for the first time according to TBSize and MCS;
UE ability rating and UE buffer region state reporting (Buffer Status Report, BSR) are taken small, obtained
The UE supports the transport block size MaxTB of scheduling in a sub-frame of uplink maximumFirstSecond, according to MaxTBFirstSecondWith
The MCS of the UE obtains RB number Rbs of the UE in a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain the UE simultaneously in the maximum branch of two sub-frame of uplink transmission
Hold the transport block size MaxTB of schedulingThird, according to MaxTBThirdIt is simultaneously up at two that the UE is obtained with the MCS of the UE
The RB numbers Rb of sub-frame transmission maximum schedulingBRS4(2*UE)(MaxTB);
Obtain current UE dispatch M1 and M2, wherein, M1 for power headroom reporting (PowerHeadroom Report,
PHR) the maximum TBSize that the UE is sent when being 0, M2 are that can demodulate correct maximum TBSize under present channel;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBrS4(2*UE)(MaxTB) and
Small value is taken in twice of M2, tetra- values;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 (MaxTB)
Small value is taken in four values;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
Preferably, second of resource allocation of carry out in the step 203 can be:
Work as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic is more than or equal to equivalent maximum bit rate
When (Maximum Bit Rate, MBR), according to system background on the basis of VirtualResourcePoolRbNum in the updated
The allocative decision of configuration, calculates the RB numbers RbSecondAllcom for obtaining second of predistribution;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucFirstRbNum, after M2, renewal and more
Small value is taken in five values of VirtualResourcePoolRbNum after new;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucSecondRbNum, after M2, renewal and
Small value is taken in five values of VirtualResourcePoolRbNum after renewal;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4(2*UE)(MaxTB), after twice M2, renewal
Small value is taken in tetra- values of VirtualResourcePoolRbNum;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) and after renewal
Small value is taken in tri- values of VirtualResourcePoolRbNum;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
Preferably, the final RB numbers in the step 203 determine can be:
According to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that finally
The Tbsize of distributionAllocationTotalNun;
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally
The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows,
It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched
The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor
RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited
To RB numbers, and be defined as the corresponding MCS of RB numbers of UE to be dispatched distribution.
The embodiment for a kind of base station that the present invention is provided, as shown in figure 3, the base station includes:
Virtual shared resource pond determining unit, each dispatching uplink is treated for basis with scheduling UE at the uplink authorization moment
The remaining bandwidth resource of subframe, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Resource allocation pre-scheduling identifies determining unit, for treating the dispatch situation of two sub-frame of uplink of scheduling according to UE,
Determine that resource allocation pre-scheduling identifies AllocationFlag;
RB number determining units, for the VirtualResourcePoolRbNum and AllocationFlag according to determination,
First time resource allocation, second of resource allocation and final RB numbers are carried out successively to determine, obtain distributing for each UE to be dispatched
RB numbers;
Descending control information format generation unit, for according to the RB numbers for each UE distribution to be dispatched, obtaining to be each
The RB resource bitmaps of UE distribution to be dispatched, generate DCI0, it is up that the DCI0 indicates that UE is carried out on scheduled sub-frame of uplink
Business is transmitted.
Preferably, the virtual shared resource pond determining unit, the subframe structure specifically for matching 0 according to TDD, respectively
Statistics authorizes the moment to treat the remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink of first sub-frame of uplink of scheduling
Remaining bandwidth resource ucSecondRbNum;
UcFirstRbNum is added with ucSecondRbNum and obtains virtual shared resource pond multiplied by with percentage specific factor
VirtualResourcePoolRbNum, wherein, percentage specific factor=α (1 one β)+β, span [α, 1];α=max
(ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+ucSecondRbNum);β is to be determined by system testing
Value, span be [α, 1].
Preferably, resource allocation pre-scheduling mark determining unit, specifically for when UE in first sub-frame of uplink not
There is retransfer scheduling, UCI scheduling, when second sub-frame of uplink has retransfer scheduling, UCI scheduling etc., it is determined that described
AllocationFlag is 1, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, do not deposit re-transmission in second sub-frame of uplink and adjust
When degree, UCI scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two
The NDI of sub-frame of uplink HARQ processes is identical, and it is 3 to determine the AllocationFlag, represents resource in advance at first and the
Two sub-frame of uplink public resource bitmaps are distributed simultaneously and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and on two
When the NDI of row subframe HARQ processes is differed, it is 4 to determine the AllocationFlag, represent resource in advance at first and
Second sub-frame of uplink is distributed simultaneously and NDI is differed.
Preferably, the RB numbers determining unit, specifically for not being space-time when UE queues to be dispatched, takes UE to be dispatched successively
UE in queue;
When UE historical traffic is more than or equal to equivalent G BR, current UE to be dispatched TBSize and MCS is obtained, according to
TBSize and MCS obtain the RB numbers RbFirstAllcom pre-allocated for the first time;
The BSR of UE ability rating and UE is taken into the small transmission for obtaining the UE in a sub-frame of uplink maximum support scheduling
The size MaxTB of blockFirstSecond, according to MaxTBFirstSecondThe UE is obtained with the MCS of the UE in a sub-frame of uplink most
The RB numbers Rb dispatched greatlyBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain the UE simultaneously in the maximum branch of two sub-frame of uplink transmission
Hold the size MaxTB of the transmission block of schedulingThird, according to MaxTBThirdThe UE is obtained with the MCS of the UE while on two
The RB numbers Rb of row sub-frame transmission maximum schedulingBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 are
Correct maximum TBSize can be demodulated under the UE present channels;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)(MaxTB) and
Small value is taken in twice of M2, tetra- values;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 (MaxTB)
Small value is taken in four values;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
Preferably, the RB numbers determining unit, specifically for working as RbAllocationMaxNmu_FirstMore than 0, and UE history stream
When amount is more than or equal to equivalent MBR, configured on the basis of VirtualResourcePoolRbNum in the updated according to system background
Allocative decision, calculate and obtain the RB numbers RbSecondAllcom of second of predistribution;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucFirstRbNum, after M2, renewal and more
Small value is taken in five values of VirtualResourcePoolRbNum after new;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) ucSecondRbNum, after M2, renewal and
Small value is taken in five values of VirtualResourcePoolRbNum after renewal;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4(2*UE)(MaxTB), twice of M2 and update after
Small value is taken in tetra- values of VirtualResourcePoolRbNum;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor RbSecondAllcom, RbBRS4UE(MaxTB) and after renewal
Small value is taken in tri- values of VirtualResourcePoolRbNum;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
Preferably, the RB numbers determining unit, specifically for according to RbAllocationMaxNmu_FirstWith
RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that the Tbsize finally distributedAllocationTotalNun;
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that finally
The RB numbers Rb of distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows,
It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched
The corresponding MCS of RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor
RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited
To RB numbers, and be defined as the corresponding MCS of RB numbers of UE to be dispatched distribution.
The second embodiment of uplink shared resources Pooled resources distribution method of the present invention is introduced with reference to Fig. 4.
Step 401, the subframe structure according to TDD proportionings 0, count authorize the moment to treat first sub-frame of uplink of scheduling respectively
Remaining bandwidth resource ucFirstRbNum and second sub-frame of uplink remaining bandwidth resource ucSecondRbNum;
Here, the remaining bandwidth resource refers to remove PUCCH resource, PRACH resources, Msg3 scheduling, retransmission process, single-shot
PUSCH bandwidth resources outside the bandwidth of the occupancy such as UCI.
Step 402, according to ucFirstRbNum and ucSecondRbNum, obtain virtual resource shared pool
VirtualResourcePoolRbNum;
VirtualResourcePoolRbNum is obtained specifically, being calculated according to formula (1),
VirtualResourcePoolRbNum=(ucFirstRbNum+ucSecondRbNum) * Percentfactor
(1)
Wherein, percentage specific factor Percentfactor=α (1 one β)+β, β are the value determined by system testing, and β's takes
It is [α, 1] to be worth scope, and α is definite value, α=max (ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+
UcSecondRbNum), Percentfactor spans [α, 1];
For example in a radio frame, 9U and 2U, 2U and 3U, 4U and 7U, 7U and 8U separately constitute virtual shared resource pond,
During wherein 9U and 2U combinations, 9U is first sub-frame of uplink, and 2U is second sub-frame of uplink, and other combinations are similar.Implementation
One:The 5D of moment current radio frames is being authorized to the 9U of current radio frames and 2U mandates, the current radio frames of next radio frames
6S authorized to the 2U and 3U of next radio frames, the 0D of current radio frames is authorized to current radio frames 4U and 7U, current wireless
The 1S of frame is authorized to the 7U and 8U of current radio frames;Or, implementation two:Given authorizing the 5D/6S of moment current radio frames
Authorized to the 9U of current radio frames and the 2U of next radio frames, the 6S of current radio frames is awarded to the 2U and 3U of next radio frames
Power, the 0D/1S of current radio frames are authorized to the 4U and 7U of current radio frames, the 1S of current radio frames is to current radio frames 7U and 8U
Authorize;
Using virtual shared resource pond as one foundation of UE resource allocations, can avoid upstream bandwidth distribution it is excessive cause it is excellent
The low UE distribution of first level can also avoid the too small up band for causing single UE or many UE to distribute of upstream bandwidth distribution less than resource
The waste of wide resource, more rationally distributes up-link resource for UE, improves cell uplink flow system flow.
Step 403, according to UE waiting dispatch two sub-frame of uplink dispatch situation, determine resource allocation pre-scheduling mark money
Source distribution pre-scheduling mark AllocationFlag;
If specifically, retransfer scheduling, UCI scheduling etc. is not present in first sub-frame of uplink in UE, in second up son
When frame has retransfer scheduling, UCI scheduling etc., the AllocationFlag is entered as 1, represents resource in advance on first
Row subframe is distributed;
If UE has retransfer scheduling, UCI scheduling etc. in first sub-frame of uplink, re-transmission is not deposited in second sub-frame of uplink
When scheduling, UCI scheduling etc., the AllocationFlag is entered as 2, represents resource in advance in second sub-frame of uplink point
Match somebody with somebody;
If UE is in first sub-frame of uplink and second sub-frame of uplink UE not retransfer scheduling, UCI scheduling etc., and two
The new data of individual sub-frame of uplink hybrid automatic repeat-request (Hybrid Automatic Repeat Request, HARQ) process
When indicating that (New Data indication, NDI) is identical, the AllocationFlag is entered as 3, represents that resource is advance
Distributed simultaneously with second sub-frame of uplink public resource bitmap at first and NDI is identical;
If UE is in first sub-frame of uplink and second sub-frame of uplink not retransfer scheduling, UCI scheduling etc., and two
When the NDI of sub-frame of uplink HARQ processes is differed, the AllocationFlag is entered as 4, represents resource in advance first
Individual and second sub-frame of uplink is distributed simultaneously and NDI is differed.Two DCI0 can be now issued by same descending sub frame
For sub-frame of uplink mandate, or DCI0 issued for sub-frame of uplink mandate by different descending sub frames respectively;
Because PRACH resources and Msg3 scheduling can only a sub-frame of uplink, therefore without resource allocation pre-scheduling wherein
Mark;
The effect of the AllocationFlag is similar but different with UL index effect, and UL index values are
Determined after final resource allocation success, and AllocationFlag carries out resource point for mark UE in advance in which sub-frame of uplink
The subframe index matched somebody with somebody, can determine that UL index guide direction to be final, for example, AllocationFlag=1 UE resources point
With the UL index=10 after success;UL index=01 after AllocationFlag=2 UE resource allocations success;
UL index after AllocationFlag=3 UE resource allocations success are generally 10,01 or 11;AllocationFlag=
ULindex is 01 or 10 after 4 UE resource allocations success, can so reduce the time of system resource allocation, lifting user's money
Source allocative efficiency.
Step 404, when UE queues to be dispatched not be sky, and UE (Buffer Status Reporting, BSR)
BSREquivalent G BR(the BSR of > 0Equivalent G BRIt is not 0 logic channel BSR sums for the BSR with GBR and PBR in logic channel group) when, root
Identified according to the virtual shared resource pond of determination and resource allocation pre-scheduling, carry out first time resource allocation and obtain final for the first time point
The RB numbers Rb matched somebody with somebodyAllocationMaxNmu_First;
Specifically, when UE queues to be dispatched not are space-time, UE in UE queues to be dispatched is taken successively, when UE historical traffic is big
When equal to equivalent G BR, current UE to be dispatched TBSize and MCS is obtained, is obtained pre-allocating for the first time according to TBSize and MCS
RB numbers RbFirstAllcom;
The BSR of UE ability rating and the UE is taken and small obtain the UE in sub-frame of uplink maximum and supports scheduling
The size MaxTB of transmission blockFirstSecond, according to MaxTBFirstSecondThe UE is obtained with MCS to adjust in a sub-frame of uplink maximum
The RB numbers Rb of degreeBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain the UE simultaneously in the maximum branch of two sub-frame of uplink transmission
Hold the size MaxTB of the transmission block of schedulingThird, according to MaxTBThirdThe UE is obtained with MCS to adjust in a sub-frame of uplink maximum
The RB numbers Rb of degreeBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 are
Correct maximum TBSize can be demodulated under present channel;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor ucFirstRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor ucSecondRbNum, VirtualResourcePoolRbNum, RbFirstAllcom,
RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4(2*UE)(MaxTB) and
Small value is taken in twice of M2, tetra- values;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the first time
Number RbAllocationMaxNmu_FirstFor RbFirstAllcom, VirtualResourcePoolRbNum, RbBRS4UEAnd M2 (MaxTB)
Small value is taken in four values.
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
Step 405, according to resource allocation pre-scheduling identify, update after VirtualResourcePoolRbNum,
UcFirstRbNum and ucSecondRbNum, carries out the RB numbers that second of resource allocation obtains finally distributing for the second time
RbAllocationMaxNmu_Second;
Specifically, working as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic be more than or equal to equivalent MBR when, more
The allocative decision configured on the basis of VirtualResourcePoolRbNum after new according to system background, calculating is obtained second
The RB numbers RbSecondAllcom of predistribution;
When UE resource allocations pre-scheduling mark AllocationFlag is 1, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor the ucFirstRbNum after renewal, the VirtualResourcePoolRbNum after renewal,
RbSecondAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 2, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor the ucSecondRbNum after renewal, the VirtualResourcePoolRbNum after renewal,
RbSecondAllcom, RbBRS4UE(MaxTB) and in five values of M2 small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 3, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor VirtualResourcePoolRbNum, the RbSecondAllcom after renewal,
RbBRS4(2*UE)(MaxTB) and in twice of M2, tetra- values small value is taken;
When UE resource allocations pre-scheduling mark AllocationFlag is 4, it is determined that the RB finally distributed for the second time
Number RbAllocationMaxNmu_SecondFor the VirtualResourcePoolRbNum after renewal, RbSecondAllcom and
RbBRS4UE(MaxTB)Small value is taken in three values.
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and
VirtualResourcePoolRbNum。
Step 406, the RB numbers Rb finally distributed according to resource allocation pre-scheduling mark, first timeAllocationMaxNmu_First
The RB numbers Rb finally distributed for the second timeAllocationMaxNmu_Second, carry out final RB numbers and determine, obtain as each UE to be dispatched
The RB numbers Rb of distributionAllocationTotalNmu;
Specifically, according to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE,
It is determined that the Tbsize finally distributedAllocationTotalNun;
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is defined as treating
Dispatch the RB numbers Rb of UE distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows,
It is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE to be dispatched
The RB numbers of distribution;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor
RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil
(TbsizeAllocationTotalNun/ 2) > M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor power limited
To RB numbers, and be defined as the corresponding MCS of RB numbers of UE to be dispatched distribution.
Step 407, the RB numbers Rb distributed for UE to be dispatched according to determinationAllocationTotalNmu, it is generated as each waiting to dispatch
The RB resource bitmaps of UE distribution, obtain sub-frame of uplink authorization message, and the sub-frame of uplink authorization message are handed down to corresponding
UE。
Step 408, UE demodulate corresponding DCI0 from the sub-frame of uplink authorization message received, are indicated by DCI0 described
UE's carries out uplink traffic transmission on which sub-frame of uplink.
To sum up, the present invention causes up-link bandwidth resources of the UE more rationally using proportioning 0 by virtual shared resource pond,
The efficiency more having for instructing UE to lift resource allocation is identified by pre-scheduling, finally cell uplink flow is optimal.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.
Claims (12)
1. a kind of uplink shared resources Pooled resources distribution method, applied to base station, it is characterised in that methods described includes:
According to each remaining bandwidth resource for treating dispatching uplink subframe for treating scheduling user's set (UE) at the uplink authorization moment, really
Fixed virtual shared resource pond VirtualResourcePoolRbNum;
The dispatch situation of two sub-frame of uplink of scheduling is being treated according to UE, is determining that resource allocation pre-scheduling is identified
AllocationFlag;
According to the VirtualResourcePoolRbNum and AllocationFlag of determination, first time resource point is carried out successively
Match somebody with somebody, second of resource allocation and final resource block (RB) number are determined, obtain the RB numbers for each UE distribution to be dispatched;
According to the RB numbers for each UE distribution to be dispatched, the RB resource bitmaps for each UE distribution to be dispatched are obtained, are generated descending
Control information form 0 (DCI0), the DCI0 indicates that UE carries out uplink traffic transmission on scheduled sub-frame of uplink.
2. according to the method described in claim 1, it is characterised in that the basis each UE to be dispatched at the uplink authorization moment
The remaining bandwidth resource of dispatching uplink subframe is treated, it is determined that virtual shared resource pond, is:
According to the subframe structure of time division duplex (TDD) proportioning 0, count authorize the moment to treat the surplus of first sub-frame of uplink of scheduling respectively
Remaining bandwidth resources ucFirstRbNum and second sub-frame of uplink remaining bandwidth resource ucSecondRbNum;Will
UcFirstRbNum is added with ucSecondRbNum obtains VirtualResourcePoolRbNum multiplied by with percentage specific factor,
Wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max (ucFirstRbNum, ucSecondRbNum)/
(ucFirstRbNum+ucSecondRbNum);β is the value determined by system testing, and span is [α, 1].
3. according to the method described in claim 1, it is characterised in that described that the scheduling of two sub-frame of uplink of scheduling is being treated according to UE
Situation, determines that resource allocation pre-scheduling is identified, is:
Dispatched when retransfer scheduling, ascending control information (UCI) is not present in first sub-frame of uplink in UE, in second sub-frame of uplink
When there is retransfer scheduling, UCI scheduling etc., it is 1 to determine the AllocationFlag, represents resource in advance in first up son
Frame is distributed;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, retransfer scheduling, UCI are not deposited in second sub-frame of uplink
During scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is dispatched etc. in first sub-frame of uplink and second sub-frame of uplink UE without retransfer scheduling, UCI, and two up
The new data of subframe hybrid automatic repeat-request (HARQ) process indicates that (NDI) is identical, determines that the AllocationFlag is
3, represent that resource is distributed simultaneously at first with second sub-frame of uplink public resource bitmap in advance and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and two up sons
When the NDI of frame HARQ processes is differed, it is 4 to determine the AllocationFlag, represents resource in advance at first and second
Individual sub-frame of uplink is distributed simultaneously and NDI is differed.
4. method according to claim 3, it is characterised in that described according to the virtual shared resource pond of determination and resource point
With pre-scheduling mark, first time resource allocation is carried out, is:
When UE queues to be dispatched not are space-time, UE in UE queues to be dispatched is taken successively;
When UE historical traffic is more than or equal to equivalent guarantee bit rate (GBR), the transmission block for obtaining current UE to be dispatched is big
Small TBSize and modulation and coding strategy (MCS), the RB numbers for obtaining pre-allocating for the first time according to TBSize and MCS
RbFirstAllcom;
UE ability rating and UE buffer region state reporting (BSR) are taken small, obtain the UE in a sub-frame of uplink maximum
Support the transport block size MaxTB of schedulingFirstSecond, according to MaxTBFirstSecondThe UE is obtained one with the MCS of the UE
The RB numbers Rb of individual sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken small, obtain the biography that the UE supports scheduling in two sub-frame of uplink maximum
Defeated piece of size MaxTBThird, according to MaxTBThirdThe UE is obtained simultaneously in two sub-frame of uplink transmission with the MCS of the UE
The RB numbers Rb of maximum schedulingBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, M1 is the maximum that the UE is sent when power headroom reporting (PHR) is 0
TBSize, M2 are that can demodulate correct maximum TBSize under the UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
ucFirstRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) and in five values of M2
Take small value;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
ucSecondRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) it is worth with M2 five
In take small value;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4(2*UE)(MaxTB) and in twice of M2, tetra- values take small
Value;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4UE(MaxTB) and in tetra- values of M2 small value is taken;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolR
bNum。
5. method according to claim 4, it is characterised in that described second of resource allocation of carry out, is:
Work as RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic be more than or equal to equivalent maximum bit rate (MBR) when,
The allocative decision configured on the basis of VirtualResourcePoolRbNum after renewal according to system background, calculating obtains second
The RB numbers RbSecondAllcom of secondary predistribution;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after ucSecondRbNum, after M2, renewal and renewal
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra-
The medium and small value of value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small
Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePool
RbNum。
6. method according to claim 5, it is characterised in that the final RB numbers are determined, are:
According to RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that final distribution
TbsizeAllocationTotalNun;
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that final distribution
RB numbers RbAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, it is determined that
The RB numbers Rb distributed for UE to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE distribution to be dispatched
The corresponding MCS of RB numbers;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/
2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstWith
RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/
2) during > M1, it is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and determine
The corresponding MCS of RB numbers distributed for UE to be dispatched.
7. a kind of base station, it is characterised in that the base station includes:
Virtual shared resource pond determining unit, for treating dispatching uplink subframe at the uplink authorization moment according to each UE to be dispatched
Remaining bandwidth resource, it is determined that virtual shared resource pond VirtualResourcePoolRbNum;
Resource allocation pre-scheduling identifies determining unit, for treating the dispatch situation of two sub-frame of uplink of scheduling according to UE, it is determined that
Resource allocation pre-scheduling identifies AllocationFlag;
RB number determining units, for the VirtualResourcePoolRbNum and AllocationFlag according to determination, successively
Carry out first time resource allocation, second of resource allocation and final RB numbers to determine, obtain the RB for each UE distribution to be dispatched
Number;
Descending control information format generation unit, for according to the RB numbers for each UE distribution to be dispatched, obtaining waiting to adjust to be each
The RB resource bitmaps of UE distribution are spent, DCI0 is generated, the DCI0 indicates that UE carries out uplink service on scheduled sub-frame of uplink
Transmission.
8. base station according to claim 7, it is characterised in that the virtual shared resource pond determining unit, specifically for
According to the subframe structure of TDD proportionings 0, count authorize the moment to wait to dispatch the remaining bandwidth resource of first sub-frame of uplink respectively
The remaining bandwidth resource ucSecondRbNum of ucFirstRbNum and second sub-frame of uplink;
UcFirstRbNum is added with ucSecondRbNum and obtained multiplied by with percentage specific factor
VirtualResourcePoolRbNum, wherein, percentage specific factor=α (1- β)+β, span [α, 1];α=max
(ucFirstRbNum, ucSecondRbNum)/(ucFirstRbNum+ucSecondRbNum);β is to be determined by system testing
Value, span be [α, 1].
9. base station according to claim 7, it is characterised in that the resource allocation pre-scheduling identifies determining unit, specifically
For when UE first sub-frame of uplink be not present retransfer scheduling, UCI dispatch, second sub-frame of uplink exist retransfer scheduling,
During UCI scheduling etc., it is 1 to determine the AllocationFlag, represents resource in advance in first sub-frame of uplink distribution;
Dispatched when UE has retransfer scheduling, UCI in first sub-frame of uplink, retransfer scheduling, UCI are not deposited in second sub-frame of uplink
During scheduling, it is 2 to determine the AllocationFlag, represents resource in advance in second sub-frame of uplink distribution;
When UE is dispatched etc. in first sub-frame of uplink and second sub-frame of uplink UE without retransfer scheduling, UCI, and two up
The NDI of subframe HARQ processes is identical, and it is 3 to determine the AllocationFlag, represents resource in advance in first and second
Sub-frame of uplink public resource bitmap is distributed simultaneously and NDI is identical;
If UE is dispatched in first sub-frame of uplink and second sub-frame of uplink without retransfer scheduling, UCI, and two up sons
When the NDI of frame HARQ processes is differed, it is 4 to determine the AllocationFlag, represents resource in advance at first and second
Individual sub-frame of uplink is distributed simultaneously and NDI is differed.
10. base station according to claim 9, it is characterised in that the RB numbers determining unit, specifically for when UE history
When flow is more than or equal to equivalent G BR, current UE to be dispatched TBSize and MCS is obtained, is obtained for the first time according to TBSize and MCS
The RB numbers RbFirstAllcom of predistribution;
The BSR of UE ability rating and the UE is taken and small obtains MaxTBFirstSecond, according to MaxTBFirstSecondObtained with MCS
RB number Rbs of the UE in a sub-frame of uplink maximum schedulingBRS4UE(MaxTB);
UE BSR and twice of UE ability rating are taken and small obtain MaxTBThird, according to MaxTBThirdObtained with the MCS of the UE
The UE is simultaneously in the RB numbers Rb of two maximum scheduling of sub-frame of uplink transmissionBRS4(2*UE)(MaxTB);
Current UE to be dispatched M1 and M2 is obtained, wherein, the M1 maximum TBSize that the UE is sent when being PHR=0, M2 is described
Correct maximum TBSize can be demodulated under UE present channels;
When the AllocationFlag of the UE is 1, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
ucFirstRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) and in five values of M2
Take small value;
When the AllocationFlag of the UE is 2, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
ucSecondRbNum、VirtualResourcePoolRbNum、RbFirstAllcom、RbBRS4UE(MaxTB) it is worth with M2 five
In take small value;
When the AllocationFlag of the UE is 3, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4(2*UE)(MaxTB) and in twice of M2, tetra- values take small
Value;
When the AllocationFlag of the UE is 4, it is determined that the RB numbers Rb finally distributed for the first timeAllocationMaxNmu_FirstFor
RbFirstAllcom、VirtualResourcePoolRbNum、RbBRS4UE(MaxTB) and in tetra- values of M2 small value is taken;
According to RbAllocationMaxNmu_First, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePoolR
bNum。
11. base station according to claim 10, it is characterised in that the RB numbers determining unit, specifically for working as
RbAllocationMaxNmu_FirstMore than 0, and UE historical traffic be more than or equal to equivalent MBR when, in the updated
The allocative decision configured on the basis of VirtualResourcePoolRbNum according to system background, calculating obtains second of predistribution
RB numbers RbSecondAllcom;
When AllocationFlag is 1, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after ucFirstRbNum, after M2, renewal and renewal
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 2, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) after, the ucSecondRbNum after M2, renewal updates
Small value is taken in five values of VirtualResourcePoolRbNum;
When AllocationFlag is 3, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4(2*UE)(MaxTB), twice of M2 and update after VirtualResourcePoolRbNum tetra-
Small value is taken in value;
When AllocationFlag is 4, it is determined that the RB numbers Rb finally distributed for the second timeAllocationMaxNmu_SecondFor
RbSecondAllcom、RbBRS4UE(MaxTB) and in tri- values of VirtualResourcePoolRbNum after renewal take small
Value;
According to RbAllocationMaxNmu_Second, update ucFirstRbNum, ucSecondRbNum and VirtualResourcePool
RbNum。
12. base station according to claim 11, it is characterised in that the RB numbers determining unit, specifically for basis
RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondThe MCS of sum and the UE, it is determined that finally distribute
TbsizeAllocationTotalNun;
When AllocationFlag is 1,2,3 or 4, and TbsizeAllocationTotalNunDuring less than or equal to M1, it is determined that final distribution
RB numbers RbAllocationTotalNmuFor RbAllocationMaxNmu_FirstAnd RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 1,2 or 4, and TbsizeAllocationTotalNunDuring more than M1, into PHR flows, it is determined that
The RB numbers Rb distributed for UE to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and it is defined as UE distribution to be dispatched
The corresponding MCS of RB numbers;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/
2)≤M1 when, be defined as the RB numbers Rb of UE to be dispatched distributionAllocationTotalNmuFor RbAllocationMaxNmu_FirstWith
RbAllocationMaxNmu_SecondSum;
When AllocationFlag is 3, and TbsizeAllocationTotalNunMore than M1, and ceil (TbsizeAllocationTotalNun/
2) during > M1, it is defined as the RB numbers Rb of UE distribution to be dispatchedAllocationTotalNmuFor the corresponding RB numbers of power limited, and determine
The corresponding MCS of RB numbers distributed for UE to be dispatched.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210548154.5A CN103874210B (en) | 2012-12-17 | 2012-12-17 | A kind of uplink shared resources Pooled resources distribution method and base station |
PCT/CN2013/083840 WO2014094474A1 (en) | 2012-12-17 | 2013-09-18 | Resource allocation method for uplink shared resource pool and base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210548154.5A CN103874210B (en) | 2012-12-17 | 2012-12-17 | A kind of uplink shared resources Pooled resources distribution method and base station |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103874210A CN103874210A (en) | 2014-06-18 |
CN103874210B true CN103874210B (en) | 2017-09-12 |
Family
ID=50912245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210548154.5A Active CN103874210B (en) | 2012-12-17 | 2012-12-17 | A kind of uplink shared resources Pooled resources distribution method and base station |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103874210B (en) |
WO (1) | WO2014094474A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018000362A1 (en) * | 2016-06-30 | 2018-01-04 | 华为技术有限公司 | Resource scheduling method and corresponding device |
CN106533982B (en) * | 2016-11-14 | 2019-05-21 | 西安电子科技大学 | The dynamic queue's dispatching device and method borrowed based on bandwidth |
EP4132179A1 (en) | 2017-03-21 | 2023-02-08 | Telefonaktiebolaget LM Ericsson (publ) | Method and apparatus for transmitting and receiving data in a wireless communication system |
CN107426822B (en) * | 2017-09-11 | 2021-04-02 | 西北工业大学 | Overhead-free resource reallocation method in wireless network |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101286946A (en) * | 2008-05-30 | 2008-10-15 | 北京北方烽火科技有限公司 | Method of service flow access control and bandwidth allocation based on OFDM system |
CN101494589A (en) * | 2008-01-22 | 2009-07-29 | 中兴通讯股份有限公司 | Management system and method for transmission resource |
CN101529957A (en) * | 2006-11-01 | 2009-09-09 | 富士通株式会社 | Wireless communication apparatus and wireless communication method |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101179361B (en) * | 2006-11-08 | 2012-01-11 | 中兴通讯股份有限公司 | Method of distributing enhanced mixture automatic retransmission request indicating channel |
KR20080092222A (en) * | 2007-04-11 | 2008-10-15 | 엘지전자 주식회사 | Data transmission method in tdd system |
EP2341678A1 (en) * | 2010-01-05 | 2011-07-06 | Panasonic Corporation | Signaling of resource assignments in cross-carrier scheduling scenarios |
-
2012
- 2012-12-17 CN CN201210548154.5A patent/CN103874210B/en active Active
-
2013
- 2013-09-18 WO PCT/CN2013/083840 patent/WO2014094474A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101529957A (en) * | 2006-11-01 | 2009-09-09 | 富士通株式会社 | Wireless communication apparatus and wireless communication method |
CN101494589A (en) * | 2008-01-22 | 2009-07-29 | 中兴通讯股份有限公司 | Management system and method for transmission resource |
CN101286946A (en) * | 2008-05-30 | 2008-10-15 | 北京北方烽火科技有限公司 | Method of service flow access control and bandwidth allocation based on OFDM system |
Also Published As
Publication number | Publication date |
---|---|
WO2014094474A1 (en) | 2014-06-26 |
CN103874210A (en) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102918896B (en) | transmission power control for physical random access channel | |
CN103313402B (en) | The method of a kind of ascending resource distribution, Apparatus and system | |
JP6157643B2 (en) | Method and apparatus for reporting power headroom in case of carrier aggregation | |
CN102742212B (en) | Traffic scheduling method of guaranteed bit rate based on quality of service | |
EP2654358A1 (en) | Resource scheduling method, apparatus, and base station | |
CN104469946B (en) | A kind of physical uplink control channel resource distribution method | |
CN102415187A (en) | Logical channel prioritization procedure for generating multiple uplink transport blocks | |
CN103857054B (en) | Multiplexing and combined dispatch processing method in long evolving system MAC layer | |
CN101132225B (en) | Transmission method for sharing unscheduled and scheduled resource in ascending reinforcement system | |
CN103874210B (en) | A kind of uplink shared resources Pooled resources distribution method and base station | |
CN106102169B (en) | PUCCH resource configuration method and base station in a kind of LTE system | |
JPWO2005039229A1 (en) | Method and system for capacity scheduling | |
CN107567105B (en) | PUCCH resource scheduling method and device | |
CN110198565A (en) | The distribution method and device of ascending resource in a kind of small bandwidth system | |
CN105611638B (en) | A kind of method of dispatch terminal and base station | |
CN105992325B (en) | Method and apparatus for the power control in carrier wave polymerization enhancing | |
CN104981020A (en) | Uplink GBR (Guaranteed Bit Rate) service scheduling method and base station | |
WO2014090005A1 (en) | Resource allocation method and device | |
CN102595609B (en) | A kind of method and system of realizing uplink sub-frame dispatch in sub-frame binding | |
CN101877905B (en) | Method and device for controlling power of downlink control channel | |
CN102124715B (en) | Channel allocation method and apparatus | |
CN104394597A (en) | A semi-persistent scheduling method based on a priority in VoLTE service | |
CN101741413A (en) | Dispatching method of HSUPA (high speed uplink packet access) system | |
CN104684086B (en) | The distribution method of control channel unit | |
CN107820216A (en) | Dispatching method and device based on SC MTCH |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |