- CN103871531B CN103871531B CN201210531664.1A CN201210531664A CN103871531B CN 103871531 B CN103871531 B CN 103871531B CN 201210531664 A CN201210531664 A CN 201210531664A CN 103871531 B CN103871531 B CN 103871531B
- Authority
- CN
- China
- Prior art keywords
- feed water
- auxiliary feed
- steam generator
- water pump
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/04—Safety arrangements
- G21D3/06—Safety arrangements responsive to faults within the plant
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Plasma & Fusion (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
- Control Of Turbines (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Control Of Positive-Displacement Pumps (AREA)
Abstract
本发明属于一种压水堆核电厂事故应对方法,具体涉及一种用于压水堆核电厂事故工况下延长蒸汽发生器满溢时间的方法。它包括如下步骤,第一步:发生了导致所有辅助给水泵启动的事故;第二步:停运辅助给水泵;第三步:判断是否需要再启动辅助给水泵。本发明的优点是,该方法通过增加保护控制信号,自动调节蒸汽发生器辅助给水的流量,在保证堆芯安全的前提下延长了蒸汽发生器发生满溢的时间,从而延长操纵员不干预事故的时间,减小操纵员的失误。
Description
技术领域
本发明属于一种压水堆核电厂事故应对方法,具体涉及一种用于压水堆核电厂事故工况下延长蒸汽发生器满溢时间的方法。
背景技术
压水堆核电厂在部分事故中将导致所有辅助给水泵全部启动,如果辅助给水流量大于蒸汽流量,将造成蒸汽发生器二次侧水装量持续增加。如果操纵员未能及时减小辅助给水流量,将造成蒸汽发生器满溢。
国内现役核电站没有设置在这类事故工况下防止SG满溢的措施,为了防止事故工况下SG满溢就要求操纵员尽快采取干预措施,对操纵员的要求就比较高,容易发生误操作。
通过设置合理的自动保护措施,在不影响SG带走堆芯余热的情况下,合理控制辅助给水流量,延长SG达到满溢的时间,从而延长操纵员不干预事故的时间,减小操纵员的失误。在操纵员干预后最终实现SG不会发生满溢。
发明内容
本发明的目的是提供一种用于压水堆核电厂事故工况下延长蒸汽发生器满溢时间的方法,它能够在压水堆核电厂的一些启动辅助给水泵的事故中,通过设置“蒸汽发生器水位达到高定值停运相应的辅助给水泵”信号来调节蒸汽发生器的辅助给水流量,在确保蒸汽发生器有足够的带热能力来保证堆芯安全的前提下,延长SG达到满溢的时间,从而延长操纵员不干预事故的时间,减小操纵员的失误。
本发明是这样实现的,一种用于压水堆核电厂事故工况下延长蒸汽发生器满溢时间的方法,它包括如下步骤,
第一步:发生了导致所有辅助给水泵启动的事故;
第二步:停运辅助给水泵;
第三步:判断是否需要再启动辅助给水泵。
所述的第二步为随着SG二次侧水位的增加,当任一SG二次侧水位高于设计整定值时,将根据如下情况停运辅助给水泵:
在4台辅助给水泵均启动运行的情况下,如果有一台蒸汽发生器的水位达到高高水位整定值,则停运其中2台辅助给水泵;
如果只有3台辅助给水泵启动在运行,则只用停运1台辅助给水泵。
所述的第三步为如果因停运辅助给水泵导致SG水位低低与同一台SG给水流量低符合信号产生,则将自动重新启动所有停运的辅助给水泵,确保SG二次侧保持足够的水装量。
本发明的优点是,该方法通过增加保护控制信号,自动调节蒸汽发生器辅助给水的流量,在保证堆芯安全的前提下延长了蒸汽发生器发生满溢的时间,从而延长操纵员不干预事故的时间,减小操纵员的失误。
附图说明
图1为一种用于压水堆核电厂事故工况下延长蒸汽发生器满溢时间的方法的流程图。
具体实施方式
下面结合附图和实施例对本发明进行详细介绍:
(一)基本原理
在核电厂发生启动辅助给水泵的事故下,通过设置“蒸汽发生器水位达到高定值停运相应的辅助给水泵”信号来调节辅助给水流量,延长SG达到满溢的时间,从而延长操纵员不干预事故的时间,减小操纵员的失误。在操纵员干预后最终实现SG不满溢。
(二)主要设备
事故工况下延长蒸汽发生器满溢时间的方案中涉及的相关设备包括控制逻辑及操纵员接口。
为防止核电厂在发生启动辅助给水泵的事故下蒸汽发生器满溢,核电厂增设如下控制逻辑:
在4台辅助给水泵均启动的情况下,如果有一台蒸汽发生器的水位达到设定的高水位整定值,则停运2台辅助给水泵;若只有3台辅助给水泵启动,如果有一台蒸汽发生器的水位达到设定的高水位整定值,则只停运1台辅助给水泵。即在事故情况下维持有两台辅助给水泵运行。
操纵员接口是提供操纵员“停运2台辅助给水泵”、“停运1台辅助给水泵”信号的指示和复位接口。
一种用于压水堆核电厂事故工况下延长蒸汽发生器满溢时间的方法,具体运行流程如下:
第一步:发生了导致所有辅助给水泵启动的事故;
在核电厂发生需要启动所有辅助给水泵的事故时,较大流量的辅助给水注入将导致SG二次侧水位逐渐增加。
第二步:停运辅助给水泵;
随着SG二次侧水位的增加,当任一SG二次侧水位高于设计整定值时,将根据如下情况停运辅助给水泵:
在4台辅助给水泵均启动运行的情况下,如果有一台蒸汽发生器的水位达到高高水位整定值,则停运其中2台辅助给水泵;
如果只有3台辅助给水泵启动在运行,则只用停运1台辅助给水泵。
即:在事故情况下只需要有两台辅助给水泵运行,这样既可以保证堆芯安全,又将延长蒸汽发生器发生满溢的时间。
第三步:判断是否需要再启动辅助给水泵;
如果因停运辅助给水泵导致SG水位低低与同一台SG给水流量低符合信号产生,则将自动重新启动所有停运的辅助给水泵,确保SG二次侧保持足够的水装量。
操纵员干预之后根据相应的事故处理规程进行事故干预和处理。
Claims (1)
1.一种用于压水堆核电厂事故工况下延长蒸汽发生器满溢时间的方法,其特征在于:它包括如下步骤,
第一步:发生了导致所有辅助给水泵启动的事故;
第二步:停运辅助给水泵;
第三步:判断是否需要再启动辅助给水泵;
所述的第二步为随着SG二次侧水位的增加,当任一SG二次侧水位高于设计整定值时,将根据如下情况停运辅助给水泵:
在4台辅助给水泵均启动运行的情况下,如果有一台蒸汽发生器的水位达到高高水位整定值,则停运其中2台辅助给水泵;
如果只有3台辅助给水泵启动在运行,则只用停运1台辅助给水泵;
所述的第三步为如果因停运辅助给水泵导致SG水位低低与同一台SG给水流量低符合信号产生,则将自动重新启动所有停运的辅助给水泵,确保SG二次侧保持足够的水装量。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210531664.1A CN103871531B (zh) | 2012-12-11 | 2012-12-11 | 一种事故工况下延长蒸汽发生器满溢时间的方法 |
PCT/CN2013/088608 WO2014090107A1 (zh) | 2012-12-11 | 2013-12-05 | 一种事故工况下延长蒸汽发生器满溢时间的方法 |
ARP130104607A AR093900A1 (es) | 2012-12-11 | 2013-12-10 | Metodo para prolongar el tiempo de desbordamiento del generador de vapor bajo condiciones de accidente de una central nuclear con reactor de agua a presion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210531664.1A CN103871531B (zh) | 2012-12-11 | 2012-12-11 | 一种事故工况下延长蒸汽发生器满溢时间的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103871531A CN103871531A (zh) | 2014-06-18 |
CN103871531B true CN103871531B (zh) | 2016-08-31 |
Family
ID=50909970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210531664.1A Active CN103871531B (zh) | 2012-12-11 | 2012-12-11 | 一种事故工况下延长蒸汽发生器满溢时间的方法 |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN103871531B (zh) |
AR (1) | AR093900A1 (zh) |
WO (1) | WO2014090107A1 (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111651713B (zh) * | 2020-06-10 | 2023-10-20 | 三门核电有限公司 | 一种核电厂运行期间蒸汽发生器腐蚀产物沉积计算方法 |
CN113421676B (zh) * | 2021-06-18 | 2022-05-10 | 中国核动力研究设计院 | 一种核电厂事故规程整定值的确定方法及装置 |
CN113436768B (zh) * | 2021-06-23 | 2022-05-20 | 中国核动力研究设计院 | 一种用于核电厂稳压器水位整定值的确定方法 |
CN114251646B (zh) * | 2021-11-15 | 2023-12-26 | 中广核研究院有限公司 | 适用于主泵启停工况的蒸汽发生器液位控制方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4692297A (en) * | 1985-01-16 | 1987-09-08 | Westinghouse Electric Corp. | Control of nuclear reactor power plant on occurrence of rupture in coolant tubes |
US4738818A (en) * | 1986-09-29 | 1988-04-19 | Westinghouse Electric Corp. | Feedwater control in a PWR following reactor trip |
CN1080769A (zh) * | 1992-06-24 | 1994-01-12 | 西屋电气公司 | 用无源安全系统缓解压水堆中蒸汽发生器管的破裂事故 |
JP2009250923A (ja) * | 2008-04-10 | 2009-10-29 | Hitachi-Ge Nuclear Energy Ltd | プラントの給水温度制御方法、発電プラント及び給水温度制御装置 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT1186920B (it) * | 1985-08-02 | 1987-12-16 | Ansaldo Spa | Impianto per la prevenzione del riempiemnto di un generatore di vapore |
US4832898A (en) * | 1987-11-25 | 1989-05-23 | Westinghouse Electric Corp. | Variable delay reactor protection system |
CN103050158A (zh) * | 2012-12-11 | 2013-04-17 | 中国核电工程有限公司 | 自动停运辅助给水泵的控制方法 |
-
2012
- 2012-12-11 CN CN201210531664.1A patent/CN103871531B/zh active Active
-
2013
- 2013-12-05 WO PCT/CN2013/088608 patent/WO2014090107A1/zh active Application Filing
- 2013-12-10 AR ARP130104607A patent/AR093900A1/es active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4692297A (en) * | 1985-01-16 | 1987-09-08 | Westinghouse Electric Corp. | Control of nuclear reactor power plant on occurrence of rupture in coolant tubes |
US4738818A (en) * | 1986-09-29 | 1988-04-19 | Westinghouse Electric Corp. | Feedwater control in a PWR following reactor trip |
CN1080769A (zh) * | 1992-06-24 | 1994-01-12 | 西屋电气公司 | 用无源安全系统缓解压水堆中蒸汽发生器管的破裂事故 |
JP2009250923A (ja) * | 2008-04-10 | 2009-10-29 | Hitachi-Ge Nuclear Energy Ltd | プラントの給水温度制御方法、発電プラント及び給水温度制御装置 |
Non-Patent Citations (1)
Title |
---|
秦山核电厂蒸汽发生器传热管破裂事故分析;浦胜娣、李吉根;《原子能科学技术》;19930731;第27卷(第4期);289-294页 * |
Also Published As
Publication number | Publication date |
---|---|
WO2014090107A1 (zh) | 2014-06-19 |
AR093900A1 (es) | 2015-06-24 |
CN103871531A (zh) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103871531B (zh) | 一种事故工况下延长蒸汽发生器满溢时间的方法 | |
CN104538068B (zh) | 一种传热管破裂事故工况下防止蒸汽发生器满溢的方法 | |
CN104332207B (zh) | 一种反应堆冷却剂丧失事故工况下自动停运冷却剂泵方法 | |
CN102903403B (zh) | 一种能动与非能动相结合的堆芯注水热量导出装置 | |
US20130070887A1 (en) | Reactor adapted for mitigating loss-of-coolant accident and mitigation method thereof | |
CN103050161B (zh) | 辅助给水管线自动隔离的方法 | |
CN104299661A (zh) | 一种核电站调试启动过程中的瞬态试验控制方法及系统 | |
CN104682393A (zh) | 抽水蓄能电站机组自动发电和自动抽水的控制方法 | |
CN202948734U (zh) | 反应堆atws事故应对系统 | |
CN204010702U (zh) | 一种蒸汽发生器应急给水系统 | |
CN111753394B (zh) | 先进压水堆核电厂一回路快速冷却功能调试的设计方法 | |
CN103700411A (zh) | 核电站冷却剂失流事故的处理方法和系统 | |
CN111678120B (zh) | 一种330mw亚临界机组汽动给水泵与跳闸电泵联启的控制方法 | |
CN103725813B (zh) | 一种trt协调控制方法及系统 | |
KR20120115753A (ko) | 원자로 보조급수 시스템 | |
CN106409355A (zh) | 用于启动安全壳冷却系统的非能动自动控制系统 | |
KR102214119B1 (ko) | 원자로냉각재 재순환 시스템 | |
CN104131846A (zh) | 应用于300mw汽轮机组汽动给水泵的汽源自动切换装置及方法 | |
CN111916233A (zh) | 一种小型压水堆非能动与能动相结合的安全注射系统 | |
CN103050158A (zh) | 自动停运辅助给水泵的控制方法 | |
CN103426483B (zh) | 一种针对两环路的主泵跳闸逻辑控制方法 | |
CN110752046B (zh) | 安全装置、核电厂系统以及核电厂的安全运行方法 | |
CN204530859U (zh) | 核电厂应急给水系统流量调节机构 | |
CN202613047U (zh) | 一种天然气输气系统 | |
CN115451342A (zh) | 一种火电厂动力设备充氮保护方法、装置及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |